MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010

DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
JuIy 2008 Abu Dhabi Shuweihat S2 IWPP Project (Power) GDF SUEZ 820 SAMSUNG/KOREA-SIEMENS/GERMANY Powergen 2011
JuIy 2008 Abu Dhabi Shuweihat S2 IWPP Project (DesaIination) GDF SUEZ 800 DOOSAN/KOREA Water/desaI 2011
January 2009 Abu Dhabi SAS Project Package A Adco 2300 PETROFAC Production 2012
January 2009 Abu Dhabi SAS Project Package B Adco 1300 TECNICAS REUNIDAS/SPAIN-CCC Production 2012
March 2009 Abu Dhabi Bab Gas Compression Project Adco 805 SK ENG/KOREA Production 2012
May 2009 Abu Dhabi IGD Project (Offshore portion) Adma Opco 405 NPCC/UAE Production 2012
JuIy 2009 Abu Dhabi IGD Project (Habshan 5 PIant) Gasco 4700 JGC/J - MAIRE TECNIMONT/ITALY Gas/treatment 2013
JuIy 2009 Abu Dhabi IGD Project (Habshan 5 Offsites & UtiIities) Gasco 1700 HYUNDAI ENG Gas/treatment 2013
JuIy 2009 Abu Dhabi IGD Project (Ruwais 4th NGL Train) Gasco 2100 PETROFAC / GS ENGINEERING Gas/treatment 2013
JuIy 2009 Abu Dhabi IGD Project (Ruwais Storage Tanks) Gasco 533 CB&I/USA Storage 2013
JuIy 2009 Abu Dhabi IGD Project (Das IsIand Gas PIant) Adgas 1000 HYUNDAI HEAVY INDUSTRIES/SOUTH KOREA Gas/treatment 2013
JuIy 2009 Abu Dhabi Borouge 3 Project (ethane cracker) Borouge 1070 LINDE/GERMANY PetrochemicaI 2013
October 2009 Abu Dhabi Ruwais FertiIizer Expansion FertiI 1200 SAMSUNG/KOREA-UHDE/GERMANY PetrochemicaI 2013
November 2009 Abu Dhabi Ruwais Refinery (CDU Package) Takreer 2110 SK ENG/KOREA Refining 2014
November 2009 Abu Dhabi Ruwais Refinery (RFCC Package) Takreer 3110 GS ENGINEERING/SOUTH KOREA - TARGET ENG Refining 2014
November 2009 Abu Dhabi Ruwais Refinery (O&U Package) Takreer 2700 SAMSUNG ENGINEERING Refining 2014
November 2009 Abu Dhabi Ruwais Refinery (Tankage Package) Takreer 1200 DAEWOO/SOUTH KOREA - CB&I/USA Storage 2014
November 2009 Abu Dhabi Ruwais refinery (Marine FaciIities Package) Takreer 524 GS ENGINEERING/SOUTH KOREA Refining 2014
November 2009 Abu Dhabi Asab 3 Project Gasco 415 TECHNIP/ABU DHABI Gas/treatment 2013
December 2009 Abu Dhabi Bab & Qusahwira FieIds DevIpt Adco 1250 NPCC/UAE Production 2012
January 2010 Abu Dhabi PipeIine between Thamama C & Asab Gasco 85 DODSAL/UAE Transportation 2011
January 2010 Abu Dhabi Mirfa-Habshan Nitrogen PipeIine EIixier 84 DODSAL/UAE Transportation 2011
February 2010 Abu Dhabi Bida EI Qemzan FieId DevIpt Adco 300 VECO/USA (CH2M HILL) Production 2012
March 2010 Abu Dhabi Construction of Four NucIear PIants Kepco 6140 HYUNDAI ENG / SAMSUNG ENG / KOPEC Powergen 2020
ApriI 2010 Abu Dhabi Ruwais Isomerate QuaIity Improvement Pjt Takreer LITWIN/F Refining 2011
ApriI 2010 Abu Dhabi Shah Gas Project (Processing PIant) Adnoc 1900 SAIPEM/ITALY Gas/treatment 2014
ApriI 2010 Abu Dhabi Shah Gas Project (SuIfur Recovery Unit) Adnoc 1450 SAIPEM/ITALY Gas/treatment 2014
ApriI 2010 Abu Dhabi Shah Gas Project (PipeIines Package) Adnoc 196 SAIPEM/ITALY Transportation 2014
ApriI 2010 Abu Dhabi Shah Gas Project (Offsites&UtiIities) Adnoc 1500 SAMSUNG ENGINEERING Gas/treatment 2014
ApriI 2010 Abu Dhabi Shah Gas Project (Gas Gathering System) Adnoc 463 TECNICAS REUNIDAS/SPAIN-PUNJLLOYD/INDIA Gas/treatment 2014
May 2010 Abu Dhabi IRP Project (Tankage portion) Takreer 272 DAEWOO/SOUTH KOREA Storage 2012
May 2010 Abu Dhabi Borouge 3 Project (PoIyoIefins Package) Borouge 1255 TECNIMONT/ITALY-SAMSUNG ENGINEERING PetrochemicaI 2014
May 2010 Abu Dhabi Borouge 3 Project (LDPE Package) Borouge 400 TECNIMONT/ITALY-SAMSUNG ENGINEERING PetrochemicaI 2014
May 2010 Abu Dhabi Borouge 3 Project (Offsites & UtiIities) Borouge 935 HYUNDAI ENG PetrochemicaI 2014
May 2010 Abu Dhabi Ruwais Base OiI Production FaciIites Takreer 463 HYUNDAI ENG Refining 2013

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
May 2010 Abu Dhabi Zakum CentraI Super CompIex DemothbaIIing Adma Opco 350 NPCC/UAE Production 2012
June 2010 Abu Dhabi Lower Zakum FieId Adma Opco 350 J.RAY McDERMOTT Production 2012
June 2007 AIgeria Arzew FertiIizer CompIex Sorfert 1600 UHDE/GERMANY-OCI ALGERIA PetrochemicaI 2011
JuIy 2007 AIgeria Skikda LNG Train Reconstruction Sonatrach 2800 KBR/USA Gas/treatment 2012
November 2007 AIgeria Terga/Ain Temouchent Power PIant SoneIgaz 1970 ALSTOM/F-ORASCOM/EG Powergen 2011
November 2007 AIgeria Koudiet Edraouch Power PIant SoneIgaz 2100 GENERAL ELECTRIC/USA-IBERDROLA/SPAIN Powergen 2011
March 2008 AIgeria Mers eI Hadjaj Ammonia-Urea CompIex Sonatrach/Bahwan 3000 MITSUBISHI HEAVY IND/J-DAEWOO ENG PetrochemicaI 2012
JuIy 2008 AIgeria Rhourde Nouss FieId DeveIopment Sonatrach 500 JGC/JAPAN Gas/treatment 2011
JuIy 2008 AIgeria Arzew LNG PIant Sonatrach 4200 SAIPEM/ITALY - CHIYODA/JAPAN - DAEWOO ENG Gas/treatment 2012
JuIy 2008 AIgeria Skikda Storage Tanks (Skikda Lng Pjt) Sonatrach ENTREPOSE CONTRACTING/F Storage 2011
November 2008 AIgeria Arzew Refinery Expansion Naftec 405 HYUNDAI ENG / HANWHA CORP / DAEWOO Refining 2011
November 2008 AIgeria Hassi Messaoud LPG FaciIity Sonatrach 1640 SAIPEM/ITALY - SHAW/USA Gas/treatment 2012
November 2008 AIgeria AIrar Power PIant Expansion Sonatrach 143 BONATTI / GAVAZZI IMPIANTI Powergen 2011
November 2008 AIgeria GREO Gas PipeIine (packages 1-2-3) SoneIgaz 156 COSIDER/KANAGHAZ/ENAC/ERCIYAS-T Transportation 2011
November 2008 AIgeria GREO Gas PipeIine (package 5 ) SoneIgaz 54 GUNSAYIL/TURKEY Transportation 2011
March 2009 AIgeria EL Merk FieId DevIpt (CPF Package) Sonatrach/Anadarko 2200 PETROFAC - ORASCOM Production 2012
March 2009 AIgeria EI Merk FieId DevIpt (FIowIines/Gathering) Sonatrach/Anadarko 673 ABB SARPI/ALGERIA - PETROJET/EGYPT Production 2012
March 2009 AIgeria MLE FieId DeveIopment Sonatrach/ENI 1800 SAIPEM/ITALY Production 2012
May 2009 AIgeria Skikda Refinery Upgrading Sonatrach 2600 SAMSUNG/KOREA Refining 2012
June 2009 AIgeria Hamra Gas Processing FaciIities Sonatrach 1090 LAVALIN/Canada Gas/treatment 2012
June 2009 AIgeria Gassi TouiI Gas Processing FaciIities Sonatrach 1500 JGC/JAPAN Gas/treatment 2013
June 2009 AIgeria Haoud Berkaoui Gas FIaring Sonatrach 233 ABB SARPI/ALGERIA Gas/treatment 2012
June 2009 AIgeria GK-3 PipeIine (pack 1 & 2) Sonatrach 800 PETROJET/EGYPT Transportation 2011
June 2009 AIgeria GK-3 PipeIine (pack 3) Sonatrach 580 SAIPEM/ITALY Transportation 2011
October 2009 AIgeria EI Merk FieId DevIpt (PipeIines) Sonatrach/Anadarko 150 BONATTI /ITALY Transportation 2011
February 2007 AngoIa Soyo LNG Project AngoIa LNG 4000 BECHTEL/USA Gas/treatment 2012
December 2007 AngoIa PazfIor Project (Subsea Package) TotaI 1800 TECHNIP/F - ACERGY Production 2011
February 2008 AngoIa PazfIor Project (FPSO & Topsides) TotaI DAEWOO/SOUTH KOREA - KBR/USA Production 2011
JuIy 2008 AngoIa BIock 31 PSVM Pjt (subsea fIowIines - umbiIicaIs)BP 645 TECHNIP/F Production 2011
JuIy 2008 AngoIa BIock 31 PSVM Pjt (FPSO) BP MODEC/SINGAPORE - TOYO ENGINEERING/JAPAN Production 2011
JuIy 2008 AngoIa BIock 31 PSVM Pjt (URF Risers) BP 1000 HEEREMA MARINE CONTRACTORS Production 2011
JuIy 2008 AngoIa BIock 31 PSVM Pjt (UmbiIicaIs) BP 520 SUBSEA 7 - AKER SOLUTIONS Production 2011
December 2008 AngoIa PipeIine Network for Soyo LNG AngoIa LNG 550 SPIE CAPAG/F - ACERGY Transportation 2011
September 2009 AngoIa BIock 17/18 GEP Phase 2 Project TotaI E&P AngoIa 110 ACERGY GROUP Production 2010
JuIy 2009 AngoIa Kizomba SateIIites DevIpt (TieBack) Esso ExpIoration AngoIa SAIPEM/ITALY - PONTICELLI/F - AMEC Production 2011

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
December 2007 Argentina EI Rio Turbio Power PIant YACIMIENTO CARBONIFERO 670 ISOLUX CORSAN/SPAIN Powergen 2011
August 2009 Argentina La PIata CCR PIant YPF 348 ODEBRECHT Refining 2012
March 2008 AustraIia North Rankin 2 Project North West SheIf Venture 5000 HHI/SOUTH KOREA-EOS-McDERMOTT Production 2011
August 2008 AustraIia Fishermann's Landing LNG Project LNG Ltd SK ENG/KOREA - LAING O'ROURKE Gas/treatment 2011
November 2008 AustraIia Southern Seawater DesaIination Project Water Corporation 620 TECNICAS REUNIDAS/SPAIN-AJ LUCAS Water/desaI 2011
February 2009 AustraIia AdeIaide DesaIination PIant Ministry 868 ACCIONA AGUA/SPAIN-McCONNELL DOWELL Water/desaI 2011
March 2009 AustraIia Reindeer Gas Project (onshore Portion) Apache / Santos CLOUGH/AUSTRALIA - J.HOLLAND Gas/treatment 2011
June 2009 AustraIia CoIIie Urea Project Perdaman ChemicaIs 2800 SAMSUNG/KOREA-IKPT/INDONESIA PetrochemicaI 2013
JuIy 2009 AustraIia Wonthaggi DesaIination PIant Victoria Government 1700 DEGREMONT/F - THIESS/AUSTRALIA Water/desaI 2011
September 2009 AustraIia Reindeer Gas Project (weIIhead pIatform) Apache / Santos SHENZHEN CHIWAN SEMBAWANG ENG/CHINA Production 2011
September 2009 AustraIia Gorgon LNG PIant Chevron/ExxonMobiI/SheII 2300 KJVG (KBR/JGC/CLOUGH/HATCH) Gas/treatment 2014
October 2009 AustraIia Gorgon LNG Pjt (Storage Tanks) Chevron/ExxonMobiI/SheII 550 CB&I/USA Storage 2013
October 2009 AustraIia Gorgon LNG Pjt (LNG moduIes) Chevron/ExxonMobiI/SheII 2060 HYUNDAI HEAVY IND/SOUTH KOREA-COOEC/CHINA Gas/treatment 2013
October 2009 AustraIia DeviI Creek DeveIopment Project Apache / Santos 170 SAPURAACERGY Transportation 2010
February 2010 AustraIia Curtis LNG PIant QGC / BG Group BECHTEL/USA Gas/treatment 2014
ApriI 2010 AustraIia MorweII coaI-fired power pIant HRL Corporation 750 CNEEC/CHINA Powergen 2013
May 2010 AustraIia GIadstone LNG Project (Upstream Portion) Santos / Petronas FLUOR AUSTRALIA Production 2014
August 2008 Austria MeIIach Combined CycIe Power PIant Verbund Austrian Power 826 SIEMENS/AUSTRIA - AE&E/AUSTRIA Powergen 2011
August 2008 Bahrain Addur IWPP (Power Package) Suez Energy / GIC Kuwait HYUNDAI/KOREA Powergen 2011
August 2008 Bahrain Addur IWPP (DesaIination Package) Suez Energy / GIC Kuwait DEGREMONT/F Water/desaI 2011
August 2008 Bahrain Sitra Base Lube OiI PIant Bapco / Neste 314 SAMSUNG/KOREA PetrochemicaI 2011
February 2010 BangIadesh Chandpur & SyIhet Power PIants Government 251 CHENGDA ENG/CHINA - SHANGHAI ELECTRIC Powergen 2011
December 2008 BeIgium TessenderIo Power PIant T-Power 414 SIEMENS/GERMANY-FABRICOM GTI-PAUWELS INT Powergen 2011
June 2010 BoIivia Margarita Gas Processing PIant RepsoI YPF 500 TECNICAS REUNIDAS/SPAIN Gas/treatment 2012
May 2010 Bosnia Stanari ThermaI EIectric PIant EFT Group 616 DONGFANG ELECTRIC CORP/CHINA Powergen 2014
November 2008 Botswana MorupuIe B Power Station Botswana Power Corp CNEEC/CHINA - SBW/CHINA Powergen 2012
November 2008 Botswana MmamabuIa Energy Project CIC Energy SHANGHAI ELECTRIC GROUP/CHINA Powergen 2013
January 2008 BraziI P-57 PIatform Petrobras 1250 SBM OFFSHORE/NETHERLANDS Production 2011
January 2008 BraziI Itaqi/Maranhao & Pecem Power PIants MPX 1600 TECNIMONT/ITALY Powergen 2011
March 2008 BraziI Refap HDS Unit Petrobras 150 SKANSKA/BRAZIL Refining 2011
March 2008 BraziI Vittoria Gas Treatment PIant Petrobras 241 MAIRE TECNIMONT/BRAZIL - ALUSA Gas/treatment 2011
JuIy 2008 BraziI Repar Refinery Upgrading (deIayed coker) Petrobras 1500 CAMARGO CORREA/PROMON Refining 2011
JuIy 2008 BraziI Repar Refinery Upgrading (interconnections) Petrobras 1400 INTERPAR/BRASIL Refining 2011
September 2008 BraziI P-55 PIatform Petrobras 845 QUEIROZ GALVAO - IESA - UTC ENGENHARIA Production 2011
September 2008 BraziI SuppIy of Equipment for North East Refinery Petrobras 160 LARSEN & TOUBRO/INDIA Refining 2011

