Вы находитесь на странице: 1из 1

DOCUMENT TRANSMITTAL

To

Date

May, 31th 2016

Transmital No.

SMMEC-T-WECJ-046

: PT.SULUH ARDI ENGINEERING

Cilandak Commercial Estate, #103 Building


Jl. Raya Cilandak KKO, Jakarta, 12560, Indonesia
Attn
CC

From

: PROJECT MANAGER ( MR.HIROKAZU SATO )


: DEPUTY PM ( BP.URFIAN SOEGIHARTO )

Job/Inquiry No.

STEEL STRUCTURE
FABRICATION

IFR
IFI
IFA
IFC
AS

:
:
:
:
:

Issued
Issued
Issued
Issued
Issued

PT.WELTES ENERGI NUSANTARA


JL.RAYA KEDAMEAN 168 GRESIK
EDWARD SETIAWAN

Following Documents
are :

Original (Orig)

Reproducible
copies ( R )

The following
Are transmitted here
with for your

Aproval

Record

Information

Construction

Review

No

No Document

W15078-DOC-025 B Material
Receive Report

Qty

Rev

Status

IFI

_____________________
Signature

X Softcopy

Title

Material Receive Report

Receipt acknowledge

By

For
For
For
For
For

Prepared By

_______________

___________________

Date

Edward Setiawan

Please acknowledge this transmittal by sign and clear name, and email to :
edward@weltes.co.di

Review
Information
Approval
Construction
Asbuilt

Вам также может понравиться