Вы находитесь на странице: 1из 1

ARO:

MATRCULA CEI:
END. OBRA
UF:

VERSO:
NOME:
51.231.75118/65
INCIO OBRA:
RUA ROTARY, 24 - LOTE 11
SP
CIDADE:
CEP:
CABREVA
DADOS INFORMADOS
DESTINAO
REA
REA RED.
RESIDENCIAL CASA
REA RED.

TOTAL

at 100m
acima de 100 a 200m
acima de 200 a 300m
acima de 300m
TOTAL

ARO

4,381.74

=> 100%
=> 50%
=> 75%

REA OBRA NOVA


73.43
0.00
0.00

REA
REA RED.
REA RED.

=> 100%
=> 50%
=> 75%
P/CLCULO
DADOS DO ENQUADRAMENTO
VARIAVEIS
RES
COM
IND
BAIXO
MEDIO
ALTO

73.43
0.00
0.00
73.43

DADOS DA OBRA
DESTINAO
PADRO
NUMERO DE UNIDADES
R(01)
ENQUADRAMENTO
MEDIO
R(01)
VALOR CUB
AREA ENQUADRAMENTO
AFERIO DA REMUNERAO DA MAO DE OBRA TOTAL
REA FAIXA
CUSTO GLOBAL
% DESCONTO
CUSTO LIQUIDO
73.43
109,543.61
0.00
109,543.61
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
73.43
109,543.61
109,543.61
QUADRO DE REAS E REMUNERAES
AREA TOTAL PROJETO % NO DECADENTE

REM. MO TOTAL

HOMERO LUIZ VAZ DOMINGES JUNIOR


7/22/2003 TRMINO OBRA:
7/24/2015
13.318-000

OBRA NOVA
RESIDENCIAL
MEDIO
1
R(01)
1,491.81
73.43
% MO
4.00
8.00
14.00
20.00

REMUN. MO
4,381.74
0.00
0.00
0.00
4,381.74

REA TOTAL
NO
DECADENTE

REA P/ CALCULO

REM. DE REC.
ATUAL

REA A
REGULARIZAR
73.43
TOTAL A
RECOLHER

73.43

100%

73.43

73.43

REM. MO N. DEC.

REM MO A REG.

CDIGO PAG.

INSS (31%)

TERCEIROS (5,8%)

4,381.74

4,381.74

2208

1,358.34

254.14

1,612.48

SINDUSCON (S

Aug-15

Вам также может понравиться