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
October 2008 BraziI Pecem II Power Station MPX 343 MAIRE TECNIMONT/BRAZIL Powergen 2012
March 2009 BraziI Tambau Urugua & P-56 DeveIopment Petrobras 200 SUBSEA 7 Transportation 2010
JuIy 2009 BraziI Refap Refinery Upgrading (interconnections) Petrobras 100 SKANSKA/BRAZIL Refining 2011
October 2009 BraziI Papa Terra TLWP P-61 Petrobras 1000 FLOATEC/USA Production 2013
October 2009 BraziI Papa Terra FPSO P-63 Petrobras 1300 BW OFFSHORE/QUIP CONSORTIUM Production 2013
October 2009 BraziI Roncador FieId (P-55 connection) Petrobras 200 SUBSEA 7 / BRAZIL Transportation 2011
December 2009 BraziI Abreu e Lima Refinery Petrobras 8900 CAMARGO CORREA-CNEC-ODEBRECHT Refining 2012
March 2010 BraziI Comperj Refinery (DAV Portion) Petrobras 623 SKANSKA/BRAZIL-PROMON-ENGEVIX Refining 2013
March 2010 BraziI Comperj Refinery (UHC Portion) Petrobras 824 ALUSA/BRAZIL Refining 2013
March 2010 BraziI Comperj Refinery (deIayed coker) Petrobras 1000 TECHINT/BRAZIL - ANDRADE GUTTIEREZ Refining 2013
May 2010 BraziI Cabo Power PIant Energetica Suape II 250 WARTSILA/FINLAND Powergen 2012
March 2010 Cameroon Kribi Power PIant Kribi Power DevIpt Cy 175 WARTSILA/FINLAND Powergen 2011
June 2010 Cameroon Limbe Refinery Upgrade 1st Phase Sonara FOSTER WHEELER Refining 2012
November 2007 Canada North West Upgrader Pjt (Gasifier unit) North West Upgrading 500 LURGI/GERMANY-KBR/USA Gas/treatment 2011
ApriI 2008 Canada Vancouver LNG Peak Shaving Project Terasen Gas 150 HORTON CBI Storage 2011
June 2008 Canada Regina Refinery Expansion Project CCRL 1900 COLT WORLEYPARSONS/CANADA Refining 2012
August 2008 Canada Horizon Expansion project Canadian NaturaI Resources 195 TECHNIP/ITALY Production 2011
November 2009 Canada OakviIIe Power PIant Transcanada 380 AKER SOLUTIONS Powergen 2013
January 2008 ChiIe MejiIIones Power PIant Suez / Antofagasta MineraIs COBRA/SPAIN Powergen 2011
ApriI 2008 ChiIe Construction of two power pIants Aes Gener 1310 POSCO ENGINEERING/SOUTH KOREA-ANSALDO/I Powergen 2011
January 2009 ChiIe MejiIIones SuIfuric Acid PIant Noracid 40 OUTOTEC/FINLAND PetrochemicaI 2011
December 2006 China Construction of 4 nucIear PIants SNPTC 8000 SHAW/USA - WESTINGHOUSE/USA Powergen 2014
December 2008 China Huizhou AcryIic Acid PIant CNOOC Energy 53 LURGI/GERMANY PetrochemicaI 2011
January 2009 China Fujian LNG TerminaI Project CNOOC Fujian LNG CB&I/USA Storage 2011
June 2009 China Yinchuan LNG PIant Ningxia Hanas Nat Gas Cy TECHNIP/MALAYSIA-CHINA Gas/treatment 2011
August 2009 China Nanjing PetrochemicaI CompIex Expansion BASF - YPC 1400 TOYO/JAPAN PetrochemicaI 2011
September 2009 China Shanghai PoIycarbonate Resin PIant Mitsubishi Gas ChemicaI TOYO/JAPAN PetrochemicaI 2012
November 2009 China Zheijiang Ningbo LNG TerminaI CNOOC 1030 CNOOC/CHINA - CHENGDA ENGINEERING Gas/treatment 2012
November 2009 CoIombia Cartagena Refinery Expansion Reficar 1400 CB&I/USA Refining 2013
June 2009 Czech repubIic Pocerady Power PIant CEZ 1000 SKODA PRAHA Powergen 2013
JuIy 2009 Cyprus VasiIikos Power PIant Expansion EIectricity Authority 322 J&P AVAX/GREECE - HITACHI POWER EUROPE Powergen 2011
December 2008 Ecuador EsmeraIdas Refinery RehabiIitation Petroecuador 187 SK ENG/KOREA Refining 2011
March 2009 Ecuador Monteverde Storage FaciIities FIopec 50 CB&I/USA Storage 2010
January 2010 Ecuador Refineria deI Pacifico Petroecuador-PDVSA 10000 SK ENG/KOREA Refining 2014
August 2009 EquatoriaI Guinea Aseng FPSO NobIe Energy 1200 SBM OFFSHORE/NETHERLANDS-KEPPEL SHIPYARD Production 2012

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
August 2007 Egypt Mostorod Refinery Egyptian Refining Cy 1800 MITSUI/J - GS ENGINEERING/SOUTH KOREA Refining 2014
January 2008 Egypt Sidi Krier & EI Atf Power PIants DeIta EIectricity 132 ANSALDO ENERGIA Powergen 2010
August 2008 Egypt KhaIda 5th Gas Processing Train KhaIda PetroIeum Cy PETROFAC Gas/treatment 2010
February 2009 Egypt AIexandria DeIayed Coker Expansion Midor 55 TECHNIP/ITALY Refining 2010
February 2010 Egypt Ain Sokhna Power PIant East DeIta EIectricity Cy 330 DOOSAN/KOREA Powergen 2013
June 2010 Egypt West DeIta Deep Marine Phase VIIIa DevIpt BuruIIus Gas Cy 367 TECHNIP/F Production 2012
June 2008 FinIand Porvoo Isomerization Unit Neste OiI 120 NESTE JACOBS/FINLAND Refining 2011
March 2010 FinIand Forssa Power PIant Fingrid 101 ANSALDO ENERGIA Powergen 2012
March 2008 France Bayet Power PIant AteI (3CB) 375 ANSALDO ENERGIA Powergen 2011
June 2008 France Beynes underground gas storage faciIity GDF 214 LITWIN/F Storage 2011
June 2009 France Etrez Gas Storage Expansion Project Storengy JACOBS ENGINEERING/FRANCE Storage 2012
September 2009 France GonfreviIIe Cracker Expansion TotaI PetrochemicaIs TECHNIP/F PetrochemicaI 2011
January 2010 France Cere Ia Ronde Gas Storage Expansion Pjt Storengy JACOBS ENGINEERING/FRANCE Storage 2012
June 2007 Fujairah Fujairah II Power Project IP / Marubeni ALSTOM/F Powergen 2010
June 2007 Fujairah Fujairah II DesaIination Project IP / Marubeni SIDEM/F Water/desaI 2010
ApriI 2010 Fujairah Fujairah OiI TerminaI Expansion Vopak Horizons 100 BELLELI/ITALY Storage 2011
May 2010 Gabon AnguiIIe FieId WeIIhead PIatform TotaI SAIPEM/ITALY - EIFFEL/F Production 2012
May 2007 Germany Construction of 2 coaI-biomass Power PIants EIectrabeI HITACHI POWER EUROPE Powergen 2012
October 2007 Germany Lnen Power PIant TrianeI Power 600 SIEMENS/GERMANY-A-TEC/AUSTRIA-IHI/J Powergen 2012
March 2008 Germany Mainz combined Heat & Power PIant Mainz-Wiesbaden AG 1500 SIEMENS/GERMANY-AE&E/AUSTRIA-IHI/J Powergen 2011
ApriI 2008 Germany Hamm power pIant RWE 750 ALSTOM/F Powergen 2012
June 2008 Germany WiIheImshaven LNG PIant E.ON TECNIMONT/I-SOFREGAZ/F-VINCI/F-ENTREPOSE Gas/treatment 2011
JuIy 2009 Germany EtzeI CrystaI Gas Storage Project EDF / ENBW ENERGIE TECHNIP/GERMANY Storage 2011
August 2009 Germany Connect Project Phase I SheII DeutschIand GmbH TECHNIP/GERMANY Refining 2010
November 2009 Germany Mannheim 9 Power Project Grosskraftwerk Mannheim 673 ALSTOM/F Powergen 2013
March 2010 Germany KrefeId-Uerdingen ChIorine PIant Bayer MateriaIscience AG UHDE/GERMANY ChemicaI 2011
August 2008 Ghana JubiIee FPSO TuIIow Ghana Ltd MODEC/USA Production 2010
October 2009 Ghana JubiIee FieId (subsea) TuIIow Ghana Ltd TECHNIP/USA Production 2010
May 2008 Greece EIefsis Refinery Upgrade HeIIenic PetroIeum 1560 TECNICAS REUNIDAS/SPAIN Refining 2011
JuIy 2008 Greece ThessaIoniki Refinery Upgrade HeIIenic PetroIeum 170 FOSTER WHEELER ITALIANA Refining 2011
November 2008 Greece Corinth Power PIant Motor OiI HeIIas/MytiIineos 360 METKA/GREECE Powergen 2011
December 2008 Greece Nea Messambria Compressor Station Desfa 72 STROYTRANSGAZ/RUSSIA Transportation 2011
August 2009 Greece MegaIopoIis Power PIant PubIic Power Corp 731 METKA/GREECE Powergen 2012
August 2008 Hungary SzazhaIombatta Hydrocracking CompIex MOL Hungarian OiI&Gas TECNICAS REUNIDAS/SPAIN Refining 2011
May 2007 India Mundra UItra Mega Power Project Tata Power Cy 1220 DOOSAN/KOREA - TOSHIBA/J Powergen 2012

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
November 2007 India Kochi LNG TerminaI (storage tanks) Petronet 250 IHI/JAPAN Storage 2011
November 2007 India Krishnapatnam Power PIant CoastaI Andhra Power 3000 RELIANCE ENERGY LTD/INDIA Powergen 2014
January 2008 India North Chennai Power Station TamiI Nadu EIectricity 1128 BHEL/INDIA Powergen 2011
February 2008 India Anpara D Power Station UPRVUNL 841 BHEL/INDIA Powergen 2012
February 2008 India Construction of two power pIants in Gurajat GSEG - GSPC 743 BHEL/INDIA Powergen 2010
March 2008 India Mumbai Lube OiI Base Stock PIant Hindustan PetroIeum 144 LARSEN & TOUBRO/INDIA Refining 2010
March 2008 India Mumbai High Offshore FieId (PRP-2 Project) ONGC 720 LEIGHTON AUSTRALIA Transportation 2011
June 2008 India Barauni MSQ Upgradation Project Indian OiI Corporation 152 PUNJ LLOYD/INDIA Refining 2010
June 2008 India DeIhi Power PIant Pragati Power Corp PPCL 835 BHEL/INDIA Powergen 2011
June 2008 India PaIIatana Power PIant in Tripura ONGC Tripura Power Cy 514 BHEL/INDIA-GE/USA Powergen 2012
June 2008 India Bokaro Power PIant Damodar VaIIey Corp 428 BHEL/INDIA Powergen 2011
June 2008 india Sasan UItra Mega Power Project ReIiance Industries 2500 RELIANCE INFRASTRUCTURE LTD/INDIA Powergen 2012
JuIy 2008 India Mettur Power PIant Expansion TamiI Nadu EIectricity 550 BGR ENERGY/INDIA Powergen 2012
JuIy 2008 India KaIisindh ThermaI Power Project RRVUNL 1100 BGR ENERGY/INDIA Powergen 2012
August 2008 India Guwahati/Digboi MS QuaIity Upgradation Pjt Indian OiI Corporation UHDE/INDIA Refining 2010
August 2008 India GoindwaI Sahib Power PIant GVK Power Ltd 262 BHEL/INDIA Powergen 2011
September 2008 India Bharuch Nitric Acid PIant GNVFC UHDE/INDIA PetrochemicaI 2011
September 2008 India Chhabra ThermaI Power PIant Expansion RRVUNL 209 BHEL/INDIA Powergen 2011
November 2008 India Hydrogen Units at Bhatinda Refinery HPCL-MittaI 143 LARSEN & TOUBRO/INDIA Refining 2010
November 2008 India SRU Units at Bhatinda Refinery HPCL-MittaI TOYO INDIA Refining 2010
November 2008 India Kakatiya ThermaI Power Generating Unit APGenco 267 BHEL/INDIA Powergen 2012
December 2008 India Dahej EthyIene PIant OPAL 1430 LINDE/GERMANY-SAMSUNG/SOUTH KOREA PetrochemicaI 2012
December 2008 India Bina Power PIant Jaiprakash Power Ventures 245 BHEL/INDIA Powergen 2012
December 2008 India Mauda Super ThermaI Power Project NTPC 435 BHEL/INDIA Powergen 2012
January 2009 India MangaIore Refinery Expansion (CDU/VDU) MRPC JACOBS ENGINEERING / INDIA Refining 2011
January 2009 India TiIaiya UItra Mega Power Project Government 3200 RELIANCE POWER/INDIA Powergen 2013
February 2009 India Sri Damodaram Sanjeevaiah ThermaI Power APPDCL 561 TATA PROJECTS/INDIA Powergen 2012
February 2009 India MaIwa ThermaI Power Project MPPGC 968 BHEL/INDIA - LARSEN & TOUBRO/INDIA Powergen 2012
March 2009 India Paradip Refinery (EPCM-1) Indian OiI Corporation FOSTER WHEELER/UK Refining 2012
ApriI 2009 India MangaIore Refinery Expansion (DHT/HGU) MRPC 265 LARSEN & TOUBRO/INDIA Refining 2011
ApriI 2009 India Mumbai High North ICP-R PIatform ONGC 362 GUNANUSA/INDONESIA-AFCON/INDIA Production 2011
ApriI 2009 India Paradip Refinery (EPCM-2) Indian OiI Corporation UHDE INDIA Refining 2012
May 2009 India Avantha Bhandar ThermaI Power Project Korba West Power Cy Ltd 316 BHEL/INDIA Powergen 2011
May 2009 India BeIa ThermaI Power Project IdeaI Energy Projects Ltd 150 BHEL/INDIA Powergen 2011
June 2009 India Paradip Refinery (EPCM-4) Indian OiI Corporation TOYO INDIA Refining 2012

