Вы находитесь на странице: 1из 1

2'-101"

9'-9"

4'-101"
2

1"
0'-42

11'-71"
2

1"
3'-42

1"
0'-42

1"
3'-42

4'-101"
2

1"
0'-42

9'-9"

2'-0"

1"
2'-12

2'-101"
2

2'-3"

1"
3'-42

11'-71"
2

1"
3'-42

0'-6"
0'-41
2"
1"
2'-12

1"
0'-42

2'-11"
2

11'-0"

11'-0"

0'-61"
2

PROPOSED PLAN FOR THE


CONSTRUCTION OF RESIDENTIAL
HOUSE IN PLOT No A-48 IN
THE PRIDE EXT....
SITUATED AT BALAPUR, HYDERABAD

1"
2'-12

2'-9"

1"
0'-72

0'-41
2"

1"
0'-42

0'-9"
1"
0'-72

0'-71"
2

2'-3"

1"
2'-12

2'-3"

1. Use Concrete Grade-M 15 FOR P.C.C &M20 for all


structure

2'-3"

2. Grade of Steel Fe 500 from tata or equivalent.


3. Minimmum clear cover for Beam Bars 25mm or
Bar Which Ever is Greater

15'-0"

15'-0"

4. Minimum Clear Coverfor Slab Bars 15 mm or


Bar Which Ever is Greater
5. All Slab Bars Are Alternately Cranked
At 1/4th Span
6. Depth Of Beam Includes Slab Thickness
And Beam Bars Cranked At 1/5th Span
1"
2'-12

7. Depth Of Steel Chairs = (Slab Thickness-1")

& for Bars in Tension 57.


0'-41
2"

COLUMN UPTO
GF ROOF ONLY

0'-41"
2

1"
2'-12

For Slab 3 days Props Left Under,


/ 7 days Removal Of Props Upto 4.5m Span,
/ 14 days Removal Of Props Over 4.5m Span.

2'-11"
2
1"
0'-42

0'-6"

0'-6"

1"
0'-42
0'-6"

1"
0'-42

2'-11"
2

1"
2'-12

1"
2'-12

1"
2'-12

8. Minimum Curing Period & Stripping time for striking


of form work. For Beams 7 days Props Left Under,
/ 14 days Removal Of Props Upto 6m Span,
/ 21 days Removal Of Props Over 6m Span.

10'-11"
2

1"
10'-12

7. Lap Splice Length for bars in Compression 46

0'-6"

0'-4 1"
2

1'-3"

1"
2'-12

1"
0'-42

1'-3"

2'-3"

1"
2'-12

1"
2'-42

0'-6"

1"
2'-12

9. All Concrete Works Shall be mechanically vibrated.


10. Concrete work shall not be proceed untill the
consultant has inspected and approved at the site.

9'-3"

9'-3"

11. Building is designed for G+1 Floors Only.

COLUMN AXIS LAYOUT

4 T16+2 T12
T8@7"C/C

SCHEDULE OF FOOTINGS
No.S.
L

1
2
3

F1
F2
F3

4'-9"
4'-6"
4'-3"

4'-9"
4'-6"
4'-3"

4 T12+2 T16
T8@7"C/C

REINFORCEMENT

DIMENSIONS
S.NO. TYPE

FOUNDATION LAYOUT

18"
15"
15"

Along L(a)

10 @ 5"C/C

10 @ 6"C/C
10 @ 6"C/C

Along B(b)

10 @ 5"C/C

10 @ 6"C/C
10 @ 6"C/C

Along L(c) Along B(d)

-------

-------

6 T12
T8@7"C/C

DATE

25 - 05 - 2016

DRG. No.

STR -01/02

SCALE

N.T.S

REVISION

DRAWN

MOHD SUMER

CHECKED BY

Вам также может понравиться