Subject: MAYDAY MAYDAY MAYDAY TWO - Flange to Flange BALL VALVE ALLOWS SHUTTING DOWN OIL SPILL without ROV Welding.
Attachments: 052310DrillingAheadHMF-ClassH21InchRiser90Foottransocean5.bmp

Importance: High

MAYDAY MAYDAY MAYDAY TWO -- FLANGE TO FLANGE BALL VALVE ALLOWS SHUTTING DOWN OIL SPILL WITHOUT
ROV WELDING !

Ladies and Gentlemen:

Earlier we have continuously stated OVER AND OVER that the Branko R. Babic Counter Pressure PLUG or CPP WITH
OR WITHOUT THROUGH PIPING AND SHUTOFF VALVE would easily shut down the Runaway Well in the Gulf of Mexico
where Deepwater Horizon CRIME SCENE is located.

After sleeping over 8 hours on the problem last night it was revealed that the Actual Riser Pipe is in 90 foot sections of
HMF-ClassH 21 Inch Riser 90 foot FLANGED SECTIONS. See picture:

1
NOW THINK OF THIS. Take one 90 foot
SECTION and cut away the Bottom and
TOP flange, weld a 15,000 PSI BALL VALVE
PERHAPS WITH ROUND WHEEL FOR ROV TO
TURN OFF. Use Oceaneering ROV to CUT
BOLTS AND NUTS ON ONE SECTION AWAY
FROM BOP OR ON TOP OF BOP THEN PUT
ONE LONG BOLT THROUGH WELDED TOP
NUT TO BODY OF FLANGE TO KEEP IN PLACE
THEN TAKE IT TO THE SITE, REMEMBERING
WHICH WAY IS INLET SIDE AND LOWER TO
OCEAN FLOOR WHERE ROV WILL POSITION
AND ATTACH NUTS PLUS WASHER UNTIL
ALMOST DOWN TO FLANGE CONTACT. THEN
SWING UNIT OVER IN POSITION WITH BALL
VALVE AND UPPER FLANGE WIDE OPEN AND EVEN
ATTACH PERHAPS A SHORT 10 FOOT FLEXIBLE STEEL
PIPE SO THE PRESSURE AND OIL CAN STAY AWAY
FROM THE CONTACT FLANGE THEN ROTATE OVER THE
PROPER LOCATION AND PUSH DOWN INTO PLACE.

ONCE IN PLACE INSERT NEW LONG BOLTS WITH ROV


USING DEEP WELL SOCKET TO HYDRAULICALLY TIGHTEN
SAME THEN LEAVE THE LONG BOLT IN PLACE TIGHTENING
NUTS ON SAME UNLESS DAMAGED THEN THE TACK WELD
CAN BE CUT AWAY AND NEW BOLT INSTALLED.

ONCE THIS IS SEATED THEN ROV CAN ATTACH PIPING TO


THE FLEXIBLE STEEL PIPE WHICH HAS A SHUTOFF VALVE
AND FLANGE AT THE TOP TO HOOK UP LINES TO THE
SURFACE.

ADVANTAGE --- NO GAS, OIL, WATER FLOWING INTO THE GULF


2
IN A SPILL ATTITUDE. NO HYPERBARIC CHAMBER AND ROV WELD.
YOU CAN CHECK ALL WELDS ABOVE GROUND WITH XRAYS THEN
BE SURE IT WILL NOT LEAK OR FRACTURE.

BENEFIT ---- PRICELESS ! AND SAVING THE GULF AND EAST COAST
PLUS ISLANDS !

YOU CAN DO IT WITHIN 8 HOURS ALSO FOLKS…..ONE SECTION OF RISER


SACRIFICED BUT THINK OF REMOVING ONE 90 FOOT SECTION CUT AWAY
WITH THE CHOP SAW AT A POINT WHERE THE FLANGED BALL VALVE CAN
BE INSERTED IMMEDIATELY AND SAVE THE GULF SHUTTING DOWN THE
SPILL SUPER FAST.

THINK ABOUT IT BP AND GET THE EXPERTS TO LOOK AT THE SECTION


IN A YARD THEN THINK OF ATTACHING VALVES WELDED ON THE TWO
SIDE PIPES WHICH USED TO ALLOW HYDRAULIC FLUID TO THE BOP AND
ALLOW MUD PERHAPS TO THE UNIT. THAT TOO CAN HAVE NEW HOOKUPS TO ALLOW USE IN THE FUTURE WITH
LINES FROM THE SURFACE IF DESIRED. SEE http://www.scribd.com/ralphwhitleysr

MAYDAY MAYDAY MAYDAY TWO -- FLANGE TO FLANGE BALL VALVE ALLOWS SHUTTING DOWN OIL SPILL WITHOUT
ROV WELDING !

Ralph Charles Whitley, Sr. CFC032631


Backflow Prevention, Inc.
4532 W. Kennedy Blvd. PMB-276
Tampa, Florida 33609-2042
Phone: 813-286-2333
Skype: ralphwhitleysr

052310 @ 9:26 AM Eastern or 14:26 PM UCT England

Вам также может понравиться