Memorandum

TO : Distribution DATE: July 8, 1969

In reply refer to:


FROM : CF/Chief, Flight Crew Support Division CF3&2-9M-133

SUBJECT: Revision A to the Apollo 11 Final Flight Plan

Enclosed is Revision A to the Apollo 11 Final Flight Plan. Enclosure 1


contains the pen and ink changes to be made on the indicated pages.
Enclosure 2 contains the new pages which replace the same numbered pages
in the final edition of the flight plan. Changes on the new pages are
made with prestige elite type rather than gothic type so they will be
readily evident.

Enclosures 2

CF342:TAGuillory:jat 7-E-69

Buy U.S. Savings Bonds Regularly on the Payroll Savings Plan


ENCLOSURE 1

MAKE THE FOLLOWING PEN AND INK CHANGES TO THE FINAL FLIGHT PLAN

PAGE CHANGE

1-7 ON "LM POWEREDDESCENT/HIGH GATE TO TD" FIGURE CHANGE ORDINATE


AND ABSCISSA FROM "FT" TO "FT X 103"
-
l-10 ON TABLE l-3 FIRST COLUMN CHANGE "1409 EDT" TO "1209 EDT"

ON TABLE l-4 CHANGE Al LONGITUDE FROM 60.500"E TO 65.50Q"E

1-11 CHANGE Gl DELTA ALTITUDE FROM -001.97 TO -001.76

1-17 PARAGRAPH Ei, CHANGE TIMES:


103:30:00-TO 107:15
148:00:00 TO 151:00
154:00:00 TO 172:00

2-31 & 2-32 CHANGE TITLES FROM "PHASING" TO "ASCENT PHASING"

2-44 CHANGE 275 (+0418.1) TO 275 (tO418.5)

CHANGE AVX, AVY, AND AVZ BLOCKS FROM


00 0 - -*- TO 00 -----

2-48 CHANGE AVR N42 BLOCKS FROM + 0 0 TO + 0 -----

CHANGE F/A, R/L, AND D/U BLOCKS FROM 00 0 ---


TO 00 ----

3-ii AT 05:25 CHANGE "S-IVB TO ORBIT CAPABILITY" TO "CO1 CAPABILITY"

3-l AT 00:37 CHANGE "ECS REDUNDANT COMPONENTCHECK" TO "SEC GLYCOL


LOOP CK"

AT 00:43 IN BOTH COLUMNS CHANGE "RECORD AAZ CORRECTION" TO "RECORD


Z TORQUE"

3-5 AT 04:07 DELETE "THRUST MONITOR - P47"

AT 04:52 DELETE "MANEUVER TO OBSERVE SLINGSHOT"

3-6 AT 05:lO IN MCC-H COLUMN "ADD UPLINK CMC


1 ZERO TRUNNION BIAS”

3-10 AT 11:50 IN NOTES COLUMN CHANGE THE MCC NOTE TO READ: "MCCl WILL
BE DELAYED TO MCC2 IF PROPELLANT COST IS NOT PROHIBITIVE"

3-19 AT 26:50 IN NOTES COLUMN CHANGE THE MCC NOTE TO READ: "TO AVOID
EXECUTION OF MCC3, A NON FREE MCC2 WILL BE EXECUTED (SPS BURN IF
THE BT >3 SEC)"

------ .-__ --~


PAGE CHANGE

3-33 AT 53:50 IN NOTES COLUMN CHANGE THE MCC NOTE TO READ: "MCC3 WILL
BE DELAYED TO MCC4 IF PROPELLANT COST IS NOT PROHIBITIVE"

3-43 AT 70:50 IN NOTES COLUMN CHANGE THE MCC NOTE TO READ: "MCC4 WILL
BE EXECUTED WITH THE SPS IF THE BT >3 SEC"

3-44 AT 71:25 DELETE "PRE-LO1 ECS REDUNDANT COMPONENTCK ACTIVATE PRIMARY


EVAPORATOR" AND ADD "SECONDARY RADIATOR LEAK CHECK"

3-51 AT 80:12 CHANGE "DO NOT TRIM" TO "TRIM X AXIS TO 1 FPS"

3-53 AT 82:13 CHANGE R 0, P -257/297, Y 0 TO R 0, P 296/303, Y 0

3-54 AT 83:20 CHANGE R 82, -350/229, Y 0 TO R 82, P 296/229, Y 0

3-61 AT 95:00 ADD "ROLL RT 40", TO R 122, P 229, Y 0"

3-63 AT 96:48 IN MCC-H COLUMN DELETE "BLOCK DATA"

3-73 & 3-74 DELETE LOCAL HORIZONTAL PITCH OF 166.3 & 244.2 AT 106:47 AND
107:14 RESPECTIVELY

3-76 AT 109:45 IN LM COLUMNS ADD "RADIATION READOUT"

3-79 AT 112:30 IN CMP COLUMN ADD "ACTIVATE PRIM EVAPORATOR"

3-83 AT 116~40 IN LM COLUMN ADD "CONFIGURE COMM (TV-OFF)"

3-91 AT 126:00 IN MCC-H COLUMN ADD "DUMP DSE"

3-92 AT 126:07 IN LMP COLUMN CHANGE P -58 TO P +58

AT 126:30 CHANGE CSM ATTITUDE FROM R 180, P _264/177, Y 0


TO R 0, P 239/160, Y 0

3-93 AT 128:00 ADD IN CMP COLUMN "EXT RNDZ LT - OFF" AND IN MCC-H
COLUMN "DUMP DSE"

AT 127:00 IN CMP & MCC-H COLUMNS ADD "GO/NO GO FOR PYRO ARM"

3-95 AT 130:00 IN MCC-H COLUMN ADD "DUMP DSE"

3-100 AT 134:12 DELETE "ECS REDUNDANT COMPONENTSCK"

3-101 AT 135:18 CHANGE "DAP - Rl=lOlll R2=11111" TO "DAP - Rl=lOlOl


R2=lllll" AND MOVE TO 135:05

3-102 AT 136:15 ADD "DEACTIVATE PRIM EVAPORATOR"

3-132 AT 192:27 CHANGE "MENKAR (07) ENH" TO "MENKAR (07) EFH"

2
ENCLOSURE 2
SYMBOL NOMENCLATURE
ff l-- LUNAR PENUMBRA (OCCURS PRE LOI,) ALSO EARTH
PENUMBRA(PRE EI)
SPACECRAFT SUNSET
M
S
F

. b 4---
r?
MADRID 85FT DISH COVERAGE
DARKNESS (UMBRA)

MSFN LOS

SPACECRAFT SUNRISE
LUNAR PENUMBRA (OCCURS PRE LOI,) ALSO EARTH

I:--! .
-3 c---LUNAR
PENUMBRA(PRE EI)
SURFACE

IMSFN AOS
HONEYSUCKLE85~~ DISH COVERAGE

j_cGOLDSTONE 85FT DISH COVERAGE

LUNAR TERMINATOR
SPACECRAFT SUNSET

DARKNESS

+-LUNAR TERMINATOR

xi Revision A
INTRODUCTION

This Flight Plan has been prepared by the Flight Planning Branch, Flight
Crew Support Division, with technical support by TRW Systems.

