Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 1/14

SOLUTIONS TO SELECT PROBLEMS FROM CHAPTER 7

7-14 The Electrocomp Corporation manufactures two electrical products: air conditioners and large
fans. The assembly process for each is similar in that both require a certain amount of wiring and
drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each fan must go
through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of
wiring time are available and up to 140 hours of drilling time maybe used. Each air conditioner
sold yields a profit of $25. Each fan assembled may be sold for a $15 profit. Formulate and solve
this LP production mix situation to find the best combination of air conditioners and fans that
yields the highest profit. Use the corner point graphical approach.

Let X1 = the number of air conditioners scheduled to be produced


X2 = the number of fans scheduled to be produced

Maximize 25X1 + 15X2 (maximize profit)


Subject to: 3X1 + 2X2 ≤ 240 (wiring capacity constraint)
2X1 + X2 ≤ 140 (drilling capacity constraint)
X1, X2 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = 40 X2 = 60 Profit = $1,900

7-15 Electrocomp’s management realizes that it forgot to include two critical constraints (see Problem
7-14). In particular, management decides that to ensure an adequate supply of air conditioners for
a contract, at least 20 air conditioners should be manufactured. Because Electrocomp incurred an
oversupply of fans in the preceding period, management also insists that no more than 80 fans be
produced during this production period. Resolve this product mix problem to find the new
optimal solution.

Let X1 = the number of air conditioners scheduled to be produced


X2 = the number of fans scheduled to be produced

Maximize 25X1 + 15X2 (maximize profit)


Subject to: 3X1 + 2X2 ≤ 240 (wiring capacity constraint)
2X1 + X2 ≤ 140 (drilling capacity constraint)
X1 ≥ 20 (a/c contract constraint)
X2 ≤ 80 (maximum # of fans constraint)
X1, X2 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = 40 X2 = 60 Profit = $1,900


Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 2/14

7-16 A candidate for mayor in a small town has allocated $40,000 for last-minute advertising in the
days preceding the election. Two types of ads will be used: radio and television. Each radio ad
costs $200 and reaches an estimated 3,000 people. Each television ad costs $500 and reaches an
estimated 7,000 people. In planning the advertising campaign, the campaign manager would like
to reach as many people as possible, but she has stipulated that at least 10 ads of each type must
be used. Also, the number of radio ads must be at least as great as the number of television ads.
How many ads of each type should be used? How many people will this reach?

Let X1 = the number of radio ads purchased


X2 = the number of television ads purchased

Maximize 3,000X1 + 7,000X2 (maximize exposure)


Subject to: 200X1 + 500X2 ≤ 40,000 (budget constraint)
X1 ≥ 10 (at least 10 radio ads purchased)
X2 ≥ 10 (at least 10 television ads purchased)
X1 ≥ X2 (# of radio ads ≥ # of television ads)
X1, X2 ≥ 0 (non-negativity constraints)

For solution purposes, the fourth constraint would be rewritten as:


X1 − X2 ≥ 0

Optimal Solution: X1 = 175 X2 = 10 Exposure = 595,000 people

7-17 The Outdoor Furniture Corporation manufactures two products, benches and picnic tables, for
use in yards and parks. The firm has two main resources: its carpenters (labor force) and a supply
of redwood for use in the furniture. During the next production cycle, 1,200 hours of labor are
available under a union agreement. The firm also has a stock of 3500 feet of good-quality
redwood. Each bench that Outdoor Furniture produces requires 4 labor hours and 10 feet of
redwood; each picnic table takes 6 labor hours and 35 feet of redwood. Completed benches will
yield a profit of $9 each, and tables will result in a profit of $20 each. How many benches and
tables should Outdoor Furniture produce to obtain the largest possible profit? Use the graphical
LP approach.