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
June 2009 India Vizag FormaIdehyde PIant Kanoria ChemicaIs UHDE/INDIA ChemicaI 2011
June 2009 India Aditya Power PIant HindaIco Industries BHEL/INDIA Powergen 2011
JuIy 2009 India JharkIand Power PIant APNRL 269 BHEL/INDIA Powergen 2012
JuIy 2009 India Chandrapur Super ThermaI Power Station Mahagenco 334 BGR ENERGY/INDIA Powergen 2012
JuIy 2009 India KOCHI LNG TerminaI (Iiquefaction faciIities) Petronet CTCI/TAIWAN Gas/treatment 2012
August 2009 India MangaIore Refinery CHTU Project MRPC 80 TECNIMONT INDIA Refining 2011
August 2009 India Derang ThermaI Power Project JindaI India ThermaI Power 545 BHEL/INDIA Powergen 2011
August 2009 India Mumbai High North Process PIatform ONGC 1180 LARSEN & TOUBRO/INDIA Production 2012
August 2009 India MangaIore PoIypropyIene Unit MRPC 312 EIL/INDIA PetrochemicaI 2012
August 2009 India Marwa ThermaI Power Project Chhattisgarh State Power 334 BGR ENERGY/INDIA Powergen 2011
August 2009 India Nigrie SupercriticaI ThermaI Power PIant Jaypee Group 828 LARSEN & TOUBRO/INDIA - MHI/INDIA Powergen 2013
September 2009 India MangaIore Coke drum structure package MRPC 113 PUNJ LLOYD/INDIA Refining 2011
September 2009 India MangaIore CDU/VDU n1 revamping MRPC TOYO INDIA Refining 2011
September 2009 India Vemagiri Power PIant GMR Energy 415 LARSEN & TOUBRO/INDIA Powergen 2012
September 2009 India Meenaskshi Power PIant Meenaskshi Energy 198 THERMAX/INDIA Powergen 2011
September 2009 India B-22 FieId DeveIopment ONGC 278 NPCC/UAE Production 2011
October 2009 India Vizag DieseI Hydrotreat Project Hindustan PetroIeum 150 TECHNIP/INDIA Refining 2012
October 2009 India Mumbai DieseI Hydrotreat Project Hindustan PetroIeum 720 TOYO INDIA Refining 2011
October 2009 India MangaIore Refinery DeIayed Coker BOP MRPC TOYO INDIA Refining 2011
October 2009 India JindaI Power PIant Expansion JindaI India ThermaI Power 1070 BHEL/INDIA Powergen 2011
October 2009 India Haripur NucIear Power PIant NucIear Power Corp ATOMSTROYEXPORT Powergen 2015
November 2009 India Koradi Power Station Mahagenco 1490 LARSEN & TOUBRO/INDIA Powergen 2013
November 2009 India Prayagraj ThermaI Power Project Prayagraj Power Generation 1200 BHEL/INDIA Powergen 2012
December 2009 India Bharuch Ammonia PIant GNFC 212 LARSEN & TOUBRO/INDIA PetrochemicaI 2012
December 2009 India RS-12 WeII PIatform at Mumbai High FieId ONGC 162 NPCC/UAE Production 2011
January 2010 India Panipat & Bathinda Ammonia Conversion Pjt NationaI FertiIizers Ltd 464 LARSEN & TOUBRO/INDIA PetrochemicaI 2013
January 2010 India Maharashtra coaI-fired power pIant Lanco Mahanadi Power Ltd 1200 LANCO INFRATECH Ltd Powergen 2012
January 2010 India Raipur-Chhattisgarh CoaI-Fired Power PIant GMR Energy 1000 DOOSAN/KOREA Powergen 2013
February 2010 India Godhna Power PIant Karnataka Power Corp 2100 LARSEN & TOUBRO/INDIA Powergen 2013
March 2010 India MangaIore Aromatics CompIex ONGC MangaIore Petr 446 LARSEN & TOUBRO/INDIA PetrochemicaI 2012
March 2010 India Nasik & Amravati coaI-fired power pIants EIena Power Infrastr. Ltd 1300 BHEL/INDIA Powergen 2012
March 2010 India Paradip Captive Power PIant Indian OiI Corporation 735 BHEL/INDIA Powergen 2012
March 2010 India TadaIi Power PIant DhariwaI Infrastructure 223 PUNJ LLOYD/INDIA Powergen 2012
March 2010 India NangaI Ammonia PIant Conversion Pjt NationaI FertiIizers Ltd 240 TECNIMONT INDIA PetrochemicaI 2013
March 2010 India Paradip FCC Reactor Regenerator Pjt Indian OiI Corporation 312 LARSEN & TOUBRO/INDIA Refining 2012

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
March 2010 India Mumbai High North Phase II ONGC 224 LARSEN & TOUBRO/INDIA Production 2012
ApriI 2010 India Jharsuguda coaI-fired power pIant Vedanta Resources 1500 SEPCO/CHINA Powergen 2012
ApriI 2010 India Deen DayaI WeIIhead PIatform Gujarat State PetroIeum 235 LARSEN & TOUBRO/INDIA Production 2012
ApriI 2010 India CuddaIore Refinery (Inside Battery Limit) Nagarjuna OiI Corp PUNJ LLOYD/INDIA Refining 2011
ApriI 2010 India Karnataka Power PIant Raichur Power Corp Ltd 1400 BHEL/INDIA Powergen 2013
May 2010 India ManaIi Resid Upgradation Project Chennai PetroIeum 650 JACOBS ENGINEERING / INDIA Refining 2012
May 2010 India CuddaIore Refinery (DHDS Package) Nagarjuna OiI Corp SAMSUNG ENGINEERING INDIA Refining 2012
May 2010 India MaIIavaram Onshore Gas TerminaI GSPC 315 EIL/INDIA Gas/treatment 2012
May 2010 India BabraIa FertiIizer Expansion (ammonia pack) Tata ChemicaIs HALDOR TOPSOE/DENMARK PetrochemicaI 2013
May 2010 India BabraIa FertiIizer Expansion (urea pack) Tata ChemicaIs SAIPEM/ITALY PetrochemicaI 2013
May 2010 India B-193 FieId DevIpt (pIatform) ONGC 618 SWIBER HOLDINGS / SIME DARBY Production 2012
May 2010 India D-1 FieId DevIpt (pIatforms/pipeIines) ONGC 235 ESSAR OFFSHORE SUBSEA / IOEC Production 2012
June 2010 India Gautami Power PIant Expansion Pjt GVK Gautami Power 689 HYUNDAI ENG / LARSEN & TOUBRO Powergen 2013
June 2010 India Hazira AdditionaI Gas Processing faciities ONGC 66 LARSEN & TOUBRO/INDIA Gas/treatment 2012
September 2007 Indonesia Cirebon ThermaI Power PIant PT Cirebon EIectric Power 540 DOOSAN/KOREA Powergen 2011
December 2007 Indonesia BaIongan Refinery Expansion Pertamina 300 TOYO/JAPAN - PT REKAYASA/INDONESIA Refining 2011
ApriI 2008 Indonesia 2 power pIants in East Java and Aceh PT PLN 889 CNEEC/CHINA - SINOHYDRO/CHINA Powergen 2011
August 2008 Indonesia Muara Tawar Combined CycIe Power PIant PT PLN 240 ALSTOM/F-MARUBENI/J Powergen 2010
December 2008 Indonesia AdipaIa Power PIant PT PLN 605 CNTIC/CHINA Powergen 2012
December 2008 Indonesia Donggi-Senoro LNG TerminaI PT Donggi Senoro LNG JGC/JAPAN Gas/treatment 2012
January 2009 Indonesia Tanjung Priok CCGT Power PIant PT PLN MITSUBISHI HEAVY IND/J Powergen 2011
May 2009 Indonesia Gajah Baru FieId DeveIopment Premier OiI Natuna 430 SMOE/INDONESIA - PT SAIPEM/INDONESIA - NISCONI Production 2011
June 2009 Indonesia Bontang Ammonium Nitrate PIant PT KaItim Nitrate Indonesia 173 PT REKAYASA/INDONESIA PetrochemicaI 2011
ApriI 2010 Indonesia South Mahakam FieId (pIatform/pipeIines) TotaI 240 PT NISCONI Production 2012
March 2007 Iran Esfahan Refinery Upgrading Project Esfahan OiI Refining Cy 1720 DAELIM/KOREA - LURGI/G-UHDE/G Refining 2011
ApriI 2007 Iran Lorestan & Mahabad PoIyethyIene PIants Bakhtar PetrochemicaI Cy 628 NARGAN/IRAN-TECNIMONT/I PetrochemicaI 2011
February 2007 Iran Nioc LNG Project (tankage Project) NIOC LNG 320 DAELIM/KOREA - KHATAM AL ANBIA Storage 2010
September 2007 Iran Tehran Refinery Upgrading Phase II NIORDC 310 IGC/IRAN-ODCC/IRAN-D&I/IRAN Refining 2011
ApriI 2008 Iran South Pars Phase 12 (epc-1) Petropars 284 ARAS CONSORTIUM Storage 2011
October 2008 Iran Imam Khomeini Propane Dehydrogenation NIPC UHDE/GERMANY PetrochemicaI 2012
December 2008 Iran Three Ammonia-Urea CompIexes NIPC HAMPA ENGINEERING CONTRACTOR/IRAN PetrochemicaI 2011
March 2009 Iran AssaIuyeh Ammonia PIant Star Aria Ammonia Chem Cy CHINA TCC / MEHVAR SAZAN PetrochemicaI 2011
March 2009 Iran AssaIuyeh ESBR PIant AssaIuyeh Sadaf ChemicaI 340 TECNIMONT/I-NARGAN/IRAN PetrochemicaI 2012
May 2009 Iran South Pars Phase 20-21 NIOC 5500 OIEC/IRAN Production 2014
June 2009 Iran South Pars Phase 12 (epc-3) Petropars 1800 TECNIMONT/ITALY-NARGAN-DORRIZ-GAMMA Gas/treatment 2012

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
June 2009 Iran Tombak Liquefaction PIant Iran LNG 1000 GS ENGINEERING/SOUTH KOREA-PIDECO/IRAN Gas/treatment 2012
October 2009 Iran AssaIuyeh Gas Sweetening PIant Pars OiI & Gas Cy 1400 GS ENGINEERING/SOUTH KOREA Gas/treatment 2013
October 2009 Iran South Pars Phase 12 (epc-2) Petropars 1800 DAELIM/SOUTH KOREA - SAZEH-KAYSON-IIND Gas/treatment 2012
August 2008 Iraq Samawah Refinery Upgrading Ministry of OiI 81 CICSCO/USA Refining 2010
JuIy 2009 Iraq Akas and AI Mansuria FieIds DevIpt Scop 80 BGR ENERGY/INDIA Production 2011
September 2009 Iraq HiIIa & AI Taji Power PIants Ministry 170 SNC LAVALIN/CANADA - URUK GROUP Powergen 2012
November 2009 IsraeI Ashdod DesaIination PIant Mekorot 451 SADYT/SPAIN - MINRAV/ISRAEL Water/desaI 2012
May 2010 IsraeI Mishor Rotem Power PIant OC Power Ltd 470 DAEWOO/SOUTH KOREA Powergen 2012
February 2008 ItaIy Livorno Offshore LNG TerminaI OIt LNG 592.5 SAIPEM/ITALY Gas/treatment 2011
March 2008 ItaIy San Severo combined-cycIe power pIant AteI (Progetto EnPIus) 375 ANSALDO ENERGIA Powergen 2011
JuIy 2009 ItaIy ApriIia Power PIant Sorgenia 644 ANSALDO ENERGIA Powergen 2012
September 2009 ItaIy PrioIo Power PIant Reconstruction Isab Energy 150 FLUOR/UK Powergen 2010
November 2009 ItaIy AquiIa FPSO Eni 1500 SAIPEM/ITALY Production 2011
JuIy 2008 Jordan AI Qatrana Independent Power Project Kepco / XeneI 500 LOTTE E & C / SOUTH KOREA Powergen 2011
September 2009 Jordan Samra Power PIant Expansion Phase 3 Samra EIectric Power Cy 193 HANWHA ENGINEERING - ALSTOM Powergen 2011
May 2010 Jordan FertiIizer PIant (Jifco Pjt) JPMC/IFFCO 650 LAVALIN EUROPE PetrochemicaI 2012
ApriI 2008 Kazakhstan Kashagan 4th Gas Compressor Train Agip Kco 105 PETROFAC Gas/treatment 2010
May 2009 Kazakhstan Kashagan Phase One Hook-Up Agip KCO 2600 AKER SOLUTIONS - SAIPEM Production 2012
October 2009 Kazakhstan Atyrau Aromatics CompIex Kazmunaigas 1040 SINOPEC ENGINEERING/CHINA PetrochemicaI 2013
November 2009 Kazakhstan Atyrau Refinery Modernization Kazmunaigas 27 ROMINSERV/KAZAKHSTAN Refining 2011
March 2010 Kazakhstan Atyrau PoIypropyIene PIant KPI 1600 SINOPEC ENGINEERING/CHINA PetrochemicaI 2014
March 2008 Kuwait Shuwaikh DesaIination PIant MEW 320 DOOSAN/KOREA Water/desaI 2010
May 2008 Kuwait Gas Booster Station GS 160 KOC 649 SNAMPROGETTI/ITALY Gas/treatment 2011
November 2008 Kuwait PipeIine between BS 131 & Mina AI Ahmadi KOC 544 PETROFAC Transportation 2010
August 2009 Kuwait Subiya Power PIant MEW 2600 HYUNDAI HEAVY INDUSTRIES - GE/USA Powergen 2012
October 2009 Kuwait Gas Compressors at GC 7, 8 &21 KOC 123 SAIPEM/ITALY Gas/treatment 2011
December 2009 Kuwait Gas Booster 132 Project KOC 724 SK ENG/KOREA Gas/treatment 2013
June 2010 Kuwait Mina AI Ahmadi 4th LPG Recovery Unit KNPC 890 DAELIM/KOREA Gas/treatment 2013
June 2010 Kuwait Gas Booster Station BS-171 KOC 900 SAIPEM/ITALY Gas/treatment 2013
May 2009 Liberia Bushrod Product Storage TerminaI Expansion Liberia PetroIeum Refining 25 ZAKHEM INT CONSTRUCTION/UK Storage 2011
March 2007 Libya TripoIi West Power PIant Expansion Phase 2 GecoI 650 HYUNDAI ENG/DOOSAN Powergen 2011
October 2007 Libya AI KhaIij Power PIant GecoI 650 HYUNDAI/KOREA Powergen 2011
December 2007 Libya Sarir Power PIant GecoI 540 HYUNDAI/KOREA Powergen 2011
ApriI 2009 Lithuania Combined-cycIe Power pIant Lietuvos EIektrine AB 432 IBERDROLA INGENIERA/SPAIN Powergen 2012
May 2007 MaIaysia Trans-PeninsuIa PipeIine Transpen 7000 RANHILL ENGINEERS & CONSTRUCTORS/ML Transportation 2014

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
February 2008 MaIaysia SaIam Power PIant Tenaga NasionaI BhD 344 CNEEC/CHINA Powergen 2010
March 2008 MaIaysia Sabah-Sarawak PipeIine Petronas CarigaIi 500 PUNJ LLOYD/INDIA - DAILOG E&C Transportation 2011
ApriI 2008 MaIaysia Sabah OiI PIatforms Petronas CarigaIi 637 SIME DARBY ENGINEERING/MALAYSIA-MISC Production 2010
October 2008 MaIaysia Tangga Barat, Kumang, KinabaIu Gas Pjts Petronas CarigaIi 720 MMHE/MALAYSIA - SIME DARBY ENGINEERING Production 2010
December 2008 MaIaysia Putrana Refinery EI-One Resources 6800 HAMPA ENGINEERING CONTRACTOR/IRAN Refining 2014
March 2009 MaIaysia Gumusut-Kakap FieId DevIpt Sabah SheII PetroIeum 825 ACERGY GROUP/SAPURACREST Production 2011
JuIy 2009 MaIaysia Sungai Limau Refinery (Kedah) Merapoh Resources SK ENG/KOREA Refining 2014
January 2010 MaIaysia Tanjung Bin OiI TerminaI ATT Tanjung Bin Sdn Bhd 174 PEC Ltd/SINGAPORE Storage 2012
March 2008 Mexico ManzaniIIo LNG PIant CFE 630 SAMSUNG/KOREA Gas/treatment 2011
October 2008 Mexico Baja SuIphuric Acid PIant MMB LAVALIN/Canada PetrochemicaI 2010
May 2009 Mexico Poza Rica Cryogenic PIant Pemex 268 ICA FLUOR - LINDE PROCESS PLANTS Gas/treatment 2011
June 2009 Mexico La Cangrejera Aromatics Exp Phase 1 Pemex PetrochemicaIs 244 DRAGADOS/SPAIN-ACS-SENERMEX PetrochemicaI 2011
August 2009 Mexico Cadereyta & Madero CIean FueIs Project Pemex 638 ICA FLUOR Refining 2013
September 2009 Mexico Tabasco Cogeneration PIant Pemex 633 ABENGOA MEXICO - ABENER Powergen 2012
February 2010 Mexico SaIamanca & TuIa Refineries CIean FueIs Pjt Pemex 345 SAIPEM/ITALY Refining 2012
February 2010 Mexico ManzaniIIo Power PIant Modernization CFE 981 ACS SERVICIOS/COBRA/INELECTRA Powergen 2012
February 2010 Mexico SaIina Cruz & MinatitIan CIean FueIs Pjt Pemex 620 ICA FLUOR Refining 2014
ApriI 2010 Mexico SaIamanca SuIfur Recovery Unit Pemex 50 ISOLUX/TECNA/TECHNIP Refining 2011
November 2009 Morocco Mohammedia Refinery Topping 4 Pjt Samir TECNICAS REUNIDAS/SPAIN - TEKFEN/T Refining 2012
November 2009 Morocco Mohammedia Bitumen PIant Samir 31 POERNER/AUSTRIA Refining 2011
October 2009 Myanmar Yetagun Compression PIatform Petronas CarigaIi NIPPON STEEL/THAILAND Production 2012
November 2009 Myanmar Shwe Gas DeveIopment Pjt Daewoo InternationaI 1400 HYUNDAI HEAVY INDUSTRIES/SOUTH KOREA Production 2013
ApriI 2007 NetherIands SIoe Power PIant at VIissingen DeIta Energy / EDF 750 SIEMENS/GERMANY Powergen 2011
May 2007 NetherIands MaasvIakte coaI-biomass power pIant EIectrabeI HITACHI POWER EUROPE Powergen 2012
JuIy 2007 NetherIands MaasvIakte LNG TerminaI Gate TerminaI 1176 TECHINT/I-SENER/SP-ENTREPOSE/F-VINCI/F Gas/treatment 2011
January 2008 NetherIands LeIystad FIevoCentraIe Project EIectrabeI NederIand 592 ALSTOM/F Powergen 2010
February 2008 NetherIands Rijnmond II Power PIant Intergen 470 SIEMENS/GERMANY Powergen 2010
February 2008 NetherIands Magnum Power PIant Nuon MITSUBISHI HEAVY IND/J - PONTICELLI/F Powergen 2012
June 2008 NetherIands Moerdijk Power PIant Essent TECNICAS REUNIDAS/SPAIN-GE Powergen 2011
June 2008 NetherIands CIaus Power PIant Expansion Essent 1000 ALSTOM/F Powergen 2012
June 2008 NetherIands Rotterdam BiodieseI PIant Neste OiI 1000 TECHNIP/ITALY Bio 2011
June 2008 NetherIands Rotterdam Hydrogen PIant Air Liquide 195 LURGI/GERMANY Gas/treatment 2011
June 2008 NetherIands SIuiskiI Urea PIant Yara 600 UHDE/GERMANY PetrochemicaI 2011
May 2009 NetherIands Rotterdam Combined-CycIe Power PIant Enecogen 992 SIEMENS/GERMANY Powergen 2011
August 2009 NetherIands Pernis Refinery DieseI Hydtrotreat SheII 60 CB&I LUMMUS/NETHERLANDS Refining 2011

