FORMATO DE METRADOS - TUBERIA - MOV- DE TIERRAS - LINEA DE CONDUCCION- ADUCCION

SECTOR N 01 - LLIMPE - CHINCHEROS


MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DE CHINCHEROS, DISTRITO DE CHINCHEROS, PROVINCIA DE CHINCHEROS
PROYECTO

APURIMAC

DIFERENCIA DE
COTAS

% DE PENDIENTE

LONG
REAL

9.90
18.02
-3.71
8.55

9.56
11.73
-24.73
4.60

104.01
154.61
15.45
186.21

LONGITUD EN METROS

110 MM

90 MM

63 MM

48 MM

TN

TSR

LINEA CONDUCCION

CAP
CR
CD
CAP 2

CR
CD
R200
CR

103.540
153.56
15.00
186.01

2987.520
2977.620
2959.600
2986.170

2977.620
2959.600
2963.310
2977.620

458.110

TOTAL

460.28

104.01
15.45
186.21

104.01
154.61
15.45
186.21

305.67

460.28

15.54

15.54

321.21

475.82

154.614

154.61

LINEA DE CONDUCCION

CD

R110

TOTAL
LINEA DE ADUCCION

15.000

2959.600

2963.660

-4.06

-27.07

15.000
DE R200
R200

45.670

2958.750

2957.630

1.12

DE R110
R110
CVP

CVP
CVP

424.160
544.720
968.880

2958.750
2900.000

2900.000
2855.000

58.75
45.00

15.54
475.82

154.61

2.45

45.68

45.68

13.85
8.26

428.21
546.58
974.78

45.68

TOTAL
LINEA DE ADUCCION

428.21
546.58
974.78

428.21
546.58
1020.47

PARCIAL:
Long.
(m)
RESUMEN TUBERIAS
TUBERIA DE CONDUCCION

TUBERIA (sin considerar perdidas)

Aduccion
M

LONGITUD DE TUBERIA PVC- 110 MM


LONGITUD DE TUBERIA PVC- 110 MM

974.78

LONGITUD DE TUBERIA PVC- 90 MM


TUBERIA DE ADUCCION

Conduccion

154.61
321.21
45.68

LONGITUD DE TUBERIA PVC- 110 MM

Pgina 1

Total
475.82

1,020.47

TR

LONG
HORIZONTAL

TRAMO

COTA FINAL

ARTERIA

COTA INICIAL

Fecha : 15 de marzo de 2013

FORMATO DE METRADOS - TUBERIA - RED DE DISTRIBUCION


SECTOR N 01.2 - CHINCHEROS
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DE CHINCHEROS, DISTRITO DE CHINCHEROS, PROVINCIA DE CHINCHEROS
APURIMAC

75.60
8.05
7.75
62.68
87.35
54.19
129.95
5.36
59.68
60.75
77.10
6.66
7.11
85.38
13.10
47.66
25.49
82.44
61.82
80.85
124.70
127.11
64.31
39.32
105.63
127.06
35.70
45.05
72.35
61.88
30.48
454.72

2852.73
2831.87
2831.24
2831.24
2824.55
2814.73
2810.00
2831.24
2830.86
2848.35
2837.03
2828.34
2828.06
2827.34
2816.88
2815.00
2811.44
2806.94
2826.25
2818.49
2801.45
2782.82
2824.75
2813.40
2809.00
2792.29
2776.50
2773.46
2770.83
2768.94
2775.00
2760.10

2831.87
2831.24
2831.24
2824.55
2814.73
2810.00
2792.82
2830.86
2825.06
2837.03
2828.34
2828.06
2827.34
2816.88
2815.00
2811.44
2806.94
2791.37
2815.84
2801.45
2782.82
2774.79
2813.40
2809.00
2792.29
2776.50
2773.46
2770.83
2768.94
2775.00
2760.10
2720.00

% DE PENDIENTE

J-167
J-179
J-178
J-177
J-176
J -173
J-188
J-181
J-182
J-98
J-166
J-184
J-185
J-175
PRV-27
J-174
J-186
J-187
J-196
J-193
J-212
J-213
J-198
PRV-29
J-199
J-214
J-215
J-216
J-217
PRV-47
J-218
PRV-15

DIFERENCIA DE
COTAS

J-95
J-167
J-179
J-178
J-177
J-176
J -173
J-178
J-181
J-96
J-98
J-166
J-184
J-185
J-175
PRV-27
J-174
J-186
J-195
J-194
J-193
J-212
J-197
J-198
PRV-29
J-199
J-214
J-215
J-216
J-217
PRV-47
J-218

