Академический Документы
Профессиональный Документы
Культура Документы
http://www.opsys4u.com
50 Main Duct
PC&ABS
OP-05MD 59 X 54.5 X 2.0T
(Halogen Free)
Length : 2,000mm
MAIN DUCT
OP-0305MDC 36 X 8 X 1.5T
(Halogen Free)
Length : 2,000mm
100 H-Cross
PC&ABS
OP-10CA 260 X 106 X 3.0T
(Halogen Free)
Length : 260mm
160 H-Cross
PC&ABS
OP-16CA 300 X 106 X 3.5T
CROSS
(Halogen Free)
Length : 300mm
220 H-Cross
PC&ABS
OP-22CA 360 X 106(+5) X 3.5T
(Halogen Free)
Length : 360mm
300 H-Cross
PC&ABS
OP-30CA 440 X 106(+5) 3.5T
(Halogen Free)
Length : 440mm
30X50 H-Tee
PC&ABS
OP-0305TA 75 X 52.5 X 1.5T
(Halogen Free)
Length : 55.5mm
100 H-Tee
PC&ABS
OP-10TA 260 X 106 X 3.0T
(Halogen Free)
Length : 183mm
TEE
160 H-Tee
PC&ABS
OP-16TA 300 X 106 X 3.5T
(Halogen Free)
Length : 233.5mm
220 H-Tee
PC&ABS
OP-22TA 360 X 106(+5) X 3.5T
(Halogen Free)
Length : 293.5mm
300 H-Tee
PC&ABS
OP-30TA 440 X 106(+5) X 3.5T
(Halogen Free)
Length : 373.5mm
Length : 192.5mm
50 V-Elbow 45’ Up
PC&ABS
OP-05UA 54 X 63 X 2.0T
(Halogen Free)
Length : 99mm
100~50 Reducer
PC&ABS
OP-10RD 106 X 106 X 3.0T
(Halogen Free)
Length : 110mm
REDUCER
160~100 Reducer
PC&ABS
OP-16RD 167 X 106 X 3.5T
(Halogen Free)
Length : 125mm
220~160 Reducer
PC&ABS
OP-22RD 227 X 106 X 3.5T
(Halogen Free)
Length : 140mm
300~220 Reducer
PC&ABS
OP-30RD 307 X 106(+5) X 3.5T
(Halogen Free)
Length : 150mm
Length : 114.5mm
50 Outlet Trumpet
PC&ABS
OP-05TP 96 X 54 X 2.0T
(Halogen Free)
Length : 45.5mm
PC&ABS
OP-16EC 175 X 127 X 3.0T
(Halogen Free)
Length : 13mm
100 H-Top
PC&ABS
TOP & COVER
100 V-Top
PC&ABS
OP-10VT 220 X 90 X 3.0T
(Halogen Free)
Length : 196mm
50 Joiner
PC&ABS
OP-05JO 58 X 56 X 2.0T
(Halogen Free)
Length : 34(+4)mm
100 Joiner
PC&ABS
OP-10JO 112 X 109 X 3.0T
(Halogen Free)
Length : 45(+4)mm
JOINER
160 Joiner
PC&ABS
OP-16JO 196 X 119.5 X 3.0T
(Halogen Free)
Length : 55(+4)mm
220 Joiner
PC&ABS
OP-22JO 256 X 119.5 X 3.0T
(Halogen Free)
Length : 55(+4)mm
300 Joiner
PC&ABS
OP-30JO 336 X 119.5 X 3.0T
(Halogen Free)
Length : 55(+4)mm
Accessories
Insulator PC&ABS
OP-APP855
Additional
Structure-
Mounting Bracket
OP-APP854 SPCC
112.5 X 63 X 6.0T
Length : 50mm
Structure Joiners
40 X 40 X 5.0T SPCC
OP-APP856-2
Hex Screw(M10X25) SCM440
Length : 160mm
Long Nut(5/8”)
Ø 21 X 55mm
OP-SP1’KITS SCM440
Anchor Set(5/8”)
Ø 21 X 122mm
Threaded Rod(5/8”)
5/8” X 600mm
OP-SP2’KITS SCM440
Cap Nut & Washer
5/8” X 25mm
30x50mm
RACK TYPE
①0305 MD
②0305 MDC
50mm
DUCTING - ②
RACEWAY
④
①05 MDC ③
②05 MD
③05 JOINERS
④SCREW(M3x6)
100mm ⑤
DUCTING -
RACEWAY