This document schedules the AS-506/CSM-107/LM-5 operations and crew activities


to fulfill, when possible, the test objectives defined in the Mission Re-
quirements, G Type Mission Lunar Landing.

The trajectory parameters used in this Flight Plan are for July 16, 1969
launch, with a 72" launch azimuth and were supplied by Mission Planning and
Analysis Division as defined by the Apollo Mission G Spacecraft Operational
Trajectory.

The Apollo 11 Flight Plan is under the configuration control of the Crew
Procedures Control Board (CPCB). All proposed changes to this document
that fall in the following categories should be submitted to the CPCB via
a Crew Procedures Change Request:

1. Items that impose additional crew training or impact crew procedures.

2. Items that impact the accomplishment of detailed test objectives.

3. Items that result in a significant RCS or EPS budget change.

4. Items that result in moving major activities to a different activity


day in the Flight Plan.

5. Items that require a change to the flight data file.

The Chief, Flight Planning Branch (FCSD) will determine what proposed changes
fall in the above categories.

Mr. T. A. Guillory will act as co-ordinator for all proposed changes to


the Apollo 11 Flight Plan.

Any requests for additional copies or changes to the distributicn lists of


this document must be made in writing to Mr. W. J. North, Chief, Flight Crew
Support Division, MSC, Houston, Texas.

xii
b. The coolant loop operation will be as follows:
(1) Launch - primary loop operation
(2) Earth Orbit - primary loop operation and secondary
loop test
(3) Post TLI - deactivate both evaporators
(4) Pre LO1 set rad leak ck only.
(5) At 112:30 activate primary evaporator
(6) Post TEI - deactivate primary evaporator
(7) Entry interface minus 1 hour - activate primary and
secondary evaporator.

3. Guidance and Navigation


a. During lunar orbit, the CSM and LM
will utilize the same landing site
REFSMMAT such that the gimbal angles
would be O,O,O at landing with the
LM sitting face forward on landing
site number two and the CSM over
the landing site pitched up 90"
from local horizontal "heads up".
b. During PTC the CSM/LM x-axis is Ditched up 90" (North)%A
for TLC and down 90" (South) for TEC with the Y-Z axes
in the plane of the ecliptic. This change in x-axis
pointing is to enable simultaneous viewing of the earth
and moon through the side windows while maintaining a
favorable hiqh aain antenna oosition.
c. The CSM tracking light will be on continuously from undock-
ing to landing and from LM lift-off to docking.

4. Landmark Tracking
The following ground rules were used for landmark tracking.
a. IMU to be realigned on the dark side preceding each track-
ing period.
b. MSFN is reacquired after each tracking period. The
tracking data will be acquired by MSFN after all the
marks have been made and while N49 (hR,hV) is displayed.
MSFN will give a GO when data acquisition has been verified.
c. The pseudo landmark tracking (Al) will be used to determine
the altitude of an area in which the LM will be making al-
titude checks after DOI. The data will be processed during
the sleep period after the trackings and relayed to the LM
prior to undocking.

1-18 Revision A
d. In the docked configuration the CSM/LM v
MZO
approaches the landmark in an inertial
hold attitude.
places the spacecraft
local horizontal
This inertial
2" below the
at the 35" elevation
attitude +
es \\,i
angle point. At 35" elevation angle a
pitch down of 0.3"/sec is initiated. HY+k
Five marks are then taken with the
time between marks a minimum of 25
seconds. (See tracking profile)
e. In the undecked configuration the CSM ,'
approaches the landmark in ORB RATE and.
pitched down 22" from the local horizon- '
9 \ ,;c
tal. At 35" elevation angle five marks
are taken with the time between marks a
minimum of 25 seconds. ORB RATE is
q-
continued throughout the marking period.
f. In the undecked COAS tracking the CSM \
will approach the LM in ORB RATE heads
up and pitched down 40" from the local --------
horizontal. When the LM is centered
in the COAS the CSM will initiate a Q
variable pitch rate to keep the LM &< I
centered in the COAS.

5. CSM/LM and CSM attitude maneuvers will normally be at a rate


of 0.2"/sec or 0.5"/sec. unless other rates are required.
NOTE: At 0.2"/sec,15 minutes is required to maneuver 180".
At O.S"/sec, 6 minutes is required to maneuver 180".

6. Passive thermal control mode will be initiated after MCCl or


as soon as MCCl is scrubbed and maintained throughout the
mission (except in lunar orbit) until at least three hours
before entry except for interruptions for midcourse corrections,
communications orientation (maximum interruption of three
hours). PTC will not be initiated before approximately 7:00
GET.

7. Service Propulsion System All SPS burns will be initiated


on Bank A except LO11 which will be initiated on Bank B.

F. LM Notes
1. Entries into the LM
a. Three entries into the LM are scheduled in the timeline
at 56:30, 81:30 and 95:52 GET respectively.