Let X1 = the number of benches produced


X2 = the number of tables produced

Maximize 9X1 + 20X2 (maximize profit)


Subject to: 4X1 + 6X2 ≤ 1,200 (labor hours constraint)
10X1 + 35X2 ≤ 3,500 (redwood capacity constraint)
X1, X2 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = 262.5 X2 = 25 Profit = $2,862.50


Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 3/14

7-18 The dean of the Western College of Business must plan the school’s course offerings for the fall
semester. Student demands make it necessary to offer at least 30 undergraduate and 20 graduate
courses in the term. Faculty contracts also dictate that at least 60 courses be offered in total. Each
undergraduate course taught costs the college an average of $2,500 in faculty wages, and each
graduate course costs $3,000. How many undergraduate and graduate courses should be taught in
the fall so that total faculty salaries are kept to a minimum?

Let X1 = the number of undergraduate courses scheduled


X2 = the number of graduate courses scheduled

Minimize 2,500X1 + 3,000X2 (minimize faculty salaries)


Subject to: X1 ≥ 30 (schedule at least 30 undergrad courses)
X2 ≥ 20 (schedule at least 20 grad courses)
X1 + X2 ≥ 60 (schedule at least 60 total courses)
X1, X2 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = 40 X2 = 20 Cost = $160,000

7-19 MSA Computer Corporation manufactures two models of minicomputers, the Alpha 4 and the
Beta 5. The firm employs five technicians, working 160 hours each per month, on its assembly
line. Management insists that full employment (i.e., all 160 hours of time) be maintained for each
worker during next month’s operations. It requires 20 labor hours to assemble each Alpha 4
computer and 25 labor hours to assemble each Beta 5 model. MSA wants to see at least 10 Alpha
4s and at least 15 Beta 5s produced during the production period. Alpha 4s generate $1,200 profit
per unit, and Beta 5s yield $1,800 each. Determine the most profitable number of each model of
minicomputer to produce during the coming month.

Let X1 = the number of Alpha 4 computers scheduled for production next month
X2 = the number of Beta 5 computers scheduled for production next month

Maximize 1,200X1 + 1,800X2 (maximize profit)


Subject to: 20X1 + 25X2 = 800 (full employment, 5 workers x 160 hours)
X1 ≥ 10 (make at least 10 Alpha 4 computers)
X2 ≥ 15 (make at least 15 Beta 5 computers)
X1, X2 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = 10 X2 = 24 Profit = $55,200


Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 4/14

7-20 A winner of the Texas Lotto has decided to invest $50,000 per year in the stock market. Under
consideration are stocks for a petrochemical firm and a public utility. Although a long-range goal
is to get the highest possible return, some consideration is given to the risk involved with the
stocks. A risk index on a scale of 1–10 (with 10 being the most risky) is assigned to each of the
two stocks. The total risk of the portfolio is found by multiplying the risk of each stock by the
dollars invested in that stock. The following table provides a summary of the return and risk:

Stock Estimated Return Risk Index


Petrochemical 12% 9
Utility 6% 4

The investor would like to maximize the return on the investment, but the average risk index of
the investment should not be higher than 6. How much should be invested in each stock? What is
the average risk for this investment? What is the estimated return for this investment?

Let X1 = the number of dollars invested in petrochemical stocks


X2 = the number of dollars invested in utility stocks

Maximize .12X1 + .06X2 (maximize return on investment)


Subject to: X1 + X2 ≤ 50,000 (limit on total investment)
3X1 − 2X2 ≤ 0 (average risk cannot exceed 6)
X1, X2 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = $20,000 X2 = $30,000 Return = $4,200


The total risk is 300,000 (9 x $20,000 + 4 x $30,000), which yields an average risk of 6
(300,000/50,000 = 6).

7-21 Referring to the Texas Lotto situation in Problem 7-20, suppose the investor has changed his
attitude about the investment and wishes to give greater emphasis to the risk of the investment.
Now the investor wishes to minimize the risk of the investment as long as a return of at least 8%
is generated. Formulate this as an LP problem and find the optimal solution. How much should
be invested in each stock? What is the average risk for this investment? What is the estimated
return for this investment?

