LOCATION OF THE PROJECT

MADE BY: RAVI PORIYA(210


04)
PROJECT TRAINING 2008-09
DESIGN CONSTRUCT UNDER GROUND
STATION AND TUNNEL ON BOTH SIDE.
GREEN PARK, NEAR 
MADE BY: RAVI PORIYA(2104) HAUZ KHAS, NEW 
DELHI 3

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

NEED OF METRO IN DELHI LOCATION OF THE PROJECT (CONTD.)

 ROAD SPACE IS LIMITED AND VEHICLES


ARE INCREASING DAY BY DAY
MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


 METRO OCCUPIES VERY LESS ROAD SPACE

 REQUIRED VERY LESS ENERGY PER


PESSENGER TRAVELL
 LESS AIR AND NOISE POLLUTION
COMPARED TO ROAD SYSTEM
04)

04)
 METRO IS FASTER AND MORE RELIABLE
AND SAFER.

2 4

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

1
12/16/2010

GENERAL ALIGNMENT OF SITE SITE LAYOUT

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


04)

04)
5 7

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

GENERAL ALIGNMENT OF SITE (CONTD.) SITE LAYOUT(CONTD.)


MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


04)

04)
6 8

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

2
12/16/2010

PROJECT BREAK DOWN STRUCTURE ORGANISATION CHART FOR THE COMPANY


PROJECT
MANAGER

ACCOUNT QA/QC
P&M IN- CHIEF
PLANNIN S&
BC 17-DESIGN AND MANAGE CHARG SHE
CONSTRUCTION OF UNDER G NEER ADMIN IN- R E ENG.
GROUND STATION AND CHARGE
TUNNEL ON BOTH SIDE AT QC SR SHE
GREEN PARK ELECTRI JUNIOR MANAG QC ENG.
ENG QC ENG.
ENG ENG.
CAL STAFF ER
DESIGN ACCOU ENG.

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


CO- NT ENG.
NORTH STATION SOUTH ENVIRO
SHIFT QC ENG. SR. SHE
TUNNEL TUNNEL NMENT
MECHAN INCHAR ERECTIO
IN IN MANAGE
SURVEY STORE ICAL GE N ENG.
CHARGE CHARGE R
ENG. INCHAR ENG.
GE QC ENG.
OCCUPATI
FABRICA ROOF & SHE ONAL
ROOF &
ENG. HEALTH
CLIENT : DMRC REINFO INDUSTRI TION SR.ENG. JR. ENG. CONCOURS CONCOURS SECTIO RCC SECTIO
RCEME ERECTIO E SLAB E SLAB WRK/ROO N IN ENG.
AL N
NT RELATION N ENG. ENG. INCHAR F SLAB CHARG
OFFICER GE INCHARG E SHE
E SHE
RCC FIREMA
TRAFFIC
ENGINE ENGINE RCC FORM WORK N
CONTROL
ER ER WORK WORK INCHAR ENG.
FOREMA GE
N SHE
ANCILLAR ERECTI FIREMA BARRICA
DIAPHAR
Y ON N DDING
GM WALL
BUILDING WORK MANAGE
IN
INCHARG R
CONTRACTOR : LARSON GENERAL CHARGE
E
AND TOUBRO LIMITTED CONSULTANTS

04)

04)
DIAPHAR HOUSEK
MISALI EEPING
GM NOUS
WALL MANAGE
WORK R
ENG.

DELTA CONSTRUCTION STRUCTURAL


DESIGNER : Ms. MOTT NAVYUGA FOR GOPAL ENTERPRISES
SYSTEM LIMITED FOR WATERPROOFING
MACDONALD DIAPHARGM WALL FOR ELECTRICAL
EXCAVATION COMPANY

9 11

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

INTRODUCTION TO THE PROJECT WORK BREAK DOWN STRUCTURE


INITIAL SURVEY
& SOIL
INVESTIGATION

 CLIENT : Delhi Metro Rail Corporation (DMRC) SITE


ESTABLISHMEN
 CONTRACTOR : Larson & toubro (L&T) SITE
T
POSSESSION
 TYPE OF PROJECT : Infrastructure MOBILIZATION

