50 Kw project

Intro :- complete turnkey basis


Development , financing support & EPC
Optimum solution for low losses , max output .

Benefits :- Govt promting , JNNMS mission


Subsidy – Rs 70/watt grid connection.

Rs 90 / watt Off- grid .

Or

30% Project cost which ever is less.

Soft loan at 5% Per annum .

Benchmark Price
Rs 300 / Wp for off- grid .
Rs 210 / Wp for Grid connection .

Funding
70% on sanction .
30 % on completion.

Approval mechanism .
45 days

Beneficial Points
• Reduction in more that 60 tonnes Co2 emission

• Grid connection can save pto 20 – 30 % total cost in compare to off – grid
battery type and battery losses too.

• Saving of Rs 26646.16 Per month , energy profit @ rate of 4.14 Rs Per


month ,

Avrage saving annually is 3.19 Lakhs .

• 50 Kw , 30 day Sunlight for 5 hr / day

• Produces = 250 Kwh / day


i.e 7500 Kwh / month

7500 units

• Tracking system (optional) Dual Axis will increase the efficiency by 27 %


w.r.t fixed type mounting system .

• Operational cost is very low than the capital investment

• Solar panels SUNGEN ( Hong Kong) , IEC Certified with 25 year of


warranty on efficiency .

TUV , UL Certificate.

• Annual Energy feed 72.2 Mw , for grid connected .

 Metering – 15 min time interval , at output of inverter billing purpose net


export Export & import .

 Levelised Tariff - (Rs / Kwh ) 18 .45 or Rs / unit

 AC power is stepped up by 415 / 11Kv Feed it to the grid .

 Life – 25 Year , after that Efficiency reduced to 80- 75 %

 Excise duty is exempted as per MNRE consideration .

 Packing , forwarding , inland transport , insurance @ 2.5 % for all


equipment .
COMPONENTS USED

1. Solar PV modules

2. Structure – MS Hot Dip Galvanized.

3. Field junction box.

4. Main junction box .

5. Grid – tie inverter – synchronized , meter equivalent and data logging

6. Ground fault protection system.

7. Cordless modem / Web box etc.

8. Cables

9. Lightning Arresters.

10. Earthning.
Energy Profits
Array Type: Fixed Tilt

Station Identification Results


City: New Delhi Solar AC Energy
Month Radiation Energy Value
Country/Province: IND
(kWh/m2/day) (kWh) (rupee)
Latitude: 28.58° N
1 5.56 6192 25634.88
Longitude: 77.20° E
2 5.90 5778 23920.92
Elevation: 216 m
3 6.65 7046 29170.44
Weather Data: IWEC
4 7.01 6995 28959.30
PV System Specifications 5 6.91 6925 28669.50
DC Rating: 50.0 kW 6 6.34 6139 25415.46
DC to AC Derate Factor: 0.770 7 5.28 5332 22074.48
AC Rating: 38.5 kW 8 5.25 5376 22256.64
Array Type: Fixed Tilt 9 5.89 5843 24190.02
Array Tilt: 28.6° 10 6.17 6400 26496.00
Array Azimuth: 180.0° 11 5.74 5864 24276.96
Energy Specifications 12 5.56 6053 25059.42
Energy Cost: 4.1400 rupee/kWh

Year 6.02 73941 306115.72


Array Type: 1-Axis Tracking

Station Identification Results


City: New Delhi
Solar AC Energy
Country/Province: IND Month Radiation Energy Value
(kWh/m2/day) (kWh) (rupee)
Latitude: 28.58° N
1 6.56 7281 30143.34
Longitude: 77.20° E
2 7.07 6955 28793.70
Elevation: 216 m
3 8.05 8579 35517.06
Weather Data: IWEC
4 8.63 8609 35641.26
PV System Specifications
5 8.49 8546 35380.44
DC Rating: 50.0 kW
6 7.89 7700 31878.00
DC to AC Derate
0.770
Factor: 7 6.23 6298 26073.72
AC Rating: 38.5 kW 8 6.21 6379 26409.06
1-Axis Tracking 9 6.96 6926 28673.64
Array Type:
10 7.33 7588 31414.32
Array Tilt: 28.6°
11 6.77 6953 28785.42
Array Azimuth: 180.0°
12 6.47 7028 29095.92
Energy Specifications
4.1400
Energy Cost:
rupee/kWh
Year 7.22 88842 367805.88
Array Type: 2-Axis Tracking

Station Identification Results


City: New Delhi
Solar AC Energy
Country/Province: IND Month Radiation Energy Value
(kWh/m2/day) (kWh) (rupee)
Latitude: 28.58° N
1 7.02 7729 31998.06
Longitude: 77.20° E
2 7.29 7156 29625.84
Elevation: 216 m
3 8.13 8668 35885.52
Weather Data: IWEC
4 8.80 8779 36345.06
PV System Specifications
5 8.94 8981 37181.34
DC Rating: 50.0 kW
DC to AC Derate 6 8.51 8276 34262.64
0.770
Factor: 7 6.60 6656 27555.84
AC Rating: 38.5 kW 8 6.39 6557 27145.98
2-Axis
Array Type: 9 7.00 6975 28876.50
Tracking
10 7.47 7720 31960.80
Array Tilt: N/A
Array Azimuth: N/A 11 7.18 7309 30259.26

Energy Specifications 12 7.04 7557 31285.98

4.1400
Energy Cost:
rupee/kWh

Year 7.53 92362 382378.66


Energy Profit on the basis for New Delhi- electricity Prices – 4.14 Rupee/
Kwh
i.e - Avg solar radiation – 6.02

Break Even Point (including subsidy)

1st case – 19 yrs


2nd case – 16.6 yrs
3rd care – 16 yrs

 Estimated cost 85 Lakhs – based on normative cost Rs 17 Crore /Mw


adopted by CERC notification Date 16th September.