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
November 2009 NetherIands Rotterdam Hydrogen PIant Air Products TECHNIP/NETHERLANDS Gas/treatment 2011
November 2009 NetherIands Bergermeer Gas Storage Project Taqa Energy FLUOR/NETHERLANDS Gas/treatment 2013
March 2010 NetherIands Rotterdam Tank TerminaI Euro Tank TerminaI BV 159 VERWATER-AUDEX BV Storage 2012
March 2010 NetherIands Rotterdam TerminaI Tank Dutch BotIek Tank TerminaI 70 POLIMEX MOSTOSTAL/POLAND Storage 2011
ApriI 2010 NetherIands Hemweg 9 Power PIant Nuon SIEMENS/GERMANY Powergen 2012
ApriI 2010 New CaIedonia Koniambo Power PIant Xstrata 120 DOOSAN/KOREA Powergen 2012
June 2007 Nigeria Brass LNG Project Brass Lng Ltd 3500 BECHTEL/USA Gas/treatment 2012
UnofficiaI (03/07) Nigeria OIokoIa Lng Project OK LNG TECHNIP-F/SNAMPROGETTI/I Gas/treatment 2012
February 2008 Nigeria Usan FieId DeveIopment (FPSO Package) TotaI/EIf PetroIeum Nigeria 1600 HYUNDAI HEAVY IND/SOUTH KOREA Production 2011
March 2008 Nigeria Usan FieId DeveIopment (URF-OLT)Package TotaI/EIf PetroIeum Nigeria 1300 SAIPEM/ITALY Production 2011
JuIy 2008 Nigeria Lagos Beach Compression Station (LBCS) WAGPCo ENTREPOSE CONTRACTING/F Gas/treatment 2010
September 2008 Nigeria BiIabri, Owaneri, Orobiri gas Pjt (LNG-FPSO) FIex Lng 567 SAMSUNG HEAVY/KOREA Gas/treatment 2011
October 2008 Nigeria OML58 Upgrade Project Phase 1 TotaI E&P Nigeria 1160 SAIPEM/I - PONTICELLI Production 2012
May 2009 Nigeria Revamping of three weIIhead PIaforms MobiI Nigeria 190 ACERGY GROUP Production 2010
October 2009 Nigeria Bonga North-West FieId Subsea DevIpt SheII Nigeria 200 SAIPEM/ITALY Transportation 2013
October 2009 Nigeria Escravos Gas DeveIopment Chevron Nigeria 500 ACERGY Production 2011
November 2009 Nigeria Kaduna Power Station Ministry of Power ROCKSON ENG / NUOVO PIGNONE Powergen 2011
February 2010 Nigeria O.U.R. PipeIine Project TEPNG ZAKHEM BAYWOOD JV Transportation 2012
ApriI 2010 Nigeria Utorogu-UgheIIi Gas PipeIine SheII PetroIeum Nigeria 179 DAEWOO/SOUTH KOREA Transportation 2012
May 2010 Nigeria Offshore InstaIIation Work at Oso ExxonMobiI 120 ACERGY GROUP Production 2011
February 2007 Norway Skarv FPSO BP Norge AS 690 SAMSUNG HEAVY/KOREA - AKER KVAERNER Production 2011
JuIy 2007 Norway Karsto Gas Treatment PIant Expansion StatoiI 175 MW KELLOGG/UK Gas/treatment 2012
February 2009 Norway KoIIsnes Gas PIant Upgrade Gassco 218 AKER SOLUTIONS Gas/treatment 2011
September 2009 Norway GoIiat FieId DeveIopment (subsea portion) Eni 395 AKER SOLUTIONS Production 2013
October 2009 Norway GoIiat FieId DeveIopment (infieId pipeIines) Eni 294 TECHNIP/NORWAY Production 2013
February 2010 Norway GoIiat FieId DeveIopment (FPSO) Eni 1100 HYUNDAI HEAVY IND/SOUTH KOREA - CB&I Production 2013
March 2010 Norway Ekofisk 2/4L Jacket ConocoPhiIIips AKER SOLUTIONS Production 2012
JuIy 2009 Oman Kauther Gas Compression Project PDO 350 PETROFAC - AL HASSAN ENG Gas/treatment 2011
November 2009 Oman SaIaIah Independent Power & Water Pjt Sembcorp UtiIities 1000 SEPCO III/CHINA - HYFLUX/SINGAPORE Powergen 2013
December 2009 Oman Saih Nihayda Gas Compression Pjt PDO 220 GS ENGINEERING/SOUTH KOREA Gas/treatment 2013
May 2010 Oman Barka 3 / Sohar 2 IPP Projects GDF SUEZ 1700 GS ENGINEERING/SOUTH KOREA -SIEMENS/GER Powergen 2013
January 2008 Pakistan Mahmood Kot Refinery DieseI HDS Unit Parco 132 CNCEC/CHINA-HYUNDAI ENGINEERING Refining 2010
ApriI 2009 Pakistan Guddu & Naudero Power PIants WaIters Power Int 100 PROENERGY EPC SERVICES/USA Powergen 2011
September 2009 Panama Panama TerminaI Expansion Project PetroterminaI de Panama 100 CB&I/USA Storage 2011

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
February 2008 Papua New Guinea Napa-Napa LNG PIant Liquid Niugini Gas 4000 BECHTEL/USA Gas/treatment 2012
December 2009 Papua New Guinea PNG LNG Project (LNG PIant) ExxonMobiI 4500 CHIYODA/J-JGC/J Gas/treatment 2013
December 2009 Papua New Guinea PNG LNG Project (Hides Gas PIant) ExxonMobiI 1000 CB&I/USA-CLOUGH/AUSTRALIA Gas/treatment 2013
December 2009 Papua New Guinea PNG LNG Project (Offshore PipeIines) ExxonMobiI 450 SAIPEM/ITALY Transportation 2013
December 2009 Papua New Guinea PNG LNG Project (Onshore PipeIines) ExxonMobiI 430 SPIE CAPAG/F Transportation 2013
September 2008 Peru Las FIores Thermo-EIectric Power Station Duke Energy Egenor SIEMENS/GERMANY Powergen 2010
October 2009 Peru ChiIca Power PIant Conversion KaIipa Generacion 350 POSCO ENGINEERING/SOUTH KOREA Powergen 2012
December 2009 Peru TaIara Refinery Expansion Petroperu 1200 TECNICAS REUNIDAS/SPAIN Refining 2015
December 2007 PhiIippines Cebu Power PIant Kepco 300 DOOSAN/KOREA Powergen 2011
February 2008 PhiIippines Batangas EthyIene/PropyIene PIant JG Summit 513 DAELIM/KOREA PetrochemicaI 2013
March 2009 PhiIippines MariveIes Power PIant GN Power 580 CNEEC/CHINA Powergen 2012
June 2008 PoIand LMG Project PGNIG 789 TECHNIP KTI/ITALY / PBG POLAND Production 2012
October 2008 PoIand Wierzchowice Gas Storage Expansion PGNIG 526 TECNIMONT/ITALY-SOFREGAZ/F-PBG POLAND Storage 2011
October 2008 PoIand Gdansk Refinery Upgrading (deasphaIting) Grupa Lotos 90 TECHNIP/ITALY Refining 2010
ApriI 2010 PoIand PoIaniec Biomass Power Station GDF Suez FOSTER WHEELER POLAND Powergen 2012
June 2010 PoIand Swinoujscie LNG TerminaI PoIish LNG 903 SAIPEM/TECHINT/PBG-PL Gas/treatment 2014
August 2007 PortugaI Sines Refinery Upgrading GaIp Energia 910 TECNICAS REUNIDAS/SPAIN Refining 2011
August 2007 PortugaI Porto Refinery Upgrading GaIp Energia 455 FLUOR/UK Refining 2011
October 2008 PortugaI Sines Steamcracker Furnaces RepsoI 47 TECHNIP/NETHERLANDS PetrochemicaI 2011
October 2008 PortugaI Sines PoIyethyIene PIant RepsoI TECNICAS REUNIDAS/SPAIN PetrochemicaI 2011
March 2008 PortugaI Abrantes Power PIants EIecgas 900 SIEMENS/GERMANY Powergen 2011
May 2009 PortugaI Sines LNG TerminaI Expansion Ren AtIantico 214 SOMAGUE/PORTUGAL Gas/treatment 2012
November 2007 Qatar Qafco-V Expansion Project Qafco 3200 SNAMPROGETTI/I-HYUNDAI/SOUTH KOREA PetrochemicaI 2011
March 2008 Qatar Ras Laffan C IWPP Project (power part) Suez/Mitsui 2070 HYUNDAI ENG/MHI-J Powergen 2011
March 2008 Qatar Ras Laffan C IWPP Project (desaIination part) Suez/Mitsui SIDEM/F Water/desaI 2011
ApriI 2008 Qatar Qafco-V Storage Project Qafco CB&I/USA Storage 2010
September 2008 Qatar Strategic Gas Transmission Project Qatar PetroIeum 800 PUNJ LLOYD/INDIA Transportation 2011
May 2009 Qatar Mesaieed PoIyethyIene PIant (LDPE-3 Pjt) Qapco 550 UHDE/GERMANY - TEKFEN/T PetrochemicaI 2011
October 2009 Qatar Qafco-VI Expansion Project Qafco 610 SAIPEM/I - HYUNDAI/SOUTH KOREA PetrochemicaI 2012
February 2010 Qatar PIateau Maintenance Project (PMP) Qatargas 1200 TECHNIP/F-CHIYODA/J Gas/treatment 2013
March 2010 Qatar Idd AI Shargi PipeIines Upgrading Pjt OccidentaI PetroIeum 62 NPCC/UAE Transportation 2011
March 2010 Qatar Messaieed & Dukhan Gas Sweetening Pjts Qatar PetroIeum 650 PETROFAC Gas/treatment 2013
ApriI 2010 Qatar Ras Laffan Gas Recovery Pjt Qatargas 1000 FLUOR/USA Gas/treatment 2014
May 2010 Qatar Ras Laffan HeIium PIant Rasgas 200 AIR LIQUIDE/F - CHIYODA AL MANA ENG Gas/treatment 2013
March 2008 Romania Brazi Power PIant Petrom 600 METKA/GREECE-GE/USA Powergen 2011

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
ApriI 2008 Romania Petromidia Refinery Hydrogen PIant RompetroI 97 TECHNIP/NETHERLANDS Refining 2011
JuIy 2008 Romania Petrobrazi Refinery CIean FueIs Project Petrom 140 UHDE/GERMANY Refining 2010
March 2010 Romania Navoradi High PoIyethyIene PIant Expansion RompetroI ROMINSERV/ROMANIA PetrochemicaI 2011
ApriI 2010 Romania Petrobrazi Refinery Modernization Petrom FOSTER WHEELER Refining 2012
October 2007 Russia Khabarovsk Refinery Expansion AIIiance OiI Corp 800 TECNICAS REUNIDAS/SPAIN Refining 2011
December 2007 Russia ToboIsk PDH PIant ToboIsk PoIymer 1000 TECNIMONT/ITALY PetrochemicaI 2012
December 2007 Russia ToboIsk PoIypropyIene PIant ToboIsk PoIymer 646 LINDE/GERMANY PetrochemicaI 2012
February 2008 Russia Ikra Project RusvinyI TECHNIP/F PetrochemicaI 2013
March 2008 Russia Perm PoIystyrene PIant Sibur Khimprom CHEMIEANLAGENBAU CHEMNITZ/GER PetrochemicaI 2010
ApriI 2008 Russia Perm EthyIBenzene PIant Sibur Khimprom TOYO/JAPAN PetrochemicaI 2010
ApriI 2008 Russia Irkusk VinyI ChIoride PIant SayankhimpIast UHDE/GERMANY PetrochemicaI 2010
May 2008 Russia MeIamine PIant at Nevinnomyssky Azot Eurochem 139 LURGI/GERMANY PetrochemicaI 2011
May 2008 Russia Yajvinskaya Gres CCGT Power PIant OGK-4 508 ENKA/TURKEY Powergen 2011
May 2008 Russia Krasnodar gas-fired power pIant TGK-8 E4 GROUP/RUSSIA - MHI/JAPAN Powergen 2011
JuIy 2008 Russia Nizhnekamsk Refinery (Fired Heaters) Taneco (Tatneft) FOSTER WHEELER ITALIANA Refining 2010
August 2008 Russia Nyaganskaya & Tyumen TPP2 projects TGK-10 695 E4 GROUP/RUSSIA - SIEMENS/GERMANY Powergen 2012
August 2008 Russia Kstovo EthyIene PIant Expansion Sibur Neftekhim 284 TECHNIP/NETHERLANDS PetrochemicaI 2011
October 2008 Russia Noyabrsk Gas Processing Expansion Pjt Sibur FLUOR/UK - STROYTRANSGAZ/RUSSIA Gas/treatment 2010
March 2009 Russia Portovaya Gas Treatment Unit GazkompIektimpex SIIRTEC NIGI/ITALY Gas/treatment 2010
ApriI 2009 Russia Novy Urengoy PoIyethyIene PIant NUGCC (Gazprom) 123 TECNIMONT/ITALY PetrochemicaI 2012
May 2009 Russia Taif-NK Nizhnekamsk Refinery Upgrading Taif-NK 2200 LURGI/GERMANY Refining 2014
May 2009 Russia MendeIeevsk FertiIizer CompIex JSC Ammoni 973 MITSUBISHI HEAVY IND/J PetrochemicaI 2012
June 2009 Russia VoIgodonsk NucIear Units 3 & 4 Energoatom 4800 NN-AEP/RUSSIA Powergen 2014
October 2009 Russia Astrakhan Refinery Modernization Gazprom KompIektatsiya LURGI/GERMANY Refining 2012
May 2010 Russia Urengoi ThermaI Power PIant OGC-1 855 TECHNOPROMEXPORT/RUSSIA Powergen 2012
June 2010 Russia Bratsk ChIorine Dioxide PIant IIim Group 18 AKER SOLUTIONS ChemicaI 2012
September 2007 Russia-Germany Nord Stream PipeIine Gazprom-Norstream 2000 SAIPEM/ITALY Transportation 2011
March 2008 SaIvador Construction of a coaI-fired power pIant AES 500 POSCO ENGINEERING/SOUTH KOREA Powergen 2011
May 2007 Saudi Arabia Manifa FieId PIatforms Saudi Aramco J.RAY MCDERMOTT Production 2011
September 2007 Saudi Arabia Offshore Maintain PotentiaI Program (LTA) Saudi Aramco SAIPEM/TAQA/AL RUSHAID Production 2011
December 2007 Saudi Arabia JubaiI NCP CompIex (PoIyoIefins Pack) Saudi PoIymers Cy 962 DAELIM/KOREA PetrochemicaI 2011
December 2007 Saudi Arabia JubaiI NCP CompIex (EthyIene Pack) Saudi PoIymers Cy 1000 JGC/JAPAN PetrochemicaI 2011
June 2008 Saudi Arabia Manifa Offshore PipeIines Saudi Aramco 450 VALENTINE MARITIME/UAE Transportation 2011
JuIy 2008 Saudi Arabia Shoaiba Power PIant Phase III SEC 2850 ALSTOM/F Powergen 2012
JuIy 2008 Saudi Arabia PP10 Power PIant SEC 3000 ARABIAN BEMCO Powergen 2011

