Академический Документы
Профессиональный Документы
Культура Документы
Issue No : 4
Title:
HACCP for Whole Milk Powder (Reg.) & ‘Instant’ FCP Date: 1/3/06
FLOWCHART
Approved by: Jim O’Neill
Pat O’Leary
.
se
ru
he
ot
CCP 1 Antibiotics Antibiotic milk disposed of to
ny
Condensate used in external
fo y.
WHOLE MILK INTAKE
d nl
effluent
ra
re o
lorry wash.
ui es
eq os
r r rp
Buffer silos 7/8
ne pu
Daily Milk tanker washes to
(Filters)
ow ion
effluent. Tankers flushed to silo
ht ct
ig pe
prior to CIP with mains water. Cooled & stored
yr ns
First stage of CIP uses
op r i
recovered rinse water. f c Fo
SILOS 9AND 10 SEPARATOR
Lactol detergent is also
to
recovered.
en
ns
SKIM CREAMDISPATCHED
Co
Issue No : 4
Title:
HACCP for Whole Milk Powder (Reg.) & ‘Instant’ FCP Date: 1/3/06
FLOWCHART
Approved by: Jim O’Neill
Pat O’Leary
(Filters)
.
se
Uncontaminated cooling water
ru
WHOLE MILK CONCENTRATE
he
seal water and condensate to
ot
ny
SW-2
fo y.
d nl
ra
re o
Conductivity & Turbidity
ui es
eq os
probes control divert valves.
r r rp
ne pu
DRIER FEED TANK
ow ion
ht ct
ig pe
yr ns
Drier washes to effluent
op r i
SHELL AND TUBE HEATER
f c Fo
to
en
ns
Issue No : 4
Title:
HACCP for Whole Milk Powder (Reg.) & ‘Instant’ FCP Date: 1/3/06
FLOWCHART
Approved by: Jim O’Neill
Pat O’Leary
.
se
ru
he
CCP 3
ot
SIEVE
ny
fo y.
d nl
ra
re o
ui es
eq os
r r rp
POWDER SILOS
ne pu
ow ion
(A) (B) FROM SILOS 4,5,6 BULK BAGS (1 TONNE)
ht ct
ig pe
(A) FROM STORAGE SILOS 3,4,5,6 FOR 25KG
yr ns
BAGS (POWDER STORAGE SILOS)
op r i
f c Fo
SCREW CONVEYOR SCREW CONVEYOR
to
CCP 3A
en
CCP 4
ns