Академический Документы
Профессиональный Документы
Культура Документы
PMS No.
01.1.1
01.1.2
01.1.3
Unit / System
PI C
C/E
(2)Checkrockerarmbushforwearandslackness.
(2)Periksarockerarambushdarikeausandankelonggaran.
(3)Checkmovementofvalvesandensuretheyarenot
sticky.
(4)Checkvalvespringsforbreakage.
(5)Ensureoilpassageforrockergearareclear.
(3)Periksapergerakankatup-katupdanpastikantidak
lengket.
(4)Periksapegaskatupdarikepatahan.
(5)Pastikanminyakyanglewatkerockergearbaik.
Current
Data since
last
Maint
Months
6,945
62
7,007
C/E
agu/13
agu/13
agu/13
1/Nov/14
1/Sep/14
1/Aug/14
Agu/2013
0
0
0
0
0
0
1/Sep/14
1/Sep/14
0
0
0
1/Mar/15
1/Mar/15
0
0
C/E
1/Mar/15
1/Mar/15
01.1.4
01.1.5
01.1.6
01.1.7
01.1.8
01.1.9
AIR FILTER
(1)Bersihkansaringan
(2)Untukjenisfilteryangsekalipakai,hembusakanudara
(2)Fordisposabletypefilter,blowairfromthecleanside
darisisibersihkesisiyangkotoruntukmemindahkan
throughtothedirtysidetoremovedirt.
kotoran.
NOTE:CATATAN:
PerbaruisaringanjikatandapenunjukanREDsetelah
Renewfilterifindicatorstillshows"RED"aftercleaning.
dibersihkan.
TURBO-CHARGER
TURBO-CHARGER
(1)Drainoilfromsump,checkforanyforeignmaterialinoil.(1)Buangolidarisump,periksadaribendaasing.Isidengan
Refillwithnewoil.
oliyangbaru.
AIR FILTER
(1)Cleanfilter.
C/E
1/Mar/15
1/Mar/15
1/Mar/15
0
0
0
1/Mar/15
C/E
1/Mar/15
0
C/E
1/Feb/15
(2)Checkandensurerotorarefreetorotate.
(2)Periksadanpastikanrotorberputardenganbebas.
1/Feb/15
COOLERS
Cleancoolerseawaterside,ifnecessary.
Checkzincanodeandreplaceifnecessary.
CoatendcoverswithAPEXIORNo.3.
Replacecoversandcheckforleaks.
COOLERS
(1)Bersihkansisiairlaut,jikaperlu.
(2)Periksazincanodedangantijikaperlu
(3)LapisiendcoversdenganAPEXIORNo.3
(4)PasangCoversdanperiksakebocoran.
C/E
C/E
1/Mar/15
1/Mar/15
1/Mar/15
1/Mar/15
1/Aug/13
1/Aug/13
1/Aug/13
1/Aug/13
1/Aug/13
(6)Periksalinerketikaposisipistonpadatitikmatiatas.
1/Aug/13
(7)Runprimingpumptoensurealloilpassagesareclear.
(7)Jalankanpompapriminguntukmemastikanoli
bersirkulasidenganbaik.
1/Aug/13
0
1
0
0
0
0
19
19
19
19
19
19
19
C/E
1/Aug/13
1/Aug/13
1/Aug/13
19
19
19
01.1.10
Checkandensurealloilpassagesareclear.
Cleancamshaftspace.
(4)Periksadanpastikansirkulasiolibaik.
(5)Bersihkanareacamshaft
INJECTORS
Checkinjectorsopeningpressure.(Specificationreferto
ServiceManual).
Checkspraypattern.
INJECTORS
(1)Periksatekananinjector(spesifikasisesuadenganbuku
petunjukpabrik).
(2)Periksasemprotannya.
1/Aug/13
1/Aug/13
19
19
C/E
1/Feb/15
1/Feb/15
Written by : Technical
1
1
PMS No.
01.1.11
Unit / System
PIC
Checkfordryseatandexcessivebackleakage.
Replacefaultynozzle,preservedefectivenozzleandsend
ashoreforre-conditioning.(Donotattempttore-condition
nozzleonboard).
NOTE:-
Ensurecleanlinessduringservicingofinjector.
(3)Periksadryseatdankebocoranyangberlebihan.
(4)Gantinoxxleyangtidakbaik,siapkannozzleyngaus
dankirimkedaratuntukdirekondisi.Janganmerekondisi
nozzledikapal)
CATATAN :
Pastikankebersihansewaktumengerjakaninjectors.
