Efficiency factor (
describes the power losses from the prime movers to the end-use equipment,
which can be expressed as follows:
Where energy output is from the prime mover and energy input is the amount remaining for actual
usage after some losses. The system losses result from friction, gears, and belt and line losses.
Density
Heating Value
Diesel
7.2
19000
Gasoline
6.6
20000
Butane
4.7
21000
Methane
24000
Table 2.1: Heating value of various fuel types
Fuel Type
The power, P
Where t is time
and distance, D
Hence, to rearrange the equation it give the engine output or BHP, BHP (hp);
Where
angular velocity
Or
(hp);
Where
is fuel consumption rate in
and H is the heat value of fuel in
.
The overall efficiency factor is defined as the energy output over energy input and yields;
Example 2.1
Based on the data given, determine the output power, BHP and overall efficiency,
Output torque from a diesel engine,
Engine speed,
Fuel type = Diesel
Answer:
Example 2.2
In a drilling operation major power supply is required by the hoisting system, rotary system,
circulation system and mud cleaning equipment. If the output horsepower required by the top drive
is 2200 hp, the hoisting system is 2000hp, the circulation system 2400hp, cleaning equipment 300hp
and 20% of all is required for additional facilities, calculate the diesel consumption for a 25 day
drilling operation and casing operation (in gallons). The overall engine efficiency, , is 15% and
transmission efficiency,
Answer:
EXERCISES
1. Calculate the overall efficiency,
Density of fuel,
Fuel consumption,
at an engine speed of
. If
the engine?
Answer: 331.29 hp and 19.24%
3. The total power consumed by different equipment on a land rig is 7000hp. If the rig is
operating for a period of 25 days, how much diesel fuel will be required? The overall engine
efficiency and transmission efficiency are 20% and 95% respectively.
CIRCULATING SYSTEM
MAJOR COMPONENTS
Circulating system can be described as the blood of the drilling operation. This is because, all its
major components especially drilling mud is flowing throughout the entire drilling operation. It
travels from (1) the mud tanks (2) to the mud pumps, (3) through the surface connections, (4) to the
drill string, (5) then to the bit, (6) up the annulus, (7) to the mud cleaners and (8) back to the suction
tank. This is to remove drill cuttings from the hole as the drilling progresses and also to clean the
wellbore, to cool and to lubricate the bit and also to transmit hydraulic horsepower to the bit. The
major components of the circulating system are;
Mixing equipment
Pits
Mud cleaners
Mud pumps
MIXING EQUIPMENT
The drilling mud mixing equipment;
Hopper; mud chemicals and solids are poured through the hopper, which is connected to a
high shear jet. Due to the jet action, the mud chemicals are homogeneously mixed.
Mud gun & Agitators; the resulting mud is again vigorously agitated with a mud gun and
then directed to the suction tank. In the suction tank, mud is further kept in motion with
mechanical agitators. This is done to prevent solid settlement. Before the mud is delivered
to the main pump it is charged by a centrifugal pump to give the mud a pressure of 80-90
psi.
PITS
It is usually a series of large steel tanks, all interconnected and fitted with agitators to maintain the
solids, used to maintain the density of the drilling fluid, in suspension. Some pits are used for
circulating (e.g. suction pit) and others for mixing and storing fresh mud. Most modern rigs have
equipment for storing and mixing bulk additives (e.g. barite) as well as chemicals (both granular and
liquid). The mixing pumps are generally high volume, low pressure centrifugal pumps.
MUD CLEANERS
Solid control or cutting separation can be done by using one or more methods of solid separation;
Settling
Screening
Hydrocyclone
Rotating centrifuge
While settling and screening methods are the mainly the mechanism of shale shaker by using
gravitational force, hydrcocyclone and centrifuge, however, achieve higher rates of separation by
using centrifugal forces than can be obtained by gravitational settling. Cutting can divide into four
sizes which are;
Category
Colloidal
Silt
Sand
Gravel
Size
2 or less
2 to 74
74 to 2000
More than 2000
Example
Bentonite, clays and ultra-fine drill solids
Barite, silt and fine drill solids
Sand and drill solids
Drill solids, gravel and cobble
Shale Shaker
The most important cutting separation equipment is shale shaker, a vibrating screen separators used
to remove drill cuttings from the mud. It is the first line of defense against solids accumulation in
mud cleaning equipment or solid removal chain. A modern shale shaker works by removing about
100% of solids greater than 74microns. The shale shaker cannot remove silt and colloidal size solids.
Thus, it requires dilution and other equipment to control the ultra-fine drill solids.
There are three basic types of shale shakers that are widely use in the industry which are;
The circular-motion shaker; an older design and produces lowest centrifugal force, or Gforce.
