Design by : Eng'r: Muhammad Eshiba

E-mail: eng_eshiba2010@yahoo.com

a SIEMENS Company
Site Test Report for AVR SPAU 341 C3
Project NEW NEWARIAH Substation 110/13.8 kv MAKKAH (1-1)
Consumer SEC-WOA Jop# I=3199
Location WJ01 Equipment Tag N101

1- GENERAL DATA & INFORMATION :

RELAY ANSI NO. SPAU 341 C3 RELAY FUNCTION VOLTAGE REGULATION


RELAY MAKE ABB S. NO.: 627205
TYPE / STYLE SPCU 1D50 AUXILIARY SUPPLY: 80…….265 DC/AC
RATED VOLTAGE 100V/110V/120V RATED FREQUENCY: 60 HZ

2- MECHANICAL CHECKS AND VISUAL INSPECTION :

ITEM DESCRIPTION CHECKED

1 Inspect for physical damage / defects ok


2 Verify connections as per approved drawings ok
3 Check tightness of all connection. ok
4 Test Plug Fn. Checked ok

3- SECONDARY INJECTION TEST:


Selection voltage By SGF1
*DISPLAY Ud=0 For INJECTION VOLTAGE: 0.05 Un=100v SGF1/7= 0 SGF1/8=0
0 Un=110v SGF1/7=1 SGF1/8=0
-0.03 Un=120v SGF1/7=0 SGF1/8=1
*Operating Value Check:
Rated voltageUn =100v CAL∆Us=(U2-U1)/(U1+U2)*100 & REG=(U1+U2)/2
SET VALUE OPERATE VALUE(V) EXPECTED VALUE
REF. VOLT BAND REG CAL ∆US%
Us RAISE (U1) LOWER (U2) RAISE LOWER
WIDTH
2% 87.49 92 88.2 91.8 89.75 2.5
0.9Un 4% 85.29 94.1 86.4 93.6 89.7 4.9
Up=90v 6% 83.13 96.3 84.6 95.4 89.72 7.34
2% 97.4 102 98 102 99.7 2.3
1.0Un 4% 95.2 104.2 96 104 99.7 4.5
Up=100v 6% 93.1 106.3 94 106 99.7 6.62
2% 107.5 112.2 107.8 112.2 109.85 2.13
1.1Un 4% 105.3 114.4 105.6 114.4 109.85 4.14
UP=110v 6% 103 116.6 103.4 116.6 109.8 6.19
Un= rated voltage #Up= Control voltage = Us±Uz±Uci-Ursv
Ud= difference voltage (Um-Up) -- Measuring Range -100% …43% ×Un
Um= ph-ph voltage -------- Measuring Range 0…..1.28 × Un
∆Us= Band Width 0.6……….9.0%×Un #Us= Ref. voltage ----Setting Range 0.85----1.15×Un
Tested By SEC-WOA Witness
Name Muhammad Eshiba abdul ghafoor
Sign
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

Date

a SIEMENS Company
Site Test Report for AVR SPAU 341 C3
Project NEW NEWARIAH Substation 110/13.8 kv MAKKAH (1-2)
Consumer SEC-WOA Jop# I=3199
Location WJ01 Equipment Tag N101
*Operating Time Check(T1):
T1: Delay Time for the first control pulse LIMITS msec = ± 250
∆Us=2%× Un T2=0 Un=100 v Us = 1.00× Un
OPERATING TIME sec EXPECTED TIME sec
APPLIED APPLIED INV .diff.
SET TIME OPERATI (V) AT (V) AT INVERSE INVERSE
DEFINITE DEFINITE limits ms
T1 sec ON B.W 2% B.W 4% B.W 2% B.W 4% B.W 2% B.W 4%
RAISE 97 95 10.03 7.84 8.47 10 7.85 8.61 -10-140
10 SEC
LOWER 103 105 10.08 6.79 8.34 10 6.6 8.4 190 &-60
RAISE 97 95 20.02 15.83 16.78 20 15.69 16.82 140 &-40
20 SEC
LOWER 103 105 20.08 13.44 16.6 20 13.19 16.82 250 &-220
INV.TIME CAL: T1/2^(B-1) B=Ud/∆Us