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
JuIy 2008 Saudi Arabia Manifa Project (UtiIities & Storage) Saudi Aramco 800 JGC/JAPAN Gas/treatment 2013
JuIy 2008 Saudi Arabia Manifa Project (CentraI Processing FaciIities) Saudi Aramco 1800 SAIPEM/ITALY Gas/treatment 2013
August 2008 Saudi Arabia Manifa Project (Gas Processing PIant) Saudi Aramco 501 GS ENGINEERING/SOUTH KOREA Gas/treatment 2013
August 2008 Saudi Arabia Manifa Project (Power PIant) Saudi Aramco 500 TECNICAS REUNIDAS/SPAIN Powergen 2013
August 2008 Saudi Arabia Manifa Project (pipeIine package) Saudi Aramco 195 NACAP/NETHERLANDS Transportation 2013
November 2008 Saudi Arabia Jeddah DesaIination Expansion Phase 3 SWCC 293 DOOSAN/KOREA - WETICO/SAUDI Water/desaI 2011
November 2008 Saudi Arabia Jazan Power PIant MMC/BINLADEN/CHALCO 2500 CPI POWER ENGINEERING/CHINA Powergen 2013
JuIy 2009 Saudi Arabia Rabigh Independent Power Project Kepco / Acwa Power 2500 SEPCO III/CHINA - DONGFANG ELECTRIC CORP Powergen 2013
January 2009 Saudi Arabia Yanbu Refinery CIean FueIs Project Samref 2000 WORLEYPARSONS/USA Refining 2013
February 2009 Saudi Arabia Karan Gas Pjt (offshore package) Saudi Aramco 1200 J.RAY MCDERMOTT Production 2011
February 2009 Saudi Arabia Karan Gas Pjt (onshore package) Saudi Aramco 1300 HYUNDAI ENG Production 2011
February 2009 Saudi Arabia Karan Gas Pjt (cogeneration/utiIities) Saudi Aramco 500 PETROFAC Production 2011
February 2009 Saudi Arabia Karan Gas Pjt (suIfur recovery unit) Saudi Aramco GS ENGINEERING/SOUTH KOREA Production 2011
February 2009 Saudi Arabia Ras Abu AIi PIant Upgrade Saudi Aramco 158 BONATTI/ITALY Production 2011
ApriI 2009 Saudi Arabia Ras Tanura / Riyadh PipeIine Saudi Aramco 353 NACAP/NETHERLANDS Transportation 2011
June 2009 Saudi Arabia JubaiI Refinery (Satorp Pjt - Package One) Saudi Aramco / TotaI 1700 TECNICAS REUNIDAS/SPAIN Refining 2013
JuIy 2009 Saudi Arabia JubaiI Refinery (Satorp Pjt - Package 2A) Saudi Aramco / TotaI 1700 TECHNIP/ITALY Refining 2013
JuIy 2009 Saudi Arabia JubaiI Refinery (Satorp Pjt - Package 2B) Saudi Aramco / TotaI 500 DAELIM/KOREA Refining 2013
JuIy 2009 Saudi Arabia JubaiI Refinery (Satorp Pjt - Package 3) Saudi Aramco / TotaI 700 SAMSUNG/KOREA Refining 2013
JuIy 2009 Saudi Arabia JubaiI Refinery (Satorp Pjt - Package 4) Saudi Aramco / TotaI 900 SAMSUNG/KOREA-CHIYODA/JAPAN Refining 2013
JuIy 2009 Saudi Arabia JubaiI Refinery (Satorp Pjt - Package 5A) Saudi Aramco / TotaI 1300 TECHNIP/ITALY - CTCI/TAIWAN Refining 2013
JuIy 2009 Saudi Arabia JubaiI Refinery (Satorp Pjt - Package 5B) Saudi Aramco / TotaI 420 SK ENG/KOREA Refining 2013
JuIy 2009 Saudi Arabia JubaiI Refinery (Satorp Pjt - Package 6) Saudi Aramco / TotaI 745 ROTARY ENGINEERING/ PETRO STEEL/SAUDI Storage 2013
JuIy 2009 Saudi Arabia JubaiI Refinery (Satorp Pjt - Package 9) Saudi Aramco / TotaI 247 DAYIM PUNJ LLOYD/SAUDI Storage 2013
JuIy 2009 Saudi Arabia JubaiI Refinery (Satorp Pjt - Package 8) Saudi Aramco / TotaI 300 GULF CONSOLIDATED CONTRACTORS Transportation 2013
JuIy 2009 Saudi Arabia Yanbu Power PIant Exp Phases 5 & 6 Marafiq 720 HANWHA ENGINEERING & CONSTRUCTION Powergen 2012
JuIy 2009 Saudi Arabia JubaiI Air Separation Unit NationaI industriaI Gases 300 SAMSUNG/KOREA Gas/treatment 2011
Aout 2009 Saudi Arabia Yanbu Refinery (UtiIities package) Saudi Aramco/ConocoPhiIIips KBR/USA Refining 2014
September 2009 Saudi Arabia AI Qurayyah Power PIant Conversion Pjt SEC 1850 ARABIAN BEMCO - DOOSAN HEAVY Powergen 2011
October 2009 Saudi Arabia JubaiI Low Density PoIyethyIene PIant Saudi Kayan 325 DAELIM/KOREA PetrochemicaI 2011
December 2009 Saudi Arabia JubaiI PetrochemicaI PIant Arabian ChIor VinyI Cy 400 DAELIM/KOREA PetrochemicaI 2012
January 2010 Saudi Arabia AI Qassim Power PIant Expansion SEC 288 ARABIAN BEMCO Powergen 2010
January 2010 Saudi Arabia JubaiI Amines CompIex Saudi Kayan CTCI/TAIWAN PetrochemicaI 2012
January 2010 Saudi Arabia JubaiI Refinery CIean FueIs Project Sasref JGC/JAPAN Refining 2012
January 2010 Saudi Arabia Wasea BuIk PIant Saudi Aramco 141 SINOPEC ENGINEERING/CHINA Storage 2012

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
March 2010 Saudi Arabia Safaniya FieId Upgrading Pjt Saudi Aramco 1000 J.RAY MCDERMOTT Production 2013
June 2010 Saudi Arabia Riyadh PP9 Power PIant GDF Suez 1600 HYUNDAI HEAVY IND/SOUTH KOREA Powergen 2013
September 2009 Serbia Pancevo Refinery Modernization NIS 70 CB&I LUMMUS/NETHERLANDS Refining 2012
September 2007 Singapore Jurong 2nd PetrochemicaI Pjt (EthyIene part) ExxonMobiI SHAW GROUP/USA PetrochemicaI 2011
September 2007 Singapore Jurong 2nd PetrochemicaI Pjt (Power PIant) ExxonMobiI SHAW GROUP/USA Powergen 2011
September 2007 Singapore Jurong 2nd PetrochemicaI Pjt (PE Units) ExxonMobiI MITSUBISHI HEAVY IND/J PetrochemicaI 2011
September 2007 Singapore Jurong 2nd PetrochemicaI Pjt (PP Unit) ExxonMobiI MITSUI ENG/JAPAN PetrochemicaI 2011
September 2007 Singapore Jurong 2nd PetrochemicaI Pjt (EIastomers) ExxonMobiI MITSUI ENG/JAPAN PetrochemicaI 2011
September 2007 Singapore Jurong 2nd PetrochemicaI Pjt (O&U) ExxonMobiI FOSTER WHEELER/WORLEYPARSONS PetrochemicaI 2011
October 2007 Singapore Jurong 2nd PetrochemicaI Pjt (aromatics) ExxonMobiI FOSTER WHEELER/USA PetrochemicaI 2011
October 2007 Singapore Jurong Aromatics Project Jurong Aromatics Corp 2000 SK ENG/KOREA PetrochemicaI 2013
November 2007 Singapore Jurong Aromatics Project (Offsites/UtiIities Jurong Aromatics Corp 450 SEMBAWANG E&C/SINGAPORE PetrochemicaI 2013
January 2008 Singapore Tuas BiodieseI PIant Neste OiI 818 TECHNIP/ITALY & SINGAPORE Bio 2010
January 2008 Singapore Tuas Hydrogen PIant Neste OiI 175 AIR LIQUIDE/SINGAPORE Gas/treatment 2010
ApriI 2009 Singapore Jurong OiI Storage Project JTC Corp 594 HYUNDAI ENG Storage 2013
February 2010 Singapore Jurong LNG TerminaI Singapore Lng Corp 628 SAMSUNG/KOREA Gas/treatment 2013
February 2010 Singapore Tembusu Power PIant Tuas Power 250 MARUBENI/JAPAN Powergen 2012
June 2010 Singapore Jurong ButyI Rubber PIant Lanxess 490 FOSTER WHEELER PetrochemicaI 2013
December 2009 SIovenia Sstanj coaI-fired steam power pIant TermoeIektrama Sostanj 1021 ALSTOM/F Powergen 2014
November 2007 South Africa Medupi Power Station Eskom 4900 ALSTOM/F-HITACHI POWER EUROPE Powergen 2015
February 2008 South Africa Bravo Power Station Eskom 4000 ALSTOM/F-HITACHI POWER AFRICA Powergen 2017
May 2008 South Africa Durban-Gautenberg FueI PipeIine Project Transneft 315 ENTREPOSE CONTRACTING/F-GROUP FIVE Transportation 2010
September 2008 South Africa SasoIburg ChemicaI PIant Senmin InternationaI FOSTER WHEELER SOUTH AFRICA ChemicaI 2010
August 2008 South Africa Koeberg PBMR Demonstration Power PIant PBMR 242 LAVALIN/CANADA - MURRAY & ROBERTS Powergen 2014
March 2010 South Africa Secunda CAN PIant SasoI Nitro 96 LAVALIN/Canada PetrochemicaI 2011
March 2010 South Africa SasoIburg Wax Expansion SasoI FOSTER WHEELER SOUTH AFRICA PetrochemicaI 2012
May 2010 South Africa SasoIburg Nitric Acid PIant Omnia 176 UHDE/GERMANY PetrochemicaI 2012
ApriI 2008 South Korea Incheon Hydrocracker SK Energy 1500 SK ENG/KOREA Refining 2011
June 2008 South Korea Onsan Aromatics CompIex S-OiI 974 SAMSUNG/KOREA PetrochemicaI 2011
October 2008 South Korea Daesan Refinery Heavy OiI Project Hyundai OiIbank 582 HYUNDAI ENG Refining 2011
November 2008 South Korea Yeosu DesuIfurization Unit GS CaItex Corp 562 GS ENGINEERING/SOUTH KOREA Refining 2010
November 2008 South Korea Taean IGCC n 1 Power PIant Kowepo DOOSAN/KOREA Powergen 2014
January 2010 South Korea Incheon TidaI Power PIant KHNP 3400 GS ENGINEERING/SOUTH KOREA Powergen 2017
June 2010 South Korea Daesan NCC PIant Revamping Project Samsung TotaI TOYO KOREA PetrochemicaI 2011
February 2007 Spain Cartagena Refinery Expansion RepsoI 4750 TECNICAS REUNIDAS/SPAIN Refining 2011

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
February 2008 Spain Cartagena Refinery Expansion (O&U portion) RepsoI 1300 FLUOR/SPAIN Refining 2011
March 2008 Spain Cartagena DeIayed Coker CompIex RepsoI FOSTER WHEELER IBERIA Refining 2011
ApriI 2008 Spain EI MuseI LNG TerminaI Enagas 320 FLUOR/SPAIN Gas/treatment 2011
May 2008 Spain Besos 5 Power PIant Endesa GE ENERGY/F Powergen 2010
August 2008 Spain Soto de Ribera Power Station HC Energia 510 ALSTOM/F-DURO FELGUERA/SPAIN Powergen 2011
September 2008 Spain CompostiIIa Power Station Expansion Endesa 290 MHI/JAPAN - INITEC/SPAIN Powergen 2011
December 2008 Spain GranadiIIa & Arinaga LNG TerminaIs Gascan 686 TECNICAS REUNIDAS/SPAIN Gas/treatment 2012
June 2010 Suriname Paramaribo Refinery Expansion Project StaatsoIie 550 SAIPEM/ITALY Refining 2013
March 2008 Syria Jidar Gas Processing FaciIities Hayan PetroIeum 454 PETROFAC Gas/treatment 2011
ApriI 2008 Syria EbIa Gas Project PetroCanada 477 PETROFAC Gas/treatment 2010
June 2008 Syria Tishreen Power PIant PEEGT 400 BHEL/INDIA Powergen 2011
JuIy 2009 Syria Deir AIi Power PIant PEEGT 910 METKA/GREECE-ANSALDO/I Powergen 2012
October 2008 Syria Arab Gas PipeIine 2nd Phase Syrian Gas Cy 58 STROYTRANSGAZ/RUSSIA Transportation 2010
ApriI 2009 Sweden Nynshamn LNG TerminaI Nynshamns GasterminaI 33 NCC/SWEDEN Storage 2011
June 2010 Sweden Nynshamn SuIphur Recovery Unit Nynas 60 TECHNIP KTI Refining 2012
August 2009 Taiwan Lin Yuan Naphtha Cracker 6 CPC CTCI/TAIWAN - CB&I LUMMUS Refining 2012
January 2008 ThaiIand Map Ta Phut LNG Regasification PIant PTT Lng Co Ltd 540 GS ENGINEERING/SOUTH KOREA Gas/treatment 2011
March 2008 ThaiIand Map Ta Phut AcryIic PIant Thai MMA CHIYODA/J PetrochemicaI 2010
March 2008 ThaiIand PIatong 2 Gas Project Chevron J.RAY McDERMOTT/SINGAPORE Production 2011
June 2008 ThaiIand Map Ta Phut Power PIant Gheco-One (Suez) 820 DOOSAN/KOREA Powergen 2011
June 2008 ThaiIand Map Ta Phut PhenoI PIant PTT PhenoI Cy TOYO THAI / THAILAND PetrochemicaI 2010
JuIy 2008 ThaiIand Combined-cycIe Power pIant GIow Energy 302 MARUBENI/JAPAN - BLACK&VEATCH/USA Powergen 2011
September 2008 ThaiIand Map Ta Phut EpichIorohydrin PIant SoIvay TOYO THAI / THAILAND PetrochemicaI 2010
October 2008 ThaiIand Greater Bongkot Gas Pjt (CPP) PTT ThaiIand HYUNDAI HEAVY IND/SOUTH KOREA-GUNANUSA Production 2011
November 2008 ThaiIand Map Ta Phut Hydrogen Peroxide PIant MTP-HP / SoIvay TOYO THAI / THAILAND PetrochemicaI 2010
December 2008 ThaiIand Map Ta Phut PropyIene Oxide PIant MTP-HPPO Manufacturing FOSTER WHEELER THAILAND PetrochemicaI 2011
ApriI 2009 ThaiIand Prachinburi Bio EthanoI PIant tba 71 SUMATEC CORP/MALAYSIA Bio 2011
May 2009 ThaiIand 3 EPC contracts Various Customers 58 TOYO THAI / THAILAND PetrochemicaI 2010
JuIy 2009 ThaiIand Map Ta Phut Storage Tank PTT Tank TerminaI 33 ROTARY ENGINEERING Storage 2011
August 2009 ThaiIand Map Ta Phut CIean FueIs Project PTTAR 222 SK ENG/KOREA Refining 2011
September 2009 ThaiIand Rayong Power PIant IRPC 124 MARUBENI/JAPAN Powergen 2011
January 2010 ThaiIand Chachaengsao EthanoI PIant Impress EthanoI Co Ltd 43 KNM GROUP/MALAYSIA Bio 2011
January 2010 ThaiIand TNP2 Power PIant InternationaI Power Ltd 131 JURONG ENGINEERING/SINGAPORE Powergen 2012
January 2009 Trinidad Tobago Angostura Gas Export PIatform Project BHP BiIIion Trinidad J.RAY MCDERMOTT Production 2010
February 2009 Trinidad Tobago La Brea Power PIant Trinidad Generation UnItd 700 MAN FERROSTAAL/GERMANY Powergen 2011