The elliptical-motion shaker; a modified circular motion type in which the center of gravity
is raised above the deck and counter weights are used to produce an egg-shaped motion
that varies in both intensity and throw as solids move down the deck.
The liner-motion shaker; use two circular-motion motors mounted on the same deck. The
motors are set for opposite rotation to produce a downward G-force and an upward G-force
when the rotations are complementary, but zero G-force when the rotations are opposed.
Sand trap
It is a settling pit located directly after the shale shaker. It can gather the larger particles that can
plug or damage the next solid removal equipment if a screen develops a hole of if the shaker is
bypassed. It use gravitational force acting on the particle for settlement, thus this compartment
should never be stirred or used as suction for discharge for hydrcyclones.
Mud Cleaner
A mud cleaner, basically will remove sand size drill solids from the mud and it somehow can retain
the barite. Firstly, the mud is passing through the desilter, and then screens the discharge through
a fine-mesh shaker. The larger solids trapped on the screen are discarded leaving the mud and
solids that pass through return into the circulation. Generally, 97% of barite particles are less than
74-micron in size. Thus, most of the barite will be discharged by the hydrocyclone and moving
through the screen and returned into the mud system. In other words, we can say that mud
cleaner is a backup to the shale shakers and in order for a mud cleaner to be an effective cutting
separator equipment, the screen size must be finer than the screen size on the shale shaker.
Centrifuge
Basically, a centrifuge is solid-control equipment that able to remove fine and ultrafine solids. In
normal industrial practice, a decanting-type centrifuge is used to increase the forces causing
separation of the solids by increasing centrifugal force. It consists of a conical, horizontal steel bowl
rotating at a high speed, with a screw shaped conveyor inside. Mud feeds into one end and the
cuttings are separated and moved up the bowl by a rotating scroll to exit at the other end. Even
though it principle is quite similar to hydrocyclone, there is a key difference between these two
equipment. The centrifuge is dynamic separator that is able to apply much more centrifugal force
than hydrocyclone thus remove finer materials while the hydrocyclone is passive separator capable
of applying modest amounts of centrifugal force.
On the rig site, this mud cleaning equipment arrangement is really important to get maximum
separation efficiency. The mechanical equipment is set up based on the particle size that it will
remove. In addition, although a degasser or mud-gas separator is technically a not solid removal
device, it needs to be located after the shale shaker since the centrifugal pumps and other solid
control equipment do not operate efficiently in existence of gas in the mud. Thus, the proper
arrangement for mud cleaning equipment is per below;
1. Shale shaker
2. Sand trap
3. Degasser
4. Desander
5. Desilter
6. Mud Cleaner
7. Centrifuge
8. Cutting dryer (if using oil-based mud, to recover the mud before the dumped the cuttings)
DRILLING ENGINEERING by Muhammad Aslam Md Yusof
MUD PUMPS
At least two slush pumps are installed on the rig. At shallow depths they are usually connected in
parallel to deliver high flow rates. As the well goes deeper the pumps may act in series to provide
high pressure and lower flow rates. Positive displacement pumps are used (reciprocating pistons) to
deliver the high volumes and high pressures required to circulate mud through the drill string and up
the annulus. There are two types of positive displacement pumps which are;
Duplex pump (two cylinders) double acting (pump on the up-stroke and down-stroke)
Triplex pump or three-cylinder pump is a single acting pump only on forward piston stroke. It means
that when the piston moves forward, it will pump and suction happen when the piston moves in
backward direction. Triplex pump system needs three different cylinders, one each while the duplex
pump requires only single cylinder unit. This pump are the most common type of pump used in well
service activities since it require less maintenance, light, compact, cheaper than duplex pump and
generally is capable of handling many fluid types including corrosive fluids, abrasive fluids and
slurrys containing relatively large particulates.
10
11
Where
is liner diameter
and
is stroke length
(
Where
is piston diameter
Taking into account of both strokes, the total volume displaced for a complete cycle by a pump,
can be expressed as;
For a triplex pump, the piston diameter does not affect the pump output because the piston
discharges in one direction. The total volume displacement for single-acting triplex pump can be
expressed as;
(
Considering a volumetric efficiency,
( )
(
( )
)
(
in cycles
per minute (in oilfield, 1 complete pump revolution = 1 stroke, hence pump speed is usually given in
strokes per minute).
Where
is given by;
is pump pressure
12
Example 2.3
Calculate the pump factor in units of barrel per stroke for a duplex pump below
Stroke length
Rod diameter
Liner diameter
Volumetric efficiency
17
2.5
6.5
90%
Answer:
13
Example 2.4
A triplex pump with 6.5 liners, 2.5 rods and 18 strokes is operating at 150 cycles per minute and a
discharge pressure of 4000 psig.
a) Determine the pump factor in gal per cycle at 100% volumetric efficiency
b) Calculate the flow rate in gal per min
c) Compute the pump power developed during the operation
Answer:
14
Example 2.5
A double-acting duplex piston pump with 6.5 liner, 2.5 rod and 17 stroke was operated at 4,000
psig and 20 cycles/min for 10 minutes with the suction pit isolated from the return mud flow. The
mud level of the suction pit, which is 6.5 ft wide and 20 ft long, was observed to fall 20 during this
period. Compute (a) volumetric pump efficiency, (b) pump factor and, (c) the hydraulic horsepower
developed by the pump.
