Cálculo para obtenção de curvas de nível

Segmento 12:
1 (-90,000; 25,000; 41,630)
2 (0,000; -100,000; 39,500)

x² = (90)² + (-125)²  x²= 8100 + 15625   154,029m

Desnível  41,630 – 39,500 = 2,130m


154,029 - 2,130
X - 0,630 x = 45,558m  C.N. = 41m
154,029 - 2,130
X - 1,630 x = 47,272m  C.N. = 40m

Segmento 23:
2 (0,000; -100,000; 39,500)
3 (95,000; -35,000; 37,300)

x² = (95)² + (65)²  x²= 9025 + 4225   115,109m

Desnível  39,500 – 37,300 = 2,200m


115,109 - 2200
X - 0,500 x = 26,161m  C.N. = 39m
115,109 - 2,200
X - 1,500 x = 78,483m  C.N. = 38m

Segmento 34:
3 (95,000; -35,000; 37,300)
4 (172,000; -98,000; 36,500)

x² = (77)² + (63)²  x²= 5929 + 3969   99,489m

Desnível  37,300 – 36,500 = 0,800m


99,489 - 0,800
X - 0,300 x = 37,308  C.N. = 37m
Segmento 45:
4 (172,000; -98,000; 36,500)
5 (233,000; 50,000; 34,800)

x² = (61)² + (148)²  x²= 3721 + 21904   160,078m

Desnível  36,500 – 34,800 = 1,700m


160,078 - 1,700
X - 0,500 x = 47,082m  C.N. = 36m
160,078 - 1,700
X - 1,500 x = 141,245m  C.N. = 35m

Segmento 56:
5 (233,000; 50,000; 34,800)
6 (190,000; 160,000; 36,350)

x ² = (-43)² + (110)²  x²= 1849 + 12100   118,106m

Desnível  36,350 – 34,800 = 1,550m


118,106 - 1,550
X - 0,350 x = 26,669m  C.N. = 36m
118,106 - 1,550
X - 1,350 x = 102,867m  C.N. = 35m

Segmento 67:
6 (190,000; 160,000; 36,350)
7 (60,000; 120,000; 39,500)

x ² = (-130)² + (-40)²  x²= 16900 + 1600   136,015m

Desnível  39,500 – 36,350 = 3,150m


136,015 - 3,150
X - 0,500 x = 21,59m  C.N. = 37m
136,015 - 3,150
X - 1,500 x = 64,769m  C.N. = 38m
136,015 - 3,150
X - 2,500 x=107,948  C.N. = 39m
Segmento 78:
7 (60,000; 120,000; 39,500)
8 (30,500; 130,000; 39,200)

x² = (-29,5)² + (10)²  x²= 870,25 + 100   31,149m

Desnível  39,500 – 39,200= 0,300m


Não há curva de nível.

Segmento 81:
8 (30,500; 130,000; 39,200)
1 (-90,000; 25,000; 41,630)

x² = (-120,500)² + (-105)²  x²= 14520,25 + 11025   159,829m

Desnível  41,630 – 39,200 = 2,430m


159,829 - 2,430
X - 0,630 x = 41,437m  C.N. = 41m
159,829 - 2,430
X - 1,630 x = 107,210m  C.N. = 40m

Segmento 1E:
1 (-90,000; 25,000; 41,630)
E (25,000; 30,000; 39,900)

x ² = (115)² + (5)²  x²= 13225 + 25   115,109m

Desnível  41,630 – 39,900 = 1,730m


115,109- 1,730
X - 0,630 x = 41,418m  C.N. = 41m
115,109 - 1,730
X - 1,630 x = 108,455m  C.N. = 40m

Segmento 2E:
2 (0,000; -100,000; 39,500)
E (25,000; 30,000; 39,900)
x²=(25)² + (130)²  x²= 625 + 16900   132,382m

Desnível  39,900 - 39,500 = 0,400m


Não há curva de nível.
Segmento 3E:
3 (95,000; -35,000; 37,300)
E (25,000; 30,000; 39,900)

x² = (-70)² + (65)²  x²= 4900 + 4225   95,525m

Desnível  39,900 - 37,300 = 2,600m


95,525 - 2,600
X - 0,900 x = 33,066m  C.N. = 39m
95,525 - 2,600
X - 1,900 x = 69,806m  C.N. = 38m

