ANALYSIS PHASE

Learners will be required to complete the different activities about


structures.
Scenario
Two villages which have been separated by a river of which the are
secondary schools on the other side, while the is a primary
school and supper market on the other side.
Learners have to answer the following questions
(1) Identify a problem from the above scenario.
a. indicate the problem.
b. who are affected.
c. how are they affected.
(2) Give a solution to the problem.
(3) Determine the time frame and environment impact.
(4) Make a free hand drawing, design a structure which can be used as a
solution to the problem identified.
a. draw arrows to show how the weight of the road and the traffic on it
is distributed.
b. the drawings should have initial idea 1, 2 and chosen idea of which
each one match the specification which shall have been listed in the
solution of the problem.
(5) Indicate the type of the load that will be carried by the structure.
(6) Calculate the total cost of material.

ITEM PURPOSE UNIT PRICE COST


Cement Brick wall 1 bag R70 per bag
Bricks Single brick wall R2.50 each
3m long, 2m
high, 55
bricks/m²
Pit sand Brick wall ¾m³ R400 per m³
needed
Plaster sand Brick wall: ½m³ R600 per m³
needed
Steel rod Reinforcement R199. 00 each
4x3m long, 2m
width