①10 MDC
⑥
②10 MD
③10 JOINERS
②
④SCREW(M3x6)
⑤DUCT CLIP ④
(OPTION +) ③
⑥Rubber
Packing(Ø 6)
160mm
DUCTING -
⑥
RACEWAY ⑤
①160 MDC
② ⑦
②160 MD
③160 JOINERS
④SCREW(M3x6) ③
⑤SCREW(M4x10)
⑥DUCT CLIP
(OPTION +)
⑦Rubber
Packing(Ø 6)
Cable Diameter : 2.0mm 2,250
④ ①
220mm
DUCTING -
RACEWAY
⑥
⑤
①220 MDC
②220 MD
⑦
③220 JOINERS
④SCREW(M3x6) ②
⑤SCREW(M4x10)
③
⑥DUCT CLIP
(OPTION +)
⑦Rubber
Packing(Ø 6)
Cable Diameter : 2.0mm 3,100
④
①
300mm ⑥
DUCTING -
RACEWAY ⑦
②
①300 MDC
③
②300 MD ⑤
③300 JOINERS
④SCREW(M3x6)
⑤SCREW(M4x10)
⑥DUCT CLIP
(OPTION +)
⑦Rubber Cable Diameter : 2.0mm 4,240
Packing(Ø 6)
PART W D H REMARK
OP-10CA & OP-10CAC 265mm 265mm 125mm
OP-16CA & OP-16CAC 307mm 307mm 125mm
OP-22CA & OP-22CAC 367mm 367mm 125mm View Sample
OP-30CA & OP-30CAC 447mm 447mm 125mm
PART W D H REMARK
OP-10TA & OP-10TAC 265mm 193mm 125mm
OP-16TA & OP-16TAC 307mm 244mm 125mm
OP-22TA & OP-22TAC 367mm 304mm 125mm View Sample
OP-30TA & OP-30TAC 447mm 384mm 125mm
PART W D H REMARK
OP-10HA & OP-10HAC 120mm 193mm 125mm
OP-16HA & OP-16HAC 181mm 291mm 125mm
OP-22HA & OP-22HAC 241mm 352mm 125mm View Sample
OP-30HA & OP-30HAC 321mm 431mm 125mm
PART W D H REMARK
OP-05DA & OP-05DAC 66mm 138mm 56.5mm
OP-10DA & OP-10DAC 120mm 230mm 125mm
OP-16DA & OP-16DAC 181mm 232mm 125mm
OP-22DA & OP-22DAC 241mm 232mm 125mm View Sample
OP-30DA & OP-30DAC 321mm 232mm 125mm
PART W D H REMARK
OP-05UA & OP-05UAC 66mm 135mm 56.5mm
OP-10UA & OP-10UAC 120mm 207mm 125mm
OP-16UA & OP-16UAC 181mm 232mm 125mm
OP-22UA & OP-22UAC 241mm 214mm 125mm View Sample
OP-30UA & OP-30UAC 321mm 208mm 125mm
PART W / W2 D H / H2 REMARK
OP-10RD (100→50) 120mm / 70mm 114.5mm 125mm / 57.5mm
OP-16RD (160→100) 181mm / 121mm 131mm 125mm
OP-22RD (220→160) 241mm / 181mm 147mm 125mm View Sample
OP-30RD (300→220) 321mm / 241mm 156.5mm 125mm
OP-30TP Cut
TPJO Bonding
Ass’y
OUTLET TRUMPET
Description
OP-30EC Cut
View
OP-10,16,22,30MDC
OP-851(DMTB)
T-BOLT (M6)
Description
OP-10,16,22,30MDC
T-BOLT (M6)
Description
How to
Connect
Structure
View
Ass’y
SMTB
Composition
SUSPENSION KIT
How to extend
Structure
OP-APP857
OP-APP855
OP-APP856-1
Description
OP-APP854
Tee
View
Ass’y
Joiner
TEE TYPE DROP KIT
Down Elbow 90
Trumpet
DOWN
MD TEES +REDUCERS + MD TRUMPET REMARK
45' / 90'
Composition (Drop Tree)
Horizontal Top
Outlet Drop
HORIZONTAL TOP OUTLET DROP KIT
View
Ass’y
Reducer
Down Elbow 90
Joiner
Trumpet
DOWN
MD HT +REDUCERS + MD TRUMPET REMARK
45' / 90'
Composition (Drop Tree)
OP-10MD
OP-16MD
OP-05DA OP-05MD OP-05TP View
OP-10HT OP-10RD