20.86
0.63
0.00
6.69
9.82
4.73
17.18
0.38
5.80
11.32
8.69
0.28
0.72
10.46
1.88
3.56
4.50
15.57
10.41
17.04
18.63
8.03
11.35
4.40
16.71
15.79
3.04
2.63
1.89
-6.06
14.90
40.10

27.59
7.83
0.00
10.67
11.24
8.73
13.22
7.09
9.72
18.63
11.27
4.20
10.13
12.25
14.35
7.47
17.65
18.89
16.84
21.08
14.94
6.32
17.65
11.19
15.82
12.43
8.52
5.84
2.61
-9.79
48.88
8.82

LONGITUD EN METROS

LONG
REAL

LONG
HORIZONTAL

COTA FINAL

TRAMO

COTA INICIAL

Fecha : 15 de marzo de 2013

110 MM

90 MM

63 MM C-7.5

0.00

63.04
87.90
54.40

63.04
87.90
54.40

61.80

61.80

13.23
47.79

13.23
47.79

82.63
126.08
127.36
65.30
39.57
106.94
128.04
35.83
45.13
72.37
62.18
33.93
456.48

82.63
126.08
127.36
65.30
39.57
106.94
128.04
35.83
45.13
72.37
62.18
33.93
456.48

Pgina 2

63 MM C-10

FORMATO DE METRADOS - TUBERIA - RED DE DISTRIBUCION


SECTOR N 01.2 - CHINCHEROS
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DE CHINCHEROS, DISTRITO DE CHINCHEROS, PROVINCIA DE CHINCHEROS
APURIMAC

425.24
183.76
210.87
913.71
440.27
134.66
475.20
394.61
67.75
84.77
66.19
260.69
127.11
115.00
13.84
79.63
107.31
55.65
77.04
54.75
62.42
175.31
109.56
7.71
72.78
95.79
125.44
157.07
111.30
37.46
152.35
116.25

2720.00
2675.91
2670.00
2655.89
2592.00
2515.00
2498.00
2467.28
2825.00
2812.24
2818.40
2816.17
2782.82
2790.00
2838.78
2838.23

2828.78
2816.55
2852.73
2848.35
2844.50
2838.23
2830.86
2827.10
2827.34
2826.25
2824.75
2825.00
2820.42
2816.07
2838.78
2831.87

2675.91
2670.00
2655.89
2592.00
2515.00
2498.00
2467.28
2440.28
2812.24
2802.91
2807.49
2776.83
2774.79
2776.63
2838.23
2828.78
2816.55
2810.23
2848.35
2844.50
2837.03
2831.24
2827.10
2827.34
2826.25
2824.75
2825.00
2820.42
2816.07
2813.06
2831.87
2828.34

% DE PENDIENTE

J-223
PRV-17
J-225
PRV-18
PRV-31
J-229
J-230
J-231
J-200
J-206
J-207
J-208
J-213
J-191
J-169
J-170
J-171
J-172
J-96
J-97
J-98
J-179
J-183
J-185
J-195
J-197
J-205
J-202
J-203
J-204
J-167
J-166

DIFERENCIA DE
COTAS

PRV-15
J-223
PRV-17
J-225
PRV-18
PRV-31
J-229
J-230
J-205
J-200
J-201
J-203
J-112
J-189
J-168
J-169
J-170
J-171
J-95
J-96
J-97
J-169
J-181
J-183
J-185
J-195
J-197
J-205
J-202
J-203
J-168
J-167

44.09
5.91
14.11
63.89
77.00
17.00
30.72
27.00
12.76
9.33
10.91
39.34
8.03
13.37
0.55
9.45
12.23
6.32
4.38
3.85
7.47
6.99
3.76
-0.24
1.09
1.50
-0.25
4.58
4.35
3.01
6.91
3.53

10.37
3.22
6.69
6.99
17.49
12.62
6.46
6.84
18.83
11.01
16.48
15.09
6.32
11.63
3.97
11.87
11.40
11.36
5.69
7.03
11.97
3.99
3.43
-3.11
1.50
1.57
-0.20
2.92
3.91
8.04
4.54
3.04

LONGITUD EN METROS

LONG
REAL

LONG
HORIZONTAL

COTA FINAL

TRAMO

COTA INICIAL

Fecha : 15 de marzo de 2013

110 MM

90 MM

63 MM C-7.5

427.52
183.86
211.34
915.94
446.95
135.73
476.19
395.53
68.94
85.28
67.08
263.64
127.36
115.77

427.52
183.86
211.34
915.94
446.95
135.73
476.19
395.53
68.94
85.28
67.08
263.64
127.36
115.77