1-19
FLIGHT PLAN
CSM LM MCC-H
CMP 1730 EDT CDR LMP
CLEAR TUNNEL OF CM
HATCH
INSPECT TUNNEL &
DOCKING LATCHES
REMOVE PROBE & DROGUE _-.. .~~
TEMPORARILY STOW - :lO OPEN LM HATCH
PROBE AND DROGUE RECORD ROLL CAL ANGLE
IVT TO LM
CONFIGURE DSE TRANS TO LM PWR
TO RECORD LM DATA
CSM PWRTO LM - ON ACT VHF B FOR DATA
(AT LMI' REQUEST) - :20 XMIT FOR 5 IMINUTES
DUMP DSE (LM DATA) -TRANS TO CSM PWR
IVT TO LM ASSIST CDR
PWRTO LM - OFF
(AT LMP KEQUOST)

PTC L 56:30 VERIFY OPERATION


OF LM 16mm CAMERA

- :40
LM FAMILI (IZATION LM FAMIL lIZATION

- :50

L 57:oo

’ MISSION EDITION DATE TIME DAY/REV PAGE


APOLLO 11 l&vision A July 8, 1969 56:00 - 57:00 3/TLC 3-35
-__
":;I: I;~?,T; 21"' f:;T) (:Tr.,, : j FLIGHT PLANNING BRANCH
-
T
LOI,
BURN CHART

P OR Y ATT SHUTDOWN
PESIDUALS
RATES DEVIATION TIME

loo/SEC +lO"
LOI, TAKEOVER BT + 10 SEC DO NOT TRIM
TAKEOVER

LOI, ABORT MODES

BT TRAJECTORY ABORT MODE


Lo1l 'GO
2924.0 - 2129.0 O-01:50 HYPERBOLIC MODE I - COAST 2 HR - OPS - P37
(P37 BEYOND SPHERE FOR
VGO >2279 AND BT <01:3(
2129.0 - 1589.0 01:50 - (UNSTABLE MODE II - COAST 2 HR - 2 DPS
03:oo BURNS FOR STABILIZA-
TION AND bfATEt? or CLA
LANDING
1589.0 - 0 03:;; is LUNAR ORBIT MODE III - DPS BURN AFTER
ONE REV

3-46a Revision A
2130 EDT
MCC-I4
_ 84;O0
FLIGHT PLAN NOTES
l-
- 84:Ol j
02 FUEL CELL PURGE
5M PRESiEEP CHECKLIST
,\,
CREW STATUS REPORT
1 REV 5 (RADIATION & MEOICATION)
,YCLE 02 & H2 FANS
IHLORINATE POTABLE WATER
SELECT NORMAL LUNAR COMM
CONFIGURATION - EXCEPT:
S-BAND SQUELCH-ENABLE
HGA TRACK-REACO
HGA BEAM - NARROW
IIERIFY:
WASTE MNGMT OVBD DRAIN-OFF
WASTE STOW VENT-CLOSED
EAT EMERGENCY CABIN PRESS-BOTH
; 84:30 SURGE TANK 02 VALVE-ON
PERIOD
REPRESS PACK 02 VALVE - OFF
- 84:33 POTABLE WATER HTR-OFF
iL LM TUNNEL VENT VALVE-LM PRESS

'02 FILTER CHANGE NO. 7


9 INTO A, STORE 7 IN B6

MISSION 1 EDITION DATE I TIME DAY/REV 1 PAGE


APOLLO 11 FINAL JULY 1, 1969 84:00 - U5:OO 4/5 3-55
YSC Form 29 (yay 69) fLlOn1 RINNINO BUANCH
LUNAR ORBIT REST PERIOD ATTITUDE

LOCAL
HORIZONTAL

I
LOS
EARTH

3-55a Revision A
FLIGHT PLAN
CSM LM MCC-H
1130 EDT CDR LMP
CMP
98:00
DON HELMET & GLOVES DON HELMET & GLOVES

ARS/PGA PRESSURE ARS/PGA PRESSURE


INTEGRITY CHECK INTEGRITY CHECK

MANEUVER TO TRACKING
ATTITUDE
CABIN REGULATOR CHECK CABIN REGULATOR CHECK
R 0 ,P297/27O,YD
DOFF HELMET & GLOVES
98:21 DOFF HELMET & GLOVES DOFF HELMET & GLOVES
SELECT OMNI C
COPY DAP DATA SELECT OMNI -FWD UPDATE LM
COPY GYRO TORQUE ANGLES BIO MED SWITCH - RIGHT DAP DATA
AND FINE ALIGN IMU GYRO TORQUE
98:30 X , Y ) z ANGLES
GO INERTIAL
UNSTOW OPTICS OPT:ICS 1
P22 ORBITAL NAVIGATION LMK ID 130
T1 9 8: 4 0: 0 2 (HOR)
T2 1yr.4 5.08(35")
4.6 NM @i%g'--m-
RATE GYRO 4GS ACT &
CHECK SELF TEST N 89
LAT +ocl.2 4 3
LONG/Z + 11..8 4 4
ALTITUDE- ,o 0 l..A&NM
RO,P126.5/22.5,YO

CONTINUEPITCH TO
AGS CAL PITCH ATT (22.5)-
V64 ACQUIRE IdSFN DUMP DSE
V64 ACQUIRE MSFN ANT P 187, Y 70

MISSION 1 EDITION I DATE I TIME DAY/REV PAGE


APOLLO 11 Revision A July 8, J9hY 98:00 - 99:00 5112 3-65
I
)Gp','; j:r,lrr, 'IF,, (c)T) (:j<-: I:) FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-H
CMP 1230 EDT
99:oo
CDR LMP UPLINK LGC
STOW FLIGHT PLAN DRIFT CHECK-REPORT GIMBAL
UNSTOW SOLO BOOK .ANGLES & TIME TO MSFN
I
COPY PADS DEPLOY LANDING GEAR
VECTORS
ORDEAL INITIALIZATION LGC/CMC CLOCK SYNC
PIPA BIAS
LOAD DAP DATA - 32012
LGC ABORT CONSTANT
CSM WT -- V47 INITIALIZE AGS
P TRIM
Y TRIM m
DON HELMET & GLOVES COPY AGS ABORT CONSTANT
DPS GIMBAL DRIVE AND
SC CONT - SCS AND K FACTOR
THROTTLE TEST
MIN/MAX DB, LOW/HIGH /f%%%&r
RATE RCS PRESSURIZATION RCS PRESSURIZATION
(AT REQUEST OF CDR) UPDATE CSM
GO/NO-GO FOR UNDOCKING GO/NO-GO FOR UNDOCKING
DISABLE ROLL JETS FOR RCS CHECKOUT RCS CHECKOUT
RCS HOT FIRE
VERIFY TUNNEL VENT
VALVE - OFF
RECORD LM PCM DATA
SC CONT - CMC AUTO
MANEUVERTO
ACS CALIBRATION ATTITUDE