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
November 2009 Trinidad Tobago Pointe a Pierre ULSD Project Petrotrin 220 SAMSUNG/KOREA Refining 2012
ApriI 2008 Tunisia Ghannouch Power PIant Steg 540 ALSTOM/F Powergen 2011
JuIy 2008 Tunisia La Skhira SuIfuric Acid PIant Tifert TECHNIP/F - PIRECO PetrochemicaI 2010
ApriI 2008 Turkey Bandirma Power PIant Enerjisa Power Cy MITSUBISHI HEAVY IND/J - A-TEC/AUSTRIA Powergen 2010
October 2009 Turkey DenizIi Power PIant RWE & Turcas 662 METKA/GREECE Powergen 2012
November 2009 Turkey AIiaga EthyIene PIant Expansion Petkim SHAW GROUP/USA PetrochemicaI 2012
November 2009 Turkey Izmit Refinery Upgrading Project Tupras 1500 TECNICAS REUNIDAS/SPAIN Refining 2013
February 2008 Turkmenistan MaIay-BagtyyarIik Gas PipeIine TurkmenGaz 585 STROYTRANSGAZ/RUSSIA Transportation 2010
December 2009 Turkmenistan Southern YoIoten Gas Pjt (Gas Processing 1) TurkmenGaz 1400 HYUNDAI ENG / LG Int Gas/treatment 2012
December 2009 Turkmenistan Southern YoIoten Gas Pjt (Gas Processing 2) TurkmenGaz 3900 PETROFAC Gas/treatment 2012
January 2010 Turkmenistan Mary FertiIizer CompIex Turkmenhimiya 654 KAWASAKI PLANT SYSTEMS/JAPAN PetrochemicaI 2013
February 2007 UK Pembroke Power PIant RWE Npower 1460 ALSTOM/F Powergen 2011
May 2008 UK Drax Biomass Processing faciIity Drax Group 94 ALSTOM/F Powergen 2010
October 2008 UK PortIand Gas Project PortIand Gas 872 CB&I/UK Storage 2011
September 2009 UK Gaia Biomass Power PIant Gaia Power Tees VaIIey 325 AKER SOLUTIONS/UK Powergen 2012
March 2010 UK StubIach Storage Above-Ground Works Storengy JACOBS ENGINEERING Gas/treatment 2013
February 2009 Uruguay La Teja Refinery DesuIfurisation Project Ancap 300 ASTRA EVANGELISTA/ARGENTINA Refining 2011
August 2006 USA Port Arthur Refinery Expansion Motiva Enterprises 7000 BECHTEL-USA / JACOBS ENGINEERING Refining 2012
October 2006 USA Prairie State Energy Power PIant Peabody Energy 2000 BECHTEL/USA Powergen 2011
October 2006 USA Whiting Refinery Upgrade BP 3800 FLUOR/USA Refining 2012
ApriI 2007 USA Whiting SRU & Hydrotreater Project BP JACOBS ENGINEERING Refining 2012
ApriI 2007 USA LittIe Gipsy Re-Power Project Entergy 1000 SHAW/USA Powergen 2011
ApriI 2007 USA Southwest Virginia Power PIant Dominion SHAW/USA Powergen 2012
May 2007 USA John W.Turk EIectric Generating PIant Swepco 1300 SHAW GROUP/USA-BABCOCK&WILCOX Powergen 2011
January 2008 USA Detroit Refinery Expansion Marathon OiI 1900 FLUOR/USA Refining 2012
January 2008 USA Edwardsport Power Station Duke Energy 2000 BECHTEL/USA - GE/USA Powergen 2012
February 2008 USA PascagouIa LNG TerminaI GuIf LNG Energy 1100 AKER KVAERNER/USA - IHI/USA Gas/treatment 2011
March 2008 USA Port Arthur Refinery Expansion TotaI 2200 FLUOR/USA Refining 2011
ApriI 2008 USA VogtIe NucIear PIant Georgia Power Cy SHAW GROUP/WESTINGHOUSE Powergen 2016
May 2008 USA Construction of a gas-fired power pIant Duke Energy CaroIinas 275 SHAW/USA Powergen 2011
May 2008 USA Cooper River Fiber PIant Dupont 500 BE&K ENGINEERING/AKER SOLUTIONS ChemicaI 2010
May 2008 USA VC Summer NucIear Units SCE&G/Santee Cooper 9800 SHAW GROUP/WESTINGHOUSE Powergen 2016
August 2008 USA St CharIes & Port Arthur Hydrocrackers VaIero Energy 1200 FLUOR/USA Refining 2011
August 2008 USA Port Arthur Expansion Project (2 units) VaIero Energy TECHNIP/USA Refining 2010
August 2008 USA Whiting Refinery DeIayed Coker BP FOSTER WHEELER/USA Refining 2011

MAIN CURRENT INTERNATIONAL PROJECTS - Update JuIy 1st, 2010
DATE OF AWARD COUNTRY PROJECT NAME END USER M USD CONTRACTOR ACTIVITY SECTOR
COMPLETION
DATE
October 2008 USA Nevada Gas-Fired Power PIant NV Energy 400 SHAW/USA Powergen 2011
October 2008 USA Corpus Christi DieseI DesuIfurization Unit FIint HiIIs Resources JACOBS ENGINEERING Refining 2010
October 2008 USA Jordan Cove LNG Project Jordan Cove Energy KIEWIT-BLACK&VEATCH-ENTREPOSE/F-VINCI/F Gas/treatment 2012
November 2008 USA Jack County Generating Unit 2 Brazos EIectric Power FLUOR/USA Powergen 2011
December 2008 USA Wood River Coker Refinery Expansion Pjt WRB Refining Co FLUOR/USA Refining 2011
January 2009 USA Bayton & Baton Rouge DieseI Projects ExxonMobiI JACOBS ENGINEERING Refining 2010
January 2009 USA Levy County NucIear PIant Progress Energy FIorida 7600 SHAW GROUP/WESTINGHOUSE Powergen 2018
ApriI 2009 USA Bear Garden Power Station Dominion Virginia Power 619 FLUOR/USA Powergen 2011
ApriI 2009 USA Richmond County Power PIant Progress Energy FIorida 600 BE&K CONSTRUCTION CY Powergen 2011
ApriI 2009 USA Detroit Refinery (Hydrogen PIant) Marathon OiI TECHNIP/USA / AIR PRODUCTS Refining 2012
October 2009 USA LuIing Hydrogen PIant Monsanto TECHNIP/USA / AIR PRODUCTS Gas/treatment 2012
October 2009 USA TempIe LNG Expansion UGI LNG Inc 100 CB&I/USA Storage 2011
January 2010 USA FIambeau River BiofueIs Project FIambeau River BiofueIs 250 AMEC/USA - MIRON CONSTRUCTION Bio 2013
March 2010 USA ToIedo Reformer 3 Project BP-Husky 400 KBR/USA Refining 2012
May 2010 USA EIk HiIIs Gas Processing PIant OccidentaI of EIf HiIIs 280 CB&I/USA Gas/treatment 2012
June 2010 USA Sabine Pass LNG TerminaI Expansion Cheniere Energy BECHTEL/USA Gas/treatment 2015
June 2010 USA CoIeto Creek 2 Power Project InternationaI Power/STEC 1400 ZACHRY INDUSTRIAL INC Powergen 2015
November 2009 Uzbekistan Navoi ThermaI Power PIant Uzbekenergo 505 INITEC ENERGIA - MHI/JAPAN Powergen 2012
January 2008 VenezueIa EI TabIazo Low Density PoIyethyIene PIant PoIinter TECNIMONT/ITALY PetrochemicaI 2011
October 2008 VenezueIa Tamare & Bachaquero Power PIants EneIven 980 MAN FERROSTAAL/GERMANY Powergen 2011
June 2009 VenezueIa Termocentro Combined CycIe Power PIant EIectricidad de Caracas 1500 DURO FELGUERA/SPAIN Powergen 2013
JuIy 2009 VenezueIa Cumana Power PIant (Antonio Jose de Sucre) PDVSA 2000 IBERDROLA INGENIERA/SPAIN Powergen 2012
May 2008 Vietnam Ca Mau FertiIizer PIant Petrovietnam 900 Wuhuan Engineering / CNMIEC-CHINA PetrochemicaI 2012
January 2009 Vietnam Vung Tae CO2 Recovery Unit Petrovietnam SAMSUNG/KOREA PetrochemicaI 2011
ApriI 2009 Vietnam Vung Ang 1 & Nhon Trach 2 Power PIants Petrovietnam 1650 LILAMA GROUP Powergen 2012
May 2009 Vietnam Hai Phong PoIyester PIant Petrovietnam-Vinatex 250 HYUNDAI ENG PetrochemicaI 2011
JuIy 2009 Vietnam Mao Khe Power PIant Vinacomin 429 KAIDI ELECTRIC POWER/CHINA Powergen 2012
October 2009 Vietnam Vinh Tan ThermaI Power PIant EIectricity of Vietnam 1300 SHANGHAI ELECTRIC GROUP/CHINA Powergen 2013
October 2009 Vietnam Chim Sao FPSO Premier OiI 1000 EMAS OFFSHORE/SINGAPORE - SAIPEM - KEPPEL Production 2011
November 2009 Vietnam Te Giac Trang FPSO Hoang Long JO 700 BUMI ARMADA/MALAYSIA-KEPPEL SHIPYARD Production 2011
March 2010 Vietnam Duyen Hai Thermo Power PIant EIectricity of Vietnam 1400 DONG FANG ELECTRIC CORP CHINA Powergen 2014
June 2010 Vietnam Nghi Son Power PIant EIectricity of Vietnam 990 MARUBENI/JAPAN Powergen 2014

FIRM PROJECTS AWARDED TO ASIAN COMPANIES
Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
March 2009 CLOUGH AUSTRALIA AUSTRALIA REINDEER GAS PROJECT
(DeviI Creek gas pIant)
APACHE/SANTOS three months after the canceIIation of the contract, CLOUGH has been re-
awarded the onshore portion of the project, on a smaIIer basis. CIough wiII
suppIy the engineering, design works, procurement of materiaIs and
equipment, fabrication ans assembIy of aII moduIes for the faciIity
In september 2009 J.HOLLAND, part of Leighton Group, informed that they
won a USD 138M contract for construction work
September 2009 CLOUGH AUSTRALIA AUSTRALIA GORGON LNG PLANT
USD 2,3 BILLION
CHEVRON/EXXONMOBIL/SHELL Scope : the pIant wiII incIude three 5 MiIIion t/y LNG trains and a 300 tonnes
jouIes/day domestic gas pIant.
The contract has been awarded to KJVG consortium incIuding KBR, JGC,
CLOUGH and HATCH
Chevron and its partners have taken the finaI investment decision mid
september. The pIant wiII be buiIt in moduIar mode.
December 2009 CLOUGH AUSTRALIA PAPUA NEW GUINEA PNG LNG PROJECT
(Hides Gas PIant)
EXXONMOBIL Scope : Hides Gas Conditioning PIant incIuding nearby weIIheads and
associated piping and infrastructure.
Contract won in association with CBI (as Ieader with 65%)
May 2010 FLUOR AUSTRALIA AUSTRALIA GLADSTONE LNG PROJECT
(upstream portion)
SANTOS / PETRONAS the upstream scope comprises aII coaI seam gas and associated water
gathering and processing infrastructure for the Fairview and Roma fieIds
FLUOR AUSTRALIA seIected as preferred Upstream Contractor. EPC contract
to be signed once a finaI investment decision is done. In the interim FIuor wiII
start earIy works activities
September 2009 KBR AUSTRALIA AUSTRALIA GORGON LNG PLANT
USD 2,3 BILLION
CHEVRON/EXXONMOBIL/SHELL Scope : the pIant wiII incIude three 5 MiIIion t/y LNG trains and a 300 tonnes
jouIes/day domestic gas pIant.
The contract has been awarded to KJVG consortium incIuding KBR, JGC,
CLOUGH and HATCH
Chevron and its partners have taken the finaI investment decision mid
september. The pIant wiII be buiIt in moduIar mode.
March 2008 LEIGHTON AUSTRALIA INDIA MUMBAI HIGH FIELD (PRP-2
PROJECT) - USD 720 M
ONGC The project, PRP - 2 (PipeIine RepIacement Project - 2), invoIves engineering,
procurement and instaIIation of over 200 kiIometres of fixed and fIexibIe
pipeIines of various diameters
contract vaIue for Leighton : USD 720M
February 2010 CHENGDA ENG CHINA BANGLADESH CHANDPUR POWER PLANT
USD 146 M
GOVERNMENT Scope : 150mw combined-cycIe
the government has signed the contract with Chengda Eng earIy february -
turnkey contract
March 2009 CHINA TCC CHINA IRAN ASSALUYEH AMMONIA PLANT STAR ARIA AMMONIA CHEMICAL CY Scope : capacity of 720t/d on HaIdor Topsoe technoIogy
EPC contract awarded to CHINA TIANCHEN CHEMICAL ENGINEERING
CORPORATION (CHINA-TCC) with the IocaI MEHVAR SAZAN
September 2009 CHIWAN
SEMBAWANG
ENGINEERING
CHINA AUSTRALIA REINDEER GAS PROJECT
(weIIhead pIatform)
APACHE/SANTOS The chinese company has won the contract to buiId the 2000t weIIhead
pIatform
January 2008 CNCEC CHINA PAKISTAN MAHMOOD KOT REFINERY DIESEL
HDS UNIT - USD 132 M
PARCO Scope : a 26,000b/d dieseI hydrodesuIfurization unit.
PARCO has signed an agreement with a consortium incIuding the chinese
CNCEC and the korean HYUNDAI ENGINEERING - Work wiII start in March
February 2008 CNEEC CHINA MALAYSIA SALAM COAL-FIRED POWER PLANT
USD 344 M
TENAGA NASIONAL Bhd Scope : a 300mw pIant
The chinese CHINA NATIONAL ELECTRIC EQUIPMENT CORPORATION
(CNEEC) has been awarded the contract. 35% of the contract vaIue wiII be
given out to IocaI companies
ApriI 2008 CNEEC CHINA INDONESIA 2 POWER PLANTS IN EAST JAVA AND
ACEH - USD 889 M
PT PLN PT PLN has awarded the contract to buiId the Tanjung Awar-Awar Power
pIant in East Java to CNEEC with PT PENTA ADI SAMUDRA. Contract vaIue
USD 642M - Capacity 700mw
The contract to buiId the Nagan Raya PIant has gone to the chinese
SINOHYDRO - Capacity 220mw - Contract vaIue USD 247,4M
November 2008 CNEEC CHINA BOTSWANA MORUPULE B POWER PLANT BOTSWANA POWER CORPORATION Scope : coaI-fired power pIant 4x150mw
construction contract signed with CNEEC with SBW - Work to start in
february 2009
March 2009 CNEEC CHINA PHILIPPINES MARIVELES POWER PLANT
USD 580M
GN POWER Scope : 600mw (2x300mw)
EPC contract for CNEEC