 PURPOSE OF PROJECT : Mass Rapid Transportation


MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


DESIGN,
DESIGN,
 NAME OF THE PROJECT : Design and construction of underground PLANNING
DRAWINGS &
WMS
DRAWINGS & WMS
APPROVAL
station building & tunnel on both side of SUBMISSION

station, Green Park. TRAFFIC WEST SIDE


DIVERSION
 ESTIMATED COST : Rs. 12911.5 lakhs FROM IOC
BUILDING TO
 DATE OF STRATING : 18th January 2007 END OF
CONTRACT EAST SIDE

 CONTRACT OF PERIOD : 169 weeks COLUMNS / COLUMNS /


DIAPHRAGM STATION CONCOURSE BLOCK WORK AT PLAT FORM BLOCK WORK
BASE SLAB
 DATE OF COMPLETION : 14th April 2010 BC 17 CONTRACT -
GREEN PARK STATION STATION
WALL ROOF SLAB SLAB CONCOURSE
LEVEL
SLAB AT BASE SLAB
LEVEL
& TUNNEL GREEN PARK
 TYPE OF CONTRACT : Lump sum base Design and Built contract GUIDE WALL
TRAFFIC
DIVERSION
 DEFECT LIABILITY PERIOD : 365 Days
STATION
04)

04)
ANCILLARY
 MOBILIZATION ADVANCE : 10% off Contract
C t t Price
P i ENTRY EXIT
STRUCTURE
BUILDING

 CURRENCY OF PAYMENT : INR NORTH


EXCAVATION
ER PILING AND BASE SLAB WALLS ROOF SLAB BACK FILLING
TUNNEL
 SITE ADDRESS : DDA land, Yusuf Sarai, Aurobindo TUNNEL
STRUTTING

Marg, Green Park, New Delhi-110016 SOUTH SOLDIER


EXCAVATION BACK FILLING
AND BASE SLAB WALLS ROOF SLAB ABOVE ROOF
TUNNEL PILING
 SPECIFIC METHOD USED : For tunnel top-down construction STRUTTING SLAB

For station building bottom top construction


10 12

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

3
12/16/2010

STATION BUILDING PLAN VIEW SCOPE OF WORK

 Design and construction of underground station at green park & tunnel on both
side of station by cut and cover method on Central Secretariat – Qutub Minar
Corridor of Phase-II of Delhi MRTS.
 S
Specific
ifi Technology
T h l U d For
Used F Construction:
C i

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


 Bottom Up Cut and Cover Method
 Top Down Cut and Cover Method
As per contract document the following specific work are covered............

 Construction of one underground station, length 318mtrs, as Cut and cover


structures by Top down Method, including access and other associated
structures (with urban redevelopment and landscaping)

 Temporary steel decking over Cut and Cover structures under roadways to
allow flow of traffic and other all associated temporary works.
works

04)

04)
 Construction of approximately 485mtrs of Cut and Cover Tunnel and other
associated structures, excluding station.

 Traffic and Utilities management during construction (Divert and Support


13 Utilities) 15

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

SOUTH TUNNEL PLAN AND


SCOPE OF WORK(CONTD.)
SECTION
STATION BUILDING
DIAPHARGM PLUNGE CONCOURSE
ACTIVITY GUIDE WALL EXCAVATION ROOF SLAB BASE SLAB
WALL COLUMN SLAB
MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


QUANTITY 636 M 143 NO 108 NO 102834 CU.M 6567 SQ.M 5803 SQ.M 6567 SQ.M

SOUTH TUNNEL
STRUT STRUT STRUT
DIAPHARM SOLDIER BASE
ERECTION ERECTION ERECTION
ACTIVITY EXCAVATION WALLS ROOF
WALL PILE SLAB
1ST LAYER 2ND LAYER 3RD LAYER

