Project: VISTA VERDE

DAILY AHEAD SCHEDULE


No.
STT

Block

Description
M t cng vic

Tower 3

Installation of water supply pipe

Tower 3

Installation of sanitary pipe system in toilet

Tower 3

Installation of AC drain pipe

Tower 3

Testing of corridor ducting

Tower 3

Installation of fire protection pipe

Tower 3

Marking point works, cut, drill & install flush box, embedded conduit on shear wall & brick wall in unit and corridor

Tower 3

Connect exposed conduit in corridor

Tower 3

Installation tray and trunking

Tower 3

Swabbing conduit in unit and corridor

10

Tower 4

Marking point works, cut, drill & install flush box, embedded conduit on shear wall & brick wall in apartment unit -Zone 1

11

Tower 4

12

Employer: CAPITALAND

Ref:

VIS1413/DR/ME/

Contractor: Construction Joint Stock Company No.1 - COFICO

Date:

Monday,20-Jun-2016

Location
a im

Number of worker

Time
Thi gian

Contractor's staff in charge


Cn b ph trch

23,25,26F

16

07:00-17:00

Mr Son

33F

14

07:00-17:00

Mr Son

8, 20F

07:00-17:00

Mr Son

25,26F

07:00-17:00

Mr Son

11,12F

07:00-17:00

Mr Son

24,28,29F

16

07:00-17:00

Mr Thinh/Mr Thoa

19,20F

07:00-17:00

Mr Thinh/Mr Thoa

3,4F

07:00-17:00

Mr Thinh/Mr Thoa

8,27F

07:00-17:00

Mr Thinh/Mr Thoa

23F,24F

07:00-17:00

Mr Dong/Mr Vu

Installation of exposed conduit in corridor

25F

07:00-17:00

Mr Dong/Mr Vu

Tower 4

Repair defect for flush box at apartment unit

18F

07:00-17:00

Mr Dong/Mr Vu

13

Tower 4

Installation of lightning protection

14F

07:00-17:00

Mr Dong/Mr Vu

14

Tower 4

Installation of distribution board in apartment unit

19F

07:00-17:00

Mr Dong/Mr Vu

15

Tower 4

Installation sanitary pipe and storm water pipe system in toilet

30,31F

11

07:00-17:00

Mr Hoa/Mr Vu

16

Tower 4

Modify for AC drain pipe

10F

07:00-17:00

Mr Hoa/Mr Vu

18

Tower 4

Installation water supply pipe system in toilet

23,26F

07:00-17:00

Mr Hoa/Mr Vu

19

Tower 4

Installation for ducting pipe at room

16F

07:00-17:00

Mr Hoa/Mr Vu

20

Tower 4

Installation protection pipe at corridor

28,29F

07:00-17:00

Mr Son

21

Tower 4

Installation of sprinkler head

2,11F

07:00-17:00

Mr Son

22

Tower 4

Installation for protection pipe

UNDERGROUND

07:00-17:00

Mr Hoa/Mr Vu

Main Contract - CFC


Submitted by:

Khau Quoc Viet

Day

Night

CAPITALAND
Check by:

Vo Dinh Chien

Approved by:

Pham Ngoc Lam

Remark
Ghi ch

Project: VISTA VERDE

Employer: CAPITALAND
Contractor:
Construction Joint
Date:
Stock Company No.1
- COFICO

Project: VISTA VERDE

Attention:
Prepared by:

Client/ Ch u t Capitaland:
Supervisor/T vn gim st Cideco:
Main Contractor/Nh thu chnh Cofico:

Phm Ngc Lm
V nh Chin
Trn Hng Phng

Monday, June 20, 2016

Position / Chc v: ME Resident Engineer / K s trng ME


Position / Chc v: Supervisor / T vn gim st
Position / Chc v: Site Engineer / K s

Site's activities Today: Monday, June 20, 2016


No.

