Вы находитесь на странице: 1из 6

Vessel's Winch and Mooring Arrangement.

PLEASE FILL IN THE BLANKS

Name of vessel

STERN

CENTER OF MANIFOLD

107.9

m )

P
25

W W
W 28
W 29

21 20 19

W W

18 17 16

W W

m )

55.6

m )
(

m )

WINCH
W W
DOUBLE DRUM

WIRE ON DRUM

ROPE ON DRUM

44.8

example.
W

W W

SINGLE DRUM

m )

13 14 15

30

R
L

116.1

24 23 22

11.0

O
V

W 26
W 27

BENNY PRINCESS

W W W
TRIPLE DRUM

Other ropes/wires available.


rope
place
length
forecastle
fwd. main deck
aft. main deck
poop deck
OTHERS
Wires End (date of replacement)

number

m )

wire
length

number

No. 1, 2, 12, 16 on 1ST JAN 2

No. 4, 5, 6, 7, 10, 11 on 14th D

No. 14, 15 on 31st Oct 2007


No. 13 on 17 Nov 2007
No. 8, 9 on 8th Dec 2007
No. 3 on 26th Apr 2009
If the wire/rope is handled with bollards,

Mooring Tails (date of replacement)

please put above the cell.

Winch Brakes (date of the last testing)

5-Sep-10 No. 1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 12


6-Jan-11 No. 10
26-Jan-11

(example)

R R R

= bollard

If there are special coments or other items,


please use columns below or write in the diagram avobe.

BOW

W 8
W 9
15

W 10
W 11
12

27.4

m )

number

1ST JAN 2007,


on 14th Dec

Oct 2007
007
2007
009

, 9, 11, 12, 1

m )

Vessel's Winch and Mooring Arrangement.

(SAMPLE)

Name of vessel

STERN
m )

P
25

W W
R 28
R 29

21 20 19

W W

18 17 16

W W

m )

46.1

m )
(

m )

WINCH
W W
DOUBLE DRUM

WIRE ON DRUM

ROPE ON DRUM

45.3

example.
W

W W

SINGLE DRUM

13 14 15

30

m )

24 23 22

12.3

120.2

R 26
R 27

CENTER OF MANIFOLD

117.6

SENDAI MARU

If the wire/rope is handled with bollards,


please put above the cell.
(example)

R R R
= bollard

W W W
TRIPLE DRUM

Other ropes/wires available.


rope
place
length
forecastle
fwd. main deck
200
aft. main deck
200
poop deck
OTHERS
Ropes/Wires End (date of replacement)

number

m )

wire
length
200

2
2
200

number
4
4

No.8,9,10,11,26,27 : 31 Oct
No.5,6,14,15,,20,21: 18 Oct
No.5, 6, 14, 15, 20, 21, 23, 24
24th July 2006

Mooring Tails (date of replacement)


Winch Brakes (date of the last testing)
If there are special coments or other items,
please use columns below or write in the diagram avobe.
On drum No.9-11 and No.26-29 the wire is winded under the rope.
Vessel has another 4 mooring ropes on main deck. (Fwd.-2,Aft.-2)

BOW

R
R

8
9

15

R 10
R 11
12

15.2

m )

m )

number
4
4

: 31 Oct 05,
1: 18 Oct 04
21, 23, 24: 18th Aug 0

Вам также может понравиться