INSPECTION AND TEST PLAN

Activity Activity Description Inspection/Test Requirements Reference Document Contract QC. 3rd Party Client Remark
No. Rep. Rep.
1.0 Inspection of Materials
• Visual and dimensional checks of pipes
H S

and fittings (diameters, Joints beveling as


applicable), to ensure materials procured for
flowline works are of Specific standard
2.0 Verify welder qualified, and correct WPSs used
• Check welder qualification I.D. against qualified H S

welder list

• Check weld procedure table


3.0 Weld Joint Preparation
• Verify as per approved WPS. H S

4.0 Welding of Pipes and fittings


• Visual inspection of completed welds P S

5.0 NDE. (RT) of Joints


• Verify NDE as per spec. W P R

6.0 Tie-in welds of section carried out


• Verify Joint alignment, fitup and pre-heat as P W

applicable.

• Verify welder Qualification and WPS


• Verify Inspect completed weld joints
7.0 NDE of Tie-in Joints Completed Verify NDE as per spec. W P R
8.0 Pressure Testing Verify Pressure testing as per spec. W P W
9.0 Inspection of excess materials Check materials and documentation. Return excess P W
materials to ware house
10.0 Installation of Spool Pieces Check for correct alignment of items installed P W
11.0 Installation of Valves Check for correct alignment of Valves P W
12.0 Painting of Pipes & others Verify Painting as per SPEC P W

Legend: S= Surveillance Inspection W= Witness Inspection Point H= Mandatory Hold Point for Inspection R= Record Review P= Perform