SC CONT - SCS
RATES <O.l'=/SEC :99:49
DISABLE THRUSTERS FOR - REV 13
17 --.,
"- err r
(AT REQUEST OF LMP)
MANEUVER TO UNDOCKING
ATTITUDE
1 DPS PRESS &; CHECKOUT
RO. P320/14, YD
MISSION EDITION DATE TIME DAY/REV PAGE
APOLLO 11 Revision A July b, lYh9 99:oo - loo:oo 5/12-13 3-66
1‘, . 1.I-.,.,,, 11s;I) i ( T ) (. T,..; \ F'LIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-H
CMP 1330 EDT CDR LMP
-100:00
RR TRANSPONDER
ACT & SELF TEST DAP DATA LOAD V47 AGS ALIGN
CONFIGURE DAP GDC ALIGN TO
FOR UNDOCKING, CSN ONLY
21112 CSM: R 0, P15 /14,
-
Rl = 11102 II
R2 = 11111 DON HELMETS AND GLOVES /'<'
SC CONT - SCS PREPARE FOR UNDOCKING
START 16HM CAMERA
-mOCKI
RO, P194, Y60
ENABLE 83 & C4 RCS JETS JPLrNK LGC
'AW LEFT 60", PITCH UP 110"
V64 ACQUIRE MSFN
LM INPECTION, )ET ORDEAL ACOUIRE MSFN
I 'AW 360". LM INSPECTION ANT P 123, Y -37
CAMERA OFF
DOFF HELMET & GLOVES DESCENT TARGET LOAD
COPY PADS CONFIG FOR PIPA BIAS
SC CONT - CMC CSM VOICE
P30 EXT A’/
P41 RCS THRUSTRELAY
? JPDATE LM
DO1 MNVR PAD
PDI PAD
i PDI ABORT <lo MIN
SEPARATION
c NO PDI +12 PAD
PDI ABORT >lO MIN
JPLINK LGC
100:48 CSM STATE VECTOR
P20 AUTO MANEUVER ;;o;;;gEsT LM E: (5)
SXT & VHF RANGING

JPDATE LM
100:54 piGp&m
VHF RANGING
RR - OFF
UPDATE CSM
COPY PA0 i 101:oo IrtUE PAD

MISSION EDITION DATE TIME DAY /REV PAGE


APOLLO 11 Kevisior. A July 8, 1969 100:00 - 101:oo 5113 3-67
.q,.,. ,. .! I I. \, i , j FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-H
CMP 1430 EDT CDR LMP
101:oo REPORT: UPLINK CMC
P52 (LDG SITE REFSMMAT)
P52 IMU REALIGN
N71: _ --) -.. -~
OPTION 3 REFSMMAT LM STATE VECTOR
REPORT: N05: -_-.--
N93 :
I SYSTEMS CHECKS
M X - DUMP DSE
_.- -- -
S
Y _ _.-- - -
k z _ _'---
GET ----- V47 AGS ALIGN GO/NO GO FOR DO1
--
P40 DPS THRUST UPDATE LM
MNVR TO DO1 ATTITUDE STEERABLE ANTENNA
OMNI AFT, PCM LBR ANGLES
VHF A-VOICE, B-DATA (GET: To2:19)
GDC ALIGN TO IMU
VHF 6 - DATA 1: 101:30
P20 AUTO MANEUVER SLEW STEERABLE ANTENNA
TO SEXTANT TRACK LM ANT P 220, Y 28 CSM: RO, P215/319,YO
-

CONFIRM DOI-VHF RANGING


INCORPORATE P76 - DPS,DO
P20 AUTO MANEUVER - 101:41 TRIM Vx RESIDUALS ULLAGE: 2 JET, 7.5 SEC
TO SEXTANT TRACK LM BT: 28.5 SEC
SEXTANT TRACK ONLY PITCH DOWN, P=195, RR-01
P20 MAN LOCK - ON
- 101347
ORUIT 8.97 X 57.87
RR-OFF
- REV 14 VHF A-VOICE/RNG LM FDAI: RO, P294.9, Yo
__~.~~ . <
i'%J tXl AV VHF B - XMTR - OFF
SEXTANT'AND VHF LOAD PDI + 12 ABORT SET CAMERA
TRACKING OF LM PITCH DOWNTO 106.5'
16mm/HCEX(4,500,INF) 6 fps
YAW LEFT 180"
102:oo COAS OVERHEAD
I-
MISSION 1 EDITION DATE TIME DAY /REV PAGE
APOLLO 11 Revisiun A July 8, 1969 101:oo - 102:oo 5/13-14 3-68
by ,,,- ,.:,, 1' / ,.>T! i 1~\. 8' ' FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-H
CMP CDR LMP
7- P52 PITCH ALIGNMENT V06N20, ENTER ON MARK
SEXTANT AND VHF CHECK RECORD PITCH CDU
TRACKING OF LM N22, REOCRD PITCH CDU

BATTERIES 5 & 6 ON
RR - ON
P20 MODE II LOCK - ON SYSTEMS CHECK
TERMINATE P20 TRACK DPS, OPS, RCS, EPS, CWEA

ANT P 220, Y 28
LPD ALTITUDE, ATTITUDE ACQUIRE MSFN D!JMPDSE
102:19
POSITION CHECK DO1 POST BURN REPORT COPY BURN REPORT
P20 AUTO MANEUVER GO/NO GO FOR PDI GO/NO GO
TO SEXTANT TRACK LM
LR - ON CSM; RO, FE+77 u
LPD ALTITUDE, ATTITUDE
POSITION CHECK, N20 AGS ALIGN

POO,
PITCH
ij
M
102:30
1M
ULLAGE
7.5 SEC
CONFIGURE AGS
START 16mm CAMERA
DOWN0.2O/SEC S 3ETI: 102:35:13
S LPD ALT CE
N' YAW RIGHT 174' THEN 6" "LLAGE: 2 JET, 7.5 SEC LM ;DAI:RlBO,P286.5,YO
N' ;; =,1;7;;NF;; SEC 1
EVALUATE MANUAL CONTROL
PITCH OVER AT P64 SYiTEMS MONITOR
102:46 MANUAL ATTITUDE CONTROL
TOUCHDOWN
LM
PERFORM LUNAR CONTACT CHECKLIST
CONFIRM STAY/NO STAY ,';"I: STAY/NO STAY STAY/NO STAY
102:53
V44 SET LS FLAG a
~CP&I ;M&At;/NO STAY PO STAY/NO STAY
STAY/NO STAY
0 YO 1 STOP 16mm CAMERA
R 0, P -206/80, Y 0 ENABLE MSFN
i 103:oo INITIATE DPS VENTING 1 ASCENT ATTE ES OFF
RR TRANSPONDER - OFF kI V76 RCS MIN IMPULSE REPORT !47, !;3 RELAY
V64 ACQ MSFN
__ _ - _ _ OFF
VHF RANGTNC . m
” , . :nlTlnN
LYIIIVI.
I DATE TIME 1 DAY/REV PAGE
I