Let X1 = the number of dollars invested in petrochemical stocks


X2 = the number of dollars invested in utility stocks

Minimize 9X1 + 4X2 (minimize total risk)


Subject to: X1 + X2 ≤ 50,000 (limit on total investment)
.04X1 − .02X2 ≥ 0 (average return must be at least 8%)
X1, X2 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = $16,666.67 X2 = $33,333.33 Total risk = 283,333.33 (which


equates to an average risk of 283,333.33/50,000 = 5.67).
The total return would be $4000 (.12 x 16,666.67 + .09 x 33,333.33), which just happens to
be a return of exactly 8% ($4000/$50,000).
Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 5/14

7-24 The stock brokerage firm of Blank, Leibowitz, and Weinberger has analyzed and recommended
two stocks to an investors’ club of college professors. The professors were interested in factors
such as short term growth, intermediate growth, and dividend rates. These data on each stock are
as follows:

Stock
Louisiana Gas and Trimex Insulation
Factor Power Company
Short term growth .36 .24
potential, per dollar
invested
Intermediate 1.67 1.5
growth potential
(over next three
years), per dollar
invested
Dividend rate 4% 8%
potential

Each member of the club has an investment goal of (1) an appreciation of no less than $720 in
the short term, (2) an appreciation of at least $5,000 in the next three years, and (3) a dividend
income of at least $200 per year. What is the smallest investment that a professor can make to
meet these three goals?

Let X1 = the number of dollars invested in Louisiana Gas and Power


X2 = the number of dollars invested in Trimex Insulation Co.

Minimize X1 + X2 (minimize total investment)


Subject to: .36X1 + .24X2 ≥ 720 (appreciation in the short term)
1.67X1 + 1.50X2 ≥ 5,000 (appreciation in next three years)
.04X1 + .08X2 ≥ 200 (dividend income per year)
X1, X2 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = $1,359 X2 = $1,818.18 Total investment = $3,177.18


Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 6/14

7-25 Woofer Pet Foods produces a low-calorie dog food for overweight dogs. This product is made
from beef products and grain. Each pound of beef costs $0.90, and each pound of grain costs
$0.60. A pound of the dog food must contain at least 9 units of Vitamin 1 and 10 units of
Vitamin 2. A pound of beef contains 10 units of Vitamin 1 and 12 units of Vitamin 2. A pound of
grain contains 6 units of Vitamin 1 and 9 units of Vitamin 2. Formulate this as an LP problem to
minimize the cost of the dog food. How many pounds of beef and grain should be included in
each pound of dog food? What is the cost and vitamin content of the final product?

Let X1 = the number of pounds of beef in each pound of dog food


X2 = the number of pounds of grain in each pound of dog food

Minimize .90X1 + .60X2 (minimize cost per pound of dog food)


Subject to: X1 + X2 = 1 (total weight should be one pound)
10X1 + 6X2 ≥ 9 (at least 9 units of vitamin 1 in a pound)
12X1 + 9X2 ≥ 10 (at least 10 units of vitamin 2 in a pound)
X1, X2 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = .75 X2 = .25 Cost = $.825


Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 7/14

SOLUTIONS TO SELECT PROBLEMS FROM CHAPTER 8

8-1 (Production problem) Winkler Furniture manufactures two different types of china cabinets: a
French Provincial model and a Danish Modern model. Each cabinet produced must go through
three departments: carpentry, painting, and finishing. The table below contains all relevant
information concerning production times per cabinet produced and production capacities for
each operation per day, along with net revenue per unit produced. The firm has a contract with
an Indiana distributor to produce a minimum of 300 of each cabinet per week (or 60 cabinets per
day). Owner Bob Winkler would like to determine a product mix to maximize his daily revenue.
(a) Formulate as an LP problem.
(b) Solve using an LP software program or spreadsheet.

