Академический Документы
Профессиональный Документы
Культура Документы
Document:
Effective Date:
Project: ______________________________
Location: ____________________________
Incharge: ____________________________
A. Formwork & Survey
Inspection ready date : _______________________
Engineer: ___________________________________
Formwork Supervisor: ________________________
Survey Supervisor: ___________________________
a.Site cleanliness
b.Surface condition
i.Form oil
ii.Gaps
iii.Surface wear & tear
c.Support stability
d.Initial line/level checking before rebar placing
Time: ______________
Foreman: __________________________
Ok/Not Ok
Ok/Not Ok
Ok/Not Ok
Ok/Not Ok
Ok/Not Ok
Ok/Not Ok
Ok all grids / Not Ok
B. Rebar Placing
Inspection ready date : _______________________
Engineer: ___________________________________
Supervisor: _________________________________
Brand of steel: ______________________________
Column Rebar check
Diameter of rebar
Laping of Rebar length/position
Main bar nos. requied as per drawing
Dia of stirrups placing and nos.
Concrete cover blocks bottom
C. Concrete Pour
QC Engineer: _______________________________
Supervisor: ________________________________
Concreting date: ____________________________
Actual cement used (bags): _________
Line/Level
Formwork Stability
Concrete mix ratio
a.Column ratio:
b. Slab & beam ratio:
c.Material stock at site
i. Aggregate at site (cft) __________
ii. Sand (cft) ____________________
iii.Cement brand (bags) __________
iv. Chemical name & quantity ________________
Time: ______________
Foreman: __________________________
Ok/Not
Ok/Not
Ok/Not
Ok/Not
Ok/Not
Ok
Ok
Ok
Ok
Ok
QC Foreman: __________________________
Foreman: ___________________________
Volume of concreting (cft.): ___________
Ok/Not Ok
Ok/Not Ok
W/C Ratio: ________
W/C Ratio: ________
D. Equipment
Mechanics: _________________________________
a. Vibrators
Nos: ___
b. Mixture
c. Dumper
d. Wheel barrows
Operator: _____________________
Ready/Not Ready
Ready/Not Ready
Ready/Not Ready
Ready/Not Ready
Ok/Not Ok
Ok/Not Ok
Started Date: ____________________
F. Lab Engineer
Cube Conditon: ___________
No of cubes: ________
______________
Checked by
Engineer
______________
Approved by
Project Manager