7434 8280 7434


QUANTITY 4 NO 412 NO 138800 CU.M 41 NO 41 NO 41 NO
SQ.M SQM SQM

NORTH TUNNEL
04)

04)
STRUT STRUT STRUT
DIAPHARM SOLDIER BASE ROOF
ERECTION ERECTION ERECTION
ACTIVITY EXCAVATION WALLS
WALL PILE SLAB SLAB
1ST LAYER 2ND LAYER 3RD LAYER

2738 2087 2499


QUANTITY 5 NO 134 NO 48400 CU.M 14 NO 14 NO 14 NO
SQ.M SQM SQM

14 16

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

4
12/16/2010

STATION BUILDING STATION BUILDING CONSTRUCTION


CONSTRUCTION METHODOLOGY METHODOLOGY( CONTD.)
EARTH OPENING FOR
SERVICES AND
DIA PHARGM EXCAVATION COLUMN
WALL
ROOF

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


SLAB

04)

04)
17 19

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

STATION BUILDING CONSTRUCTION STATION BUILDING CONSTRUCTION


METHODOLOGY(CONTD.) METHODOLOGY( CONTD.)

EARTH ROOF
SLAB
COLUMN
MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


DIA PHARGM
WALL

EXCAVATION
COLUMN UNDER ROOF
SLAB
04)

04)
18 20

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

5
12/16/2010

STATION BUILDING CONSTRUCTION STATION BUILDING CONSTRUCTION


METHODOLOGY( CONTD.) METHODOLOGY( CONTD.)
DIA PHARGM
WALL
ROOF ROOF
SLAB SLAB

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


CONCOUR
SE SLAB
CONCOUR
SE SLAB BASE SLAB

04)

04)
21 23

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

STATION BUILDING CONSTRUCTION STATION BUILDING CONSTRUCTION


METHODOLOGY( CONTD.) METHODOLOGY( CONTD.)

ROOF
SLAB
MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


PLATFORM

CONCOUR TRACK
04)

04)
SE SLAB INSTALLATION

22 24

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

6
12/16/2010

TUNNEL CONSTRUCTION
TUNNELCROSS SECTION
METHODOLOGY(CONTD.)
EXCAVATION AND STRUTTING(CONTD.)

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


04)

04)
25 27
Ø BORE HOLE
FILLED WITH M20 CONC.

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

TUNNEL CONSTRUCTION TUNNEL CONSTRUCTION


METHODOLOGY METHODOLOGY(CONTD.)
EXCAVATION AND STRUTTING EXCAVATION AND STRUTTING(CONTD.)
MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


04)

04)
Ø BORE HOLE
26 FILLED WITH M20 CONC. 28

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

7
12/16/2010

TUNNEL CONSTRUCTION TUNNEL CONSTRUCTION


METHODOLOGY(CONTD.) METHODOLOGY(CONTD.)
EXCAVATION AND STRUTTING(CONTD.) BASE SLAB CONSTRUCTION

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


04)

04)
Ø BORE HOLE Ø BORE HOLE
FILLED WITH M20 CONC. FILLED WITH M20 CONC.

29 31

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

TUNNEL CONSTRUCTION TUNNEL CONSTRUCTION


METHODOLOGY(CONTD.) METHODOLOGY(CONTD.)
EXCAVATION AND STRUTTING(CONTD.) WALL CONSTRUCTION
MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


04)

04)
30 32

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

8
12/16/2010

TUNNEL CONSTRUCTION CONSTRUCTION OF TUNNEL


METHODOLOGY(CONTD.) ROOF SLAB(CONTD.)
ROOF SLAB CONSTRUCTION POINT OF OBSERVATION

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


04)

04)
33 35

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

CONSTRUCTION OF TUNNEL CONSTRUCTION OF TUNNEL


ROOF SLAB ROOF SLAB(CONTD.)
CONSTRUCTION SEQUENCE FOR ROOF SLAB PLAN
FORM WORK

• LEVELLING
MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


• FORM WORK CHECK

RENFORCEMENT FOR SLAB

• CUTTING AND BENDING OF R/F BARS AS PER BBS
• LAYOUT OF REINFORCEMENT
• PLACING OF RENFORCEMENT

CONCRETING

• BOOM PLACER AT NIGHT
BOOM PLACER AT NIGHT
04)