APOLLO 11 Kevision A July 8, 1969 102:oo - 103:oo 5114 3-69


:.;:;“ ,li,)‘rn ~.lAC (W) (;:c$ r \ FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-Ii
CMP 1630 EDT CDR LMP
AGS LUNAR SURFACE GYRO
CALIBRATION COPY AGS
LOAD AGS ASCENT TARGET AZIMUTH
DOFF HELMET ~=6O,uuO FT, H DOT=32 Fp:
NO5: __--.-.-- AND GLOVES CLOSE SHADES, DOFF
N93: HELMET AND GLOVES
X _-.-.--- i M ~57-1~~ ALIGN (REFSMMAT)
RR TO STANDBY. GRAVITY MEASUREMENT
Y - -.-- - -
j : REPORTESTIMATE OF LANDED N04: ------ :OPY LANDED
2
I N LOCATION .OCATION, GRAVITY
--*--- CLOSE SHADES rlEASURE
ET: AGS LUNAR ALIGNMENT
ALIGN GDC. VERIFY ORDEE
~57-1~~ ALIGN (REFSMMAT)
COPY LM TRACKING PAD 2 CELESTIAL BODIES
(SEE GET - 104:35)
8omm/BW/CHECKLIST N04: __-.--
UPDATE CSM
60mm/HCEX/CHECKLIST N05: __-'--
/
6 FRAMES FAR FIELD N71: --)--
(FOCUS 50') 6 FRAMES N93 :
NEAR FIELD (FOCUS 20') X --.----
p22 AUTO MNVR TO
TRACKING ATTITUDE WITH EACH CAMERA Y
ORB RATE(IF TIME PERMIT - 103:39 REMOVE MAGS AND STOW 2 __.---
IF NOT AT 104:lO) INSTALL PROTECTIVE NE9 :
RO P338/76, YO COVER AND STOW CAMERAS COPY P57 DATA
LAT --.---
1103:45 LONG/2
ALT cAozpI~U%s
GET ------- UPLINK LGC
-REV 15

PHOTOGRAPH'LUNAR
t INITIALIZE AGS
Lt%‘Y ANIJ LlJ&J
&
ASCENT PAD DATA VECTOR
SURFACE
INSTALL WINDOWSHADES I (TD + 1:40)
UPDATE LM
1 COARSEALIGN RR CDU ( ASCENT PAD

MISSION 1 EDITION I DATE I TIME DAY /REV PAGE


APOLLO 11 Revision A July 8, 1969 103:oo - 104:oo 5114-15 3-70
~I,, ;‘c,.n 1'I "Tj f,:r, , FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-H
CMP 1730 EDT CDR REPORT: LMP
F 104:oo
S/C CONT - SCS
P57 - GRAVITY AND ONE
/ CELESTIAL BODY (T-ALIGN)
N04: _--.--
fa N71: --
P22 AUTO MANEUVER TO N93:
TRACKING ATTITUDE? X -_.---
ORB RATE
Y --.---
RO, P338/342,YO
2 - -.- --
~
GET ---I_---
DON HELMET& GLOVES
CONFIRM STAY/NO STAY STAY/NO STAY FOR LUNAR SURFACE OPERATIONS STAY/NO STAY
CONFIGURE COMM
DAP LOAD 12012 FOR LUNAR STAY
LM WT ~.__ AGS LUNAR ALIGN
CSMWT .-~__ UPDATE LM
BIOMED SWITCH-RIGHT ppTi!-q
P12 - ASCENTPROGRAM
COPY UPDATE 'LIFT OFF TIMES
P22 AUTO OPTICS
LUNAR MODULE
V47 - INITIALIZE AGS Tll~~:~j:Q1
CHECKAPS, RCS, ECS, EP
AGS GUIDANCE STEERING (HOR)

p&j END SIMULATED COUNTDOWNAT TIG -1 MINUTE


CLOSEFUEL VENT AGS PARTIAL POWERDOWN
(AGS snvus SW -STBY)
T2104:39:32
__- __ __

0.2~~
(35")
( N OR s)
CONFIGURESYSTEMSFOR PWRDWN N89
PITCH DOWNO.O5"/SEC LAT + 00.691"
STOP ORB RATE DOFF HELMET & GLOVES DOFF HELMET & GLOVES __ ---
GO INERTIAL 1 I I LONG/2 t 11.858"
_- ---
ROLL 170" TO ACQ MSFN I I ALT - -_-
001.44-- NM
V64 ACQUIRE MSFN EAT PERIOD EAT PERIOD
(40 MIN) (40 MIN) (IF REQUIRED)

I 1 L 1
UPLINK CMC
I IfD SIRED ORIENT
m CHANGE)
MISSION 1 EDITION DATE I TIME DAY/REV PAGE
APOLLO 11 Revision A July 8, 1969 104:oo - 105:oo 5115 3-71
,u,:;(; ]~yrv. -1F foT) f :r \ FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-Ii
CMP I .- 1830 EDT CDR LMP
rP52 (OPT 1 - PREFERRED DUMP DSE
GYRO.TORQUE TO
DESIRED ORIENTATION
FOR PLANE CHANGE
(IF PLANE CHANGE
IS REOUIRED)
I
GDC ALIGN TO IMU .
F 1
EAT PERIOD EAT PERIOD
N -
(40,MIN) (40 MIN)
CONFIGURELM
VHF AM A - SIMPLEX COMMFOR LUNAR
STAY SLEEP
VHF A XMIT - OFF
VHF A RCV - OFF
VHF B XMIT - OFF
VHF B RCV - OFF
:105:3D ,CREW STATUS REPORT (RADIATION, MEDICATION)
CONFIGURE SLEEP STAYION
STOW PLSS IN DONNING STATION

: 105:38
EAT PERIOD
(1 )UR)
1105:44
I REV 16
REST PERIOD REST PERIOD

(4 HPURS) (4 HOIURS)

106:OO

MISSION 1 EDITION DATE TIME 1 DAY/REV PAGE


APOLLO 11 Revision A July 8, 1969 105:OO - 106:OO 5/15-16 3-72
,.'k‘ ,,( ,‘,Y. ‘ID'1 (c)T) (?J<;\, ; \ FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-l-l
CMP 2330 EDT CDR MP
llo:oo

