Вы находитесь на странице: 1из 6

0931-DOLMEN CITY, KARACHI

S. No. Area Name Area


(Sft)
1 Basement -5000 189,010
2 Basement -2000 302,545
3 Ground Floor Shops 169,610
Corridors 47,000
4 Mezzanine Floor Shops 13,650
5 First Floor Shops 180,660
Corridors 80,900
6 Second Floor Shops 99,425
Corridors 54,900
Food Court 75,000
Food Court Kitchen 7,500
1,220,200

Fahim, Nanji & deSouza


Page 1/6
Consulting Engineers
G2 Clifton

DESIGN CRITERIA FOR HVAC SYSTEM

S. No. Area Name Person Lighting Other Fresh Air Other Loads
Sft/Person Watts/Sft Power

1 Ground Floor Shops 40 (See Notes) 1 0.15 cfm/sqft -

Corridors 30 5.0 - 0.15 cfm/sqft -

2 First Floor Shops 40 (See Notes) 1 0.15 cfm/sqft -

Corridors 40 5.0 - 0.15 cfm/sqft -

3 Second & Upper Floor Shops 40 (See Notes) 1 0.15 cfm/sqft -

Corridors 50 5.0 - 0.15 cfm/sqft -


S=30 Btu/person
L
4 Food Court 30 3.0 - 10 cfm/person = 30 Btu/person
S=30 Btu/person
L
5 Food Court-Stalls 100 3.0 1 0.2 Cfm/Sqft = 30 Btu/person
S=1000 Btu/person

6 Food Court Kitchen 60 3.0 2 10 cfm/person L = 1000 Btu/person

7 Offices-All Floors 100 2.0 1.0 10 cfm/person -

8 Gymnasium 60 2.0 5.0 w/sft 15 cfm/person -

9 Office Lobby-All Floors 200 2.0 - 10 cfm/person -

10 Entrance Lobby 60 2.0 - 10 cfm/person -

11 Sindbad 30 2.5 10 w/sft 10 cfm/person -

12 Restaurant 30 1.5 1.5 20 cfm/person 30

Notes:
1) Shop upto 100 Sft = 20 W/Sft
2) Shop upto 200 Sft = 15 W/Sft
3) Shop upto 300 Sft = 10 W/Sft
4) Shop greater than 300 Sft = 8 W/Sft

Fahim, Nanji & deSouza


Page 2/6
Consulting Engineers
5) Recheck this data for previous sindbad

Fahim, Nanji & deSouza


Page 3/6
Consulting Engineers
PROJECT: CENTER 1
PROJECT ENGINEER: MUHAMMAD ABDUL SAMAD

Load Calculations PHASE 1


Fresh Air
Total Fresh Air Total
Sq. ft. / Watt/ Total No. of AC Fresh Air Latent
Floor Space Area (sq. ft.) Load TR S.A cfm Fresh Air Sensible Fresh Air
Person Sq.ft. Persons MODEL cfm/Person Load in
cfm Load in TR Load TR
TR

Zone 1 Lift Lobby 532 100 1.5 10 1.50 Split - - - - - -

Basement
Zone 7 ELV Room 175 - - - 3.00 Split - - - - - -

TOTAL 707 10 4.50

Zone 1-A Lift Lobby 532 100 1.5 10 1.50 Split - - - - - 0.00

Zone 2 Office Lobby 404 100 1.5 4 2.00 Split 703 17 69 0.18 0.30 0.48

MDB-100D
Zone 3-A (Show Room) 3335 250 5 13 14.00 6743.0 20 267 0.70 1.16 1.86
GROUND MDB-125D
FLOOR Zone 3-B (Show Room) 5372 250 5 21 25.00 (3) 11430.0 20 430 1.12 1.88 3.00
MDB-125D
Zone 3-C (Show Room) 5597 250 5 22.4 24.00 (3) 10778.0 20 448 1.17 1.95 3.12
MDB-150D
Zone 3-D (Show Room) 12767 250 5 51 38.10 (4) 18365.0 20 1021 2.67 4.46 7.12