Carpentry Painting Finishing Net Revenue


Cabinet Style (Hours/Cabinet) (Hours/Cabinet) (Hours/Cabinet) per Cabinet ($)
French Provincial 3 1.5 .75 28
Danish Modern 2 1 .75 25
Dept. capacity (hrs) 360 200 125

Let X1 = the number of French Provincial cabinets produced each day


X2 = the number of Danish Modern cabinets produced each day

Maximize 28X1 + 25X2 (maximize revenue)


Subject to: 3X1 + 2X2 ≤ 360 (carpentry hours available)
1.5X1 + X2 ≤ 200 (painting hours available)
.75X1 + .75X2 ≤ 125 (finishing hours available)
X1 ≥ 60 (contract requirement on F.P. cabinets)
X2 ≥ 60 (contract requirement on D.M. cabinets)
X1, X2 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = 60 X2 = 90 Revenue = $3,930


Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 8/14

8-2 (Investment decision problem) The Heinlein and Krarnpf Brokerage firm has just been instructed
by one of its clients to invest $250,000 for her money obtained recently through the sale of land
holdings in Ohio. The client has a good deal of trust in the investment house, but she also has her
own ideas about the distribution of the funds being invested. In particular, she requests that the
firm select whatever stocks and bonds they believe are well rated, but within the following
guidelines:
(a) Municipal bonds should constitute at least 20% of the investment.
(b) At least 40% of the funds should be placed in a combination of electronic firms, aerospace
firms, and drug manufacturers.
(c) No more than 50% of the amount invested in municipal bonds should be placed in a high-
risk, high-yield nursing home stock.
Subject to these restraints, the client’s goal is to maximize projected return on investments. The
analysts at Heinlein and Krampf, aware of these guidelines, prepare a list of high-quality stocks
and bonds and their corresponding rates of return.

Projected Rate
Investment of Return (%)
Los Angeles municipal bonds 5.3
Thompson Electronics, Inc. 6.8
United Aerospace Corp. 4.9
Palmer Drugs 8.4
Happy Days Nursing Homes 11.8

(a) Formulate this portfolio selection problem using LP. (b) Solve this problem.

Let X1 = dollars invested in Los Angeles municipal bonds


X2 = dollars invested in Thompson Electronics
X3 = dollars invested in United Aerospace
X4 = dollars invested in Palmer Drugs
X5 = dollars invested in Happy Days Nursing Homes

Maximize .053X1 + .068X2 + .049X3 + .084X4 + .118X5 (maximize return on investment)


Subject to: X1 + X2 + X3 + X4 + X5 ≤ 250,000 (total funds available)
.8X1 - .2X2 - .2X3 - .2X4 - .2X5 ≥ 0 (municipal bond restriction)
-.4X1 + .6X2 + .6X3 + .6X4 - .4X5 ≥ 0 (electronics, aerospace, drugs combo)
-.5X1 + X5 ≤ 0 (nursing home as a percent of bonds)
X1, X2, X3, X4, X5 ≥ 0 (non-negativity constraints)

Optimal Solution: X1 = $50,000 X2 = $0 X3 = $0 X4 = $175,000 X5 = $25,000 ROI = $20,300


Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 9/14

8-3 (Restaurant work scheduling problem). The famous Y. S. Chang Restaurant is open 24 hours a
day. Waiters and busboys report for duty at 3AM., 7 AM., 11 AM., 3 P.M., 7 P.M., or 11 P.M.,
and each works an 8-hour shift. The following table shows the minimum number of workers
needed during the six periods into which the day is divided. Chang’s scheduling problem is to
determine how many waiters and busboys should report for work at the start of each time period
to minimize the total staff required for one day’s operation. (Hint: Let Xi equal the number of
waiters and busboys beginning work in time period i, where i = 1, 2,3,4,5,6.)