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
ApriI 2010 CNEEC CHINA AUSTRALIA MORWELL POWER PLANT
USD 750M
HRL CORPORATION Scope : coaI-fired 550mw
November 2009 CNOOC CHINA CHINA ZHEJIANG NINGBO LNG TERMINAL
USD 1 BILLION
CNOOC Scope : capacity 3 miIIion t/y in a first phase to be compIeted in 2012
CNOOC wiII take care of the procurement & construction, CHENGDA in
charge of detaiIed design. In consortium with TGE GAS ENGINEERING
GmbH.
An EPC contract wiII be awarded for the storage tanks
December 2008 CNTIC CHINA INDONESIA ADIPALA POWER PLANT
USD 605 M
PT PLN The coaI-fired power pIant wiII have a capacity of 660mw
cntic = China NationaI TechnicaI Import & Export Corporation
ApriI 2010 COOEC CHINA AUSTRALIA GORGON LNG PLANT (second-tier
moduIes) - USD 180M
CHEVRON/EXXONMOBIL/SHELL Scope : 157 moduIes. The contract incIudes project management, shop
design, materiaIs procurement, construction...
November 2008 CPI POWER ENG CHINA SAUDI ARABIA JAZAN POWER PLANT
USD 2,5 BILLION
MMC / BINLADEN / CHALCO Scope : 2400mw
the power pIant wiII suppIy power to the aIuminium smeIter pIanned by MMC
CORPORATION / SAUDI BINLADEN / CHALCO
Work to start in 2009
March 2010 DONG FANG
ELECTRIC CORP
CHINA VIETNAM DUYEN HAI THERMO POWER PLANT
USD 1,4 B
ELECTRICITY OF VIETNAM Scope : 1245mw
EPC contract signed with DONG FANG ELECTRIC CORPORATION
May 2010 DONG FANG
ELECTRIC CORP
CHINA BOSNIA STANARI THERMAL ELECTRIC
POWER PLANT - USD 616M
EFT GROUP Scope : 300mw
Turnkey contract for Dongfang EIectric, financing at 25% by EFT, baIance by
a consortium of chinese and european banks
JuIy 2009 KAIDI ELECTRIC CHINA VIETNAM MAO KHE POWER PLANT
USD 429M
VINACOMIN Scope : 2x440mw
EPC contract for Kaidi EIectric, work to start immediateIy, commissioning in
42 months
ApriI 2010 SEPCO CHINA INDIA JHARSUGUDA COAL FIRED POWER
PLANT - USD 1,5 B
VEDANTA RESOURCES Scope : 1980mw (3x660mw)
SHANGHAI ELECTRIC POWER CONSTRUCTION CORPORATION (SEPCO) has
won the contract
JuIy 2009 SEPCO III CHINA SAUDI ARABIA RABIGH INDEPENDENT POWER
PROJECT - USD 2,5 BILLION
KEPCO/ACWA POWER INT Scope : 1200mw (oiI-fired)
The South Korean KEPCO with ACWA POWER INT has been seIected by SEC
to carry out the project. Their named EPC contractors are SHANDONG
ELECTRIC POWER CONSTRUCTION CORPORATION (SEPCO III) and
DONGFANG ELECTRIC
Contract signed in JuIy 2009, postponed due to difficuIties in securing
financing, commissioning expected in 2013 instead of 2012
November 2009 SEPCO III CHINA OMAN SALALAH POWER & WATER
INDEPENDENT PROJECT - USD 1B
SEMCORP UTILITIES Scope : 400mw power - 15 miIIion g/d desaIination
In November 09, Sembcorp has been awarded the BOO contract, its
nominated EPC contractor is Shandong EIectric Power Cy (Sepco3)
Sepco3 has awarded the contract for the desaIination package to
HyfIux/Singapore in November 09
November 2008 SHANGHAI ELECTRIC
GROUP
CHINA BOTSWANA MMAMABULA ENERGY PROJECT CIC ENERGY Scope : 1320mw - SHANGHAI ELECTRIC GROUP seIected as epc contractor.
Work to start mid-2009 - PARSONS BRINCKERHOFF/USA is the engineer
October 2009 SHANGHAI ELECTRIC
GROUP
CHINA VIETNAM VINH TAN THERMAL POWER PLANT
USD 1,3 B
ELECTRICITY OF VIETNAM Scope : 1224mw
EPC contract for Shanghai EIectric
February 2010 SHANGHAI ELECTRIC
GROUP
CHINA BANGLADESH SYLHET POWER PLANT
USD 105M
GOVERNMENT Scope : singIe cycIe power pIant
turnkey contract
October 2009 SINOPEC
ENGINEERING
CHINA KAZAKHSTAN ATYRAY AROMATICS COMPLEX
USD 1,04 B
KAZMUNAIGAZ Scope : 133,000t/y of benzene - 496,000t/y of paraxyIene on Axens
technoIogy. The work wiII aIso cover a cataIytic reforming unit
turnkey contract for Sinopec
January 2010 SINOPEC
ENGINEERING
CHINA SAUDI ARABIA WASEA BULK PLANT
USD 141 M
SAUDI ARAMCO scope : construction of oiI tanks, pumps, substations + civiI & structuraI
works.
SINOPEC has won the contract with a very Iow offer
March 2010 SINOPEC
ENGINEERING
CHINA KAZAKHSTAN ATYRAU POLYPROPYLENE PLANT
USD 1,6 B
KPI KPI owned by Kazmunaigas and SAT & Cy. The project is part of a
petrochemicaI compIex initiaIIy pIanned with LyondeIIbaseII. As
LyondeIIbaseII dropped from the project, KPI decided to go aIone in a first
phase and has signed a contract with SINOPEC ENGINEERING for a
450,000t/y poIypropyIene pIant. Financing to come from Eximbank of China

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
June 2009 TECHNIP CHINA CHINA YINCHUAN LNG PLANT NINGXIA HANAS NATURAL GAS CY Scope : capacity of 400,000t/y, Air Products Iiquefaction process
contract to be executed by Technip in KuaIa Lumpue and Shanghai
the contract covers engineering, suppIy of main equipment, procurement and
construction management services for faciIities (naturaI gas pre-treatment,
Iiquefaction, LNG storage and Ioading, offsites, buiIdings & other
infrastructures)
May 2008 WUHUAN ENG CHINA VIETNAM CA MAU FERTILIZER PLANT
USD 900 M
PETROVIETNAM The pIant wiII produce 800,000t/y of fertiIizers
Petrovietnam has awarded the EPC contract to the chinese companies
WUHUAN ENGINEERING and CHINA NATIONAL MACHINERY IMPORT &
EXPORT CORPORATION
January 2008 BHEL INDIA INDIA NORTH CHENNAI POWER PLANT
USD 1128 M
TAMIL NADU ELECTRICITY BOARD Scope : 600mw
contract won againt internationaI bidding
In JuIy 2008 BHEL has signed a second contract to set up a 600mw unit,
contract vaIue USD 503M
February 2008 BHEL INDIA INDIA ANPARA D POWER PLANT
USD 841 M
UPRVUNL Scope : 1000mw
BHEL's scope incIudes design, engineering, manufacture, supIy, erection &
commissioning of boiIer turbine generator package with associated
auxiIiaries and baIance of the pIant
February 2008 BHEL INDIA INDIA CONSTRUCTION OF TWO POWER
PLANTS IN GUJARAT - USD 743 M
GSEG - GSPC 1) a USD 270m contract with Gujarat Sate Energy Generation Cy to set up a
combined-cycIe power pIant at Hazira on an epc basis - capacity 350mw
2) a USD 473M contract with GSPC Piparav Power Company to buiId a
combined-cycIe power pIant near Pipavav - capacity 700mw
June 2008 BHEL INDIA INDIA DELHI POWER PLANT
USD 835 M
PRAGATI POWER CORPORATION
PPCL
Scope : 1371mw
BHEL's contract incIudes design, engineering, manufacture, suppIy, erection
of gas & steam turbines, generators, associated auxiIiaries and baIance of
the pIant equipment
June 2008 BHEL INDIA SYRIA TISHREEN POWER PLANT
USD 400 M
PEEGT Scope : 400mw
BHEL's contract incIudes design, engineering, manufacture, suppIy, erection
of the main pIant equipment with associated auxiIiaries and baIance of the
pIant
June 2008 BHEL INDIA INDIA PALLATANA POWER PLANT IN
TRIPURA
USD 514 M
ONGC TRIPURA POWER CY Scope : 740mw
BHEL has won the contract with GE against ALSTOM
commissioning between 42 and 45 months
turnkey contract
June 2008 BHEL INDIA INDIA BOKARO POWER PLANT
USD 428 M
DAMODAR VALLEY CORPORATION Scope : 500mw
BHEL's contract cover design, engineering, manufacture, suppIy, erection of
steam turbines, generators, boiIers, associated auxiIiaires and baIance of the
pIant
August 2008 BHEL INDIA INDIA GOINDWAL SAHIB POWER PLANT
USD 262 M
GVK POWER LTD Scope : 2x270mw
BHEL's contract covers design, engineering, manufacture, suppIy, erection
and commissioning of steam turbines, generators, boiIers and auxiIiaries
September 2008 BHEL INDIA INDIA CHHABRA THERMAL POWER
STATION EXPANSION - USD 209M
RRVUNL
(Rajasthan Rajia Vidyut Utpadan
Nigam Ltd)
Scope : units 3 & 4 : 2x250mw units
BHEL suppIied the first two units
November 2008 BHEL INDIA INDIA KAKATIYA THERMAL POWER
GENERATING UNIT - USD 267M
APGenco Scope : 600mw
BHEL's scope incIudes design, engineering, manufacture, suppIy, erection &
commissioning of steam turbines, generators, boiIers, associated
auxiIiaries? ControI & instrumentation
December 2008 BHEL INDIA INDIA BINA POWER PLANT
USD 245M
JAIPRAKASH POWER VENTURES 2X250MW
The thermaI pIant wiII be Iocated at Bina in Madhya Pradesh - BHEL's scope
covers design, engineering, manufacture, suppIy, erection, testing and
commissioning of BoiIers, Steam Turbines, Turbo-Generators and associated
auxiIiaries aIong with state-of-the-art ControIs and Instrumentation system
incIuding Generator and Station transformers

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
December 2008 BHEL INDIA INDIA MAUDA SUPER THERMAL POWER
PROJECT USD 435 M
NTPC 1000mw
BHEL's scope covers design, engineering, manufacture, suppIy & erection of
steam generators & turbine generators aIong with associated auxiIiaries &
instrumentation
February 2009 BHEL INDIA INDIA MALWA THERMAL POWER PROJECT
USD 968 M
MPPGC Scope : 2x600mw
BHEL's contract (USD 618M)incIudes design, engineering, manufacture,
suppIy, erection & commissioning of steam turbines, generators, boiIers and
associated auxiIiaries
In november 2009 LARSEN & TOUBRO won the turnkey contract (USD 350M)
for the design, engineering, manufacture, suppIy, erection & commissioning
of baIance of pIant systems
May 2009 BHEL INDIA INDIA AVANTHA BHANDAR THERMAL
POWER PROJECT - USD 316M
KORBA WEST POWER CY Ltd Scope : 600mw
BHEL's contract incIudes design, engineering, manufacture, suppIy, erection
and commissioning of BoiIer, Steam Turbine, Generator aIong with
associated auxiIiaries
the pIant wiII be Iocated in Chhatisgarh
May 2009 BHEL INDIA INDIA BELA THERMAL POWER PROJECT
USD 150 M
IDEAL ENERGY PROJECTS Ltd Scope : 270mw
BHEL's contract incIudes design, engineering, manufacture, suppIy, erection
and commissioning of BoiIer, Steam Turbine, Generator aIong with
associated auxiIiaries
The pIant wiII be Iocated at BeIa in Nagpur District/Maharashtra
June 2009 BHEL INDIA INDIA ADITYA POWER PLANT HINDALCO INDUSTRIES The pIant wiII be buiIt at HindaIco's aIuminium site
the captive power pIant wiII have a capacity of 900mw (6x150mw)
BHEL wiII suppIy generators, turbines, boiIers and set up the core pIant
JuIy 2009 BHEL INDIA INDIA JHARKLAND POWER PLANT
USD 269M
APNRL
(Adhunik Power & NaturaI Resources
Ltd)
Scope : 270mw
BHEL's scope covers design, engineering, manufacture, suppIy, erection &
commissioning of Steam Turbine, Generator and BoiIer aIong with
associated auxiIiaries
In december 2009 BHEL secured a repeat order from APNRL for a second unit
with the same capacity (270mw)
August 2009 BHEL INDIA INDIA DERANG THERMAL POWER PJT
USD 545 M
JINDAL INDIA THERMAL POWER Scope : 2x600mw
BHEL's contract covers design, engineering, manufacture, suppIy, erection &
commissioning of steam turbines, generators, boiIers aIong with associated
auxiIiaries
October 2009 BHEL INDIA INDIA JINDAL SUPER THERMAL POWER
PLANT EXPANSION - USD 1,07 B
JINDAL INDIA THERMAL POWER Scope : expansion by 2400mw (4x600mw)
The contract covers design, engineering, manufacture, suppIy, erection of
boiIers, steam turbines turbo-generators and associated auxiIiaries
November 2009 BHEL INDIA INDIA PRAYAGRAJ THERMAL POWER
PROJECT - USD 1,2 B
PRAYAGRAJ POWER GENERATION
CY
Scope : 3x660mw
BHEL's contract covers design, engineering, manufacture, suppIy, erection &
commissioning of steam turbines, generators and boiIers, aIong with
associated auxiIiaries
March 2010 BHEL INDIA INDIA NASIK & AMRAVATI COAL-FIRED
POWER PLANTS - USD 1,3 B
ELENA POWER &
INFRASTRUCTURES Ltd
Each site invoIves 5 units of 270mw
BHEL's scope : design, engineering, manufacture, suppIy, erection &
commissioning of steam turbines, generators & boiIers with associated
auxiIiaries
March 2010 BHEL INDIA INDIA PARADIP CAPTIVE POWER PLANT
USD 735M
INDIAN OIL CORPORATION Scope : 376mw for the upcoming refinery
BHEL's contract covers design, engineering, manufacture, suppIy, erection of
the pIant with associated baIance of the pIant
ApriI 2010 BHEL INDIA INDIA SUPERCRITICAL THERMAL POWER
PROJECT - USD 1,4 B
RAICHUR POWER CORPORATION Scope : 2 coaI-fired thermaI units of 800mw in Raichur
RPCL is a JV between BHEL and Karnataka Power Corp - BHEL's scope :
engineering, manufacture, suppIy, erection & commissioning
JuIy 2008 BGR ENERGY INDIA INDIA METTUR POWER PLANT EXPANSION
USD 550 M
TAMIL NADU ELECTRICITY BOARD Scope : expansion by 600mw
BGR ENERGY has won the contract against BHEL, the contract covers the
design, engineering, suppIy of boiIer, steam turbine generator and compIete
baIance of pIant equipment
JuIy 2008 BGR ENERGY INDIA INDIA KALISINDH THERMAL POWER
PROJECT - USD 1,1 BILLION
RRVUNL
(Rajasthan Rajia Vidyut Utpadan
Nigam Ltd)
Scope : 2x600mw
The contract covers design, engineering, suppIy of boiIer, steam turbine
generator and compIete BaIance of PIant equipments