*Operating Time Check(T2): LIMITS msec = ± 250


T2: Delay time for the following control pulse, unless Um is within the ∆Us limits after the first pulse
∆Us=2%× Un T1=15 Sec Un=100 v Us = 1.00× Un
OPERATING TIME sec EXPECTED TIME sec
APPLIED APPLIED INV.diff.
SET TIME OPERATI (V) AT (V) AT INVERSE INVERSE
DEFINITE DEFINITE Limits
T2 sec ON B.W 2% B.W 4% B.W 2% B.W 4% B.W 2% B.W 4%
RAISE 97 95 5 4.12 4.09 5 3.92 4.2 200 &-110
5 SEC
LOWER 103 105 4.92 2.99 4.07 5 3.23 4.2 -240-130
RAISE 97 95 9.9 7.92 8.25 10 7.85 8.4 70 & -150
10 SEC
LOWER 103 105 10.04 6.15 8.23 10 6.39 8.4 -240-170
INV.TIME CAL: T2/2^(B-1) B=Ud/∆Us
Notes: Selection of inverse/definite time
Inverse T SGF1/5=1
Delay time range: 0…300s Definit T SGF1/5=0

* Operrating pulse duration (OPD):


setting range 0.5 …10.0 s Setting Measuring

1.5 s 1.78 s

Tested By SEC-WOA Witness


Name Muhammad Eshiba Abdul ghafoor
Sign
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

Date
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

a SIEMENS Company
Site Test Report for AVR SPAU 341 C3
Project NEW NEWARIAH Substation 110/13.8 kv MAKKAH (1-3)
Consumer SEC-WOA Jop# I=3199
Location WJ01 Equipment Tag N101

4-UNDER VOLTAGE BLOCKING U<:


Blocks automatic control during an under voltage situation
Un= 100 v Us= 1 Un T1=0 T2=0 ∆ Us= 2% Un
UNDER VOLTAGE BLOCKING
MEASURED VALUES FUNCTION
SETTING %Un EXPECTED VOLTAGE
PICK UP RESET ……ok……
70% 70 volt 69.72 v 69.77 v
80% 80 volt 79.73 v 79.78 v
90% 90 volt 89.73 v 89.75 v

5-OVER VOLTAGE DETECTION U>:


if the measured voltage exceeds the setting value , lower pulses are given faster than normally

Un= 100 v Us= 1 Un T1=0 T2=0 ∆ Us= 2% Un

OVER VOLTAGE DETECTION


MEASURED VALUES OPERATION
SETTING %Un EXPECTED VOLTAGE
PICK UP RESET …ok……
110.00% 110 volt 110.1 v 109.4 v
120% 120 volt 120.1 v 119.6 v
125% 125 volt 125 v 124.5 v

HINT:

#selection under voltage bloking:


U< SGF2/4=1 U< in use
SGF2/4=0 U< not in use

#selection over voltage detection:


U> SGF2/5=1 U> in use Output Relay:
SGF2/5=0 U> not in use SGF2/2=1 U> Active
SGF2/2=0 I > Active

Tested By SEC-WOA Witness


Name Muhammad Eshiba Abdul ghafoor
Sign
Date
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

a SIEMENS Company
Site Test Report for AVR SPAU 341 C3
Project NEW NEWARIAH Substation 110/13.8 kv MAKKAH (1-4)
Consumer SEC-WOA Jop# I=3199
Location WJ01 Equipment Tag N101

6-OVER CURRENT BLOCKING I>:


Blocks any control operation during an over current
Un= 100 v Us= 1 Un T1=0 T2=0 ∆ Us= 2% Un

MEASURED VALUES
SETTING %In EXPECTED CURRENT
PICK UP RESET
1 In 1 AMP 0.991 A 0.98 A
1.5 In 1.5 AMP 1.507 A 1.503 A
2 In 2 AMP 2.017 A 2.011 A

OVER CURRENT BLOCKING FUNCTION


…………OK………….