Segmento 4E:
4 (172,000; -98,000; 36,500)
E (25,000; 30,000; 39,900)

x² = (-147)² + (128)²  x² = 21609 + 16384   194,918m

Desnível  39,900 - 37,300 = 3,400m


194,918 - 3,400
X - 0,900 x= 51,596m  C.N. = 39m
194,918 - 3,400
X - 1,900 x = 108,925m  C.N. = 38m
194,918 - 3,400
X - 2,900 x = 166,253m  C.N. = 37m

Segmento 5E:
5 (233,000; 50,000; 34,800)
E (25,000; 30,000; 39,900)

x² = (-208)² + (-20)²  x²= 43264 + 400   208,959m

Desnível  39,900 - 34,800 = 5,100m


208,959 - 5,100
X - 0,900 x = 36,875m  C.N. = 39m
208,959 - 5,100
X - 1,900 x = 77,847m  C.N. = 38m

208,959 - 5,100
X - 2,900 x = 118,820m  C.N. = 37m
208,959 - 5,100
X - 3,900 x = 159,792  C.N. = 36m
208,959 - 5,100
X - 4,900 x = 200,764  C.N. = 35m

Segmento 6E:
6 (190,000; 160,000; 36,350)
E (25,000; 30,000; 39,900)

x ² = (-165)² + (-130)²  x²= 27225 + 16900   210,059m

Desnível  39,900 - 36,350 = 3,550m


210,059 - 3,550
X - 0,900 x = 53,254m  C.N. = 39m
210,059 - 3,550
X - 1,900 x = 112,426m  C.N. = 38m
210,059 - 3,550
X - 2,900 x = 171,597m  C.N. = 37m

Segmento 7E:
7 (60,000; 120,000; 39,500)
E (25,000; 30,000; 39,900)

x² = (-35)² + (-90)²  x²= 1225 + 8100   96,566m

Desnível  39,900 - 39,500 = 0,400m


Não há curva de nível

Segmento 8E:
8 (30,500; 130,000; 39,200)
E (25,000; 30,000; 39,900)
x² = (-5,500)² + (-100)²  x²= 30,250 + 10000   100,151m

Desnível  39,900 - 39,200 = 0,700m


Não há curva de nível

Calculo de área através de triangulos

Formula: A =

Triangulo E12

A=

A = 7412,514m²

Triangulo E23

A=

A = 5362,519m²

Triangulo E34

A=

A = 282,110m²

Triangulo E45

A=

A = 14782,120m²

Triangulo E56

A=

A = 11869,985m²

Triangulo E67
A=

A = 5147,234m²

Triangulo E78

A=

A = 1502,507m²

Triangulo E81

A=

A = 5736,355m²
ATOTAL = A1 +A2 + A3 +A4 + A5 + A6 + A7 + A8
ATOTAL = 52095,344 m²

Ângulos do internos polígono.


Obtidos através de AutoCAD.

812 = 95°
123 = 91°
234 = 254°
345 = 73°
456 = 136°
567 = 94°
678 = 216°
781= 121°

Cálculo dos Ângulos internos


1)

Coss= 56°44’8”
Coss= 38°34’42’’
1= 95°20’06’’
2)

Coss= 44°44’3”

Coss= 46°38’23’’
2= 91°22’26’’
3)

Coss= 78°56’30”

Coss= 176°24’12’’
3= 255°20’52’’

4)

Coss= 11°45’42”

Coss= 61°21’07’’
4 = 73°06’49’’

5)

Coss= 71°08’38”
Coss= 62°06’30
5 = 136°15’08’’

6)

Coss= 73°07’00”

Coss= 21°06’15
6 = 94°13’15’’
7)

Coss= 128°24’14”

Coss= 87°33’57
7 = 215°58’11’’

8)

Coss= 74°19’50”

Coss= 45°47’03”
8 = 120°06’53’’

Cálculo da Escala

Epx = Epy =

Epx = Epy =
Epx = Epy =

Usar escala

Cordenadas centrais

Xc=71,500 Yc=30,00