1/Feb/15
1/Feb/15
C/E
1/Feb/15
0
(2)Checkallfuellinkagesforexcessivebacklash.Ensure
(2)Periksasemuasambunganbahanbakar.Pastikansemua
theyareproperlyconnectedandtheirmovementisnot
tersambungdenganbaikdanpergerakannyatidakterabtas.
restricted.
(3)Lubricatealllinkages.
(3)Lumasisemuasambungan.
01.1.12
01.1.13
01.1.14
Current
Data since
last
Maint
Months
1
1/Feb/15
1/Feb/15
0
0
C/E
1/Apr/14
Checkandensurealllocknutsareinplace.
(2)Periksadanpastikansemuapenguncibautditempatnya.
1/Apr/14
C/E
C/E
11
11
1/Aug/13
1/Aug/13
1/Aug/13
19
19
19
1/Aug/13
1/Aug/13
19
19
01.1.15
01.1.16
01.1.17
01.1.18
01.1.19
Ensuretelltailholesarenotchoked.
Checkforexcessiveclearance.
TURNING GEARS
Checkengagingmechanism.
Checkoillevelandcondition,changeoilifnecessary.
Checksafetyinterlockarefunctioning.
TURNING GEARS
(1)Periksapenghubungmekanis
(2)Periksajumlahdankondisioli,gantiolijikaperlu.
(3)Periksafungsikuncipengaman.
1/Aug/13
1/Aug/13
19
19
1/Aug/13
1/Aug/13
1/Aug/13
19
19
19
C/E
C/E
C/E
C/E
C/E
Tightenupexhaustbellowbolts,ifnecessary.
Checkallsecuringbracketsandfastener.
C/E
Checkallexhaustgaspipingtoensurenoleak.
01.1.20
(3)Pastikantelltailholestidaktersumbat
(4)Periksaclearanceyangberlebihan.
1/Aug/13
1/Aug/13
1/Aug/13
19
19
19
1/Feb/15
1/Feb/15
1/Mar/15
1
1
0
1/Aug/13
1/Aug/13
1/Aug/13
19
19
19
1/Aug/13
1/Aug/13
1/Aug/13
19
19
19
1/Mar/15
1/Mar/15
0
0
1/Feb/15
NOTE:
CATATAN
EnsureenginesarerunningatidlespeedwhentestingofLow Pastikanmesinberjalandengankecepatanidleketika
LubOilpressurealarm.
melakukanpengetesanalaramlowluboil.
01.1.21
01.1.22
C/E
C/E
RecordreadingandsubmitcopytoShoreOffice.
(1)Tescontohuntukalkalinityhardnessdankandungan
chlotide.
(2)Catathasilnyadankirimkedarat.
NOTE:-
CATATAN:
Testingproceduresrefertowatertreatmentinstruction.
Prosedurpengujianmerujukpadawatertreatmentprosedur.
TestsampleforAlkalinityhardnessandchloridecontents.
1/Feb/15
1/Feb/15
Written by : Technical
1
1
PMS No.
01.1.23
Unit / System
MAIN REDUCTION GEAR
Openupinspectioncover.
Checkgearforpitting,crackandtoothbreakage.
Checksignofoverheating,slacknessorcreepinginbearing
housing.
01.1.25
01.1.26
01.1.27
C/E
C/E
Checkrubbercouplingforcracksanddeterioration.
(2)Periksarubbercouplingdarikeretakandankeusangan.
1/Aug/13
Checkallcouplingboltsfortightness.
(3)Periksasemuabautcouplingdarikekencangannya.
1/Aug/13
19
19
C/E
1/Aug/13
19
1/Aug/13
19
1/Aug/13
1/Aug/13
19
19
C/E
1/Mar/15
1/Aug/13
19
C/E
1/Aug/13
1/Feb/15
1/Aug/13
19
1
19
Checkandensureoilsprayarenotchoked.
01.1.24
PIC
Current
Data since
last
Maint
Months
1/Aug/13
1/Aug/13
1/Aug/13
1/Aug/13
1/Aug/13
19
19
19
19
19
01.1.28
01.1.29
C/E
(1)Besidestheroutinecheckingofsparesandupdatingof (1)Disampingpemeriksaanrutinpadasukucadangdan
inventory,athoroughcheckmustbecarriedouttoensurethat pencatatandaftarbarang,jugadilakukanuntukmeyakinkan
sparesareproperlysecuredandpreserved.
bahwasukucadangtersebutamandanbisadigunakan.
1/Feb/15
(2)TheChiefEngineermustbeabletoproduceanup-to(2)KKMharusmampumebuatdafatterbarupermseinan,
dateInventoryListindicatingmachinery,partnumbers,stock
nomorsukucadang,jumlahyangtersediadanposisipada
quantityandpositionofthestoresuponrequestoftheShore
tempatpenyimpananjikaadapermintaandariauditor.