Notes:
#selection over current Blocking
I> SGF2/3=1 I> IN use
SGF2/3=0 I> not use O/P relay
SGF2/2=0 Active

7-REDUCE SET VOLTAGE CHECK:

Un= 100 v Us= 1 Un T1=0 T2=0 ∆ Us= 2% Un

RAISE VOLTAGE LOWER VOLTAGE


SETTING RSV
ACT EXP ACT EXP
5% Un 92.5 v 93 v 97 v 97 v
9% Un 88.53 v 89 v 93 v 93 v

Hint:
Ursv= reduce set voltage value Setting Range (0-9%)Un
Can be used for load shedding or simple line drop compansation purposes .
the RSV can be activating by injecting dc voltage to binary input at X1 (13-14)

Tested By SEC-WOA Witness


Name Muhammad Eshiba Abdul ghafoor
Sign
Date
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

a SIEMENS Company
Site Test Report for AVR SPAU 341 C3
Project NEW NEWARIAH Substation 110/13.8 kv MAKKAH (1-5)
Consumer SEC-WOA Jop# I=3199
Location WJ01 Equipment Tag N101

8-LINE DROP COMPANSATION CHECK : (LDC) UN= 100 V Us= 1Un


T1=0 T2=0
SINGLE OPERATION TR. ∆Us =5% Un
current injected : 1 AMP
Uz=Line drop Compansation Value= Ur±Ux
# AT UR & UX =0
NO LINE DROP

RAISE LOWER
SET COMPANSATION REG CAL .∆U
OPERATE EXPECTED OPERATE EXPECTED

UR & UX =0 94.2 v 95 v 105.4 v 105 v 99.8 v 5.60%

#AT UX= 0 RESISTIVE LINE DROP I& V IN PHASE

Angle between v&I at 0 dgree & CAL ∆Us =(U2-U1)/(U1+U2)*100 & REG=(U1+U2)/2 & Up= Us+UR

RAISE LOWER
SET COMPANSATION
UR REG CAL .∆U
OPERATE EXPECTED OPERATE EXPECTED

5% Un 99.2 v 100 v 110.4 v 110 v 104.8 v 5.30%

10% Un 104.2 v 105 v 115.4 v 115 v 109.8 v 5.10%

15% Un 109.2 v 110 v 120.4 v 120 v 114.8 v 4.80%

Tested By SEC-WOA Witness


Name Muhammad Eshiba Abdul ghafoor
Sign
Date
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

a SIEMENS Company
Site Test Report for AVR SPAU 341 C3
Project NEW NEWARIAH Substation 110/13.8 kv MAKKAH (1-6)
Consumer SEC-WOA Jop# I=3199
Location WJ01 Equipment Tag N101

#AT UR= 0 Inductive Line Drop I Lag v by 90

Angle between v&I at 90 dgree & CAL ∆Us =(u2-u1)/(u1+u2)*100 & REG=(U1+U2)/2 & Up= Us+Ux

RAISE LOWER
SET COMPANSATION REG CAL .∆U
UX OPERATE EXPECTED OPERATE EXPECTED

5% Un 98.7 v 100 v 109.7 v 110 v 104.2 v 5.30%

10% Un 102.9 v 105 v 114 v 115 v 108.45 v 5.12%

15% Un 107.3 v 110 v 118.4 v 120 v 112.85 v 4.92%

Notes:
Ur% = : resistive line -drop compansating factor
0………..25% Un

Ux% = : reactive line -drop compansating factor


0………..25% Un

#AT UR= 0 Capactive Line Drop I Lead v by 90


Angle between v&I at 270 dgree & CAL ∆Us =(u2-u1)/(u1+u2)*100 & REG=(U1+U2)/2 & Up= Us-Ux

RAISE LOWER
SET COMPANSATION
REG CAL .∆U
UX OPERATE EXPECTED OPERATE EXPECTED

5% Un 89.89 v 90 v 100.9 v 100 v 95.4 v 5.70%

10% Un 85.49 v 85 v 96.5 v 95 v 90.995 v 6.04%

15% Un 81.15 v 80 v 92.1 v 90 v 86.625 v 6.32%

Tested By SEC-WOA Witness


Name Muhammad Eshiba Abdul ghafoor
Sign
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

Date
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

a SIEMENS Company
Site Test Report for AVR SPAU 341 C3
Project NEW NEWARIAH Substation 110/13.8 kv MAKKAH (1-7)
Consumer SEC-WOA Jop# I=3199
Location WJ01 Equipment Tag N101

PARALLEL TRANSFORMER OP..

