Вы находитесь на странице: 1из 1

INSTALLATION INSTRUCTIONS:

6 CORPORATE PARKWAY
GOOSE CREEK , SC . 29445 1. Before beginning installation, carefully unpack and identify all parts ,
www . quoizel . com referring to illustration ( FIGURE 1 ) .

2. Turn the electrical power to installation point OFF at circuit breaker.

3 . Locate FINIAL onto ends of SPACER TUBE. The CLIP SPRING will
engage inside wall of SPACER TUBE.
FIGURE1
4.Locate the UNIVERSAL CROSSBAR and secure to OUTLET BOX
with (2)OUTLET BOX SCREWS(not supplied).

5. Make the connections: (Quoizel recommends 2 people for this step)


TOOL Use wire connectors(not supplied)connect the HOUSE GROUND to
the FIXTURE GROUND WIRE ; attach the HOUSE WHITE WIRE to
FIXTURE WHITE (or RIBBED SIDE) SUPPLY WIRE; connect the
HOUSE BLACK (or RED) WIRE to the FIXTURE BLACK (or SMOOTH
SOCKET COLLAR SIDE) WIRE. Wrap each connection with approved electrical tape.

6. Carefully tuck all wires into the WALL MOUNTED OUTLET BOX and
position the fixture over the outlet box. Align the HOLES in the BACK
SHADE PLATE with the (2) MOUNTING SCREWS attached to the UNIVERSAL
UNIVERSAL CROSSBAR. Pass the fixture over the (2)MOUNTING SCREWS and
CROSSBAR (2) OUTLET secure against by threading (2)MOUNTING BALLS onto end of screw.
BOX SCREWS
(not supplied) SOCKET Tighten until snug.
OUTLET BOX
7.Position SOCKET through the hole on the bottom of SHADE .
Using TOOL ( included ) , thread SOCKET COLLAR onto SOCKET
and tighten until snug to secure the SHADE .
SHADE HOLDER
8. Install bulb(s) referring to fixture marking and /or labels for maximum
wattage.

BACK PLATE 9. Restore power to the installation point ON. Retain this sheet for future
(2) MOUNTING SCREWS
reference.
GREEN GROUND SCREW (2)MOUNTING BALL(S)

SPACER TUBE
FIXTURE SUPPLY WIRE CLIP SPRING
and GROUND WIRE
FINIAL

IF IN DOUBT ABOUT ELECTRICAL INSTALLATION,


CONSULT A LICENSED ELECTRICIAN! IS - PP8602
12 . 05

Вам также может понравиться