77.16
54.89
62.87

77.16
54.89
62.87

72.79
95.80
125.44
157.14
111.38
37.58

72.79
95.80
125.44
157.14
111.38
37.58

Pgina 3

63 MM C-10

FORMATO DE METRADOS - TUBERIA - RED DE DISTRIBUCION


SECTOR N 01.2 - CHINCHEROS
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DE CHINCHEROS, DISTRITO DE CHINCHEROS, PROVINCIA DE CHINCHEROS
APURIMAC

% DE PENDIENTE

2828.06
2827.04
2825.00
2828.78
2824.55
2824.55
2810.90
2816.55
2814.73
2816.88
2816.88

2827.04
2825.00
2814.04
2824.55
2824.06
2827.10
2816.55
2814.73
2816.88
2816.88
2815.84

1.02
2.04
10.96
4.23
0.49
-2.55
-5.65
1.82
-2.15
0.00
1.04

0.61
0.99
4.73
3.36
7.29
-3.37
-2.89
2.30
-2.83
0.00
1.91

J-198

66.27

2815.84

3.68

106.52
120.54
16.01
49.64
83.89
99.13
66.19
56.35
121.69
99.17

2813.40
2812.24
2818.40
2810.23
2810.00
2811.44
2801.45
2792.82
2790.00
2806.94

2813.40
2812.24
2818.40
2820.42
2810.00
2811.44
2801.45
2792.29
2790.00
2786.35
2794.17

2.44

J-200
J-201
J-202
J-173
J-174
J-193
J-199
J-189
J-190
J-192

1.16
-6.16
-2.02
0.23
-1.44
9.99
9.16
2.82
3.65
12.77

1.09
-5.11
-12.62
0.46
-1.72
10.08
13.84
5.00
3.00
12.88

J-184
J-209
J-210
J-170
J-177
J-182
J-180
J-171
J-176
J-175
J-194

J-209
J-210
J-211
J-177
J-182
J-183
J-171
J-176
J-175
J-194
J-196

J-196
J-198
J-200
J-201
J-172
J-173
J-174
J-193
J-188
J-189
J-186

PARCIAL:
Long.

LONGITUD EN METROS

LONG
REAL

COTA FINAL

167.43
206.51
231.55
126.08
6.72
75.68
195.35
79.17
76.03
66.89
54.50

LONG
HORIZONTAL

TRAMO

COTA INICIAL

DIFERENCIA DE
COTAS

Fecha : 15 de marzo de 2013

10010.080

90 MM

63 MM C-7.5

167.43
206.52
231.81

167.43
206.52
231.81

75.72
195.43

75.72
195.43

106.53
120.70
16.14
49.64

106.53
120.70
16.14
49.64
0.00

56.42
121.74
99.99

56.42
121.74
99.99

7874.27

(m)

110 MM

0.00

0.00

7874.27

63 MM C-10

0.00

0.00

0.00
7874.27

RESUMEN TUBERIAS
TUBERIA (sin considerar perdidas)

0.00

LONGITUD DE TUBERIA PVC- 110 MM C-7.5


LONGITUD DE TUBERIA PVC- 90 MM C-7.5
LONGITUD DE TUBERIA PVC- 63 MM C-7.5
LONGITUD DE TUBERIA PVC- 63 MM

C-10

TOTAL

Pgina 4

7,874.27
7,874.27

M
M
M
M
M

704.98
1,080.06
18,738.01
20,523.05

FORMATO DE METRADOS - MOVIMIENTO DE TIERRAS - RED DE DISTRIBUCION


SECTOR N 1.1 - LLIMPE BAJO - LOS ANGELES
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DE CHINCHEROS, DISTRITO DE CHINCHEROS, PROVINCIA DE CHINCHEROS
PROYECTO

APURIMAC
Fecha : 15 de enero 2013
COTA FINAL

DIFERENCIA
DE COTAS

% DE
PENDIENTE

LONG
REAL

J-106

J-107

28.92

2916.98

2913.93

J-107

J-108

53.86

2913.93

2907.95
2901.74

3.05
5.98
6.21
17.74
8.11
14.28
13.76
8.97
3.53
11.65
1.73
10.52
23.79
10.21
2.46
17.27
0.04
15.96
7.75
20.42
2.55
17.35
34.36
3.67
8.43
6.61
6.85
11.37
17.04
10.57
6.67
9.06

10.55
11.10
13.57
9.64
65.72
12.89
12.05
11.34
17.35
17.73
13.22
13.50
14.15
12.93
7.40
12.69
0.64
12.81
11.69
14.62
8.45
13.01
13.21
14.03
17.09
13.09
14.76
14.04
14.90
15.82
13.68
14.27