USING:
Minimum circulating current principle
Selection of parallel operation principle
When SGF1/2 =0 Minimizing circulating current USED OR Master/Slave
When SGF1/2 =1 Negative Reactance USED

CASE (1)
TRAFO NO. (1) , TRAFO NO. (2) IN PARALLEL OPERATION & TRAFO(3) SINGLE

1- FUNCTION TEST & Communication with SPA/LON gateway check


TRAFO 1: V=100 v I=0.5 A θ= 30° lag TRAFO 3 : off
TRAFO 2: V=100 v I=0.6 A θ= -40° lead

Digit No. AVR Of TRAFO (1) Mes. AVR Of TRAFO (2) Mes. AVR Of TRAFO (3) Mes.

1 2 5 5 2 5 5 5 5 2
2 0.3 kA 0.3 KA 0.3 kA
3 0.6 A 0.5 A 0.5 A
4 -40 30 30
5 0.3 kA 0.3 KA 0.3 KA
6 0 Amp 0 Amp 0.6 A
7 0 0 -40
HINT
By register( 3) inside of it supmenu are enabled when communication ok
from (1-7) digits
Red digit NO (1): status information
0= no communication 3= waiting for establishment of parallel operation
1= AVR blocked 4= parallel operation by NRP
2= single operation 5= parallel operation by MCC
Red digit No (2): ………..present value of In for TR# 2
Red digit No (3): ………..I1×In of TR# 2
Red digit No (4): ………..phase shift of TR# 2
Red digit No (5): ………..present value of In for TR# 3
Red digit No (6): ………..I1×In of TR# 3
Red digit No (7): ………..phase shift of TR# 3

Tested By SEC-WOA Witness


Name Muhammad Eshiba Abdul ghafoor
Sign
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

Date
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

a SIEMENS Company
Site Test Report for AVR SPAU 341 C3
Project NEW NEWARIAH Substation 110/13.8 kv MAKKAH (1-8)
Consumer SEC-WOA Jop# I=3199
Location WJ01 Equipment Tag N101
2- PARALLEL OPERATION TEST
CASE 1): Trafo 1 phase shift variable
Trafo 2 phase shift Fixed

Trafo (2) angle Trafo (1) angle Trafo (1) angle Trafo (1) angle Action Happen
pick up reset
Ф= 0º
variable (lag) 47.9º 47º Trafo 1 make LOWER

Ф= 0º variable (lead) 58.2º 58º Trafo 2 make LOWER

CASE 2): Trafo 1 phase shift fixed


Trafo 2 phase shift variable

Trafo (1) angle Trafo (2) angle Trafo (2) angle Trafo (2) angle Action Happen
pick up reset
Ф= 0º
variable (lag) 77.9º 77.1º Trafo 1 make RAISE

Ф= 0º
variable (lead) 47.3º 47º Trafo 1 make LOWER

CASE (2)
TRAFO NO. (2) , TRAFO NO. (3) IN PARALLEL OPERATION & TRAFO(1) SINGLE

1- FUNCTION TEST & Communication with SPA/LON gateway check


TRAFO 2: V=100 v I=0.5 A θ= 30° lag TRAFO 1 : off
TRAFO 3: V=100 v I=0.6 A θ= -40° lead

Digit No. AVR Of TRAFO (1) Mes. AVR Of TRAFO (2) Mes. AVR Of TRAFO (3) Mes.

