• Introduction Objective
Provide a major development which will not only
• Site Aerial and Panoramic Photos. regenerate the existing Kirkby Town Centre but
provide the imputes for future development
• Concept Sketches within the Knowlsey Area.

The development will comprise a purposed built


• Masterplan 50 000 seater stadium for Everton Football Club
integrated into a Retail Regeneration Develop-
• 3D Wireframe Massing ment

• 3D Sketch Perspective Development Criteria


• Retain Existing Green Belt along Valley Road
• Perspective View • Extend Existing Town Centre
• Relocate Existing Knowsley Community Col-
lege
• Relocate Existing All Saints High School
• Demolish Existing Buildings Fabric along
Northern Boundary

Accommodation:
• 50 000 Seater Stadium
• 350 000 sq.ft. Retail Units
• Tesco Extra Food Store
• 100 Room Luxury Hotel
• 500 Residential Units
• Offices

1
Site Aerial and Panoramic Photos

1
1

2
2

6 3

4
3

Aerial Photo Panoramics

4
Concept Sketches

Concept Zones

Concept Plan Concept Plan Developed

7
Concept Sketches

3D Concept Perspective

3D Concept Perspective Concept Axonometric

8
Masterplan
3D Wireframe Massing

South Western Perspective 3D Wire Perspective

10
3D Sketch Perspectives

South Eastern Perspective

South Western Perspective North Eastern Perspective

10
10
Coventry as Precedent

• Coventry Arena Shopping Park, Shopping


Mall and Stadium Scheme proposed by Cov-
entry Football Club on highly contaminated
British Gas site.

• Coventry football club relegated to 1st divi-


sion, project falters with financial difficulties.

• Tesco promote new scheme in partnership


with local authority.

• Tesco design team achieve Masterplan ap-


proval for whole scheme, and commence
£18 million Decontamination of entire site.

• Construction commences January 2004.

• Shopping park,Tesco and Mall completed


November 2004.

• Stadium, Casino and Conference Centre


open August 2005.