Вы находитесь на странице: 1из 1

Study of effects of Restrictor in the College Avenue Storm Sewer

100 Year localized rainfall event projected over 2-year design storm sewer, with overland flow considered

Pre-Project Flood Post Project Flood Post Project Flood Estimated Drop in Post Project Flood Estimated Drop
Water Surface Elevation*, with Full Estimated Drop in Elevation*, with Partial Flood Level*, Elevation*, No in Flood Level*,
Dead End Street Name Elevation* Restrictor Flood Level*, Inches Restrictor Inches Restrictor Inches

Swarthmore 49.00 48.47 -6.4 48.46 -6.5 48.43 -6.8

Case 48.97 48.48 -5.9 48.46 -6.1 48.43 -6.5

Byron 48.98 48.48 -6.0 48.46 -6.2 48.43 -6.6

Oberlin 48.98 48.39 -7.1 48.36 -7.4 48.30 -8.2

Villanova 48.98 48.27 -8.5 48.23 -9.0 48.14 -10.1

Marquette 48.97 48.08 -10.7 48.02 -11.4 47.90 -12.8

Southwestern 48.97 47.84 -13.6 47.83 -13.7 47.58 -16.7

Riley 48.92 47.93 -11.9 47.88 -12.5 47.06 -22.3

* Localized 100 Year rainfall Event, Does not include concurrent flood on Brays Bayou. Area will remain in floodplain of Brays Bayou until USACE Improvements on Brays are conpleted
and the FIRM flood plain maps are revised.

Date: 4/18/2011 by D. Kasper TX PE No. 86294 HDR Engineering, Inc. Tx PE Firm No. F-00754