Академический Документы
Профессиональный Документы
Культура Документы
21/10/2010 Almanshia 1st floor Add new 27 network points IT, 22/10/2010
Block C Mohammed
Abbass,
Maintenance
contractor
Almanshia Basement Install new partitions (33m2) Idriss, 23/10/2010
Block A Maintenance
contractor
Garden city Ground Install 17 network points IT, 23/10/2010
floor Mohammed
Abbass,
Maintenance
contractor
2nd floor Dismantling and reconnecting IT, 23/10/2010
Archive the network points Mohammed
Abbass,
Maintenance
contractor
30/10/2010 Almanshia 1st floor Move the training room to Idriss, 30/10/2010
Block C Almanshia A, basement Mohammed
Dafallah
Move the training staff to 2nd Facilities 30/10/2010
floor block C
18/11/2010 Alryad The entire Dismantling Network points, IT, Ahmed 20/11/2010
office building servers, PCs, printers Osman, Omer
19/11/2010 Dismantling ACs Omer, 20/11/2010
Mahjoub,
Maintenance
contractor
20/11/2010 Movement of the furniture Idriss, 13/11/2010
Mahjoub,
Maintenance
contractor
20/11/2010 Dismantling of the Generator Maint./TD 20/11/2010
and delivering to WH