88+227.055
89+409.436
90+316.704
93+665.890
94+835.746
96+617.031
97+580.000
97+992.908
98+680.000
99+361.921
101.966.700
102+391.192
100+909.292
ELEV
TIE
BRIDGE SLAB TO COPING COLUMN
(EL1&EL
BEAM
LENGTH COPING HEIGHT HEIGHT
2)
HEIGHT
56.963
39.5
2.434
1.5
5.5
1.6
60.417
39.5
2.434
1.5
6.0
1.6
66.296
39.5
2.434
1.5
5.5
1.6
91.832
39.5
2.387
1.5
5.5
1.6
97.854
39.5
2.434
1.5
4
1.6
112.29
39.5
2.434
1.5
4
1.6
113.289
39.5
2.434
1.5
5.5
1.6
114.162
39.5
2.434
1.5
6.5
1.6
118.435
39.5
2.434
1.5
7
1.6
122.761
39.5
2.434
1.5
6.5
1.6
151.886
39.5
2.387
1.5
4.5
1.6
154.187
39.5
2.434
1.5
4
1.6
140.845
46.6
2.8338
1.8
4.5
1.6
BORED
PILE
HEIGHT
MID STATION
16
20
16
10
13
13
20
20
18
18
18
18
13
242.97638981
197.02936132
149.6319311
179.33105692
164.82720642
160.12908093
201.303917
239.0720988
193.73782614
257.92475114
180.72920125
210.92458858
466.70114986
STATION
STA2
223.226
177.279
129.882
159.581
145.077
140.379
181.554
219.322
173.988
238.175
160.979
191.175
443.401
STA1
262.726
216.779
169.382
199.081
184.577
179.879
221.054
258.822
213.488
277.675
200.479
230.675
490.001
ELEVATION
E1
E2
E3
E4
54.529
53.029
47.529
45.929
57.983
56.483
50.483
48.883
63.862
62.362
56.862
55.262
89.445
87.945
82.445
80.845
95.420
93.920
89.920
88.320
109.856 108.356 104.356 102.756
110.855 109.355 103.855 102.255
111.728 110.228 103.728 102.128
116.001 114.501 107.501 105.901
120.327 118.827 112.327 110.727
149.499 147.999 143.499 141.899
151.753 150.253 146.253 144.653
138.0113 136.2113 131.7113 130.1113
ED1
56.963
60.417
66.296
91.832
97.854
112.29
113.289
114.162
118.435
122.761
151.886
154.187
140.845
ED2
56.879
60.333
66.380
91.895
97.938
112.206
113.205
114.078
118.351
122.677
151.824
154.103
140.761
ED3
56.879
60.501
66.212
91.770
97.770
112.206
113.373
114.078
118.351
122.677
151.949
154.103
140.761
Highway CL ELEV
49.613
53.068
58.946
84.482
90.504
104.94
105.939
106.812
111.085
115.411
144.536
146.837
132.995
MIN VERT
CLE
5.146
5.145
5.161
5.185
5.161
5.146
5.146
5.146
5.146
5.146
5.185
5.146
5.275
BRGY 1
BRGY 2
BULAKIN
Anastacia
Anastacia
Cabatang
Bukal Norte
Bukal Norte
Masalukot III
LALIG
Lusacan
Lusacan
Lagalag
Lagalag
Masin Norte
Masalukot II
Mangilag
Mangilag
Mangilag
Mangilag
Mangilag
Masalukot I
Malabanban Norte
Mangilag Sur
Mangilag Sur
Mangilag Sur
Norte
Norte
Norte
Norte
Norte
STATION
NAME
ELEVATION (T O C)
BEGINNING
END
BEGINNING
END
BRIDGE
LENGTH
QUIAPO
98707.650
98754.250
111.211
111.506
46.60
CABATANG
90927.200
90978.460
62.903
63.235
51.26
TAGUAN
95094.900
95198.100
92.050
92.937
103.2
ABUTMENT
A
B
A
B
A
1
2
B
SLAB TO BOT
OF LOWEST
GIRDER
2.79725
2.52
2.42625
2.42625
2.42625
2.42625
GIR BOT
TO COPI
0.269771
0.257084
0.27673
0.251259
0.293678
0.25
0.25
0.276485
COPING
HEIGHT
COLUMN
TIE BEAM
BORED
PILE
LENGTH
1.8
25
1.8
18
1.5
1.8
