MAIN PROPULSION STARB

Vessel Name : TBTB.SADP XXX


Period :
March 2015

PMS No.

01.1.1

01.1.2

01.1.3

Unit / System

Last Maint. Date

Last Month Total Running Hours


This Month Running Hours
Current Total Running Hours
CYLINDER HEADS AND FITTINGS
(1)Checkcylinderheadtieboltsfortightness,re-tightenif
necessary.

Last Month Total Running Hours


This Month Running Hours
Current Total Running Hours
CYLINDER HEAD DAN FITTINGS
(1)PeriksakekencanganbautCylnderhead,kencangkan
jikaperlu.
(2)Pastikantidakadakebocoranpadaindicatorcocksdan
(2)Ensurenoleaksonindicatorcocksandreliefvalves.
reliefvalves.
(3)Checklandingbetweencylinderheadandlinertoensure (3)Periksadudukanantaracylinderheaddanlinerdan
nocombustiongasleaking.
pastikantidakadakebocoranpembakaran.
(4)Rectifyalldefects.
(4)Amatijikaadabagianyancacat.

PI C

TAPPET CLEARANCE AND ROCKER GEAR


TAPPET CLEARANCE AND ROCKER GEAR
(1)Checktappetclearance(clearancespecificationreferto (1)Periksatappetclereance(spesifikasiclearancesesuai
ServiceManual).
denganbukupetunjuk)

C/E

(2)Checkrockerarmbushforwearandslackness.

(2)Periksarockerarambushdarikeausandankelonggaran.

(3)Checkmovementofvalvesandensuretheyarenot
sticky.
(4)Checkvalvespringsforbreakage.
(5)Ensureoilpassageforrockergearareclear.

(3)Periksapergerakankatup-katupdanpastikantidak
lengket.
(4)Periksapegaskatupdarikepatahan.
(5)Pastikanminyakyanglewatkerockergearbaik.

LUBE OIL FILTER


(1)Cleanfilter.
(2)Checkforsignofdamagefilterscreen.
(3)Checkforanyforeignmaterialorwhitemetalentrained
init.
(4)Fordisposabletypefilter,renewfilter.

LUBE OIL FILTER


(1)Bersihkansaringan
(2)Periksatandakerusakanpadascreensaringan
(3)Periksajikaadamaterialasingataurambesidandi
buang.
(4)Untukjenisfilteryangsekalipakai,perbaharui

Current
Data since
last
Maint
Months

6,945
62
7,007

C/E
agu/13
agu/13
agu/13
1/Nov/14

1/Sep/14
1/Aug/14
Agu/2013

0
0
0
0

0
0

1/Sep/14
1/Sep/14

0
0
0

1/Mar/15
1/Mar/15

0
0

C/E

1/Mar/15
1/Mar/15

01.1.4

01.1.5

01.1.6

01.1.7

01.1.8

01.1.9

FUEL OIL FILTER


Cleanfilter.
Checksignofdamagefilterscreen.
Fordisposabletypefilter,renewifnecessary.

FUEL OIL FILTER


(1)Bersihkansaringan
(2)Periksatandakerusakanpadascreensaringan
(3)Untukjenisfilteryangsekalipakai,perbaharui

AIR FILTER
(1)Bersihkansaringan
(2)Untukjenisfilteryangsekalipakai,hembusakanudara
(2)Fordisposabletypefilter,blowairfromthecleanside
darisisibersihkesisiyangkotoruntukmemindahkan
throughtothedirtysidetoremovedirt.
kotoran.
NOTE:CATATAN:
PerbaruisaringanjikatandapenunjukanREDsetelah
Renewfilterifindicatorstillshows"RED"aftercleaning.
dibersihkan.
TURBO-CHARGER
TURBO-CHARGER
(1)Drainoilfromsump,checkforanyforeignmaterialinoil.(1)Buangolidarisump,periksadaribendaasing.Isidengan
Refillwithnewoil.
oliyangbaru.
AIR FILTER
(1)Cleanfilter.