29.08
54.19
46.19
184.91
14.77
0.00
0.00
0.00
20.65
66.74
13.20
78.66
169.75
79.63
33.33
137.13
6.22
125.61
66.77
141.16
30.28
134.53
262.42
26.41
50.04
50.94
46.91
81.75
115.64
67.64
49.21
64.12

TRAMO

Av Martinelli

Av Heroes del Cenepa

Calle s/nombre

Calle s/N(cepro)
Calle Primavera

SECTOR N 02 - LLIMPI

LONG
HORIZONTAL

J-108

J-109

45.77

2907.95

J-109

PRV-8

184.06

2901.74

2884

PRV-8

J-152

12.34

2884

2875.89

J-152

J-153

110.82

2875.89

2861.61

J-153

J-154

114.18

2861.61

2847.85

J-154

J-155

79.12

2847.85

2838.88

J-124

J-125

20.35

2931.91

2928.38

J-125

J-126

65.72

2928.38

2916.73

J-126

CRV-46

13.09

2916.73

2915

CRV-46

J-121

77.95

2915

2904.48

J-121

J-122

168.07

2904.48

2880.69

J-79

J-80

78.97

2879.85

2869.64

J-111

J-112

33.24

2865

2862.54

J-112

J-113

136.04

2862.54

2845.27

J-112

J-159

6.22

2862.54

2862.5

J-159

J-158

124.59

2862.5

2846.54

J-144

J-145

66.32

2944.76

2937.01

J-72

J- 357

139.68

2936.43

2916.01

J.76

J-140

30.17

2916.01

2913.46

J-140

J-139

133.41

2913.46

2896.11

J-78

J-143

260.16

2894.76

2860.4

J-120

J-116

26.15

2923.68

2920.01

J-116

J-115

49.32

2920.01

2911.58

J-117

J-114

50.51

2915.81

2909.2

J-114

J-118

46.41

2909.2

2902.35

J-118

J-119

80.96

2902.35

2890.98

Calle S/N

J-358

J-123

114.38

2952.09

2935.05

Calle S/N

J-73

J-356

66.81

2933.62

2923.05

J-75

J-130

48.76

2923.05

2916.38

J-142

J-141

63.48

2911.16

2902.1

Calle s/n

Tipos de Suelo

COTA
INICIAL

ARTERIA

Pgina 5

T:N Manual

Semirocoso
Manual

T N.

c/Maq

17.45
32.51
27.71
110.95
8.86
0.00
0.00
0.00
12.39
40.05
7.92
47.19
101.85
47.78
20.00
82.28
3.73
75.36
40.06
84.70
18.17
80.72
157.45
15.84
30.02
30.56
28.15
49.05
69.39
40.58
29.53
38.47

Tipo de Refine

Distancia de Botadero

Semirocoso
c/Maq

Refine e T.N

Refine en T.
semirocoso

Botadero a
R=10 Km

11.63
21.68
18.48
73.97
5.91
0.00
0.00
0.00
8.26
26.70
5.28
31.46
67.90
31.85
13.33
54.85
2.49
50.24
26.71
56.47
12.11
53.81
104.97
10.56
20.01
20.38
18.77
32.70
46.26
27.06
19.69
25.65

17.45
32.51
27.71
110.95
8.86
0.00
0.00
0.00
12.39
40.05
7.92
47.19
101.85
47.78
20.00
82.28
3.73
75.36
40.06
84.70
18.17
80.72
157.45
15.84
30.02
30.56
28.15
49.05
69.39
40.58
29.53
38.47

11.63
21.68
18.48
73.97
5.91
0.00
0.00
0.00
8.26
26.70
5.28
31.46
67.90
31.85
13.33
54.85
2.49
50.24
26.71
56.47
12.11
53.81
104.97
10.56
20.01
20.38
18.77
32.70
46.26
27.06
19.69
25.65

29.08
54.19
46.19
184.91
14.77
0.00
0.00
0.00
20.65
66.74
13.20
78.66
169.75
79.63
33.33
137.13
6.22
125.61
66.77
141.16
30.28
134.53
262.42
26.41
50.04
50.94
46.91
81.75
115.64
67.64
49.21
64.12

Botadero a
D=30 m

FORMATO DE METRADOS - MOVIMIENTO DE TIERRAS - RED DE DISTRIBUCION


SECTOR N 1.1 - LLIMPE BAJO - LOS ANGELES
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DE CHINCHEROS, DISTRITO DE CHINCHEROS, PROVINCIA DE CHINCHEROS
PROYECTO