1 5 5 2 5 2 5 5 2 5
2 0.3 KA 0.3 KA 0.3 KA
3 0.5 A 0 Amp 0 Amp
4 30 0 0
5 0.3 KA 0.3 KA 0.3 KA
6 0.6 A 0.6 A 0.5 A
7 -40 -40 30

Tested By SEC-WOA Witness


Name Muhammad Eshiba Abdul ghafoor
Sign
Date
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

a SIEMENS Company
Site Test Report for AVR SPAU 341 C3
Project NEW NEWARIAH Substation 110/13.8 kv MAKKAH (1-9)
Consumer SEC-WOA Jop# I=3199
Location WJ01 Equipment Tag N101
2- PARALLEL OPERATION TEST
CASE 1): Trafo 2 phase shift variable
Trafo 3 phase shift Fixed

Trafo (3) angle Trafo (2) angle Trafo (1) angle Trafo (1) angle Action Happen
pick up reset
Ф= 0º
variable (lag) 55.9º 55.8º Trafo 2 make LOWER

Ф= 0º variable (lead) 49.5º 49.4º Trafo 3 make LOWER

CASE 2): Trafo 2 phase shift fixed


Trafo 3 phase shift variable

Trafo (2) angle Trafo (3) angle Trafo (2) angle Trafo (2) angle Action Happen
pick up reset
Ф= 0º
variable (lag) 47.9º 47.8º Trafo 3 make LOWER

Ф= 0º variable (lead) 57.8º 57.7º Trafo 2 make LOWER

CASE (3)
TRAFO NO. (1) , TRAFO NO. (3) IN PARALLEL OPERATION & TRAFO(2) SINGLE

1- FUNCTION TEST & Communication with SPA/LON gateway check


TRAFO 1: V=100 v I=0.5 A θ= 30° lag TRAFO 2 : off
TRAFO 3: V=100 v I=0.6 A θ= -40° lead

Digit No. AVR Of TRAFO (1) Mes. AVR Of TRAFO (2) Mes. AVR Of TRAFO (3) Mes.

1 5 2 5 5 5 2 2 5 5
2 0.3 KA 0.3 KA 0.3 KA
3 0 Amp 0.5 A 0.5 A
4 0 30 30
5 0.3 KA 0.3 KA 0.3 KA
6 0.6 A 0.6 A 0
7 -40 -40 0

Tested By SEC-WOA Witness


Name Muhammad Eshiba Abdul ghafoor
Sign
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

Date

a SIEMENS Company
Site Test Report for AVR SPAU 341 C3
Project NEW NEWARIAH Substation 110/13.8 kv MAKKAH (1-10)
Consumer SEC-WOA Jop# I=3199
Location WJ01 Equipment Tag N101

2- PARALLEL OPERATION TEST


CASE 1): Trafo 1 phase shift variable
Trafo 3 phase shift Fixed

Trafo (3) angle Trafo (1) angle Trafo (1) angle Trafo (1) angle Action Happen
pick up reset
Ф= 0º
variable (lag) 46.8º 46.7º Trafo 1 make LOWER

Ф= 0º variable (lead) 46.9º 46.8º Trafo 3 make LOWER

CASE 2): Trafo 1 phase shift fixed


Trafo 3 phase shift variable

Trafo (1) angle Trafo (3) angle Trafo (2) angle Trafo (2) angle Action Happen
pick up reset
Ф= 0º
variable (lag) 46.6º 46.5º Trafo 3 make Lower

Ф= 0º variable (lead) 47.8º 47.5º Trafo 1 make Lower

9-FUNCTION TEST

ITEM DESCRIPTION CHECK

1 IRF contact check (15-16) NC------(15-14)NO OK

2 External control binary input pulse for MANUAL selection at X1:1 check OK

3 External control binary input pulse for AUTO selection at X1:3 check OK

External control binary input signal at X1: 11 for BLOCKING AUTO/MANUAL votage regulation by
4 OK
using SGF1/3=0

5 External control binary input signal at X1: 11 for REMOT/LOCAL BLOCKING by SGF1/3=1 when OK
input energized (REMOTLY CONTROL) when input not energized (LOCALY CONTROL)

Tested By SEC-WOA Witness


Name Muhammad Eshiba Abdul ghafoor
Sign
Design by : Eng'r: Muhammad Eshiba
E-mail: eng_eshiba2010@yahoo.com

Date