Auditor.
1/Feb/15
1/Mar/15
1/Mar/15
NOTE:
Adanyabendaasingpadabagiandasaragardiambiluntuk
disingkirkan
CATATAN
Anyforeignmaterialinthebilgesmustberemoved.
C/E
TotalNo.ofOu
TotalNo.ofcompletedtask
PercentageofSc
YeartoDateC
Summary of unscheduled breakdown repair
* All maintenance must be supported by Maintenance/Repair Report (E-09)
PMS No.
Summary of Job
KONDISI MAIN ENGINE NORMAL
Last
Maint.
Date/Hrs
Chief Engineer
Date :
Written by : Technical
Form
N STARBOARDSIDE
TEC-B020
Revision
Page
1Of3
Symbol
Interval
Months
60
Dec/2016
30
Apr/2016
25
Aug/2016
15
Feb/2016
Jun/2015
30
Jan/2017
30
Apr/2015
6
6
Sep/2015
Sep/2015
1
1
Apr/2015
Apr/2015
C
C
C
C
C
C
S
S
S
S
S
S
S
S
S
S
Apr/2015
Apr/2015
Jan
Feb
Mar
Apr
May
Next Due
Jun
Jul
Aug
Sep
S
C
Oct
Nov
Dec
S
S
S
S
S
S
S
S
C
C
S
S
1
1
1
Apr/2015
Apr/2015
Apr/2015
C
C
C
C
C
C
C
C
C
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Apr/2015
Apr/2015
Apr/2015
Aug/2015
1
1
1
1
Apr/2015
Apr/2015
Apr/2015
Apr/2015
30
Feb/2016
30
30
30
Feb/2016
Feb/2016
Feb/2016
30
Feb/2016
30
Feb/2016
30
Feb/2016
30
30
30
Feb/2016
Feb/2016
Feb/2016
C
C
C
C
C
C
C
C
C
C
C
C
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
30
30
Feb/2016
Feb/2016
Aug/2015
Aug/2015
Approved by : VP / DPA
Form
N STARBOARDSIDE
TEEC-B020
Revision
Page
2Of3
Symbol
Interval
Months
6
Jan
Mar
Apr
May
Next Due
Jun
Jul
Aug
S
Sep
Oct
S
C
Aug/2015
Feb
C
Nov
Dec
Aug/2015
Apr/2015
Apr/2015
Apr/2015
30
Oct/2017
30
Oct/2017
60
60
60
Aug/2018
Aug/2018
Aug/2018
30
30
Feb/2016
Feb/2016
30
30
Feb/2016
Feb/2016
30
30
30
Feb/2016
Feb/2016
Feb/2016
30
Feb/2016
30
30
Feb/2016
Feb/2016
3
3
1
May/2015
May/2015
Apr/2015
30
30
30
Feb/2016
Feb/2016
Feb/2016
30
Feb/2016
30
30
Feb/2016
Feb/2016
1
1
Apr/2015
Apr/2015
Aug/2015
C
C
C
C
C
C
C
C
C
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Aug/2015
Aug/2015
Approved by : VP / DPA
Form
N STRBOARDSIDE
TEC-B020
Revision
Page
3Of3
Symbol
Interval
Months
60
60
Aug/2018
Aug/2018
60
Aug/2018
60
Aug/2018
30
Feb/2016
30
Feb/2016
30
Feb/2016
60
Aug/2018
30
Feb/2016
30
30
Feb/2016
Feb/2016
Apr/2015
60
Aug/2018
60
3
60
Aug/2018
May/2015
Aug/2018
Jan
Feb
Mar
Apr
May
Next Due
Jun
Jul
S
C
Aug
Sep
Oct
Nov
Dec
May/2015
May/2015
Apr/2015
Apr/2015
0
19
100.0%
0
36
100.0%
0
22
100.0%
23
0
0.0%
24
0
0.0%
23
0
0.0%
19
0
0.0%
36
1
2.7%
22
0
0.0%
23
0
0.0%
24
0
0.0%
25
2
7.4%
100.0%
100.0%
100.0%
75.0%
60.0%
50.0%
42.9%
37.8%
33.6%
30.3%
27.5%
25.8%
Date of
repair
done
Technical Superintendent
Date :
Approved by : VP / DPA
TEC-B020
1Of3
: Scheduled Maintenance
: Completed Maintenance
REMARKS
TEEC-B020
2Of3
: Scheduled Maintenance
: Completed Maintenance
REMARKS
TEC-B020
3Of3
: Scheduled Maintenance
: Completed Maintenance
REMARKS
219
80
26.76%
299
Technical Superintendent
Date :