METRO IS FASTER AND MORE RELIABLE
AND SAFER.
2 4
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
1
12/16/2010
04)
5 7
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
04)
6 8
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
2
12/16/2010
ACCOUNT QA/QC
P&M IN- CHIEF
PLANNIN S&
BC 17-DESIGN AND MANAGE CHARG SHE
CONSTRUCTION OF UNDER G NEER ADMIN IN- R E ENG.
GROUND STATION AND CHARGE
TUNNEL ON BOTH SIDE AT QC SR SHE
GREEN PARK ELECTRI JUNIOR MANAG QC ENG.
ENG QC ENG.
ENG ENG.
CAL STAFF ER
DESIGN ACCOU ENG.
04)
04)
DIAPHAR HOUSEK
MISALI EEPING
GM NOUS
WALL MANAGE
WORK R
ENG.
9 11
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
04)
ANCILLARY
MOBILIZATION ADVANCE : 10% off Contract
C t t Price
P i ENTRY EXIT
STRUCTURE
BUILDING
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
3
12/16/2010
Design and construction of underground station at green park & tunnel on both
side of station by cut and cover method on Central Secretariat – Qutub Minar
Corridor of Phase-II of Delhi MRTS.
S
Specific
ifi Technology
T h l U d For
Used F Construction:
C i
Temporary steel decking over Cut and Cover structures under roadways to
allow flow of traffic and other all associated temporary works.
works
04)
04)
Construction of approximately 485mtrs of Cut and Cover Tunnel and other
associated structures, excluding station.
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
SOUTH TUNNEL
STRUT STRUT STRUT
DIAPHARM SOLDIER BASE
ERECTION ERECTION ERECTION
ACTIVITY EXCAVATION WALLS ROOF
WALL PILE SLAB
1ST LAYER 2ND LAYER 3RD LAYER
NORTH TUNNEL
04)
04)
STRUT STRUT STRUT
DIAPHARM SOLDIER BASE ROOF
ERECTION ERECTION ERECTION
ACTIVITY EXCAVATION WALLS
WALL PILE SLAB SLAB
1ST LAYER 2ND LAYER 3RD LAYER
14 16
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
4
12/16/2010
04)
04)
17 19
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
EARTH ROOF
SLAB
COLUMN
MADE BY: RAVI PORIYA(210
EXCAVATION
COLUMN UNDER ROOF
SLAB
04)
04)
18 20
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
5
12/16/2010
04)
04)
21 23
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
ROOF
SLAB
MADE BY: RAVI PORIYA(210
CONCOUR TRACK
04)
04)
SE SLAB INSTALLATION
22 24
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
6
12/16/2010
TUNNEL CONSTRUCTION
TUNNELCROSS SECTION
METHODOLOGY(CONTD.)
EXCAVATION AND STRUTTING(CONTD.)
04)
25 27
Ø BORE HOLE
FILLED WITH M20 CONC.
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
04)
Ø BORE HOLE
26 FILLED WITH M20 CONC. 28
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
7
12/16/2010
04)
Ø BORE HOLE Ø BORE HOLE
FILLED WITH M20 CONC. FILLED WITH M20 CONC.
29 31
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
04)
30 32
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
8
12/16/2010
04)
33 35
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
• LEVELLING
MADE BY: RAVI PORIYA(210
RENFORCEMENT FOR SLAB
• CUTTING AND BENDING OF R/F BARS AS PER BBS
• LAYOUT OF REINFORCEMENT
• PLACING OF RENFORCEMENT
CONCRETING
• BOOM PLACER AT NIGHT
BOOM PLACER AT NIGHT
04)
04)
• WITH PUMP
CURING
• POND CURING & SPRINKLING OF WATER
REMOVAL OF FORM WORK AND STRUTS UPTO 2ND LAYER
34 36
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
9
12/16/2010
04)
37 39
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
04)
6 Diagonal 0.7
bracing
ADJUSTABLE
7 Short 11.3 4
PROP
props
8 Steel 2
38 walers 40
FOOT PLATE
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
10
12/16/2010
04)
41 43
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
DIAMETER FOR REINFORCEMENT TOTAL LENGTH OF BAR
MADE BY: RAVI PORIYA(210
04)
25 MM 3215
32 MM 9740
42 44
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
11
12/16/2010
CONSTRUCTION OF TUNNEL
ROOF SLAB(CONTD.)
CONCRETING(CONTD.)
04)
04)
45 47
SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT SCHOOL OF BUILDING SCIENCE AND TECHNOLOGY, CEPT
CONSTRUCTION OF TUNNEL
ROOF SLAB(CONTD.)
RATE ANALYSIS FOR TUNNEL ROOF SLAB
SR. NO ITEM DESCRIPTION UNIT QUANTITY RATE (Rs.) AMOUNT
(Rs.)
(A) MATERIAL
Cement Kg/sq.m 360 5 1800
fly ash Kg/sq.m 144 2 288
MADE BY: RAVI PORIYA(210
(B) LABOUR
1 Skilled No’s 2 200 400
2 Unskilled No’s 5 150 750
TOTAL 1150
04)
( C ) TOOLS EQUIPMENT & PLANTS
( C ) TOOLS , EQUIPMENT & PLANTS
15% of (A + B) 2080.84
(D) WATER & ELECTRICITY
8% of (A+B+C) 1276.25
(E) OTHER OVERHEAD
15% of (A+B+C+D) 2584.41
total 19813.83 46
so, rate for 1 sq. m concrete roof slab is 19,814 Rs.
12