Number of Waiters and


Period Time Busboys Required
1 3 A.M–7 A.M. 3
2 7 A.M–11 A.M. 12
3 11 A.M–3 P.M. 16
4 3 P.M–7 P.M. 9
5 7 P.M–11 P.M. 11
6 11 P.M–3 A.M. 4

Let Xi = the number workers beginning work at the start of time period i (i=1,2,3,4,5,6)

Minimize X1 + X2 + X3 + X4 + X5 + X6 (min. staff size)


Subject to: X1 + X6 ≥ 3 (period 1)
X1 + X2 ≥ 12 (period 2)
X2 + X3 ≥ 16 (period 3)
X3 + X4 ≥ 9 (period 4)
X4 + X5 ≥ 11 (period 5)
X5 + X6 ≥ 4 (period 6)
X1, X2, X3, X4, X5, X6 ≥ 0 (non-negativity)
Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 10/14

8-4 (Animal feed mix problem) The Battery Park Stable feeds and houses the horses used to pull
tourist-filled carriages through the streets of Charleston’s historic waterfront area. The stable
owner, an ex-racehorse trainer, recognizes the need to set a nutritional diet for the horses in his
care. At the same time, he would like to keep the overall daily cost of feed to a minimum.
The feed mixes available for the horses’ diet are an oat product, a highly enriched grain,
and a mineral product. Each of these mixes contains a certain amount of five ingredients needed
daily to keep the average horse healthy. The table below shows these minimum requirements,
units of each ingredient per pound of feed mix, and costs for the three mixes.
In addition, the stable owner is aware that an overfed horse is a sluggish worker.
Consequently, he determines that 6 pounds of feed per day are the most that any horse needs to
function properly. Formulate this problem and solve for the optimal daily mix of the three feeds.

Feed Mix
Diet Oat Enriched Mineral Minimum Daily
Requirement Product Grain Product Requirement
(Ingredients) (units/lb) (units/lb) (units/lb) (units)
A 2 3 1 6
B .5 1 .5 2
C 3 5 6 9
D 1 1.5 2 8
E .5 .5 1.5 5
Cost/lb $0.09 $0.14 $0.17

Let X1 = the number pounds of oat product per horse each day
X2 = the number pounds of enriched grain per horse each day
X3 = the number pounds of mineral product per horse each day

Minimize .09X1 + .14X2 + .17X3 (minimize cost)


s.t. 2X1 + 3X2 + X3 ≥ 6 (ingredient A)
.5X1 + X2 + .5X3 ≥ 2 (ingredient B)
3X1 + 5X2 + 6X3 ≥ 9 (ingredient C)
X1 + 1.5X2 + 2X3 ≥ 8 (ingredient D)
.5X1 + .5X2 + 1.5X3 ≥ 5 (ingredient E)
X1 + X2 + X3 ≤ 6 (maximum feed per day)
X1, X2, X3 ≥ 0 (non-negativity constraints)
Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 11/14

8-6 (Media selection problem) The advertising director for Diversey Paint and Supply, a chain of
four retail stores on Chicago’s North Side, is considering two media possibilities. One plan is for
a series of half- page ads in the Sunday Chicago Tribune newspaper, and the other is for
advertising time on Chicago TV. The stores are expanding their lines of do-it-yourself tools, and
the advertising director is interested in an exposure level of at least 40% within the city’s
neighborhoods and 60% in northwest suburban areas.
The TV viewing time under consideration has an exposure rating per spot of 5% in city
homes and 3% in the northwest suburbs. The Sunday newspaper has corresponding exposure
rates of 4% and 3% per ad. The cost of a half-page Tribune advertisement is $925; a television
spot costs $2,000.
Diversey Paint would like to select the least costly advertising strategy that would meet
desired exposure levels.
(a) Formulate using LP.
(b) Solve the problem.