APURIMAC
Fecha : 15 de enero 2013

SECTOR N 02 - LLIMPI
COTA FINAL

DIFERENCIA
DE COTAS

% DE
PENDIENTE

LONG
REAL

Tipos de Suelo

COTA
INICIAL

ARTERIA

Calle a Estadio

J-138

J-137

55.79

2896.66

2889.75

Chacra

J-100

J-355

129.8

2955.91

2911

Camino Los Incas

J-69

J-100

23.37

2957.63

2955.91

L. Izq

J-100

J-358

126.96

2955.91

2952.09

6.91
44.91
1.72
3.82
12.87
5.95
2.38
2.81
4.43
6.14
7.05
-0.01
6.16
15.09
14.91
10.21
6.71
1.96
3.14
7.16
2.30
9.06
5.99
6.36
9.06
4.55
11.14
3.60
10.05
1.27
5.93
0.46

12.39
34.60
7.36
3.01
3.78
6.09
6.92
2.67
2.71
4.54
5.45
-0.09
3.59
6.32
5.48
5.57
4.48
0.88
8.20
5.08
2.77
5.64
4.92
5.70
5.59
5.11
8.80
2.35
5.19
8.37
5.79
3.93

56.22
137.35
23.43
127.02
340.94
97.94
34.45
105.41
163.70
135.51
129.45
11.30
171.47
239.24
272.51
183.46
149.88
223.31
38.41
141.23
83.17
160.77
121.92
111.75
162.26
89.08
127.09
153.24
0.00
0.00
0.00
0.00

TRAMO

Camino Los Incas

Caminos de Inca

LONG
HORIZONTAL

J-69

J-144

340.7

2957.63

2944.76

J-144

J-71

97.76

2944.76

2938.81

J-71

J-72

34.37

2938.81

2936.43

J-72

J-73

105.37

2936.43

2933.62

J-73

J-74

163.64

2933.62

2929.19

J-74

J-75

135.37

2929.19

2923.05

J-75

PRV-43

129.26

2923.05

2916

PRV-43

J-76

11.3

2916

2916.01

J-76

J-77

171.36

2916.01

2909.85

J-77

J-78

238.76

2909.85

2894.76

J-78

J-79

272.1

2894.76

2879.85

J-79

J-80

183.18

2879.85

2869.64

J-80

J-81

149.73

2869.64

2862.93

J-145

J-123

223.3

2937.01

2935.05

J-123

J-124

38.28

2935.05

2931.91

J-125

J-129

141.05

2928.38

2921.22

J-140

J-142

83.14

2913.46

2911.16

J-142

J-141

160.51

2911.16

2902.1

J-141

J-139

121.77

2902.1

2896.11

J-139

J-137

111.57

2896.11

2889.75

J-137

J-122

162.01

2889.75

2880.69

J-122

J-110

88.96

2880.69

2876.14

J-110

J-111

126.6

2876.14

2865

J-111

J-151

153.2

2865

2861.4

J-163

J-158

193.72

2856.59

2846.54

J-158

J-113

15.18

2846.54

2845.27

J-113

J-156

102.41

2845.27

2839.34

J-156

J-155

11.69

2839.34

2838.88

Pgina 6

T:N Manual

14.06
76.21
204.57
58.76
20.67
63.24
98.22
81.31
77.67
6.78
102.88
143.54
163.50
110.08
89.93

49.90
96.46
73.15
67.05
97.36
53.45
76.25
91.95

Semirocoso
Manual

T N.

c/Maq

Tipo de Refine
Semirocoso
c/Maq

33.73
82.41

22.49
54.94

133.99
23.05
84.74

89.32
15.36
56.49

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

9.37
50.81
136.38
39.18
13.78
42.16
65.48
54.20
51.78
4.52
68.59
95.69
109.00
73.39
59.95

33.27
64.31
48.77
44.70
64.91
35.63
50.84
61.30

Distancia de Botadero

Refine e T.N

Refine en T.
semirocoso

Botadero a
R=10 Km

33.73
82.41
14.06
76.21
204.57
58.76
20.67
63.24
98.22
81.31
77.67
6.78
102.88
143.54
163.50
110.08
89.93
133.99
23.05
84.74
49.90
96.46
73.15
67.05
97.36
53.45
76.25
91.95
0.00
0.00
0.00
0.00

22.49
54.94
9.37
50.81
136.38
39.18
13.78
42.16
65.48
54.20
51.78
4.52
68.59
95.69
109.00
73.39
59.95
89.32
15.36
56.49
33.27
64.31
48.77
44.70
64.91
35.63
50.84
61.30
0.00
0.00
0.00
0.00

56.22
137.35
23.43
127.02
340.94
97.94
34.45
105.41
163.70
135.51
129.45
11.30
171.47
239.24
272.51
183.46
149.88
223.31
38.41
141.23
83.17
160.77
121.92
111.75
162.26
89.08
127.09
153.24
0.00
0.00
0.00
0.00