C/E
1/Mar/15
1/Mar/15
1/Mar/15

0
0
0

1/Mar/15

C/E

1/Mar/15
0

C/E
1/Feb/15

(2)Checkandensurerotorarefreetorotate.

(2)Periksadanpastikanrotorberputardenganbebas.

1/Feb/15

COOLERS
Cleancoolerseawaterside,ifnecessary.
Checkzincanodeandreplaceifnecessary.
CoatendcoverswithAPEXIORNo.3.
Replacecoversandcheckforleaks.

COOLERS
(1)Bersihkansisiairlaut,jikaperlu.
(2)Periksazincanodedangantijikaperlu
(3)LapisiendcoversdenganAPEXIORNo.3
(4)PasangCoversdanperiksakebocoran.

C/E

CRANKCASE INSPECTION AND RELIEF VALVES


(1)Checkallbottomendandmainbearingsboltsfor
tightness.
(2)Checksignofwaterleakage.
(3)Checkallinternalpipesfordamages.
(4)Checksumpforanywhitemetal.
(5)Checksignofoverheating,slacknessorcreepingin
bearinghousing.
(6)Checklinerforscoringwhenpistonareattopdead
centre.

CRANKCASE INSPECTION AND RELIEF VALVES


(1)Periksakekencangansemuabottomenddanbautmain
bearing.
(2)Periksatandakebocoranair.
(3)Periksapipabagiandalamdarikeruskan.
(4)Periksasumpdarirambesi.
(5)Periksatandaoverheating,kekendoranpadabearing
house.

C/E

1/Mar/15
1/Mar/15
1/Mar/15
1/Mar/15

1/Aug/13
1/Aug/13
1/Aug/13
1/Aug/13
1/Aug/13

(6)Periksalinerketikaposisipistonpadatitikmatiatas.

1/Aug/13

(7)Runprimingpumptoensurealloilpassagesareclear.

(7)Jalankanpompapriminguntukmemastikanoli
bersirkulasidenganbaik.

1/Aug/13

TIMING GEAR AND CAMSHAFT


Removeinspectioncovers.
Checkgearsforoverheating,pittingandwear.
Checkcamsandrollersforwearandpitting.

TIMING GEAR AND CAMSHAFT


(1)Bukapenutup
(2)Periksagigi-gigidarioverheatingdankeausan
(3)Periksacamsdanrollerdarikeausan.

0
1

0
0
0
0

19
19
19
19
19
19
19

C/E
1/Aug/13
1/Aug/13
1/Aug/13

19
19
19

01.1.10

Checkandensurealloilpassagesareclear.
Cleancamshaftspace.

(4)Periksadanpastikansirkulasiolibaik.
(5)Bersihkanareacamshaft

INJECTORS
Checkinjectorsopeningpressure.(Specificationreferto
ServiceManual).
Checkspraypattern.

INJECTORS
(1)Periksatekananinjector(spesifikasisesuadenganbuku
petunjukpabrik).
(2)Periksasemprotannya.

TEC-B 019 JAN 2014

1/Aug/13
1/Aug/13

19
19

C/E
1/Feb/15
1/Feb/15

Written by : Technical

1
1

MAIN PROPULSION STARB


Vessel Name : TBTB.SADP XXX
Period :
March 2015

PMS No.

01.1.11

Unit / System

PIC

Checkfordryseatandexcessivebackleakage.
Replacefaultynozzle,preservedefectivenozzleandsend
ashoreforre-conditioning.(Donotattempttore-condition
nozzleonboard).
NOTE:-
Ensurecleanlinessduringservicingofinjector.

(3)Periksadryseatdankebocoranyangberlebihan.
(4)Gantinoxxleyangtidakbaik,siapkannozzleyngaus
dankirimkedaratuntukdirekondisi.Janganmerekondisi
nozzledikapal)
CATATAN :
Pastikankebersihansewaktumengerjakaninjectors.

GOVERNOR AND FUEL RACK


(1)Drainofoilifgovernorareindependentsumptype.
Checkformetallicorforeignmaterialenstrainedinoil.
Refillwithcleanoil.

GOVERNOR DAN FUEL RACK


(1)Buangoligovernoryangjenisnyamempunyaisump
tersendiri.Periksabendabenadasingyangmasuk.Isidengan
oliyangbersih.

