Micro Scheduling Before Start Working, for every Working Item

No.
01
01.1
01.2
01.3
01.4
01.5

02

Description
Monthly Schedule Planning

Min.Lead
Time
5 W (35 D)

Man Power Planning


Material PO Planning
Material FAT
Material Arrival Planning
Working Duration Planning

Material Approval

30 D

02.1
02.2
02.3
02.4

Sample Material
Bill of Quantity
Material Schedule
Owner Approval

30
25
20
14

03

Shop Drawing

14 D

03.1
03.2
03.3
03.4

Key Plan Drawing


Lay Out Drawing
Cross Section Drawing
Detail Drawing

14
14
12
10

04
05
06
08
09

Working Methode
Safety Analisys
Inspection Request
Working Request
Working Permit

14 D
7D
7D
3D
1D

D
D
D
D

D
D
D
D

10 11 12 13 14 15

START WORK

16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36