Вы находитесь на странице: 1из 1

ISO A3 420 x 297mm

Last saved by: TURLEYC (2016-06-02 ) Last Plotted: 2016-06-02


Filename: F:\LONDON DEV PLANNING LIBRARY\PROJECTS\60430453 - MANSTON AIRPORT MASTERPLAN\DRAWINGS\MODELS\SHP ACCESS DWG\60340453-M001-SKE-0026-27_1_1_0795.SV$.DWG

10

10

Meters

1:1000 @ A3

10

20

Meters
10

20

ACCESS TO BELL HELLICOPTERS

PHASE 1 EMPLOYMENT ACCESS

VISIBILITY SPLAYS TO THE WEST OF PHASE 1 EMPLOYMENT ACCESS

1:500 @ A3

HIGHWAY BOUNDARY
VISIBILITY SPLAYS

THIS DRAWING IS A PROPOSED FINAL LAYOUT OF THE ACCESSES


REQUIRED ALONG THIS AREA OF SPITFIRE WAY.

DUE TO CONSTRUCTION PHASING, THE PRIORITY JUNCTION FOR


PHASE 1 EMPLOYMENT WILL TIE IN INITIALLY WITH THE EXISTING
SPITFIRE WAY ALIGNMENT, UNTIL THE CONSTRUCTION OF ALLAND
GRANGE LANE ROUNDABOUT.

FOR DETAILS AND ARRANGEMENT OF THE TEMPORARY TIE IN SEE


DRAWING 60340453-M001-SKE-0030

AECOM
MidCity Place
71 High Holborn
London, WC1V 6QS
+44 (0)20 7061 7000
www.aecom.com

PROJECT

Stone Hill Park

DESIGN DRAWN

CHK'D

APP'D

Contains Ordnance Survey data Crown Copyright.


All rights reserved. License Number 100019139

DATE

ISSUE/REVISION

I/R

PROJECT NUMBER

60430453

SHEET TITLE

PHASE 1 EMPLOYMENT ACCESS

GENERAL ARRANGEMENT

SHEET NUMBER

60340453-M001-SKE-0026

Вам также может понравиться