Botadero a
D=30 m

FORMATO DE METRADOS - MOVIMIENTO DE TIERRAS - RED DE DISTRIBUCION


SECTOR N 1.1 - LLIMPE BAJO - LOS ANGELES
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DE CHINCHEROS, DISTRITO DE CHINCHEROS, PROVINCIA DE CHINCHEROS
PROYECTO

APURIMAC
Fecha : 15 de enero 2013

SECTOR N 02 - LLIMPI
COTA FINAL

DIFERENCIA
DE COTAS

% DE
PENDIENTE

LONG
REAL

Tipos de Suelo

COTA
INICIAL

ARTERIA

J-162

J-160

284.18

2854

2839.28

J-160

J-156

34.52

2839.28

2839.34

Calle s/N

J-160

J-161

62.85

2839.28

2828.22

Calle s/N

J-116

J-117

38.47

2920.01

2915.81

Jiron 7

J-127

J-107

20.15

2913.43

2913.93

J-128

J-126

89.64

2915.21

2916.73

J-126

J-130

141.63

2916.73

2916.38

J-130

J-131

105.44

2916.38

2915.59

J-115

J-114

38.92

2911.58

2909.2

J-114

J-108

55.15

2909.2

2907.95

14.72
-0.06
11.06
4.20
-0.50
-1.52
0.35
0.79
2.38
1.25
0.61
-2.74
-0.25
0.43
-0.93
0.04
1.48
1.91
13.02
13.93
19.10
0.68
-3.55
-10.08
-5.01
-2.04
-5.81
-1.73
-5.90
0.00
-5.81
-0.52

5.18
-0.17
17.60
10.92
-2.48
-1.70
0.25
0.75
6.12
2.27
1.18
-2.74
-1.86
0.39
-0.88
0.64
1.33
13.25
13.28
7.62
18.57
2.69
-3.62
-6.41
-6.32
-4.99
-8.69
-1.99
-17.04
0.00
-6.00
-1.34

0.00
34.52
63.82
38.70
20.16
89.65
141.63
105.44
38.99
55.16
51.52
100.06
13.42
110.17
0.00
6.22
111.04
14.55
98.92
183.35
104.61
25.27
98.17
157.60
79.39
40.93
67.14
86.82
35.12
65.83
97.08
38.74

TRAMO

Caminos de Inca-IZQ

Jr s/n
Jiron 6

LONG
HORIZONTAL

J-118

J-109

51.52

2902.35

2901.74

J-109

J-121

100.02

2901.74

2904.48

Calle s/n

J-152

J-353

13.42

2875.89

2876.14

Jiron Tumbes

J-164

J-153

110.17

2862.04

2861.61

J-153

J-112

105.79

2861.61

2862.54

J-112

J-159

6.22

2862.54

2862.5

J-165

J-154

111.03

2849.33

2847.85

Jiron 4
Prolon Camino Inca
Ca a Casabamba

J-124

PRV-42

14.42

2931.91

2930

PRV-42

J-106

98.06

2930

2916.98

J-71

J-132

182.82

2938.81

2924.88

J-132

J-133

102.85

2924.88

2905.78

J-133

J-134

25.26

2905.78

2905.1

J-134

J-135

98.11

2905.1

2908.65

J-135

J-136

157.28

2908.65

2918.73

J-136

J-287

79.23

2918.73

2923.74

J-287

J-307

40.88

2923.74

2925.78

J-307

J-308

66.89

2925.78

2931.59

J-308

J-314

86.8

2931.59

2933.32

J-314

J-317

34.62

2933.32

2939.22

J-317

J-318

65.83

2939.22

2939.22

J-318

J-319

96.91

2939.22

2945.03

J-319

J-320

38.74

2945.03

2945.55

Pgina 7

T:N Manual

Semirocoso
Manual

T N.

c/Maq

0.00
20.71
38.29
23.22
12.09
53.79
84.98
63.27
23.40
33.10
30.91
60.03
8.05
66.10
0.00
3.73
66.62
8.73
59.35
110.01
62.77
15.16
58.90
94.56
47.63
24.56
40.29
52.09
21.07
39.50
58.25
23.25

Tipo de Refine

Distancia de Botadero

Semirocoso
c/Maq

Refine e T.N

Refine en T.
semirocoso

Botadero a
R=10 Km

0.00
13.81
25.53
15.48
8.06
35.86
56.65
42.18
15.60
22.07
20.61
40.02
5.37
44.07
0.00
2.49
44.42
5.82
39.57
73.34
41.84
10.11
39.27
63.04
31.76
16.37
26.86
34.73
14.05
26.33
38.83
15.50