1/Feb/15
1/Feb/15

C/E
1/Feb/15
0

(2)Checkallfuellinkagesforexcessivebacklash.Ensure
(2)Periksasemuasambunganbahanbakar.Pastikansemua
theyareproperlyconnectedandtheirmovementisnot
tersambungdenganbaikdanpergerakannyatidakterabtas.
restricted.
(3)Lubricatealllinkages.
(3)Lumasisemuasambungan.
01.1.12

HOLDING DOWN BOLTS


Hammertestallfoundationbolts,tightenupasnecessary.

01.1.13

01.1.14

HOLDING DOWN BOLTS


(1)Tesdenganpalusemuabautfondasi,kencangkanjika
perlu.

Last Maint. Date

Current
Data since
last
Maint
Months
1

1/Feb/15
1/Feb/15

0
0

C/E
1/Apr/14

Checkandensurealllocknutsareinplace.

(2)Periksadanpastikansemuapenguncibautditempatnya.

1/Apr/14

ATTACHED GEAR PUMPS


Removeendcover.
Checkgearbacklashandgeartiptohousingclearance.
Checkhousingandendplateforscore.

ATTACHED GEAR PUMPS


(1)Bukapenutupnya
(2)Periksagigibacklashdanjarakgigikerumahnnya.
(3)Periksarumahnyasertadudukannya.

C/E

ATTACHED CENTRIFUGAL PUMP


Removeendcover.
Checkimpellerforcavitations.

ATTACHED CENTRIFUGAL PUMP


(1)Bukapenutupnya.
(2)Periksaimpellerdaricekungannya.

C/E

11
11

1/Aug/13
1/Aug/13
1/Aug/13

19
19
19

1/Aug/13
1/Aug/13

19
19

01.1.15

01.1.16

01.1.17

01.1.18

01.1.19

Ensuretelltailholesarenotchoked.
Checkforexcessiveclearance.

TURNING GEARS
Checkengagingmechanism.
Checkoillevelandcondition,changeoilifnecessary.
Checksafetyinterlockarefunctioning.

TURNING GEARS
(1)Periksapenghubungmekanis
(2)Periksajumlahdankondisioli,gantiolijikaperlu.
(3)Periksafungsikuncipengaman.

THERMOCOUPLE AND GAUGES

1/Aug/13
1/Aug/13

19
19

1/Aug/13
1/Aug/13
1/Aug/13

19
19
19

C/E

THERMOCOUPLE AND GAUGES


(1)Periksasemuathermometerdanpengukurdari
Checkallthermometersandgaugesarefunctioningproperly.
fungsinya.
Checkallgaugesareproperlysecuredtothepanel.
(2)Periksasemuapengukuramanditempatnya.
Replacealldefectivegauges.
(3)Gantisemuapengukuryangrusak.

C/E

BATTERY STARTING SYSTEM


Checkplugforleaks.
Checkbatteryterminal
Checkbatterywaterlevel

BATTERY STARTING SYSTEM


(1)Periksakebocoranpadatutup
(2)Periksakekuatanterminalclipnya.
(3)Levelairbattery

C/E

CONTROL ENGINE THROTLE (MORSE CONTROL)


1.Lubricatingmachaniscem
2.mechancalcable
3.greasingonmechanicalhandle

CONTROL KENDALI MESIN (MORSE CONTROL)


1.Lubricatingmachanism
2.mechancalcable
3.greasingonmechanicalhandle

C/E

EXHAUST GAS PIPING SYSTEM

C/E

Tightenupexhaustbellowbolts,ifnecessary.
Checkallsecuringbracketsandfastener.

EXHAUST GAS PIPING SYSTEM


(1)Periksasemuapipagasbuanguntukmemastikantidak
adakebocoran.
(2)Kencangkanbautpegangan,jikaperlu.
(3)Periksasemuabraketpengamandankencangkan.

SAFETY TRIPS AND ALARMS


TestHighWatertemperaturealarm.
TestLowLubOilpressurealarm.

