System : O/C, E/F & CBF Protection Relay “MiCOM P127” Consultant:
Location : 33kV GIS(H06 –Interconnection Feeder to Existing 33kV S/s)
FINAL SETTING TESTING REPORT OF O/C, E/F & CBF PROTECTION RELAY “MiCOM P127”
RELAY DATA:
Serial. No 31034914
ELECTRICAL CHECKS:
System : O/C, E/F & CBF Protection Relay “MiCOM P127” Consultant:
Location : 33kV GIS(H06 –Interconnection Feeder to Existing 33kV S/s)
FINAL SETTING TESTING REPORT OF O/C, E/F & CBF PROTECTION RELAY “MiCOM P127”
1. PROTECTION FUNCTION TESTING:
1.1 Over Current Protection Function (I>):
I> Setting:
I > Testing:
Pass Criteria
- Pick-up should occur at 1.1 Is ±2%. - Reset should occur at 1.05 Is ±2%.
- IDMT operating time: ±5%+30… 50 ms.
Ie> Setting:
Ie> Testing:
Pass Criteria
- Pick-up should occur at 1.1 Ies ±2%. - Reset should occur at 1.05 Ies ±2%.
- IDMT operating time: ±5%+30… 50 ms.
COMPANY SIEMENS ISCOSA NAJM AJEC SEC
NAME Ali M Khater Mohammed Eltohamy Santhaseelan
SIGNATURE
DATE
SITE TEST REPORT Client:
DUBA POWER PLANT
(UNITS- 7 TO 9)
Najm AL Jazira CONTRACT NO: 20721047/00
System : O/C, E/F & CBF Protection Relay “MiCOM P127” Consultant:
Location : 33kV GIS(H06 –Interconnection Feeder to Existing 33kV S/s)
FINAL SETTING TESTING REPORT OF O/C, E/F & CBF PROTECTION RELAY “MiCOM P127”
Trip Time
Phase Injected Current (A)
Expected (Sec) Measured (Sec)
RYB 1.3 2.71 2.75
Pass Criteria
- CB Fail Timer (tBF) ±2% +10… 30 ms.
System : O/C, E/F & CBF Protection Relay “MiCOM P127” Consultant:
Location : 33kV GIS(H06 –Interconnection Feeder to Existing 33kV S/s)
FINAL SETTING TESTING REPORT OF O/C, E/F & CBF PROTECTION RELAY “MiCOM P127”
3. OUTPUT RELAYS CHECKS:
4. BINARY INPUT: