Page No. 1 of 6
Jobs Safety Analysis
Effective Date 15/01/09
Project Name: Cadangan Pmbangunan Bangunan Tambahan Bagi ibu Pejabat polis kontijen Kuala Location:
Lumpur (IPK KL) Serta Komponennya Di Atas Lot PT112,Seksyen 56,Mukim ,Bandar Kuala Lumpur.
1
MITISA HOLDINGS SDN BHD Revision No. 0
Page No. 2 of 6
Jobs Safety Analysis
Effective Date 15/01/09
Responsible
Item Job Steps Hazards Effects Risk Rating Controls
Person
1 General planning 1. Traffic problem. Serious 3 L 1. Traffic control by signalman with Piling supervisor
Illness / Injury flag.
Mobilization of rig. 2. Poor Access. Major Damage 3 L Foreman
2 Access ways and unloading zone
identified. Rig operator
2 Mobilization , 1. Slips, trips and falls; Fatality/ 12 H 1.Work area to be kept clear at all Piling supervisor
Unloading and abrasions, strains and Permanent times – no storing of materials
Assembly of rig sprains; manual handling Disability and/or rubbis Foreman
injuries such as back
damage.
Crane driver
2. Load unbalance. Fatality/ 8 M 2 Piling rig seating on 2 nos. of steel
Permanent plates. Piling rig operator.
Disability 2.1 Usage of crane for lifting
activities.
2.2 Usage of tagline to guide load.
4 Deformed wire rope and Serious 9 H 4 All wire rope and sling are to be
sling. Illness / inspected prior to usage.
Injury Major
5. Fall of equipment / Damage H 5. Pile lifting zone to be cleared when
materials lifting is in progress.
2
MITISA HOLDINGS SDN BHD Revision No. 0
Page No. 3 of 6
Jobs Safety Analysis
Effective Date 15/01/09
Responsible
Item Job Steps Hazards Effects Risk Rating Controls
Person
3 Stockpiling of piling 1. Congestion M 1. Sufficient area for stock piling Piling supervisor
materials. taking into consideration the
M distance from stock area to work Foreman
zone.
Crane driver
2. Trips and falls L 2. Correct stacking manner
4. Lifting of pile and 1. Fall of material due to H 1. Ensure wire rope and sling are Piling supervisor
placing into casing snapping of wire rope or examined and tested. Homemade
prior to be driven to unsecured placement in splice is prohibited. Foreman
the design depth. the casing.
1.1 Area to be kept clear other than Piling rig operator.
responsible person for the task.
3
MITISA HOLDINGS SDN BHD Revision No. 0
Page No. 4 of 6
Jobs Safety Analysis
Effective Date 15/01/09
Responsible
Item Job Steps Hazards Effects Risk Rating Controls
Person
2.1 Care in lifting and maneuvering of
Pile. Usage of tag line to control
the swinging of pile.
5 Welding of pile joints 1.Burn on body parts M 1. Welder to be certified and Piling supervisor
for continuation of specifically face cause by experienced.
driving exposure to welding arc Foreman
1.1 Full face shield with smoked
Glass and welding glove Welder
2. Fire extinguisher to be on site.
2. Fire caused by welding L
sparks 2.1 Ensure no flammable materials at
the work area.
4 Personnel Protection 1. Personnel injury M 1. All site personnel shall at all times All Personnel
wear the minimum Personnel
Protection Equipment
Project Manager
5 Monitor Compliance The Project Manager or the appointed or
personal shall on a weekly basis audit Appointed Personal
this procedure.
Qualifications and experience required to complete the task: Personnel, Duties and Responsibilities (Supervisory staff Training Required to Complete Work:
and others):
This SWMS/JSA has been developed through consultation with our employees and has been read & signed by all employees undertaking the works:
Print Names Signature Date Print Names Signature Date
RISK MATRIX.
Probability Could occur i.e Know To Occur i.e Know To Be A
Practically
Not likely to Occur heard of Has Happened in Common Or
Impossible
Consequence happening The Past. Repeating Occurrence
5
MITISA HOLDINGS SDN BHD Revision No. 0
Page No. 6 of 6
Jobs Safety Analysis
Effective Date 15/01/09
Minor illness /injury Minor Damage Required first Aid Treatment : repairable / immediate replacement
Moderate illness /Injury Damage Out patient / 4 days and less MC: repairable but limited workdays
Serious Illness / Injury Major Damage Warded / temporary disability / more than 4 days MC irreparable / total lost