1 110:09
I I
I I
EAT PERIOD EAT PERKOD
i I (1 HOUR) (1 HOUR) DUMP DSE
i I
i 1 COPY 'UPDATE r
UPDATE LM

i 1 CAMERA EXPOSURE
i 1 UPDATED FOR

?I
LM AZIMUTH AND
CHANGE CO2 FILTER 1 T7 THRU T,O
I I STAY NO STAY FOR EVA PREP
REST PERIOD STAY/ND STAY
CRE,WSTATUS REPORT (SLEEP, RADIATION)
(4 HOUR)
IM i CREW STATUS LM CONSUMABLES UPDATE
I4 sF SYSTEMS PREPARATION FOR EtiRLSS
------ GET
C&W LIGHT CK, ADJUST INTERILn711 "GHTING
L.
! NI RCS A B ~-
I ; 110:40
:I PREPARATION FOR EGRESS DESC A-H
STOW LOOSE ITEMS AND ARMREST
! I PREPARE CAMERAS ASC A-H
Ir
16mm/HCEX/AS PER DECAL I- w
6Omm/FRESH HCFX/ -
I 110:47
I AS 'PER DECAL“'
I PLSS/DPs' DONNING

I UNSTDW PLSS AND OPS


CONFIGURE PLSS AND DPS
FOR DDNNIllG

7I 1 lll:oo I

MISSION 1 EDITION DATE TIME DAY/REV PAGE


APOLLO 11 FINAL JULY 1, 1969 llo:oo - 111:DD 5/18 3-77
1.1:;; -,<-,.v ,I:'/ j:,T;r) f;:r-- I 1 FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-H
CMP 0030 EDT CDR LMP
,-111:oo
1: LMP UNSTOW AND DON OVERSHOES
CDR UNSTOWAND DON OVERSHOES
II
REST 'PERIOD
(4 HOURS)
i-
ATTACH OPS TO PLSS
I-
LMP DON PLSS
I: UNSTOW AND CONNECT RCU
,I-111:21

-I- VERIFY PLSS SWITCH AND VALVE POSITIONS

PREPARE CDR PLSS FOR DONNING


ATTACH OPS TO PLSS
-111:30 CDR DON PLSS

: 111:33 UNSTOW AND CONNECT RCU


CO2 FILTER CHAdGE NO. 9
(11 INTO A, STORE 9 IN A3) VERIFY PLSS SWITCH AND VALVE POSITIONS
I
1111:39
I
02 FUEL CELL PURGE
- REV 19

I PLSSIEXTRA VEHICULAR C~MM SYSTEM ELECTRICAL CHECKOUT


EAT PERIOD AUDIO SWITCHES CHECK
(1 HOUR) ACTIV TE PLSS COMM SYSTEM
(TV
r,,n C4 B - CLOSE THEN OPEN 5_
::::A: Lln rnllrnUr%IT
LqUlrl'ILI'II p:,:p :$z ::;:;;
UNSTOWAND CONNECT OPsx2-HOSE AND ACTUATOR
FINAL SYSTEMSPREP FOR EGRESS
GO/NO GO
CONFIRM "GO" FOR CABIN DEPRESS
- VERIFY C/B, VALVES ANU 02/H20 QUANTITY-
DATE TIME DAY/REV PAGE
July 8, 1969 111:oo - 112:oo 5118-19 3-78
FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-!-I
CMP CDR LMP
SELECT DEPLOY SITE SELECT DEPLOY SITE 1+30
CARRY CAMERAS CARRY EXPERIMENTS
DEPLOY LR3 EXPERIMENl DEPLOY PSE
PHOTO EXPERIMENTS TAKE CLOSEUP PHOTOS

DOCUMENTEDSAMPLE JOCUMENTEDSAMPLE
EL/25O/BW-BRKT, INT COLLECTION 1t40
-___ COLLECTION
(f5.6,250,INF), REST/PHOTO LMP MOVE BULK SRC TO DUMP DSE
CLOSE-UP PHOTOS STRUTS OR FOOT PAD
TETHER SAMPLE BAG PREPARE DS SRC
TO LMP
PHOTO SAMPLING COLLECT CORE TUBE 1+50
UNSTOW GNOMON SAMPLE .M ACQUISITION
CHANGE PHOTO DS AREA UNSTOWTOOLS ;ET:
SHUTTER TO l/125 PHOTO SAMPLE COLLECTION COLLECT SAMPLES
PITCH UP 38" STOW ALSCC FILM STOW ALSCC FILM
ROLL 180" TO HEADS UP COLLECT ENVIRONMENTAL COLLECT ENVIRONMENTAL
M SAMPLES SAMPLES 2+00
RO, P320/2zg,YO
S RETRIEVE AND STOW SWC COLLECT LOOSE MATERIAL
PITCH DOWN, PHOTOGRAPH F
LM WHILE TRACKING PACK SRC CORE TUBE SAMPLE
N CLOSE AND SEAL SRC
THROUGH COAS

STOP PITCH AND


ROLL 180" TO HEADS DOWN 2+10
ATTITUDE FOR SURFACE ' EVA TERMINATION
OBSERVATIONS REST/PHOTOLMF WIPE SU T ANEFEMU
STOP CAMERA WIPE FELT ON LANDING
SRC TRANSFER PAD AND LADDER
ASCEND LADDER
\ TRANSFER BULK SRC AND INGRESS CABIN
2+20
CHECK LM
STILL CAMERA MAGAZINE OPERATE SEQ CAMERA
REST CHECKEMU RECEIVE AND STOW SRC
s TRANSFER DS SRC AND MAGAZINE
R180, P282/185,
- YO I , / RECEIVE AND STOW SRC 2t30
HGA P -7, Y 183
MISSION EDITION DATE TIME 1 DAY/REV PAGE
APOLLO 11 &vision A July 8, 1969 114:00-115:oo 5/21 3-81
)"rf,(: ),‘rr,., :I"., [()T) (.jr... :- \ FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-H
CMP 0430 EDT CDR LMP
-115:oo
PRESLEEP CHECKLIST TERMINATE EVA 2+30
CREW STATUS REPORT RADIA- lr WIPE FEET ON LANDING
TION, MEDICATION) PAD AND LADDER
CYCLE 02 & Hp FANS ASCEND LADDER ---I-
CHLORINATE WATER 17 JETT EQUIP
VERIFY: CABIN REPRESS L CLOSE FWDHATCH 2+40
WASTE MNGMT OVBD DRAIN 1: POST EVA SYSTEMS CONFIGURATION END EVA
VLV - OFF
WASTE STOW VENT VLV - VERIFY CAUTION LIGHTS OFF
CLOSED IT
DISCONNECT RCU
EMER CABIN PRESS VLV - 'I 115:18
BOTH DISCONNECT OPS 02 HOSES
SURGE TANK 09 VLV - ON CONNECT LM 02 HOSES
REPRESS PACK'02 VLV-OFF
POTABLE H20 HTR - OFF CONFIGURE VALVES AND CIRCUIT BREAKERS
SELECT COMM NORMAL LUNAR DISCONNECT PLSS H20 HOSES
CONFIGURATION - EXCEPT:
S-BAND SQUELCH - 1 115:30 SWITCH TO LM COMM SYSTEM
ENABLE M
HGA TRACK - REACQ
HGA BEAM - NARROW
S I
PLSS/OPS DOFFING
F
HGA P -59, Y 355
- - 115.37 N REMOVE LMP RCU
-REV
OPS CHECK
STOW PLSS/OPS ON CABIN FLOOR 6 FRAMES EACH, FAR & NEAR
I
EAT PERIOD
REMOVE CDR RCU FIELD (FOCUS 50' & 20') AND
80mm/BW/EVA CARD iyl
STOW PLSS/OPS ON CABIN FLOOR 6 FRAMES EACH, FAR & NEAR
(' H"/IR)

