0 оценок0% нашли этот документ полезным (0 голосов)
77 просмотров1 страница
This document is a drilling application for spotting heavy mud. It contains information about the current well conditions including measured depth, mud weight, and needed bottomhole pressure. It also includes details on well geometry such as hole size and pipe dimensions. The application calculates volumes of heavy mud needed to spot different sections of the wellbore and verifies the calculated spot volume. It provides capacity details for different annuli and drill components.
This document is a drilling application for spotting heavy mud. It contains information about the current well conditions including measured depth, mud weight, and needed bottomhole pressure. It also includes details on well geometry such as hole size and pipe dimensions. The application calculates volumes of heavy mud needed to spot different sections of the wellbore and verifies the calculated spot volume. It provides capacity details for different annuli and drill components.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате XLS, PDF, TXT или читайте онлайн в Scribd
This document is a drilling application for spotting heavy mud. It contains information about the current well conditions including measured depth, mud weight, and needed bottomhole pressure. It also includes details on well geometry such as hole size and pipe dimensions. The application calculates volumes of heavy mud needed to spot different sections of the wellbore and verifies the calculated spot volume. It provides capacity details for different annuli and drill components.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате XLS, PDF, TXT или читайте онлайн в Scribd
DRILLING APPLICATION SPOTTING HEAVY MUD Date: September 18, 2010 CONDITIONS WELL GEOMETRY D. Collars Hevi-Wt. Drill Pipe Current Measured Depth, ft? = Length, ft? = 0 Current Mud Weight, ppg? = Hole Size, in? = 8.5 Needed BHP to Stabilize Well, ppg? = Pipe OD, in? = 5 Desired Density of Mud to Spot, ppg? = Pipe ID, in? = 4.28 RESULTS VOLUMES and VERIFY Spot length without drill string in place 0 BBLS Spot to cover Drill Collars 0 Barrels of heavy mud to spot 0 BBLS Spot to cover HWDP 0 Length of spot with drill string in place #DIV/0! BBLS of Spot for remaining open hole 0 Barrels needed to displace spot #DIV/0! Verification Spot Volume is Correct OKAY CAPACITY Open Hole, bbl/ft 0.00000 HWDP, bbl/ft 0.00000 Drill Collar Annulus, bbl/ft 0.00000 Drill Pipe Annulus, bbl/ft -0.02429 Drill Collar, bbl/ft 0.00000 Drill Pipe, bbl/ft 0.01776 HWDP Annulus, bbl/ft 0.00000 The Results are for a straight hole… LAST UPDATE DECEMBER 1994 THE END APPLICATION CREATED IN 1993