1.8
1.5
12
12
1.8
1.8
25
25
25
25
ELEVATION
E1
E2
108.202 106.4018
108.494 106.6942
59.789
57.989
60.119
58.319
89.391
87.891
89.699
87.899
90.035
88.235
90.274
88.774
E3
75.899
76.235
E4
74.099
74.435
E5
Highway CL ELEV
MIN VERT
CLE
49.613
59.326
BRGY 1
BRGY 2
BULAKIN
LALIG
OP2
89+409.436
OP3
90+316.704
OP4
93+665.890
OP5
94+835.746
OP6
96+617.031
OP7
97+580.000
OP8
97+992.908
OP9
98+680.000
BP
CL
BP1
BP2
BP3
BP4
CL
BP1
BP2
BP3
BP4
CL
BP1
BP2
BP3
BP4
CL
BP1
BP2
CL
BP1
BP2
BP3
BP4
CL
BP1
BP2
BP3
BP4
CL
BP1
BP2
BP3
BP4
CL
BP1
BP2
BP3
BP4
CL
BP1
BP2
BP3
NORTHING
1,545,692.854
1,545,705.950
1,545,709.466
1,545,676.606
1,545,680.122
1,545,024.705
1,545,039.591
1,545,042.398
1,545,007.302
1,545,010.109
1,544,650.112
1,544,666.636
1,544,668.572
1,544,631.852
1,544,633.788
1,543,922.987
1,543,941.059
1,543,904.915
1,543,687.489
1,543,705.038
1,543,706.206
1,543,668.894
1,543,670.061
1,543,328.908
1,543,346.457
1,543,347.625
1,543,310.313
1,543,311.480
1,543,135.058
1,543,152.607
1,543,153.775
1,543,116.463
1,543,117.630
1,543,051.938
1,543,069.487
1,543,070.655
1,543,033.342
1,543,034.510
1,542,965.630
1,542,984.023
1,542,984.141
1,542,947.131
EASTING
536,426.908
536,440.162
536,435.550
536,417.789
536,413.177
537,400.962
537,412.167
537,407.092
537,394.307
537,389.231
538,226.159
538,234.768
538,229.301
538,222.452
538,216.984
541,493.289
541,497.003
541,489.575
542,639.197
542,645.458
542,639.776
542,638.029
542,632.348
544,384.016
544,390.277
544,384.596
544,382.849
544,377.168
545,327.271
545,333.533
545,327.851
545,326.105
545,320.423
545,731.727
545,737.988
545,732.306
545,730.559
545,724.878
546,411.608
546,414.585
546,408.786
546,413.831
OP10
99+361.921
OP11
99+361.921
OP12
102+391.192
OP13
100+909.292
BP4
CL
BP1
BP2
BP3
BP4
CL
BP1
BP2
CL
BP1
BP2
BP3
BP4
CL
BP1
BP2
BP3
BP4
1,542,947.249
1,542,950.708
1,542,969.106
1,542,969.215
1,542,932.212
1,542,932.322
1,542,893.711
1,542,912.156
1,542,875.265
1,542,884.422
1,542,902.811
1,542,902.937
1,542,865.919
1,542,866.046
546,408.032
547,093.366
547,096.315
547,090.516
547,095.617
547,089.818
549,697.521
549,697.925
549,697.118
550,121.912
550,124.915
550,119.116
550,124.107
550,118.309
0.000847
DIST
ERROR REMARKS
18.6326
-0.0003
ok
5.7994
ok
0.0006
36.9002
ok
-0.0002
5.7994
ok
0.0006
36.9002
-0.0002
ok
18.6318
0.0005
ok
5.7996
0.0004
ok
36.8993
0.0007
ok
5.8004
-0.0004
ok
36.8998
0.0002
ok
18.6322
0.0001
ok
5.7997
0.0003
ok
36.9000
0.0000
ok
5.8006
ok
-0.0006
36.9003
ok
-0.0003
18.4497
0.0003
ok
36.8994
ok
0.0006
*
*
*
18.6324
-0.0001
ok
5.8008
ok
-0.0008
36.8996
ok
0.0004
5.7996
ok
0.0004
36.9004
ok
-0.0004
18.6324
-0.0001
ok
5.7998
ok
0.0002
36.8994
0.0006
ok
5.7996
0.0004
ok
36.9004
-0.0004
ok
18.6328
-0.0005
ok
5.8008
-0.0008
ok
36.8994
0.0006
ok
5.8006
-0.0006
ok
36.9004
-0.0004