t nus
PREP
-____.-FOR EQUIiMENT
- .- JETW
;O’
&,10’)
REPORT PLSS FEEDWATER COPY REPORT
REMOVE OPS,FROM PLSS
L 116:OO 1

MISSION EDITION DATE TIME DAY /REV PAGE


APOLLO 11 Revisicn A July 8, 1369 115:00-116:00 5/20-21 3-82
)"r:;t: Irl‘~, ]", (,!T) fl!r; : 1 FLIGHT PLANNINS BRANCH
-
5, L-----
UU
FLIGHT PLAN
CSM LM MCC-H
CMP 1130 EDT CDR LMP
122:oo
LGC SELF TEST
: AGS TURN ON, SELF TEST
: CREW STATUS REPORT (SLEEP: AND SYSTEM TESTS
i INITIALIZE AGS TIME
REPORT BIAS TO MCC-H COPY TIME BIAS
I : REPORT:
SELECT COMM: NORMAL
P57 - GRAVITY AND ONE
LUNAR CONFIGURATION CELESTIAL BODY (REFSMMAT)
CREW STATUS REPORT(SLEEP)
N04: ---.---
.
N71: --
N93: X - -f ---
"
I --.---
L --
GET - T’-- :
---.
?.R- ON, SELF TEST, OFF

I RCS HOT FIRE AGS GYROCALIBRATE


M 122:30 M
s 122:31 S
L :
F
N
!: 122:37
V45 RESET LUNAR SURFACE
FLAG :-
P52 IMU REALIGN
OPTION 3 (REFSKMAT) EAT PERIOD EAT PERIOD IJPL'..NK LGC
REPORT (35 MIN) (35 MIN) ,M STATE VECTOR
P52 LIFT OFF REFSMMAT ISERTION +18 MIN
N71:
N05:
N93:
X
Y
123:00 I
Z
GET: - - -:- --:- iDlTlON DATE TIME DAY /REV PAGE
APOLLO 11 <evision A July 0, lrL9 122:00 - 123:00 b/24 3-88
I
br:;L‘ F'C1‘,,..i1p 1 (f T) ji:r;r i ‘I FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-H
CMP 1230 EDT CDR LMP
123:00
COPY CONSUMABLES UPDATE COPY ASCENT PAD UPDATE LM
LOAD PAD DATA IASCENT PAD LCSI PAI
CONSUMABLES UPDATE
(A FROb! NOMINAL)
GET:
123:lO VERIFY AGS:
AZIMUTH CORRECTION = 0 RCS TOT _
H = 60,000 FT
H DOT = 32 FPS A
NO S-BAND YAW MNVR B
ORBIT INSERTION MODE
C
SET CAMERA FOR ASCENT
16mm/HCEX/OVERHEAD D
I 123:24 (f4,500,INF) 12 fps H2 TOT
O2 TOT
RR XPONDER- SELF
TEST THEN PNR
02 FUEL CELL PURGE
-123:30
REV 25
COPY CONSUMABLES UPDATE REPORT:
P57-GRA' VITY AND ONE
CELE3TIi.bLII I__
Briny (T-ALIGN)
-I LM CONSUMABLES UPDATE

GET' ---I:-
N04: --- _.- - RCS A
SET UP CAMERA FOR DOCK11 N71: -- DESC O2
16mm/l8/CEX-BRKT N93:
MIR(f8,250,INF) 6 fps X _ -.- -- DESC A-H
Y __.--- ASC A-H
z ----- '
GET: _--- -:-

123:56

3 ENTERAGS LUNAR ALIGN I DUMPDSE


124:00 +

MISSION 1 EDITION DATE TIME DAY/REV PAGE


APOLLO 11 Revision A July 8, 1969 123:00-124:00 6124-25 3-89
by;'; ,,11^,, /]:,e f(;;) (:c: ; FLIGHT PLANNING BRANCH
FLIGHT PLAN
CSM LM MCC-H
CMP 1330 EDT CDR LMP
124:OO LOAD DAP - 12012
DON HELMET AND GLOVES DON HELMET AND GLOVES
UPDATE LM
V64 ACQUIRE MSFN L;;',;""'"' PROGRAM
p2cmm-
GO/NO GO FOR PGNCS
VHF RANGING ASCENT GUIDANCE AND
MNVR TO SUPPORT PRELAUNCH SWITCH CK (PREI LIFT OFF THIS REV
LIFT OFF PRELAUNCH SWITCH CK LIFT OFF -6 MIN
VERIFY RESTRAINTS APS
VERIFY RESTRAINTS DISABLE S-BAND
RO, P250/207, YO RELAY
i LIFT OFF COMM
START 16mm CAMERA
EXT RNDZ LT - ON V47 INITIALIZE AGS
TIG-5 SEC, ABORT STAGE
PITCH DOWN, O.ZO/SEC APS, LIFT OFF II”. II-7.Ld.L”