OP-10DA OP-10MD OP-10TP Sample
OP-22MD
OP-30MD
Vertical Top
Outlet Drop
Reducer
Trumpet
OP-10MD
OP-16MD
OP-05MD OP-05TP View
OP-10VT OP-10RD
OP-10MD OP-10TP Sample
OP-22MD
OP-30MD
2,000
FDF
6,000
for Installation work
2,000
FDF
1,500
2,000 2,000 2,000
8,200
2. Anchor Set work with Suspension Kits Long Type is as follow, and the number in below photo
shows the order in doing assembling.
CEILING
① Drilling in Ceiling
1. When installed Ducting System in Ceiling area of telecommunication center, after working Anchor
Set for Structure work, please procedure & assemble Structure as below.
2. The connection between Anchor Set and Suspension Kits uses Long Nut, and please fix strongly.
Ceiling
Suspension Kits
Long Nut
Mounting Bracket
for Structure
3. After assembling Suspension kits, please put Structure, and then firmly fasten the nut of Mounting
Bracket. Further, the Connection among Structure uses Structure Joiner as below.
M8 NUT
Structure Joiner
M8 NUT
In case of close distance with Duct and Rack, SUSPENSION KIT has carefully to be installed as below
photo, keeping “A” & “B” space.
RACK
NUT
1. As SMTB gets in touch with Duct items, when assembled, please strongly fix every nut.
Structure
SMTB
SMTB
When it is hard to install Anchor set on Ceiling due to existing Ladder Rack, please use Ladder rack bracket
kit as below. The Ladder bracket kit is made up two units of one set.
Ladder Rack
Nut
Ladder Rack Washer
Bushing
Nut
Washer
Bushing
LDRB composed 2pcs for 1set is the necessary parts to install Main Duct under floor, and please take note as below
drawing.
First, Properly specify the location for LDRB in Fiber Optic Ducting Layout, and LDRB installation interval according to
installation environment is 90~120Cm to tolerate Main Duct weight. However, the recommendable distance is
every 90cm.
Second, After working the Anchor Set, solidly fix LDRB by using Bolt on the designated place. Then, Main Duct is
fastened by T-Bolt between bottom of Main Duct and top of LDRB.
T- Bolt M12(W1/2)
Hex Head Bolt
M12(W1/2)
Set Anchor
LDRB is designed as adjustable assembly parts with considering the limited height at working place.
Assembling Sequence for LDRB is as below.
M10
Hex Head NUT
M10
Hex Head Bolt
OPSYS Co.,Ltd
Headquarters : #959-40, HighTech Center, DaeChon-Dong, Buk-Gu, KwangJu City, Korea
Tel : +82 62 971 5959 Fax : +82 62 971 8482
Factory / WareHouse : #149-1, NongSo-Ri, JuChon-Myeon, GimHae City, Korea
Tel : +82 55 334 8335~6 Fax : +82 55 334 8334
WWW.OPSYS4U.CO.KR