Let X1 = the number of newspaper ads placed


X2 = the number of TV spots purchased

Minimize 925X1 + 2,000X2 (minimize cost)


Subject to: .04X1 + .05X2 ≥ .4 (city exposure)
.03X1 + .03X2 ≥ .6 (suburb exposure)
X1, X2 ≥ 0 (non-negativity constraints)
Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 12/14

8-11 (College meal selection problem) Kathy Roniger, campus dietician for a small Idaho college, is
responsible for formulating a nutritious meal plan for students. For an evening meal, she feels
that the following five meal-content requirements should be met: (1) between 900 and 1,500
calories; (2) at least 4 milligrams of iron; (3) no more than 50 grams of fat; (4) at least 26 grams
of protein; and (5) no more than 50 grams of carbohydrates. On a particular day, Roniger’s food
stock includes seven items that can be prepared and served for supper to meet these
requirements. The cost per pound for each food item and the contribution to each of the five
nutritional requirements are given in the accompanying table:

Table of Food Values and Costs


Calories/ Iron Fat Protein Carbs. Cost/
Food Item Pound (mg/lb) (gm/lb) (gm/lb) (gm/lb) Pound ($)
Milk 295 0.2 16 16 22 0.60
Ground Meat 1216 0.2 96 81 0 2.35
Chicken 394 4.3 9 74 0 1.15
Fish 358 3.2 0.5 83 0 2.25
Beans 128 3.2 0.8 7 28 0.58
Spinach 118 14.1 1.4 14 19 1.17
Potatoes 279 2.2 0.5 8 63 0.33

What combination and amounts of food items will provide the nutrition Roniger requires at the
least total food cost?

Let X1 = the number of pounds of milk per student in the evening meal
X2 = the number of pounds of ground meat per student in the evening meal
Etc., down to X7 = the number of pounds of potatoes per student in the evening meal

Minimize .6X1 + 2.35X2 + 1.15X3 + 2.25X4 + .58X5 + 1.17X6 + .33X7


S.T. (Cal.) 295X1 + 1216X2 + 394X3 + 358X4 + 128X5 + 118X6 + 279X7 ≥ 900
(Cal.) 295X1 + 1216X2 + 394X3 + 358X4 + 128X5 + 118X6 + 279X7 ≤ 1500
(Iron) .2X1 + .2X2 + 4.3X3 + 3.2X4 + 3.2X5 + 14.1X6 + 2.2X7 ≥ 4
(Fat) 16X1 + 96X2 + 9X3 + .5X4 + .8X5 + 1.4X6 + .5X7 ≤ 50
(Protein) 16X1 + 81X2 + 74X3 + 83X4 + 7X5 + 14X6 + 8X7 ≥ 26
(Carbs.) 22X1 + 28X5 + 19X6 + 63X7 ≤ 50
X1, X2, X3, X4, X5, X6, X7 ≥ 0
Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 13/14

8-12 (High tech production problem) Quitmeyer Electronics Incorporated manufactures the following
six microcomputer peripheral devices: internal modems, external modems, graphics circuit
boards, CD drives, hard disk drives, and memory expansion boards. Each of these technical
products requires time, in minutes, on three types of electronic testing equipment, as shown in
the table the following table:

Internal External Circuit CD Hard Memory


Modem Modem Board Drive Drive Board
Test device 1 7 3 12 6 18 17
Test device 2 2 5 3 2 15 17
Test device 3 5 1 3 2 9 2

The first two test devices are available 120 hours per week. The third (device 3) requires more
preventive maintenance and may be used only 100 hours each week. The market for all six
computer components is vast, and Quitmeyer Electronics believes that it can sell as many units
of each product as it can manufacture. The table that follows summarizes the revenues and
material costs for each product:

Revenue Per Material Cost


Device Unit Sold ($) Per Unit ($)
Internal modem 200 35
External modem 120 25
Graphics circuit board 180 40
CD drive 130 45
Hard disk drive 430 170
Memory expansion board 260 60

In addition, variable labor costs are $15 per hour for test device 1, $12 per hour for test device 2.
and $18 per hour for test device 3. Quitmeyer Electronics wants to maximize its profits.
(a) Formulate this problem as an LP model.
(b) Solve the problem by computer. What is the best product mix?
(c) What is the value of an additional minute of time per week on test device 1? Test device 2?
Test device 3? Should Quitmeyer Electronics add more test device time? If so, on which
equipment?