Answer:
15
16
EXERCISES
1. A triplex pump with 16 in stroke is operating at 4000psig and 20 cycles per minute. If the
volumetric efficiency of the pump is 80% and the horsepower of the pump is 350hp.
Calculate the piston/liner diameter for this pump.
Answer: 7.579 in
2. A double-acting duplex pump with 6.5 liners, 2.5 rods, and 18 strokes was operated at
3000 psig and 20 cycles/min for 10 minutes with suction pit isolated from the return mud
flow. The mud level in the suction pit, which is 7 ft wide and 20 ft long, was observed to fall
18 during this period. Compute the pump factor, volumetric pump efficiency, and hydraulic
horsepower developed by the pump.
Answer: 7.854 gal/cycle; 0.82; 274.9 hp
3. Consider triplex pump having 6-in liner and 11- in, strokes operating at 120 cycles/min and a
discharge pressure of 3000 psig. Calculate (1) pump factor in units of gal/cycle at 90%
volumetric efficiency (2) flow rate in gal/min (3) hydraulic horsepower developed.
Answer: (1) 3.635 gal/cycle (2) 436.2 gal/min (3) 763.5 hp
17
HOISTING SYSTEM
MAJOR COMPONENTS
The main function of hoisting system is provide means of lifting and lowering drill string, casing
string, and other subsurface equipment into the wellbore during drilling activities and also helps the
replacement of the drilling line when it was subjected to wearing. Two routine works carried out by
using the hoisting system are making a connection and making a trip.
The major components of hoisting system are;
Drawworks
DRAWWORKS
Drawworks, primary hoisting machinery can be described as the heart of the rig. It provides a
means of raising and lowering the travelling block. The main components of modern drawworks are;
Transmission
Catheads
The drawworks consist of wire-rope drilling line winds on the large revolving drum and extends over
a set of sheaves in the top of derrick, known as the crown block and down to another sheaves
known as travelling block. A large drilling hook is suspended at the end of the travelling block use to
suspend the drill string. This is allowing the drill string to be moved up and down as the drum turns.
There are two segments of the drilling line known as fast line and dead line. The fast line is the
wire rope drilling line that winds on the drawworks drum to the crown block. The drilling line then
enters the sheaves of the crown block and is makes several passes between the crown block and
traveling block pulleys for mechanical advantage. One end of the line then exits the last sheave on
the crown block and is anchored to a derrick leg on the other side of the rig floor. This section of
drilling line is called the "dead line" because it does not move.
18
Figure 4: Schematic design of hoisting system (After Adam T Bourgouyne et al, 1991)
Crown block
Travelling block
The main principal function of block and tackle is to provide a mechanical advantage, M to allow
easier handling of large loads. It can be defined as;
Where
is the load supported by travelling block or hook load and
drawworks (tension in the fast line).
Under a static condition, consider a free body diagram in Figure 4, in ideal mechanical advantage
condition where there is no friction in pulleys, the tension in the drilling line is constant. So, hook
load, is supported by the fast lines (i.e. by each of the strung lines through the travelling block). It
gives;
Or
Where is the number of lines strung throughout the crown block and the travelling block. The
number of lines is chosen based on the loading condition.
19
Number of lines,
6
8
10
12
14
Efficiency,
0.874
0.841
0.810
0.770
0.740
Note that dead-line load is carried by dead-line anchor and the fast-line load is carried by the
hoisting drum.
The input power,
Where
Where
is the travelling block velocity. The movement of the fast line by a unit distance tends to
shorten each of the strung lines between the block and tackle by
times the unit distance, thus;
Block and tackle efficiency is the ratio between output power to input power. In an ideal condition
where no friction in the block and tackle system, the efficiency if unity.
However, there is power loss due to friction and other factors in real system. Thus, the approximate
value of average efficiency for the block and tackle system can be referred in Table 1. Using the
value, the actual tension in the fast line for a given load can be determined by using;
20
Note that after some or total part of the drill string immersed in the drilling fluid, the weight of the
drill string is reduced because there is upward force that keeps the drill string afloat. Buoyancy
factor
Where
is the factor used to consider loss of weight because of the immersion in drilling mud.
or
Moreever, under a dynamic condition, the fast-line tension and dead-line tension are illustrated in
Figure 5.