BT: 7
RR LOCK ON, MODE II
CONFIRM INSERTION
124:30
124:31 ~.-jORBIT INSERTION
RR-OFF RO, Pw/207, YO
124:36 VERIFY 1NSERTION VEL
VHF RANGING 124:37 ECS CHECK
P52 (LIFT OFF REFSMMAT)
REPORT:
-~~--- / ,,7,: OPTION 3 V48 LOAD DAP N46. 12002
P52 (LIFT OFF REFSMMAT) V56, V41
N7,. OPTION 3 TURN ON TRACK LIGHT \:
JO5: - - -_*_ _
--)-.-- I-
i93 :
N05: ----*-- LM FDAI: RO, P257.3, Yo
X - -.- _ _~ P
N93:
Y v93 (BEFORE FIRST MARK) I
X --*--__ V80, V47 INITIALIZE AGS
-.. --_ _ _ D73
-- ,-CT
..-a DD!TWDIICT
.I-.....14. A-Y
Y -------- ” -
;ET b
2 - - -:- -:- _
---*----
CSM: RO, P235/119,
-- YO
GET -- ----- RR - ON
125:OO I

‘MISSION 1 EDITION I DATE I TIME 1 DAY/REV 1 PAGE


APOLLO 11 Revision A July 8, 1969 124:OO - 125:OO 6125 3-90
&;I: Form ?lh'l (C)T) (Nov i:') FLIGHT PLANNING BRANCH
FLIGHT PLAN NOTES

EQUIPMENT STOWAGE

131:18 VACUUM PGAS

1
Ii-131:25
REV 29
SET UP CAMERA FOR LM JETTISON
16mm/l8/CEX-BRKT,MIR
(f8,750,7) 12 fps

DAP CONFIGURATION
FOR LM JETTISON
CSM, 0.5' DB, 0.5'/SEC
SM RCS CHECK A/C ROLL, 4 JET
ENABLE JETS 8-3 AND C-4
CONFIGURE DAP - Rl=lllOZ, R2=11111
GO/NO-GO FOR PYRO ARM
GO/NO GO

DUMPDSE i

1 132:OO !I!I RO, P45/25,


HGA P-53, Y3
\

MISSION 1 EDITION DATE I TIME DAY/REV PAGE


APOLLO 11 Revision A July 8, 1969 131:00 - 132:00 6129 3-97 _
YSC Form 29 (uay se) FLlOHl PLANNINO BUNCH
MCC-n 2130 EDT FLIGHT PLAN NOTES’
132:00 MNVR TO TEI BURN ATTITUDE (EXCEPT ROLL)

V66 - TRANS CSM STATE VECTOR TO LM SLOT


BURN STATUS REPORT
UPDATE RECORD PRELIMINARY TE130 MNVR PAD
piypimm
GO INERTIAL

DOFF AND BAG PGA'S HELMETS


AND GLOVES

1L 132:23 R1.l P i.2152.6 Y13.8


HGA P -79,Y 10

132:30

1
EAT PEI ID

MISSION EDITION I DATE I TIME DAY/REV PAGE


APOLLO 11 Revision A .July 8, 1969 132:00 - 133:00 6/29 3-98
USC Form 29 (yay 99) FLlOl41 WANNINO BRANCH
-
TEI
BURN CHART

P OR Y ATT SHUTDOWN
RATES RESIDUALS
DEVIATION TIME

loo/SEC +10" BT + 2 SEC & TRIM X AXIS


TEI
TAKEOVER TAKEOVER AV, = -40 FPS TO 0.2 FPS

TEI ABORT MODES

TEI VGo BT TRAJECTORY ABORT MODE


I

3292.7 - 1436.0 o-01:3 0 LUNAR ORBIT MODE III - AFTER 1 REV


1436.0 - 1207.0 1:30- 1:4 10 UNSTABLE MODE II - 2 SPS BURNS FOR ORBIT
STABILIZATION AND WATER
OR CLA LANDING.
1207.0 - Q 1:40-02:2 9 UNSTABLE/ MODE I - 1 BURN AT TEI + 2 HRS
HYPERBOLIC P37 AT SPHERE OFINFLUENCE
HYPERBOLIC

I (Av 580 to 0, BT ;;;;; -

3-1 OOa Revision A


FLIGHT PLAN NOTES
194:oo
(EI -1
HR) PRIMARY EVAPORATOR ACTIVATION

FINAL GDC DRIFT CHECK


TERM CM RCS PPFHEAT

SECONDARY CVAPORATOR ACTIVATION


UPDATE PYRO BATTEKY CHECK
RECORD ENTRY PAD AND RECOVERY DATA
p!KF
:20 P27 UPDATE - V66 - TRANS CSM STATE VECTOR TO
LM SLOT
UPLINK SET DET TO RRT
(CSM EMS INITIALIZATION
RSI ALIGN TO GDC
194:30 CM RCS CK
(EI -30 ENTRY BATTS - ON

GO FOR PYRO ARM SEPARATION CHECKLIST


GO FOR PYRO ARM

P61 ENTRY PREP


MNVR TO CM/SM SEP ATT

L :5D ICM/SM SOP]

P62 - ENTRY ATTITUDE

1 195:oo
MNVR TO ENTRY ATT

MISSION 1 EDITION DATE I TIME 1 DAY/REV PAGE


APOLLO 11 FINAL JULY 1, 1969 194:oo - 195:oo 9/TEC 3-134
I
YSC Form 29 (#a~ 89) fLlOnT WANNINO BRANCH
MCC-I FLIGHT PLAN
P63 - ENTRY INITIATE
IEI - GET = 195:05:04 1
P64 - ENTRY POST .05G

:lO

TIME FROM
TRAJECTORY EVEN1 ENTRY INTERFACE
: 20 MIN:SEC

400,000 FEET (GET 195:05:04) 0o:oo


ENTER S-BAND BLACKOUT 00:18
0.05G 00:28
KA - INITIATE CONSTANT DRAG 00:52
- 195:30 RDOT = -700 FPS 01:18
PEAK G (6.6) 01:22
SUBCIRCULAR VELOCITY 02:08
P64 to P67 02:OB
EXIT S-BAND BLACKOUT 03:24
GUIDANCE TERMINATION 07:14
:40 DROGUE DEPLOYMENT 08:12
MAIN DEPLOYMENT 09:oo
SPLASHDOWN 13:55

y = -6.50", L/D = 0.295, V = 36,195, & R = 1285


:50

L 196:00

MISSION EDITION DATE TIME DAY /REV PAGE


APOLLO 11 Revision A July 8, 1969 195:OO - 196:00 9/TEC 3-135
YSC Form 29 (May 69) FLlOHl WANNINO BIAMCH