Let X1 = the number of internal modems scheduled for manufacture each week
X2 = the number of external modems scheduled for manufacture each week
Etc., down to X6 = the number of mem. expansion boards scheduled for mfg. each week

Maximize 161.35X1 + 92.95X2 + 135.50X3 + 82.50X4 + 249.80X5 + 191.75X6


S.T. 7X1 + 3X2 + 12X3 + 6X4 + 18X5 + 17X6 ≤ 7200
2X1 + 5X2 + 3X3 + 2X4 + 15X5 + 17X6 ≤ 7200
5X1 + 1X2 + 3X3 + 2X4 + 9X5 + 2X6 ≤ 6000
X1, X2, X3, X4, X5, X6 ≥ 0
Linear Programming Formulation Exercises from Textbook ISM 4400, Fall 2006: Page 14/14

8-15 (Material blending problem) Amalgamated Products has just received a contract to construct
steel body frames for automobiles that are to be produced at the new Japanese factory in
Tennessee. The Japanese auto manufacturer has strict quality control standards for all of its
component subcontractors and has informed Amalgamated that each frame must have the
following steel content:

Material Minimum Percent Maximum Percent


Manganese 2.1 2.3
Silicon 4.3 4.6
Carbon 5.05 5.35

Amalgamated mixes batches of eight different available materials to produce one ton of steel
used in the body frames. The table below details these materials. Formulate and solve the LP
model that will indicate how much of each of the eight materials should be blended into a 1-ton
load of steel so that Amalgamated meets its requirements while minimizing cost.

Material Manganese Silicon Carbon Pounds Cost Per


Available (%) (%) (%) Available Pound ($)
Alloy 1 70.0 15.0 3.0 No limit 0.12
Alloy 2 55.0 30.0 1.0 300 0.13
Alloy 3 12.0 26.0 0 No limit 0.15
Iron 1 1.0 10.0 3.0 No limit 0.09
Iron 2 5.0 2.5 0 No limit 0.07
Carbide 1 0 24.0 18.0 50 0.10
Carbide 2 0 25.0 20.0 200 0.12
Carbide 3 0 23.00 25.0 100 0.09

Let X1 = the number of pounds of alloy 1 in one ton of steel


X2 = the number of pounds of alloy 2 in one ton of steel
Etc., down to X8 = the number of pounds of carbide 3 in one ton of steel

Minimize .12X1 + .13X2 + .15X3 + .09X4 + .07X5 + .10X6 + .12X7 + .09X8


S.T. (Mn- .7X1 + .55X2 + .12X3 + .01X4 + .05X5 ≥ 42
min) ≤
(Mn-max) .7X1 + .55X2 + .12X3 + .01X4 + .05X5 46
(Si-min) .15X1 + .30X2 + .26X3 + .10X4 + .025X5 + .24X6 + .25X7 + .23X8 ≥ 86
(Si-max) .15X1 + .30X2 + .26X3 + .10X4 + .025X5 + .24X6 + .25X7 + .23X8 ≤ 92
(C-min) .03X1 + .01X2 + .03X4 + .18X6 + .20X7 + .25X8 ≥ 101
(C-max) .03X1 + .01X2 + .03X4 + .18X6 + .20X7 + .25X8 ≤ 107
Alloy 2 lim. X2 ≤ 300
Carbide 1 lim. X6 ≤ 50
Carbide 2 lim. X7 ≤ 200
Carbide 3 lim. X8 ≤ 100
Weighs 1 ton X1 + X2 + X3 + X4 + X5 + X6 + X7 + X8 = 2000
X1, X2, X3, X4, X5, X6, X7, X8 ≥ 0