0.00
20.71
38.29
23.22
12.09
53.79
84.98
63.27
23.40
33.10
30.91
60.03
8.05
66.10
0.00
3.73
66.62
8.73
59.35
110.01
62.77
15.16
58.90
94.56
47.63
24.56
40.29
52.09
21.07
39.50
58.25
23.25

0.00
13.81
25.53
15.48
8.06
35.86
56.65
42.18
15.60
22.07
20.61
40.02
5.37
44.07
0.00
2.49
44.42
5.82
39.57
73.34
41.84
10.11
39.27
63.04
31.76
16.37
26.86
34.73
14.05
26.33
38.83
15.50

0.00
34.52
63.82
38.70
20.16
89.65
141.63
105.44
38.99
55.16
51.52
100.06
13.42
110.17
0.00
6.22
111.04
14.55
98.92
183.35

Botadero a
D=30 m

0.00
0.00
0.00
0.00
0.00

FORMATO DE METRADOS - MOVIMIENTO DE TIERRAS - RED DE DISTRIBUCION


SECTOR N 1.1 - LLIMPE BAJO - LOS ANGELES
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DE CHINCHEROS, DISTRITO DE CHINCHEROS, PROVINCIA DE CHINCHEROS
PROYECTO

APURIMAC
Fecha : 15 de enero 2013
COTA FINAL

DIFERENCIA
DE COTAS

% DE
PENDIENTE

LONG
REAL

J-320

J-321

80.59

2945.55

2950.78

J-321

J-322

80.02

2950.78

2950.08

-5.23
0.70
31.08
10.31
57.69
39.36
17.62
22.60
17.06
14.54
17.65
14.47
10.50
20.19
11.30
22.51
10.55
2.57
32.19
36.33
4.76
25.80
-9.69
16.07
5.32
0.54
1.60
6.30
7.77
-0.52
4.23
2.00

-6.49
0.87
21.08
49.28
23.04
21.30
13.73
7.25
14.86
14.02
13.16
10.24
53.03
14.74
12.21
27.60
73.06
0.65
15.03
10.24
5.56
13.47
-10.01
21.53
42.46
1.28
9.52
11.04
16.16
-1.39
11.99
3.53

80.76
80.02
150.68
23.32
256.99
188.96
129.57
312.62
116.05
104.75
135.23
142.01
22.41
138.45
93.23
84.60
17.88
396.34
216.60
356.57
85.77
193.24
97.29
76.34
13.61
42.22
16.88
57.40
48.70
37.36
35.53
56.71

TRAMO

Vinobamba

Vinobamba

Los Angeles -1

Calle 2

SECTOR N 02 - LLIMPI

Tipos de Suelo

COTA
INICIAL

ARTERIA
LONG
HORIZONTAL

J-322

PRV-33

147.44

2950.08

2919

PRV-33

J-323

20.92

2919

2908.69

J-323

PRV-34

250.43

2908.69

2851

PRV-34

J-324

184.82

2851

2811.64

J-324

J-325

128.37

2811.64

2794.02

J-325

J-326

311.8

2794.02

2771.42

J-318

J-327

114.79

2939.22

2922.16

J-327

J-328

103.74

2922.16

2907.62

J-328

J-329

134.07

2907.62

2889.97

J-329

PRV-11

141.27

2889.97

2875.5

PRV-11

J-330

19.8

2875.5

2865

J-330

J-331

136.97

2865

2844.81

J-331

J-332

92.54

2844.81

2833.51

J-332

PRV-12

81.55

2833.51

2811

PRV-12

J-333

14.44

2811

2800.45

J-333

J-334

396.33

2800.45

2797.88

J-334

J-335

214.19

2797.88

2765.69

J-335

J-336

354.71

2765.69

2729.36

J-335

J-337

85.64

2765.69

2760.93

J-330

J-338

191.51

2865

2839.2

J-329

J-339

96.81

2889.97

2899.66

J-136

J-285

74.63

2918.73

2902.66

J-314

PRV-14

12.53

2933.32

2928

PRV-14

J-304

42.22

2928

2927.46

J-304

J-303

16.8

2927.46

2925.86

J-303

J-302

57.05

2925.86

2919.56

J-302

J-306

48.08

2919.56

2911.79

J-298

J-299

37.36

2922.24

2922.76

J-299

J-300

35.28

2922.76

2918.53

J-300

J-301

56.67

2918.53

2916.53

Pgina 8

T:N Manual

Semirocoso
Manual

T N.