SAFETY TRIPS AND ALARMS


(1)Teshighwtertemperaturealaram
(2)TesLowLubOilpressurealarm

C/E

Checkallexhaustgaspipingtoensurenoleak.

01.1.20

(3)Pastikantelltailholestidaktersumbat
(4)Periksaclearanceyangberlebihan.

1/Aug/13
1/Aug/13
1/Aug/13

19
19
19

1/Feb/15
1/Feb/15
1/Mar/15

1
1
0

1/Aug/13
1/Aug/13
1/Aug/13

19
19
19

1/Aug/13
1/Aug/13
1/Aug/13

19
19
19

1/Mar/15
1/Mar/15

0
0

1/Feb/15

NOTE:
CATATAN
EnsureenginesarerunningatidlespeedwhentestingofLow Pastikanmesinberjalandengankecepatanidleketika
LubOilpressurealarm.
melakukanpengetesanalaramlowluboil.
01.1.21

01.1.22

LUBE OIL SAMPLE


Takeoilsampleandsendashoreforlaboratoryanalysis.

LUBE OIL SAMPLE


(1)Ambilcontoholidankirimkedaratuntukdiperiksa.

C/E

FRESH WATER SAMPLE

FRESH WATER SAMPLE

C/E

RecordreadingandsubmitcopytoShoreOffice.

(1)Tescontohuntukalkalinityhardnessdankandungan
chlotide.
(2)Catathasilnyadankirimkedarat.

NOTE:-

CATATAN:

Testingproceduresrefertowatertreatmentinstruction.

Prosedurpengujianmerujukpadawatertreatmentprosedur.

TestsampleforAlkalinityhardnessandchloridecontents.

TEC-B 019 JAN 2014

1/Feb/15
1/Feb/15

Written by : Technical

1
1

MAIN PROPULSION STRBO


Vessel Name : TBTB.SADP XXX
Period :
March 2015

PMS No.
01.1.23

Unit / System
MAIN REDUCTION GEAR
Openupinspectioncover.
Checkgearforpitting,crackandtoothbreakage.
Checksignofoverheating,slacknessorcreepinginbearing
housing.

01.1.25

01.1.26

01.1.27

Last Maint. Date

MAIN REDUCTION GEAR


(1)Bukapenutup
(2)Periksagigi-gigidarikeretakan,patahdanaus.
(3)Periksatandaoverheating,kekenduran,kerapuhanpada
rumahbearing.
(4)Periksadanpastikansemprotanminaykntidak
tersumbat.

C/E

REDUCTION GEAR FLEXIBLE COUPLING


Removeprotectiveguard.

REDUCTION GEAR FLEXIBLE COUPLING


(1)Bukatutuppengaman.

C/E

Checkrubbercouplingforcracksanddeterioration.

(2)Periksarubbercouplingdarikeretakandankeusangan.

1/Aug/13

Checkallcouplingboltsfortightness.

(3)Periksasemuabautcouplingdarikekencangannya.

1/Aug/13

19
19

PROPELLER SHAFT BEARINGS


Checkbearingoilcondition,replaceifnecessary.
Checksignofoverheating,slacknessorcreepinginbearing
housing.
Ensureallcoolingpipesarenotchoked.
Ensurethermometerarefunctioning.

PROPELLER SHAFT BEARINGS


(1)Periksaolibearing,gantijikaperlu.
(2)Periksatand-tandaoverheating,kekenduranpadaruamah
bearing.
(3)Pastikansemuapipapendingintidaktersumbat.
(4)Pastikansemuthermometerberfungsi.

C/E
1/Aug/13

19

1/Aug/13

19

1/Aug/13
1/Aug/13

19
19

PROPELLER SHAFT SEALS


Checksealingarrangementandensurenoleaks.
Checksealandsterntubeoilcondition.Sendashorefor
laboratoryanalysisifsuspectcontaminationofoil.

PROPELLER SHAFT SEALS


(1)Periksasemuasealdanpastikantidakkebocoran.
(2)Periksasealdankondisisterntube.Gantiglandpacking
jikaperlu

C/E
1/Mar/15

1/Aug/13

19

MAIN ENGINE STANDBY PUMPS


Checkandensurepumparefreetorotate.
Functioningtestofpumps.
Checkallsealingarrangement.