TOTAL 28007 112 104.60 48019 2234 6 10 16


MDB-100D
Zone 4-A (Show Room) 3257 250 5 13 13.00 (2) 6260.0 20 261 0.68 1.14 1.82
MEZZANINE MDB-100D
FLOOR Zone 4-B (Show Room) 6508 250 5 26 20.00 (3) 9226.0 20 521 1.36 2.27 3.63
MDB-100D
Zone 4-C (Show Room) 6623 250 5 26 20.00 (3) 8552.0 20 530 1.38 2.31 3.69

TOTAL 16388.00 66 53.00 24038.00 1311 3 6 9

Zone 1-B Lift Lobby 532 100 1.5 10 1.50 Split - - - - - 0.00

FIRST FLOOR
Zone 5-A (Office) 14734.61 100 1.5 147 36.00 15270.0 20 2947 7.69 12.86 20.55

Zone 5-B (Office) 17957.21 100 1.5 180 43.00 17186.0 20 3591 9.37 15.67 25.04

TOTAL 33223.82 327 80.50 32456.00 6538.36 17.07 28.53 45.59

Zone 1-C Lift Lobby 532 100 1.5 10 1.50 Split - - - - - 0.00
SECOND
FLOOR Zone 6-A (Office) 14425.23 100 1.5 144 36.00 15191.0 20 2885 7.53 12.59 20.12

Zone 6-B (Office) 16974.11 100 1.5 170 55.00 23469.0 20 3395 8.86 14.81 23.67

TOTAL 31931.34 314 92.50 38660.00 6279.87 16.39 27.40 43.79

GRAND TOTAL 110257.16 819 335.10 143173 16364 43 71 114

Note:

U = 0.62 Btu/hr./Sq.ft./F For wall

U = 0.52 Btu/hr./Sq.ft./F For Clear double glazing and S.C = 0.83

U = 0.15 Btu/hr./Sq.ft./F For Roof


Sq.ft/TR
Total Load
(With
with Fresh
Fresh
Air TR
Air)

1.5 354.67

3.0 58.33

4.5

1.50 354.67

2.48 162.97

15.86 210.27

28.00 191.88

27.12 206.36

45.22 282.32

120

14.82 219.82

23.63 275.41

23.69 279.51

62

1.50 354.67

56.55 260.56

68.04 263.90

126.09

1.50 354.67

56.12 257.05

78.67 215.75

136.29

449.2 245.45
Floor wise HVAC and its corresponding Electrical Load for phase 1

Electrical
Floor Unit Equipment Location of MCC
Load
Air Handling
Basement 4.4 kW Unit / Fan coil Beside D.B
unit

Air Handling
Ground Floor 30.3 kW Beside D.B
Unit

Air Handling
First Floor 29.78 kW Beside D.B
Unit

Air Handling
Second Floor 21.25 kW Inside AHU Room
Unit

Air Handling
Third Floor 21.70 kW Inside AHU Room
Unit

Note:

Plant Room of Phase 1 is located at Fourth floor and its Electrical load is 148 kW
Floor wise HVAC and its corresponding Electrical Load for phase 2 (Back side)
Electrical
Floor Unit Equipment Location of MCC
Load
5th - 11th Air Handling
11.7 kW Inside AHU Room
Floor Unit

Air Handling
12th Floor 12.2 kW Inside AHU Room
Unit

13th Floor Fresh Air


13.07 kW Inside AHU Room
(Roof) Handling Unit

Floor wise HVAC and its corresponding Electrical Load for phase 2 (Front side)
Electrical
Floor Unit Equipment Location of MCC
Load
5th - 8th Air Handling
8.2 kW Inside AHU Room
Floor Unit

Air Handling
9th Floor 8.8 kW Inside AHU Room
Unit

10th Floor Fresh Air


5.69 kW Inside AHU Room
(Roof) Handling Unit

Note:

Plant Room of Phase 2 is located at Fourth floor and its Electrical load is 296 kW