Академический Документы
Профессиональный Документы
Культура Документы
No. Item DESCRIPTION Uni Quanty Unit Price Total Unit Price
2 6" Yellow Thermoplastic Traffic Stripe Solid. L.F. 1,640 $2.00 $3,280.00 $1.00
3 6" White Thermoplastic Traffic Stripe Solid. L.F. 1,087 $2.00 $2,174.00 $1.00
4 24" White Thermoplastic Traffic Stripe Solid. L.F. 110 $10.00 $1,100.00 $5.00
6 Asphaltic Concrete Type S-III Resurfacing (100 lb/sy avg.). S.Y. 7,866 $7.00 $55,062.00 $5.50
9 Concrete Sidewalk (4" Thick, Including Pedestrian Ramps.). S.Y. 732 $34.00 $24,888.00 $9.00
11 18" HDPE Storm Sewer, Any Depth of Cut. L.F. 204 $30.00 $6,120.00 $115.00
12 24" HDPE Storm Sewer, Any Depth of Cut. L.F. 78 $40.00 $3,120.00 $125.00
13 24" HDPE French Drain, Any Depth of Cut. L.F. 844 $120.00 $101,280.00 $125.00
14 Catch Basin w/3' Round Type P Structure Bottom (<10'). EA. 5 $1,500.00 $7,500.00 $1,800.00
15 Catch Basin w/4' Round Type P Structure Bottom (<10'). EA. 9 $2,000.00 $18,000.00 $2,500.00
16 Catch Basin w/5' Round Type J Structure Bottom ((<10') EA. 2 $3,000.00 $6,000.00 $3,000.00
17 Manhole w/4' Round Type P Structure Bottom (<10'). EA. 2 $2,000.00 $4,000.00 $2,200.00
20 DUST CONTROL (Every Day for the Duration of Project) L.S. 1 $2,000.00
Total Unit Price Total Unit Price Total Unit Price Total Unit Price
Total Unit Price Total Unit Price Total Unit Price Total Unit Price
Total Unit Price Total Unit Price Total Unit Price Total Unit Price
$50,000.00 $51,750.00
$5,000.00 $17,250.00
$10,000.00 $11,500.00
$60,000.00 $11,500.00
$20,000.00 $20,000.00
$494,613.50 $520,188.82