MAIN ENGINE STANDBY PUMPS


(1)Periksadanpastikanpompabebasberputar.
(2)Tesbakerjatidaknyapompa.
(3)Periksasemuaseal.

C/E
1/Aug/13
1/Feb/15
1/Aug/13

19
1
19

Checkandensureoilsprayarenotchoked.
01.1.24

PIC

Current
Data since
last
Maint
Months

1/Aug/13
1/Aug/13
1/Aug/13
1/Aug/13

1/Aug/13

19
19
19
19

19

01.1.28

01.1.29

SPARE AND INVENTORY

SUKU CADANG DAN INVENTARIS

C/E

(1)Besidestheroutinecheckingofsparesandupdatingof (1)Disampingpemeriksaanrutinpadasukucadangdan
inventory,athoroughcheckmustbecarriedouttoensurethat pencatatandaftarbarang,jugadilakukanuntukmeyakinkan
sparesareproperlysecuredandpreserved.
bahwasukucadangtersebutamandanbisadigunakan.

1/Feb/15

(2)TheChiefEngineermustbeabletoproduceanup-to(2)KKMharusmampumebuatdafatterbarupermseinan,
dateInventoryListindicatingmachinery,partnumbers,stock
nomorsukucadang,jumlahyangtersediadanposisipada
quantityandpositionofthestoresuponrequestoftheShore
tempatpenyimpananjikaadapermintaandariauditor.
Auditor.

1/Feb/15

1/Mar/15

1/Mar/15

MACHINERY COMPARTMENT CLEANLINES


(1)Besidesdailycleaningandregularhosedownoftank
top,thisoperationmustbecarriedoutthoroughlyonthe
cleaningofbilges,bulkheads,machinery,pipes,etc.

KEBERSIHAN RUANG PERMESINAN


(1)Disampingkebersihansecarahariandanmenyemprot
sisisebelahatastangki,tindakaniniharusdilakaukandengan
cermatsaatmembersihkanbagiandasar,dinding,mesin,pipa
dll.

NOTE:

Adanyabendaasingpadabagiandasaragardiambiluntuk
disingkirkan
CATATAN

Ensure that during hosing down or cleaning operation, no


water is allowed to settle on electrical machinery. The
compartment should look clean and tidy after this
operation. This is one of the criteria that indicates the
performance of the Chief Engineer and his subordinates.

Pastikan bahawa saat penyemprotan atau pembersihan,


jangan sampai air terkena peralatan listrik. Ruangan
harus nampak bersih dan rapih sesuadh itu. Ini adalah
suatu kriteria yang menunjukkan kepribadian KKM dan
anak buahnya

Anyforeignmaterialinthebilgesmustberemoved.

C/E

TotalNo.ofOu
TotalNo.ofcompletedtask
PercentageofSc

YeartoDateC
Summary of unscheduled breakdown repair
* All maintenance must be supported by Maintenance/Repair Report (E-09)
PMS No.

Summary of Job
KONDISI MAIN ENGINE NORMAL

Last
Maint.
Date/Hrs

Chief Engineer
Date :