ok
18.6324
-0.0001
ok
5.8008
ok
-0.0008
36.9006
ok
-0.0006
5.7998
ok
0.0002
36.9004
ok
-0.0004
18.6324
-0.0001
ok
5.8002
ok
-0.0002
36.8997
ok
0.0003
5.8002
ok
-0.0002
36.8997
18.6328
5.8000
36.9006
5.8000
36.8996
18.4494
36.8998
0.0003
-0.0006
0.0000
-0.0006
0.0000
0.0004
0.0006
0.0002
ok
ok
ok
ok
ok
ok
ok
ok
18.6326
5.8004
36.9008
5.7994
36.8998
-
-0.0003
-0.0004
-0.0008
0.0006
0.0002
18.6323
5.8000
36.9000
5.8000
36.9000
ok
ok
ok
ok
ok
x
x
x
x
x
NAME
TYPE
STA
OP1
OP2
OP3
OP4
OP5
OP6
OP7
OP8
OP9
OP10
OP11
OP12
OP13
NORMAL
+2.5%
-0.025
5.7*-2.5%
-0.025
NORMAL
+2.5%
NORMAL
NORMAL
NORMAL
5.7*+2.5%
NORMAL
NORMAL
88+227.055
89+409.436
90+316.704
93+665.890
94+835.746
96+617.031
97+580.000
97+992.908
98+680.000
99+361.921
101.966.700
102+391.192
100+909.292
OP4
OP11
5.7*-2.5%
5.7*+2.5%
93+665.890
101.966.700
ELEV
(EL1&EL2)
56.963
60.417
66.296
91.832
97.854
112.29
113.289
114.162
118.435
122.761
151.886
154.187
140.845
91.832
151.886
COPING
ELEV
54.529
57.983
63.862
89.445
95.42
109.856
110.855
39.5
116.001
120.327
149.499
151.753
138.01125
R1&R4
HEIGHT
97
217
97
XX
97
97
217
97
97
97
XX
97
126
R2&R5
HEIGHT
150
150
165
XX
165
150
150
150
150
150
XX
150
179
89.445
149.499
R1&R3
HEIGHT
75
147
R2&R4
HEIGHT
147
75
R3&R6
HEIGHT
82
82
232
XX
232
82
82
82
82
82
XX
82
111
R1 & R4
ELEVATION
54.626
58.200
63.959
XX
95.517
109.953
111.072
39.597
116.098
120.424
XX
151.85
138.137
R1 & R4
R2 & R5
ELEVATION ELEVATION
89.52
89.592
149.646
149.574
R2 & R5
R3 & R6
ELEVATION ELEVATION
54.679
54.611
58.133
58.065
64.027
64.094
XX
XX
95.585
95.652
110.006
109.938
111.005
110.937
39.650
39.582
116.151
116.083
120.477
120.409
XX
XX
151.903
151.835
138.190
138.122
NAME
QUAPO
CABATANG
ABUTMENT A
R1
R2
COPING ELEVATION: 108.2017500017
RISER HEIGHT:
0.122
0.203
TOP OF RISER ELEVATION:
108.324
108.405
ABUTMENT B
R11
R12
COPING ELEVATION: 108.4941857196
RISER HEIGHT:
0.11
0.191
TOP OF RISER ELEVATION:
108.604
108.685
ABUTMENT A
R1
SLAB ELEV ABOVE RISER
62.6896
COPING ELEVATION: 59.7888219407
HEIGHT FRM SLAB TO BOT OF PAD: 2.66755
TOP OF RISER ELEVATION:
60.022
RISER HEIGHT:
0.233
R2
62.7606
ABUTMENT B
R11
SLAB ELEV ABOVE RISER
62.9955
COPING ELEVATION: 60.1187774469
HEIGHT FRM SLAB TO BOT OF PAD: 2.66755
TOP OF RISER ELEVATION:
60.328
RISER HEIGHT:
0.209
R12
63.0649
ABUTMENT A
R1
COPING ELEVATION: 89.3908086254
RISER HEIGHT:
0.146
TOP OF RISER ELEVATION:
89.537
TOP OF
TAGUAN
TOP OF
TOP OF
TOP OF
TOP OF
PIER 1A
R11
COPING ELEVATION: 89.69925964
RISER HEIGHT:
0.117
RISER ELEVATION:
89.816
PIER 1B
R21
COPING ELEVATION: 89.69925964
RISER HEIGHT:
0.102
RISER ELEVATION:
89.801
PIER 2A
R31
COPING ELEVATION: 90.03538373
RISER HEIGHT:
0.102
RISER ELEVATION:
90.137
PIER 2B
R41
COPING ELEVATION: 90.03538373
RISER HEIGHT:
0.087
RISER ELEVATION:
90.122
ABUTMENT B
R51