50 Kw solar plant Specifications


Area for SPV Plant – 450 sq mtrs

SPV Power Plant


-Output 50 kW p
-No. of modules 180
-No. of modules in series 6
-No. of parallel combination 30
-DC BUS 1 No.

Technical details of a SPV Module

(a) PV Module type


- Poly crystalline
- 180 modules
- Rs 87/ watt
-7 x 26 string x modules.

(b) Physical Dimensions


-Length with frame 1957 mm
-Width with frame 990 mm
-Thickness 40 mm
(c)Electrical Parameter
-Maximum Power Rating = 280 kWp
-Rated Current = 7.93 A
-Rated Voltage = 35.3 V
-Short Circuit Current = 8.76 A
-Open Circuit Voltage = 43.77 V

Mounting Arrangement
-Mounting Fixed Type
-Surface azimuth angle of PV Module = 180o
-Tilt angle (slope) of PV Module = 28.32o
- Rs 49 Per Kg
- MS Hot dip galvanized.
- C/s “L” Section.

Inverter specifications
- 7 inverters
- 97 % peak efficiency
- UL certification (UL 1741/IEEE 1547)
- Grid voltage 420 and 11kv supply
- Max. DC power 8.6 Kw
- Nominal volt = 345 v
- AC nominal power = 7.6 Kw
- AC voltage range 211 – 264 V
244 – 305 V

- Max. output current = 32


- Max. efficiency = 96.3 %
96.5 %

Cables and Transformers


- copper wiring
- DC side 5 mm sq , loss = 0.55%
- AC side 6 mm sq , loss 0.72%
- Step up transformer
440v , 3ph , 50 Hz
COST OF GENERATION AND APPLICABLE TARIFF

Cost of Generation for Small Solar Systems

Summary of various parameter assumptions for the purpose of determination of


year-to-year cost of generation and levellised tariff thereof, is presented under
following table: (It is calculated for standard 1Mw capacity)

Table: Summary of Parameter assumptions

Parameters Unit Value Remarks

Plant Capacity MW 1

Capital Cost Rs Lakh/ MW 1740

Useful life years 25

Tariff Period years 25

Debt : Equity D:E 70 : 30

Debt component Rs Lakh/MW 1218

Equity component Rs Lakh/MW 522


Parameters Unit Value Remarks
Interest Rate % p.a. 13.37% SBAR (11.87%) +
150 basis points,
(based on wt. avg.
SBAR of 12.25% and
11.75% for the
Loan tenure years 10
Depreciation % p.a. 7% for first 10 years
and 1.33% for
remaining period of
useful life
Return on equity % p.a. 19% for initial 10 Pre-tax return on equity
years and 24% for
subsequent period
Discount rate % 15.96% Equivalent to WACC
Interest on % p.a. 12.87% SBAR (11.87%) +
working capital 100 basis points,
(based on wt. avg.
SBAR of 12.25% and
11.75% for the
Working Capital 1 mth O&M expense
requirement
15% of O&M expense
as maintenance
spares and
receivables of 2
months
Capacity % p.a. 18%
Utilisation Factor
Operation and Rs L/MW 11 For FY 2010-11
Maintenance
expense

Parameters Unit Value Remarks

Escalation factor % p.a. 5.72%


for O&M expense
The Levellised Cost of Generation for rooftop PV and other small solar
power projects, in accordance with the assumptions outlined above work out
to Rs 19.57
/kWh.

Applicable Tariff (Proposed):

Accordingly, it is proposed that Tariff for Small Solar Systems (< 1 MW)
may be determined as Rs 19.57/kWh to be valid for period of 25 years
from the date of commissioning provided that such small solar projects (<1
MW) are commissioned on or prior to March 31, 2012 in case of small solar
PV and on or prior to March 31, 2013 in case of small solar thermal power
projects.

Summary of Capital Cost


Sr Components Cost
no..
1 Pv Modules 43.52 lakhs

2 Inverters 13.7 lakhs

3 Mounting structures 10.9 lakhs

4 Cables and Transformers 3.51 lakhs

5 Civil and generation cost 2.7 lakhs

6 Preliminary and pre-operative 5 lakhs


cost
7 Operation and maintenance cost 0.60 lakhs escalates @ 5.72 % per year

8 TOTAL Approximate 85 - 90 lakhs

*(Land Price and subsidy not included)


Subsidy :-

Grid connected – 25 lakhs according to Rs 70 / watt


OR
27 lakhs according 30 % Capital cost

(Lesser value is considered )

Reference : CERC “Central Electricity Regulatory Commission ”