TEC-B 020 JAN 2014

Written by : Technical

Form

N STARBOARDSIDE

TEC-B020

Revision
Page

1Of3

Symbol

Interval
Months

Est. Next Due

60

Dec/2016

30

Apr/2016

25

Aug/2016

15

Feb/2016

Jun/2015

30

Jan/2017

30

Apr/2015

6
6

Sep/2015
Sep/2015

1
1

Apr/2015
Apr/2015

C
C

C
C

C
C

S
S

S
S

S
S

S
S

S
S

Apr/2015

Apr/2015

Jan

Feb

Mar

Apr

May

Next Due
Jun
Jul

Aug

Sep

S
C

Oct

Nov

Dec

S
S

S
S

S
S

S
S

C
C

S
S

1
1
1

Apr/2015
Apr/2015
Apr/2015

C
C
C

C
C
C

C
C
C

S
S
S

S
S
S

S
S
S

S
S
S

S
S
S

S
S
S

S
S
S

S
S
S

S
S
S

Apr/2015

Apr/2015

Apr/2015

Aug/2015

1
1
1
1

Apr/2015
Apr/2015
Apr/2015
Apr/2015

30

Feb/2016

30
30
30

Feb/2016
Feb/2016
Feb/2016

30

Feb/2016

30

Feb/2016

30

Feb/2016

30
30
30

Feb/2016
Feb/2016
Feb/2016

C
C
C
C

C
C
C
C

C
C
C
C

S
S
S
S

S
S
S
S

S
S
S
S

S
S
S
S

S
S
S
S

S
S
S
S

S
S
S
S

S
S
S
S

S
S
S
S

30
30

Feb/2016
Feb/2016

Aug/2015

Aug/2015

Approved by : VP / DPA

Retention Period : 1 Yea

Form

N STARBOARDSIDE

TEEC-B020

Revision
Page

2Of3

Symbol

Interval
Months
6

Est. Next Due

Jan

Mar

Apr

May

Next Due
Jun
Jul

Aug
S

Sep

Oct

S
C

Aug/2015

Feb
C

Nov

Dec

Aug/2015

Apr/2015

Apr/2015

Apr/2015

30

Oct/2017

30

Oct/2017

60
60
60

Aug/2018
Aug/2018
Aug/2018

30
30

Feb/2016
Feb/2016

30
30

Feb/2016
Feb/2016

30
30
30

Feb/2016
Feb/2016
Feb/2016

30

Feb/2016

30
30

Feb/2016
Feb/2016

3
3
1

May/2015
May/2015
Apr/2015

30
30
30

Feb/2016
Feb/2016
Feb/2016

30

Feb/2016

30
30

Feb/2016
Feb/2016

1
1

Apr/2015
Apr/2015

Aug/2015

C
C
C

C
C

C
C

C
C

S
S
S

S
S

S
S

S
S

S
S
S

S
S

S
S

S
S

S
S
S

S
S

S
S

S
S

Aug/2015

Aug/2015

Approved by : VP / DPA

Retention Period : 1 Yea

Form

N STRBOARDSIDE

TEC-B020

Revision
Page

3Of3

Symbol

Interval
Months

Est. Next Due

60
60

Aug/2018
Aug/2018

60

Aug/2018

60

Aug/2018

30

Feb/2016

30

Feb/2016

30

Feb/2016

60

Aug/2018

30

Feb/2016

30
30

Feb/2016
Feb/2016

Apr/2015

60

Aug/2018

60
3
60

Aug/2018
May/2015
Aug/2018

Jan

Feb

Mar

Apr

May

Next Due
Jun
Jul

S
C

Aug

Sep

Oct

Nov

Dec

May/2015

May/2015

Apr/2015

Apr/2015

0
19
100.0%

0
36
100.0%

0
22
100.0%

23
0
0.0%

24
0
0.0%

23
0
0.0%

19
0
0.0%

36
1
2.7%

22
0
0.0%

23
0
0.0%

24
0
0.0%

25
2
7.4%

100.0%

100.0%

100.0%

75.0%

60.0%

50.0%

42.9%

37.8%

33.6%

30.3%

27.5%

25.8%

Date of
repair
done

Remarks / Description of Work done


UNTUK STANDBY PUMP TIDAK TERSEDIA DIKAPAL
PENGAMBILAN SAMPLE LO DAN FW BELUM DILAKSANAKAN KARENA TIDAK ADA FASILITAS (BOTLE SAMPLE)

Technical Superintendent
Date :

Approved by : VP / DPA

Retention Period : 1 Yea

TEC-B020

1Of3

: Scheduled Maintenance
: Completed Maintenance
REMARKS

Retention Period : 1 Year

TEEC-B020

2Of3

: Scheduled Maintenance
: Completed Maintenance
REMARKS

Retention Period : 1 Year

TEC-B020

3Of3

: Scheduled Maintenance
: Completed Maintenance
REMARKS

219
80
26.76%

299

Technical Superintendent
Date :

Retention Period : 1 Year