COPING ELEVATION: 90.2736716427
RISER HEIGHT:
0.129
RISER ELEVATION:
90.403
60.093
0.304
R3
0.259
108.461
R13
0.246
108.740
R3
62.8054
60.138
0.349
R13
63.1091
R4
0.315
108.517
R14
0.302
108.796
R5
0.37
108.572
R15
0.358
108.852
R6
0.37
108.572
R16
R7
0.315
108.517
R17
R8
0.259
108.461
R18
R9
R10
0.203
0.122
108.405
108.324
R19
R20
0.358
108.852
0.302
108.796
0.246
108.740
0.191
0.11
108.685
108.604
R4
62.8502
R5
62.895
R6
62.8805
R7
62.8137
R8
62.7469
R9
62.6802
R10
62.5856
60.183
0.394
60.227
0.439
60.213
0.424
60.146
0.357
60.079
0.291
60.013
0.224
59.918
0.129
R14
63.1534
R15
63.1978
R16
63.1834
R17
63.1167
R18
63.0502
R19
62.9836
R20
62.89
60.397
0.279
60.442
0.323
60.486
0.367
60.530
0.411
60.516
0.397
60.449
0.330
60.383
0.264
60.316
0.197
60.222
0.104
R2
R3
R4
R5
R6
R7
R8
R9
R10
0.227
89.618
0.283
89.674
0.339
89.730
0.394
89.785
0.394
89.785
0.339
89.730
0.283
89.674
0.227
89.618
0.146
89.537
R12
R13
R14
R15
R16
R17
R18
R19
R20
0.198
89.897
R22
0.254
89.953
R23
0.309
90.008
R24
0.365
90.064
R25
0.365
90.064
R26
0.309
90.008
R27
0.254
89.953
R28
0.198
0.117
89.897
89.816
R29
R30
0.184
89.883
R32
0.239
89.938
R33
0.295
89.994
R34
0.35
90.049
R35
0.35
90.049
R36
0.295
89.994
R37
0.239
89.938
R38
0.184
0.102
89.883
89.801
R39
R40
0.184
90.219
R42
0.239
90.274
R43
0.295
90.330
R44
0.35
90.385
R45
0.35
90.385
R46
0.295
90.330
R47
0.239
90.274
R48
0.184
0.102
90.219
90.137
R49
R50
0.168
90.203
R52
0.224
90.259
R53
0.279
90.314
R54
0.335
90.370
R55
0.335
90.370
R56
0.279
90.314
R57
0.224
90.259
R58
0.168
0.087
90.203
90.122
R59
R60
0.21
90.484
0.266
90.540
0.321
90.595
0.377
90.651
0.377
90.651
0.321
90.595
0.266
90.540
0.21
90.484
0.129
90.403
normal
OP1
CONCRETE
PILE
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
56.32
44.23
85.01
4.69
13.83
96.13
19.61
30.93
350.75
REBAR
33183.52
7,046.23
21,465.21
11,595.84
1,200.83
1,888.64
14,704.83
1,578.75
3,163.59
95,827.44
LEAN
REBAR
37339.6
7,046.23
22,652.72
11,708.98
1,233.22
1,888.64
14,720.99
1,578.75
3,163.59
101,332.72
LEAN
REBAR
33183.52
7,046.23
21,465.21
11,708.98
1,240.48
1,888.64
14,712.91
1,578.75
3,163.59
95,988.31
LEAN
REBAR
10737.88
LEAN
3.94
7.29
11.23
2.50%
OP2
CONCRETE
PILE
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
56.32
48.25
85.70
4.80
13.83
94.60
19.61
30.93
354.04
3.94
7.29
11.23
-2.50%
OP3
CONCRETE
PILE
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
56.32
44.23
85.70
4.86
13.83
94.29
19.61
30.93
349.77
3.94
7.29
11.23
5.7 -2.5%
OP4
CONCRETE
PILE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
22.12
65.25
3.41
7.82
61.89
19.61
21.13
201.23
10,562.38
9,381.67
848.49
1,098.35
10,783.15
1,578.75
2,126.07
47,116.74
4.98
4.98
-2.50%
OP5
CONCRETE
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
56.32
32.20
85.70
4.86
13.83
94.29
19.61
30.93