Block /
Location

Contractor'
Engineer

Description of Work

CIDECO/
CAPITALAND

Time

Material Delivery to Site


1

Pvc paling & fittings

13h ~14h PM

27F

- Inspect installation flush box on shear wall & brick wall in apartment (inspect internal)

21F

17->21F

3F

Tower 4
Mr.Vu/Mr.Cuong

10:00:00

- Inspect pressure test for water supply pipe

Mr.Vu/Mr.Hoa

9:00:00

- Inspect leakage test of sanitary pipe in trashroom

Mr.Vu/Mr.Hoa

9:30:00

- Inspect installation of sanitary pipe and storm water pipe

Mr.Vu/Mr.Hoa

10:00:00

- Inspect installation of water supply pipe (internal inspection)

Mr. Son

13:30:00

- Inspect pressure test of water supply pipe in corridor & apartment.(internal inspection)

Mr. Son

16:00:00

- Inspect installation of FIN storm drainage pipe

Mr. Son

10:00:00

- Inspect installation of drainage pipe (internal inspection)

Mr. Son

08:30:00

Tower 3
1

17F

14, 17F

3-11F

22F
Submitted by:

Khau Quoc Viet

Checked by:

Vo Dinh Chien

Approved by:

Pham Ngoc Lam

V. HOT NG CNG TRNG/ Site Activities:


Ngy / day: 19 Thng / Month : 6 Nm / Year : 2016
1.Thi tit / Weather: nng
Nhit : 28oC - 30oC
- Sng / Morning: ma
- Chiu / Afternoon: ma
2.Nhn lc v my thi cng trong ngy / Manpower and equipment during the day:
Nhn lc/ Manpower
K s / Engineer:

My thi cng / Equipment


15

Trung cp / College:
Cng nhn / Worker:

129

Tng s / Total:

144

Xe o ; Xe ti ;Ton c: ; Xe i: ; Thy bnh: ; C


thp: ; Un thp: M.hn: ; m di: ; Xe lu: ; Xe cu
Nn kh: ; Pht in: ; M.khoan: p cc: ; Bm n
Cu thp: ; Cn BT: ; Vn thng: ; M.trn:
c B
Ph BT: ; Xe nng tay: ; M,nn thp:
; Xoa mt:
;M
. m mt: ; m cc: ; Mi/ct: ; M.tin ren:
nc: ; Container:

3.Tnh hnh thi cng, nghim thu cc cng vic xy dng trong ngy / Work progress, inspection in the da

MEP:
vTHP 3
H thng c
+ Lp t ng cu ha tng 11,12
+ Lp t ng nc cp tng 22, 25
+ Lp t ng nc ngng my lnh tng 7,13, 20F
+ Lp t ng nc thot tng 33F
+ Th kn ng gi tng 28,29,30
Cng tc nghim thu:
+ Lp t ng cu ha tng 18,19
H thng in
+ Lp t m cho SO, SW, FA tng 24,29
+ Kt ni ng ni hnh lang tng 19
+Lp tray and trunking tng 3,4
Cng tc nghim thu:
vTHP 4
H thng in:
+ ng li tng 27
+ Sa defect m tng 18,19
+ Ci t ng trong hnh lang tng 22
+ Ci t mng cp tng 31
+Thng ng cu thang b t tng 10 n tng 20
Cng tc nghim thu:
+Nghim thu lp t t trong cn h tng 7,tng 9,tng 10
H thng c:
+Chnh sa h thng ng nc ngng tng 10

+Lp t h thng ng nc thot 30


+Lp t h thng ng nc cp tng 26
+Lp t ng gi cn h tng 15
Cng tc nghim thu:
4.Cc s c, h hng v cc vn pht sinh (nu c) / Incidents, defects and other issues (if any

5. kin ca n v thi cng / Contractor s comments:

6. kin ca T vn gim st, Ch u t / Comment of Supervision, Client:

Ch u t /
Client CAPITALAND

T vn Gim st /
Supervision CIDECO

ent during the day:


My thi cng / Equipment

i ;Ton c: ; Xe i: ; Thy bnh: ; Ct


p: M.hn: ; m di: ; Xe lu: ; Xe cu: ;
in: ; M.khoan: p cc: ; Bm nc: ;
BT: ; Vn thng: ; M.trn:
c BT: ;
g tay: ; M,nn thp:
; Xoa mt:
; M.ca:
; m cc: ; Mi/ct: ; M.tin ren:
;Bn
nc: ; Container:

gy / Work progress, inspection in the day:

dents, defects and other issues (if any):

K thut ca nh thu /
Contractorsengineer COFICO