The tension in the successive fast-lines is equal to load imposed on the drawworks,
times the
sheave efficiency factor, and the tension in the last line is the tension in the dead-line,
.
The normal value for sheave efficiency, is 0.9615.
;
(
21
Figure 5: Effect of friction on the efficiency of the hoisting system (After H Rabia)
Basically, the number of lines is depending on the load to be supported by the hoisting system and
also the tensile rating of the drilling line used. After certain drilling period, the drilling line becomes
worn and must be replaced. To maintain a good drilling line while drilling, a regular practice known
as slip and cut operation has been practiced in the industry. It is a periodically replacement of a
segment of the drilling line wrapped around the crown block and the travelling block to avoid any
drilling line fatigue. The slipping the drilling line involves losing the dead line anchor and placing a
few feet of new line in service from the storage reel. Cutting the drilling line means removing the
line from the drum and cutting off a section of the line from the end.
The slip and cut operation at specific period is determined by the ton-mile calculation. It is a method
introduced to measure the work done by the drilling line by quantifying the cumulative product of
the loaf lifted (in tons) and the distance lifted of lowered (in miles).
Ton-mile is calculated for
Round trip
Drilling or connection
Setting casing
Coring
Short trip
22
Where
stand.
is the number of
Note that to run a stand in the hole, the travelling block has to move a distance of
approximately
. Similar amount of work is required to pull the stand out of the hole. Thus total
work done by travelling assembly is given by;
Assuming
ii.
, so
Where
Taking into account the buoyancy factor affecting the weight of drill pipe, the work done by drill pipe
is;
[(
Where
)]
Assuming the friction loss is the same in going into the hole as in coming out, the work done in lifting
the drill pipe is the same as in lowering, so for a round trip, the work done is equal to
[(
)]
23
Where
is the correction for the added work done in lowering and lifting assembly because drill
collars and bit weigh more per foot than drill pipe (previously it is assumed the weight of drill pipe
was run to bottom of the hole).
It yields,
Or
24
Where
is the ton-miles
(deeper depth).
is given by;
(
Since no extra weight from the drill collar, the ton-miles for setting casing operations;
Where
Where
is given by;
is the ton-miles
(deeper depth).
25
For the normal drilling operation, the pipe is requires to be handled in stands (3 joint of connected
pipe is about 90 ft height). Hence, for older rig usually requires 123 ft of derrick height.
However, in the modern drilling operation nowadays, the height of derrick normally requires
additional height to accommodate the top drive system. Most widely used size is API 19 which
provides 146ft height and 30ft square base with pipe racking capacity of 160 stands of 5ft drill pipe.
The derrick can be classed into two types which are;
Standard derrick
26
and the;
it
yields;
Noted that the load on the rig is not distributed equally over all four derrick legs because the dead
line is anchored to one of the leg and the drawworks is situated on one side of the derrick floor. The
load distribution for each derrick leg is shown in the Table 2.
The dead-line affects only the leg A to which it is anchored. Besides that, the leg C and leg D would
share the full load of fast-line tension. The leg B only loaded with the hook load during the drilling
operation. It is important to know that at block and tackle efficiency exceed 0.5, the load exerted on
leg A is greater than other legs. Since the derrick will fail if any leg failed, it is convenient to define
the maximum equivalent derrick load,
A),
27
[
[
Load
Leg A
Leg B
Leg C
Leg D
Total load
Noted that derrick efficiency,
]
[
28
Example 2.6
A rig must hoist a load of 450,000
tackle system as high as 450
. Eight lines are strung between the crown block and travelling block.
Calculate:
a) The static tension in the fast line when upward motion is impending,
b) The maximum hook horsepower available,
c) The maximum hoisting speed,
d) The actual derrick load,
e) The maximum equivalent derrick load,
f)
Answer:
29
Example 2.7
Ten lines are strung between the crown block and travelling block, and the dead line is anchored to a
derrick leg on one side of the v-door, as shown in the figure below. The rig must hoist a load of
500,000
Answer:
30
EXERCISES
1. Calculate the fast-line tension when lifting a 500,000
,
2. A rig must hoist a load of 200,000
(Answer: 106.9
(Answer: 244691
(Answer: 280000
(Answer: 0.874)
3. Eight lines are strung between the crown block and travelling block, and the dead line is
anchored to a derrick leg on one side of the v-door, as shown in the figure below. The rig
must hoist a load of 400,000
D.
Answer:
REFERENCES
1. Bourgoyne, A.T., M. E. Chenevert, K. K. Millheim, and F. S. Young. 1986. Applied Drilling
Engineering. SPE Tectbook Series, Vol. 2. Crittendon, B. C. 1959.
2. http://www.drillingcontractor.org/wp-content/uploads/2011/01/h2sfigure-1.jpg
31