337.74
REBAR
29833.28
7,046.23
18,007.63
11,708.98
1,240.48
1,888.64
14,712.91
1,578.75
3,163.59
89,180.49
LEAN
REBAR
29833.28
7,046.23
18,007.63
11,595.84
1,200.83
1,888.64
14,704.83
1,578.75
3,163.59
89,019.62
LEAN
REBAR
37339.6
7,046.23
21,465.21
11,708.98
1,233.22
LEAN
3.94
7.29
11.23
normal
OP6
CONCRETE
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
56.32
32.20
85.01
4.69
13.83
96.13
19.61
30.93
338.72
3.94
7.29
11.23
2.50%
OP7
CONCRETE
PILE
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
56.32
44.23
85.70
4.80
3.94
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
13.83
94.60
19.61
30.93
350.02
1,888.64
14,720.99
1,578.75
3,163.59
100,145.21
7.29
11.23
normal
OP8
CONCRETE
PILE
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
56.32
52.28
85.01
4.69
13.83
96.13
19.61
30.93
358.80
REBAR
37339.6
7,046.23
23,811.18
11,595.84
1,200.83
1,888.64
14,704.83
1,578.75
3,163.59
102,329.49
LEAN
REBAR
35416.88
7,046.23
24,951.84
11,595.84
1,200.83
1,888.64
14,704.83
1,578.75
3,163.59
101,547.43
LEAN
REBAR
35416.88
7,046.23
23,811.18
11,595.84
1,200.83
1,888.64
14,704.83
1,578.75
LEAN
3.94
7.29
11.23
normal
OP9
CONCRETE
PILE
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
56.32
56.30
85.01
4.69
13.83
96.13
19.61
30.93
362.82
3.94
7.29
11.23
normal
OP10
CONCRETE
PILE
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
56.32
52.28
85.01
4.69
13.83
96.13
19.61
3.94
APPROARCH SLAB
TOTAL
30.93
358.80
3,163.59
100,406.77
7.29
11.23
5.7 +2.5%
OP11
CONCRETE
PILE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
18.10
65.25
3.41
7.82
61.89
19.61
21.13
197.21
REBAR
16988.6
9,389.40
9,381.67
848.49
1,098.35
10,783.15
1,578.75
2,126.07
52,194.48
LEAN
REBAR
35416.88
7,046.23
18,007.63
11,595.84
1,200.83
1,888.64
14,704.83
1,578.75
3,163.59
94,603.22
LEAN
REBAR
29833.28
7,775.68
22,508.97
13,274.90
952.77
2,071.53
17,171.09
1,856.53
3,163.59
98,608.34
LEAN
4.98
4.98
normal
OP12
CONCRETE
PILE
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
56.32
32.20
85.01
4.69
13.83
96.13
19.61
30.93
338.72
3.94
7.29
11.23
abnormal
OP13
CONCRETE
BORED
TIE
COLUMN
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
56.32
45.80
104.54
4.91
16.27
117.17
23.22
30.93
399.16
3.94
7.29
11.23
QUIAPO
ABUTMENT
BOREDPILE
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
TAGUAN
CONCRETE
268.60
17.72
48.40
264.92
44.64
92.36
736.64
CONCRETE
ABUT PILE
ABUTMENT
ABUT SHEARKEY
PIER PILE
COILUMN TIE
PIERCOPING
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
CABATANG
ABUT PILE
ABUTMENT
SHEARKEY,STOP, RISER
DIAPHRAGM
SLAB
PARAPET
APPROARCH SLAB
TOTAL
222.68
14.42
470.52
244.22
136.78
588.94
100.40
92.36
1,870.32
CONCRETE
393.20
21.60
79.62
289.24
48.90
115.90
948.46
REBAR
34,158.83
126,821.52
4,064.58
6,039.45
43,965.11
3,355.94
9,982.62
