1. PLANNING
STAGE
Feasibility
Studies

Preparing Budget

Study involves an early investigation to


assure that a construction project is
viable. Collect data and information ,
analyzed before site investigation work
can be carried out.
Data and information that acquired are
as follows :
Topographic map
Geological map
Mining record
and
3Weather
financialreport
sources
:- etc
Own money, loan
from financial institution and etc.

Appointment of Consultant

Agreement from client,


appointed architect, engineers,
quantity surveyor and land
surveyor as the consultant.
Consultant coordinate works at
all stages of the construction
process.

2. ANALYSIS &
DESIGN STAGE
Selection of Site

Site surveying

Soil Investigation

All consultants involved have to visit


the construction site to choose and
decide the most suitable orientation for
the project. Some factors to be
considered
when
selecting
a
construction site are :Location and area of the construction
site
Earth topography
Existing infrastructure and public
facilities such as road entrance to the
construction
electricity,
source
of
To
determine site,
the actual
location
of the
water boundary
supply, markers.
drainage Based
system
sites
on and
the
telephonemarkers,
line.
boundary
the area of the site ,
ground level and grid level of the site
can be identified to determine the
ground profile of the site.
Objectives : to identify soil
strata and determine the soil
strength as well as to validate
and to gather more information .

Continue
2. ANALYSIS &
DESIGN STAGE
Designing Work

Preparing
drawings and
work
specifications

Cost Estimation

During this stage, it involves 3 stages ,


architectural design, structural and civil
engineering
design,
electrical
and
mechanical design.
The design must meet the requirements of
the Fire and Rescue Department and
Uniform Building By Law 1984.
Information obtained from the design
stage is used to prepare working
drawings. The working consists of
design, structural and service drawings.
At
the
same
time
standard
specifications for construction work are
prepared.
Is prepared based on working
drawings and standard
specification, whether in the
form of bill of quantities or lump
sum.

3. MANAGEMENT
STAGE
Gathering
Information

Tender Award

Employing
Workers

When all work in the analysis and design


stage completed, information such as
standard work specification, addendum
specification, work drawing list, instruction
and check list for tenderers, tender brief
and contract form are gathered and
compiled together in the tender document.
Tender offering is advertised after the
preparation
of
tender
document
completed. When the tender offer is
closed, QS makes an evaluation to choose
the qualified contractor to receive the
contract. Once the contractor is appointed
Acceptance Letter is handed to the client.
The contract or agreement is signed.
Contractor who has been awarded the
project
is
responsible
for
all
the
construction
work
involved
at
the
construction
site
including
the
appointment of subcontractors.

Continue
4. CONSTRUCTION
STAGE
Once permission is granted to enter a
Preliminary work

Earth work

construction site, the


following works need to be carried out;
i) Clearing of site
ii) Preparing entrance and exit passages to
the construction site.
iii) Preparing temporary road
iv) Preparing temporary building such as
site office,
material & equipment store,
guard house, canteen etc.
v) Preparing fences and safety and project
signboard.
Involves the process of preparation of

the required formation level as in the


working drawing. Cut and fill works are
carried out with reference to base level
line and datum that site has been setup.
Cutting and filling work are carried out
until the site level is exactly at the
formation level.

Continue
4. CONSTRUCTION
STAGE
All structure has its own load that need to
Substructure

Superstructure
work

Installation of the
Facilities

be supported by the ground. Every


structural work needs to begin with the
construction of substructure.
Substructure refers to all parts of
construction members that built below the
ground level or below. Substructure work
includes piling work, foundation, column
stump, underground floor and foundation
Consists of all parts of structure that are
base floor.
built above substructure which is above the
ground level. Superstructure work for
building are built in stages and it begins
with
the
construction
of
structural
members such as :
Column, ground beam, solid ground floor,
upper floor beams, roof beams, wall and
While structural work is in progress,
etc.
mechanical , electrical for plumbing
system,
clean
water
supply,
communication and telecommunication as
well as air conditioning, fire system and
sanitation are to be prepared.

5. HANDING STAGE

CPC

CF

DLP & CMGD and retention


money