c/Maq

48.46
48.01
90.41
13.99
154.19
113.38
77.74
187.57
69.63
62.85
81.14
85.21
13.45
83.07
55.94
50.76
10.73
237.80
129.96
213.94
51.46
115.94
58.38
45.80
8.17
25.33
10.13
34.44
29.22
22.42
21.32
34.02

Tipo de Refine
Semirocoso
c/Maq

Refine e T.N

Refine en T.
semirocoso

32.30
32.01
60.27
9.33
102.80
75.59
51.83
125.05
46.42
41.90
54.09
56.80
8.96
55.38
37.29
33.84
7.15
158.54
86.64
142.63
34.31
77.30
38.92
30.54
5.45
16.89
6.75
22.96
19.48
14.95
14.21
22.68

48.46
48.01
90.41
13.99
154.19
113.38
77.74
187.57
69.63
62.85
81.14
85.21
13.45
83.07
55.94
50.76
10.73
237.80
129.96
213.94
51.46
115.94
58.38
45.80
8.17
25.33
10.13
34.44
29.22
22.42
21.32
34.02

32.30
32.01
60.27
9.33
102.80
75.59
51.83
125.05
46.42
41.90
54.09
56.80
8.96
55.38
37.29
33.84
7.15
158.54
86.64
142.63
34.31
77.30
38.92
30.54
5.45
16.89
6.75
22.96
19.48
14.95
14.21
22.68

Distancia de Botadero
Botadero a
R=10 Km

Botadero a
D=30 m

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FORMATO DE METRADOS - MOVIMIENTO DE TIERRAS - RED DE DISTRIBUCION


SECTOR N 1.1 - LLIMPE BAJO - LOS ANGELES
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE DE CHINCHEROS, DISTRITO DE CHINCHEROS, PROVINCIA DE CHINCHEROS
PROYECTO

APURIMAC
Fecha : 15 de enero 2013

SECTOR N 02 - LLIMPI
% DE
PENDIENTE

LONG
REAL

J-297

J-296

39

2913.03

2911.03

J-296

J-290

33.65

2911.03

2909.49

J-290

J-291

58.43

2909.49

2906.38

J-291

J-292

36.17

2906.38

2910.16

J-292

J-293

48.09

2910.16

2892.25

J-293

J-294

168.05

2892.25

2877.66

Calle 4

J-288

J-289

35.44

2906.44

2900.51

Calle 5

J-298

J-297

34.66

2922.24

2913.03

Calle 6

J-303

J-300

34.28

2925.86

2918.53

J-300

J-290

24.71

2918.53

2909.49

J-290

J-289

42.44

2909.49

2900.51

J-301

J-291

38.4

2916.53

2906.38

J-291

J-295

22.4

2906.38

2899.73

2.00
1.54
3.11
-3.78
17.91
14.59
5.93
9.21
7.33
9.04
8.98
10.15
6.65

5.13
4.58
5.32
-10.45
37.24
8.68
16.73
26.57
21.38
36.58
21.16
26.43
29.69

39.05
33.69
58.51
36.37
51.32
168.68
35.93
35.86
35.05
26.31
43.38
39.72
23.37

TRAMO

Calle 3

Calle 7

LONG
HORIZONTAL

COTA
INICIAL

DIFERENCIA
DE COTAS

Tipos de Suelo

COTA FINAL

ARTERIA

PARCIAL:
Long.

12648.79

13568.95

T:N Manual

1917.00

Semirocoso
Manual

1278.00

Tipo de Refine
Semirocoso
c/Maq

Refine e T.N

Refine en T.
semirocoso

23.43
20.21
35.11
21.82
30.79
101.21
21.56
21.52
21.03
15.79
26.03
23.83
14.02

15.62
13.47
23.41
14.55
20.53
67.47
14.37
14.35
14.02
10.52
17.35
15.89
9.35

23.43
20.21
35.11
21.82
30.79
101.21
21.56
21.52
21.03
15.79
26.03
23.83
14.02

15.62
13.47
23.41
14.55
20.53
67.47
14.37
14.35
14.02
10.52
17.35
15.89
9.35

5672.28

3781.52

7589.27

5059.51

T N.

c/Maq

Distancia de Botadero
Botadero a
R=10 Km

Botadero a
D=30 m

7316.73

0.00

(m)
CLASIFIC. DE TERRENO :
T. N. Manual
EXCAVACION DE ZANJA

Semirocosa Manual
T.N. C/Maq
Semirocosa c/Maq

1917.00
1278.00
5672.28
3781.52
12648.79

REFINE

M
M
M
M

NORMAL :

7589.27

SEMI ROCA 5059.51

BOTADERO
10 KM

7316.73

30 M

0.00

7316.73

Roca
12,648.79

Pgina 9