228,388.05
LEAN
REBAR
126821.52
31,634.02
3,198.39
126,426.56
124,012.89
29,426.46
17,499.96
125,692.38
7,596.85
9,982.62
602,291.65
LEAN
REBAR
158526.9
35,791.75
4,458.88
10,326.97
49,408.08
3,849.88
14,302.07
276,664.53
LEAN
21.74
21.74
13.58
21.74
35.32
27.23
27.23
NON SHINK
5.5
0.42
0.42
NON SHINK
6
0.57
0.57
NON SHINK
0.63
0.63
NON SHINK
0.28
0.28
47
NON SHINK
0.63
0.63
NON SHINK
4
0.42
0.42
NON SHINK
0.57
0.57
NON SHINK
0.42
0.42
NON SHINK
0.42
0.42
NON SHINK
0.42
0.42
NON SHINK
0.28
0.28
NON SHINK
0.42
0.42
NON SHINK
0.53
0.53
NON SHINK
3.17
3.17
NON SHINK
3.44
6.18
9.62
NON SHINK
4.28
4.28
OP1
1:01
berm
2:03
221.788
70.25
345.7
108.89
1:01
berm
2:03
216.1
82.352
520.09
115.748
1:01
berm
2:03
243.91
67.52
345.15
106.38
1:01
berm
2:03
212.098
63.38
329.879
103.24
1:01
berm
2:03
234.63
66.12
313.51
104.64
1:01
berm
2:03
244.418
68.434
326.38
107.4
foot
313.66
556.06
0.50
TOTAL:
94.097
21.075
166.82
54.45
336.434
OP2
foot
305.61
836.56
0.50
TOTAL:
91.683
24.7056
250.97
57.87
425.232
OP3
foot
344.94
555.17
0.50
TOTAL:
103.482
20.256
166.55
53.19
343.480
OP4
foot
299.95
530.61
0.50
TOTAL:
89.986
19.014
159.18
51.62
319.802
OP5
foot
331.82
504.28
0.50
TOTAL:
99.545
19.836
151.28
52.32
322.985
OP6
foot
345.66
524.98
0.50
TOTAL:
103.698
20.5302
157.49
53.70
335.422
OP7
1:01
berm
2:03
233.913
75.618
478.466
115.37
1:01
berm
2:03
216.351
81.514
577.199
124.578
1:01
berm
2:03
186.933
83.625
593.642
130.62
1:01
berm
2:03
425.925
74.89
296.56
117.61
1:01
berm
2:03
228.732
60.981
314.23
99.222
323.48
1:01
berm
2:03
264.55
72.32
317.31
107.65
374.13
foot
330.80
769.61
0.50
TOTAL:
99.241
22.6854
230.88
57.69
410.494
OP8
foot
305.97
928.42
0.50
TOTAL:
91.790
24.4542
278.53
62.29
457.060
OP9
foot
264.36
954.87
0.50
TOTAL:
79.309
25.0875
286.46
65.31
456.167
OP10
foot
602.35
477.02
0.50
TOTAL:
180.705
22.467
143.10
58.81
405.081
OP11
foot
505.44
0.50
TOTAL:
97.043
18.2943
151.63
49.61
316.579
OP12
foot
510.39
0.50
TOTAL:
112.239
21.696
153.12
53.83
340.877
OP13
1:01
berm
2:03
foot
255.83
66.66
331.04
105.8
361.80
532.48
0.50
TOTAL:
108.539
19.998
159.74
52.90
341.180
quiapo
2:03 119.595
berm 12.3037
2:03
foot(1x1) 204.835
small berm 91.65
1
12.7
2
49.23
3
12.05
4
42.3
215.60
0.00
1.00
0.23
1.82
0.83
1.78
3.08
TOTAL:
64.681
3.69111
0.00
204.84
20.62
23.15
40.61
21.42
130.24
509.262
cabatang
2:03 137.139
foot
42.13
247.23
0.50
TOTAL:
74.169
21.07
95.234
taguan
2:03 949.011
foot
150.488
1710.85
0.50
TOTAL:
513.256
75.24
588.500
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.414214
1.802776
1.608495
1.802776
1.802776
1.802776
OP1
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
604(2)
SPL425
302(2)
310(2)a
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
604(2)
SPL425
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
fence
light
