Вы находитесь на странице: 1из 1

ISO A3 420 x 297mm

ACCESS TO BELL
HELLICOPTERS

AECOM
MidCity Place
71 High Holborn
London, WC1V 6QS
+44 (0)20 7061 7000
www.aecom.com
PROJECT
Meters
20

20

40

Stone Hill Park

1:1000 @ A3

PHASE 1 EMPLOYMENT
ACCESS

VISIBILITY SPLAYS EXTENTS ALONG SPITFIRE WAY FOR PHASE 1

THIS DRAWING IS A PROPOSED


TEMPORARY TIE IN TO THE
EXISTING LAYOUT ALONG
SPITFIRE WAY

Last saved by: TURLEYC(2016-04-29) Last Plotted: 2016-06-03


Filename: F:\LONDON DEV PLANNING LIBRARY\PROJECTS\60430453 - MANSTON AIRPORT MASTERPLAN\DRAWINGS\MODELS\SHP ACCESS DWG\60340453-M001-SKE-0030.DWG

DUE TO CONSTRUCTION
PHASING, THE PRIORITY
JUNCTION FOR PHASE 1
EMPLOYMENT WILL TIE IN
INITIALLY WITH THE EXISTING
SPITFIRE WAY ALIGNMENT, UNTIL
THE CONSTRUCTION OF ALLAND
GRANGE LANE ROUNDABOUT.
FOR DETAILS AND
ARRANGEMENT OF THE FINAL
PROPOSED LAYOUT SEE
DRAWINGS
60340453-M001-SKE-0026/29
FOR VEHICLE TRACKING IN&OUT
OF THE NEW ACCESS SEE DWG.
60340453-M001-SKE-0027
(PHASE 1 EMPLOYMENT ACCESS
SWEPT PATH ANALYSIS)

All rights reserved. License Number 100019139

ISSUE/REVISION

Meters
10

10

20

I/R

DATE

DESIGN DRAWN CHK'D

APP'D

PROJECT NUMBER
1:500 @ A3

60430453
SHEET TITLE
PHASE 1 EMPLOYMENT ACCESS
TEMPORARY TIE IN TO EXISTING
LAYOUT

HIGHWAY BOUNDARY
SHEET NUMBER

VISIBILITY SPLAYS

60340453-M001-SKE-0030

Вам также может понравиться