Вы находитесь на странице: 1из 2

INVERSIONES PESCE VALUACION N˚: 20

ANEXO N˚
JF.CA PERIODO

OBRA: CONSTRUCCION DE INSTALACIONES DE SERVICIOS Y ACABADOS EN LOS EDIFICIOS DE


12/26/2010 #REF!
LA PARCELA D, JUAN PABLO II, MONTALBAN. EDIFICIO 1.

PART. Nº ► 22 CANTIDAD
CONTRATADA▼ #REF!
COD.► E.414.031.350
UND.► M2 6,200.00

DESCRIPCION UND ANCHO LARGO PISOS CANTIDAD M2 PRECIO TOTAL

TORRE C
AREA DE PRESCOLAR M2 5.30 13.00 68.90
PB 68.22
1 169.70
13 128.95
14 90.95
15 10.95
SOTANO 13.20 550.87
TORRE B
PB 68.40
1 168.25
13 116.09
14 106.90
15 11.50
SOTANO 13.20 484.34
TORRE A 1230.80
TOTAL 2,266.01 45.00 101,970.45
TORRE A
ENCERADO TOTAL 1230.80 15.00 18,462.00
TORRE B
PB 68.40
13 116.09
14 106.90
15 11.50
SOTANO 13.20
TOTAL 316.09 15.00 4,741.35
TORRE C
AREA DE PRESCOLAR M2 5.30 13.00 68.90
PB 68.22
SOTANO 13.20
TOTAL 150.32 15.00 2,254.80
DESCANSO DE ESCALERA
TORRE A 43.42
TORRE B 43.42
TORRE C 43.42
TOTAL 130.26 60.00 7,815.60

TORRE B REPASO TOTAL 1127.51 20 22,550.20


TORRE C REPASO TOTAL 1093.35 20 21,867.00
A

CANCELADO HASTA ENERO - 169,000.00

Por la CONTRATISTA INVERSIONES PESCE Por el Contratante TEGAVEN,c.a. Ing. ORLANDO SALOM C.I.V. Nº.
TSU AZUYL QUIROZ SUB-TOTAL 10,661.40

TOTAL 10,661.40
Por la CONTRATISTA INVERSIONES PESCE Por el Contratante TEGAVEN,c.a. Ing. ORLANDO SALOM C.I.V. Nº.
TSU AZUYL QUIROZ

TOTAL 10,661.40