MSE WALL
tack coat
ASPHALT
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
lm
set
sqm
liters
mt
265.55
3164.14
64.00
95,827.44
20
350.75
0.42
11.23
3
6
6.70
6.70
124.57
1
4
336.43
76.20
OP3
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
fence
light
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
lm
set
228.59
3100.82
64
95,988.31
20
349.77
0.63
11.23
3
6
6.70
6.70
124.57
1
4
343.48
38.10
2
146.23
38.99
302(2)
310(2)a
MSE WALL
tack coat
ASPHALT
sqm
liters
mt
XX
146.23
38.99
OP5
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
604(2)
SPL425
302(2)
310(2)a
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
fence
light
MSE WALL
tack coat
ASPHALT
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
lm
set
sqm
liters
mt
291.06
2369.82
52
89,180.49
20
337.74
0.63
11.23
3
6
6.70
6.70
124.57
1
4
322.98
38.10
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
287.33
2959.46
80
100,145.21
20
350.02
0.57
11.23
3
6
6.70
6.70
124.57
1
4
410.494
38.10
2
146.23
38.99
OP7
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
604(2)
SPL425
302(2)
310(2)a
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
604(2)
SPL425
302(2)
310(2)a
fence
light
MSE WALL
tack coat
ASPHALT
lm
set
sqm
liters
mt
OP9
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
fence
light
MSE WALL
tack coat
ASPHALT
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
lm
set
sqm
liters
mt
213.07
3933.66
72
101,547.43
20
362.82
0.42
11.23
3
6
6.70
6.70
124.57
1
4
456.17
76.20
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
34.04
2294.12
36
52,194.48
10
197.21
0.28
4.98
2
4
5.00
5.00
69.47
1
2
2
146.23
38.99
2
146.23
38.99
OP11
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
517(2)
604(2)
SPL425
302(2)
310(2)a
sqm
lm
lm
set
sqm
liters
mt
riprap
metaldrain
fence
light
MSE WALL
tack coat
ASPHALT
316.58
38.10
2
109.13
29.10
OP13
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
SPL425
302(2)
310(2)a
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
light
tack coat
ASPHALT
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
set
liters
mt
338.72
2814.69
52
98,608.34
20
399.16
0.53
11.23
3
6
6.70
6.70
148.86
1
4
341.18
97.20
2
167.63
44.70
CABATANG
exca
Structural Backfill
pile (1.8dia)
rebar
achor
28mpa
nonshrink
lean con
girder (45m)
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
396.71
3321.49
250
276,664.53
80
948.46
4.28
27.23
10
20
26.36
26.36
469.71
2
8
95.23
517(2)
302(2)
310(2)a
103(1)a
104(5)
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
302(2)
310(2)a
metaldrain
tack coat
ASPHALT
lm
liters
mt
TAGUAN
exca
Structural Backfill
1.8dia pile
2.2dia pile
rebar
achor
28mpa
nonshrink
lean con
girder 30M
girder 40M
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
tack coat
ASPHALT
cum
cum
lm
lm
kg
ea
cum
cum
cum
ea
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
liters
mt
43.68
508.22
135.53
5415.78
1955.76
200
200
602,291.65
160
1,870.32
9.62
35.32
20
10
60
21.00
21.00
974.74
588.50
78.20
984.69
262.58
OP2
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
604(2)
SPL425
302(2)
310(2)a
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
604(2)
SPL425
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
fence
light
MSE WALL
tack coat
ASPHALT
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
lm
lm
set
sqm
liters
mt
OP4
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
fence
light
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
lm
set
177.84
3602.8
80.00
101,332.72
20
354.04
0.57
11.23
3
6
6.70
6.70
124.57
1
4
425.232
38.10
2
146.23
38.99
34.452
2837.50
20
47,116.74
10
201.23
0.28
4.98
2
4
5.00
5.00
69.47
1
2
319.8021375
38.10
2
302(2)
310(2)a
MSE WALL
tack coat
ASPHALT
sqm
liters
mt
XX
109.13
29.10
OP6
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
604(2)
SPL425
302(2)
310(2)a
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
fence
light
MSE WALL
tack coat
ASPHALT
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
lm
set
sqm
liters
mt
260.01
2348.032
52
89,019.62
20
338.72
0.42
11.23
3
6
6.70
6.70
124.57
1
4
335.42
76.20
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
316.278
3556.096
80
102,329.49
20
358.80
0.42
11.23
3
6
6.70
6.70
124.57
1
4
457.060
76.20
2
146.23
38.99
OP8
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
604(2)
SPL425
302(2)
310(2)a
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
604(2)
SPL425
302(2)
310(2)a
fence
light
MSE WALL
tack coat
ASPHALT
lm
set
sqm
liters
mt
OP10
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
fence
light
MSE WALL
tack coat
ASPHALT
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
lm
set
sqm
liters
mt
312.30
3383.824
72
100,406.77
20
358.80
0.42
11.23
3
6
6.70
6.70
124.57
1
4
405.08
76.20
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
338.72
2849.936
72
94,603.22
20
338.72
0.42
11.23
3
6
6.70
6.70
124.57
1
4
2
146.23
38.99
2
146.23
38.99
OP12
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
517(2)
604(2)
SPL425
302(2)
310(2)a
riprap
metaldrain
fence
light
MSE WALL
tack coat
ASPHALT
sqm
lm
lm
set
sqm
liters
mt
340.88
76.20
2
146.23
38.99
QUIAPO
103(1)a
104(5)
400(14)t
404(2)
SPL427
405(1)a
405(1)b
407(1)
406(1)p
412(1)b
413(3)a
413(b)
SPL420
SPL417
SPL418
517(2)
302(2)
310(2)a
exca
Structural Backfill
pile
rebar
achor
28mpa
nonshrink
lean con
girder
bearing
s80expan
s200expan
steel deck
pile dynamic
pile integ
riprap
metaldrain
tack coat
ASPHALT
cum
cum
lm
kg
ea
cum
cum
cum
ea
ea
lm
lm
sqm
ea
ea
sqm
lm
liters
mt
224.58
1909.50
200
228,388.05
80
736.64
3.17
21.74
10
20
21.00
21.00
430.42
509.26
35.00
429.03
114.41