04)
• WITH PUMP

CURING

• POND CURING & SPRINKLING OF WATER

REMOVAL OF FORM WORK AND STRUTS UPTO 2ND LAYER
34 36

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

9
12/16/2010

CONSTRUCTION OF TUNNEL CONSTRUCTION OF TUNNEL


ROOF SLAB(CONTD.) ROOF SLAB(CONTD.)
SECTION FORMWORK DETAIL(CONTD.)
H-16 WOODEN BEAM

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


04)

04)
37 39

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

CONSTRUCTION OF TUNNEL CONSTRUCTION OF TUNNEL


ROOF SLAB(CONTD.) ROOF SLAB(CONTD.)
FORMWORK DETAIL FORMWORK DETAIL(CONTD.)
U- HEAD Sr.  Descriptio Unit  Quantity  Quantity 
No. n weight in 
g p
per SQ.M
Q required per 
q p
KG tower
MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


1 Basic  0.6
frame
DIAGONAL
2 Foot plate 2.044 4
BRACING
3 U‐head 3.1 4
HORIZANTAL 4 Tower  12.1 8
BRACING spindle
5 Horizontal  4.6 0.4
bracing
04)

04)
6 Diagonal  0.7
bracing
ADJUSTABLE
7 Short  11.3 4
PROP
props
8 Steel  2
38 walers 40
FOOT PLATE

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

10
12/16/2010

CONSTRUCTION OF TUNNEL CONSTRUCTION OF TUNNEL


ROOF SLAB(CONTD.) ROOF SLAB(CONTD.)
REINFORCEMENT DETAILS CONCRETING

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


04)

04)
41 43

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

CONSTRUCTION OF TUNNEL CONSTRUCTION OF TUNNEL


ROOF SLAB(CONTD.) ROOF SLAB(CONTD.)
REINFORCEMENT DETAILS CONCRETING(CONTD.)

DIAMETER FOR REINFORCEMENT TOTAL LENGTH OF BAR 
MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


8 MM 0.0
10 MM 16600
12 MM 0.0
16 MM 0.0
20 MM 10050
04)

04)
25 MM 3215
32 MM 9740

42 44

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

11
12/16/2010

CONSTRUCTION OF TUNNEL
ROOF SLAB(CONTD.)
CONCRETING(CONTD.)

MADE BY: RAVI PORIYA(210

MADE BY: RAVI PORIYA(210


THANK YOU…….

04)

04)
45 47

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

CONSTRUCTION OF TUNNEL
ROOF SLAB(CONTD.)
RATE ANALYSIS FOR TUNNEL ROOF SLAB
SR. NO ITEM DESCRIPTION UNIT QUANTITY RATE (Rs.)  AMOUNT 
(Rs.)

(A) MATERIAL
Cement Kg/sq.m 360 5 1800
fly ash Kg/sq.m 144 2 288
MADE BY: RAVI PORIYA(210

Sand Kg/sq.m 832 0.31 257.92


Coarse Aggregate
20 mm Kg/sq.m 773 0.3 231.9
10 mm Kg/sq.m 515 0.3 154.5
Admixture Kg/sq.m 3 180 540
steel Kg/sq.m 270 35 9450
TOTAL 12722.32

(B) LABOUR
1 Skilled No’s 2 200 400
2 Unskilled No’s 5 150 750
TOTAL 1150
04)

( C ) TOOLS   EQUIPMENT & PLANTS
( C ) TOOLS , EQUIPMENT & PLANTS
15% of (A + B) 2080.84

(D) WATER & ELECTRICITY
8% of (A+B+C) 1276.25

(E) OTHER OVERHEAD
15% of (A+B+C+D) 2584.41

total 19813.83 46
so, rate for 1 sq. m concrete roof slab is 19,814 Rs.

SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT

12