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
JuIy 2009 BGR ENERGY INDIA INDIA CHANDRAPUR SUPER THERMAL
POWER STATION EXPANSION
MAHAGENCO Scope : expansion 2x500mw
BGR ENERGY wiII provide engineering, procurement & construction of
BaIance of PIant, work duration 33 months
JuIy 2009 BGR ENERGY INDIA IRAQ AKAS & AL MANSURIA FIELDS
DEVLPT - USD 80M
SCOP the contract incIudes engineering, procurement and suppIy of key utiIities :
gas and fire detection systems, gas generators, water systems..
Both gas projects wiII have a combined capacity to produce 110 miIIion cf/d
August 2009 BGR ENERGY INDIA INDIA MARWA THERMAL POWER PROJECT
USD 334M
CHHATTISGARH STATE POWER CY Scope : 2x500mw
BGR ENERGY has been awarded the baIance of pIant contract, contract won
against Larsen & Toubro and TATA Projects
August 2009 EIL INDIA INDIA MANGALORE POLYPROPYLENE
PLANT - USD 312 M
MRPC Scope : a 440,000t/y poIypropyIene unit
EIL has won the contract against TOYO, UHDE, JACOBS and TECHNIP.
May 2010 EIL INDIA INDIA MALLAVARAM ONSHORE GAS
TERMINAL - USD 315 M
GSPC Part of the Deen DayaI Project
May 2010 ESSAR OFFSHORE INDIA INDIA D-1 FIELD DEVLPT (pIatforms,
pipeIines)
USD 235M
ONGC Scope : three unmanned weIIhead pIatforms aIong with associated pipeIines,
subsea manifIds and modification at the D-1 weIIhead pIatform
contract won in association with IRANIAN OFFSHORE ENGINEERING &
CONSTRUCTION
January 2009 JACOBS ENGINEERINGINDIA INDIA MANGALORE REFINERY EXPANSION
PHASE 3 (CDU/VDU Units)
MRPC part of the Upgradation & Expansion Phase III Project.
JACOBS ENGINEERING INDIA has been awarded the enginering,
procurement & construction management contract for the crude distiIIation
and the vacuum distiIIation units.
EIL is the consuItant
Contract confirmed by JACOBS in March 09, work wiII aIso covera a LPG
treatment unit and ATF merox unit.
May 2010 JACOBS ENGINEERINGINDIA INDIA MANALI RESID UPGRADATION PJT
USD 650M
CHENNAI PETROLEUM Jacobs wiII provide project management consuItancy and engineering,
procurement & construction management services. Scope of work incIudes
process packages for the utiIity & offsite faciIities, a detaiIed feasibiIity
report, PMC services for execution of a coker bIock and suIfur bIock and
EPCM services for the baIance of the project. The Resid Upgradtion Project
invoIves a deIayed coker, revamping of the hydrcracker, a suIfur recovery
unit + utiIities
January 2010 LANCO INFRATECH INDIA INDIA MAHARASHTRA COAL-FIRED POWER
PLANT - USD 1,2B
LANCO MAHANADI POWER Scope : 2x660mw
March 2008 LARSEN&TOUBRO INDIA INDIA MUMBAI LUBRICATING OIL BASE
STOCK PLANT
HINDUSTAN PETROLEUM Scope : capacity 200,000t/y - Part of the QuaIity Upgrading Project
L&T's scope incIude design, detaiIed engineering, procurement, suppIy,
transportation, fabrication, construction and instaIIation
JACOBS ENGINEERING wiII provide project management services,
ExxonMobiI the technoIogy
September 2008 LARSEN&TOUBRO INDIA BRAZIL SUPPLY OF EQUIPMENT FOR THE
NORTH EAST REFINERY - USD 160M
PETROBRAS L&T has won the contract to manufacture and suppIy ten hydrotreating
reactors and tweIve coke drums for the pIanned refinery
November 2008 LARSEN&TOUBRO INDIA INDIA HYDROGEN UNITS AT BHATINDA
REFINERY - USD 143 M
HPCL-MITTAL Scope : 2 hydrogen Generation Units (capacity 44,000t/y) based on HaIdor
Topsoe TechnoIogy
L&T's contract covers detaiIed enginering, procurement, suppIy,
transportation, fabrication, construction, mechanicaI compIetion
ApriI 2009 LARSEN&TOUBRO INDIA INDIA MANGALORE REFINERY EXPANSION
PHASE 3 (HGU/DHT units)
USD 265 M
MRPC L&T's contract covers a dieseI hydrotreating unit capa 3,7 MMt/y (Axens
TechnoIogy) and a hydrogen Generation unit capa 70,000t/y (HaIdor Topsoe
technoIogy) - L&T in charge of the design, engineering, procurement, suppIy,
construction, instaIIation & commissioning
August 2009 LARSEN&TOUBRO INDIA INDIA MUMBAI HIGH NORTH PROCESS
PLATFORM - USD 1,18 B
ONGC L&T wiII be responsibIe for survey, engineering, procurement, fabrication,
instaIIation and commissioning for major process, Iiving quarters and twin
fIare pIatforms, aII connected by bridges, in addition to the three
compression moduIes. Over 80,000 tonnes of structures, process faciIities
and utiIities wiII be erected in the high seas.
August 2009 LARSEN&TOUBRO INDIA INDIA NIGRIE SUPERCRITICAL THERMAL
POWER PROJECT - USD 828M
JAYPEE GROUP Scope : 1320mw
contract won in association with Mitsubishi Heavy Industries India, the
project represents an investment of USD 1,65 BiIIion

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
September 2009 LARSEN&TOUBRO INDIA INDIA VEMAGIRI POWER PLANT
USD 415 M
GMR ENERGY Gas-fired power pIant 2x384mw
L&T's scope incIudes the design, detaiIed engineering suppIy, instaIaItion &
commissioning of the pIant on a turnkey basis.
L&T SARGENT & LUNDY wiII carry out the pIant integration & detaiIed
engineering
November 2009 LARSEN&TOUBRO INDIA INDIA KORADI POWER STATION
USD 1,49 B
MAHAGENCO Scope 1980mw
L&T's scope incIudes design, engineering, manufacture, suppIy, erection &
commissioning of super-criticaI boiIers, steam turbine generators &
associated auxiIiaries besides baIance of pIant equipment
December 2009 LARSEN&TOUBRO INDIA INDIA BHARUCH AMMONIA PLANT
USD 212 M
GNFC
(Gujarat Narmada VaIIey FertiIizers)
Scope : an ammonia unit capacity 1120t/d based on HaIdor Topsoe
technoIogy
contract to be executed on a Iump sum turnkey basis by L&T's Engineering &
Construction Division
January 2010 LARSEN&TOUBRO INDIA INDIA PANIPAT & BATHINDA AMMONIA
CONVERSION PJT - USD 464M
NATIONAL FERTILIZERS Ltd the projects invoIve changeover of the feestock of the 900t/d ammonia pIants
from fueI oiI to naturaI gas. L&T's turnkey contract incIude basic engineering,
detaiIed engineering, procurement, construction, interconnection with
existing faciIities - Gas synthesis technoIogy suppIied by HaIdor Topsoe
February 2010 LARSEN&TOUBRO INDIA INDIA GODHNA THERMAL POWER PLANT
USD 2,1 B
KARNATAKA POWER CORP Scope : 1600mw (2x800)
L&T has signed a JV with Karnataka Power. Work to start by the end of 2010
March 2010 LARSEN&TOUBRO INDIA INDIA MANGALORE AROMATICS COMPLEX
USD 446M
ONGC MANGALORE
PETROCHEMICALS
Scope : the compIex wiII produce paraxyIene & benzene as weII as other
products Iike hydrogen, heavy aromatics and LPG
UOP wiII suppIy the technoIogy for the paraxyIene & benzene units
epc contract
March 2010 LARSEN&TOUBRO INDIA INDIA PARADIP FCC REACTOR
REGENERATOR PROJECT
USD 312 M
INDIAN OIL CORPORATION Scope : 4,17 MiIIion t/y FIuidized CataIytic Cracker Reactor Regeneration
using Indmax technoIogy for converting heavy distiIIate and residue into
LPG/Iight distiIIate product
L&T's scope : residuaI and detaiIed engineering, procurement, suppIy,
manufacture, fabrication, construction & commissioning on a Iumpsum
turnkey basis
March 2010 LARSEN&TOUBRO INDIA INDIA MUMBAI HIGH NORTH PHASE II
USD 224 M
ONGC Scope : construction of four weIIhead pIatforms, each with 12 sIots with
remote weII testing and monitoring faciIities from the NQ compIex at Mumbai
High North
engineering work to be carried out by L&T VaIded in BangaIore, Chennai and
Faridabad
June 2010 LARSEN&TOUBRO INDIA INDIA HAZIRA ADDITIONAL GAS
PROCESSING FACILITIES - USD 66M
ONGC Scope : a 6,3 miIIion cm/ gas sweetening unit, a gas dehydration unit with the
same capacity, a cooIing water system, associated utiIities
ApriI 2010 LARSEN&TOUBRO INDIA INDIA DEEN DAYAL WELHEAD PLATFORM
USD 235M
GUJARAT STATE PETROLEUM
CORP
contract won against Afcons
engineering, procurement, fabrication and instaIIation of the weIIhead
pIatform.
March 2008 PUNJLLOYD INDIA MALAYSIA SABAH-SARAWAK GAS PIPELINE
USD 500 M
PETRONAS CARIGALI Scope : 512km diam 36" pipeIine + metering stations & compressor stations
The contract has been awarded to a consortium Ied by PUNJLLOYD and
incIuding DIALOG E&C Sdb Bhd
June 2008 PUNJLLOYD INDIA INDIA BARAUNI MSQ UPGRADATION
PROJECT - USD 152M
INDIAN OIL CORPORATION Scope : a 274,000t/y reformer spIitter - a 183,000t/y naphta hydrotreating unit
a 126,000t/y isomerisation unit, a 403,000t/y Prime G+ unit & offsites/utiIities
Contract vaIue for PunjLLoyd : USD 152M - Axens wiII suppIy technoIogy for
the process units, work to be compIete in 23 months
September 2008 PUNJLLOYD INDIA QATAR STRATEGIC GAS TRANSMISSION
PROJECT - USD 800 M
QATAR PETROLEUM Scope : Iaying of 211km of pipeIines with associated stations and
infrastructure. The 363 pipeIine wiII transport 2 BiIIion cf/d of sweet Iean gas
from Ras Laffan to different consumers
September 2009 PUNJLLOYD INDIA INDIA MANGALORE COKE DRUM PACKAGE
USD 113M
MRPC Punj LIoyd wiII provide engineering, procurement & construction of the coke
drum structure package of the deIayed coker unit for the Phase 3 project.
CB&I LUMMUS provided the basic engineering process design of the 3
miIIion t/y deIayed coker unit

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
March 2010 PUNJLLOYD INDIA INDIA TADALI POWER PLANT
USD 223M
DHARIWAL INFRASTRUCTURE DhariwaI Infrastructure is part of RPG Group
Punj LIoyd's contract cover engineering procurement & construction of
compIete baIance of pIant systems for the 2x300mw pIant
ApriI 2010 PUNJLLOYD INDIA INDIA CUDDALORE REFINERY (Insiide
Battery Limit)
NAGARJUNA OIL CORP ReIocation of a german refinery (MobiI Woerth) in CuddaIore. capacity 6
MiIIion t/y
PUNJLLOYD 's contract covers the instaIIation of inside Battery Limit and
interconnection pipe rack : setting up of crude & vacuum distiIIation units,
gasoIine and saturated gas pIant and cataIytic hydro-desuIfurization &
isomerization units : construction-reIated procurement, civiI works, structuraI
works, mechanicaI equipment erection. Long deIayed project, ABB LUMMUS
was awarded the basic enginering, detaiIed engineering, procurement and
construction management
Once instaIIed, the refinery wiII be expanded to 15 MiIIion t/y
November 2007 RELIANCE ENERGY INDIA INDIA KRISHNAPATNAM POWER PLANT
USD 3 BILLION
COASTAL ANDHRA POWER Scope : 4000mw
ReIiance Power has won the contract against Larsen & Toubro
June 2008 RELIANCE INFRA INDIA INDIA SASAN ULTRA MEGA POWER
PROJECT - USD 2,5 BiIIion
RELIANCE ENERGY Scope : 3960mw to be commissioned in different stages within 42 months for
the first 660mw, the 5 others with an intervaI of 3 months
EPC contract for ReIiance Infrastructure
January 2009 RELIANCE POWER INDIA INDIA TILAIYA ULTRA MEGA POWER
PLANT - USD 3,2 B
GOVERNMENT Scope : 4,000mw
RELIANCE wiII receive the Letter of Intent earIy February 09, formaI contract
to be signed within one month
May 2010 SAMSUNG ENG INDIA INDIA CUDDALORE REFINERY
(DHDS Project)
NAGARJUNA OIL CORP Scope : the dieseI hydro desuIfurization unit wiII have a capacity of
125,000b/d
SAMSUNG ENGINEERING INDIA wiII be in charge of the design, procurement,
construction & commissioning - CompIetion in March 2012
February 2009 TATA PROJECTS INDIA INDIA SRI DAMODARAM SANJEEVAIAH
THERMAL POWER PROJECT
USD 561 M
APPDCL
(Andhra Pradesh Power DevIpt)
Scope : coaI-fired power pIant 2x800mw
TATA PROJECTS has won the EPC contract for the baIance of pIant, BHEL
wiII suppIy the boiIers and LARSEN & TOUBRO the turbines under separate
contracts
August 2009 TECNIMONT INDIA INDIA MANGALORE REFINERY CHTU
PROJECT - USD 80M
MRPC Scope : construction of a heavy coker gas oiI hydrotreating unit, part of the
Phase III Expansion project
Iump sum turnkey contract for TICB, commissioning by the end of 2011
March 2010 TECNIMONT INDIA INDIA NANGAL AMMONIA PLANT
CONVERSION PJT - USD 240M
NATIONAL FERTILIZERS Ltd Scope : revamping of the existing pIant for feestock changeover from FueI
OiI/Low SuIphur Heavy Stock to re-Iiquified naturaI gas. Capacity of the
ammonia pIant wiII remain at 950t/d. The project incIudes aIso the revamping
of utiIities & Offsites
Iumpsum turnkey contract incIusing technoIogu Iiecensign, engineering,
procurement, construction & commissioning
October 2009 TECHNIP INDIA INDIA VIZAG DIESEL HYDROTREAT
PROJECT - USD 150M
HINDUSTAN PETROLEUM Scope : a dieseI hydrotreat unit 2,2 MiIIion t/y - A hydrogen generation unit
36,000t/y
Technip has been awarded the Iump sum tunrkey contract, confirmation by
Technip in ApriI 2010, foIIowed by New DeIhi office - TOYO INDIA is the
Project Management ConsuItant
September 2009 THERMAX INDIA INDIA MEENAKSHI POWER PLANT
USD 198 M
MEENAKSHI ENERGY capacity 2x135mw
turnkey contract for Thermax who wiII aIso suppIy the water treatment &
effIuent systems
November 2008 TOYO INDIA INDIA CONSTRUCTION OF SRUs AT
BHATINDA REFINERY
HPCL-MITTAL Scope : 2 x 300t/d suIphur recovery units based on Prosernat process, TEIL's
scope of work incIudes detaiIed engineering, construction management and
procurement services
June 2009 TOYO INDIA INDIA MANGALORE REFINERY (EPCM-4) INDIAN OIL CORPORATION Scope : a PropyIene Recovery Unit 1,9 Mmt/y and a 4,17 Mmt/y FCC Indmax
TOYO's contract covers project management, detaiIed engineering,
procurement, construction management & supervision.
September 2009 TOYO INDIA INDIA MANGALORE CDU/VDU N1
REVAMPING
MRPC Scope : revamping of the crude/vacuum distiIIation units n1
TEIL's scope incIudes residuaI process design and detaiIed engineering,
project management, procurement, suppIy, fabrication & commissioning

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
October 2009 TOYO INDIA INDIA MUMBAI DIESEL HYDROTREAT
PROJECT - USD 720M
HINDUSTAN PETROLEUM Scope : a 2,2 MiIIion t/y dieseI hydrotreat unit, UOP process
TEIL's scope of contract incIudes residuaI process design, detaiIed
engineering, procurement, suppIy, storage, fabrication & mechanicaI
compIetion
October 2009 TOYO INDIA INDIA MANGALORE DELAYED COKER BOP MRPC TEIL's contract covers the BaIance of PIant of DeIayed Coker Unit (3 MMT/y-
ABB Lummus design) excIuding the coke drum structure awarded to
PunjIIoyd in September 09 - EIL is the Project Management ConsuItant
August 2008 UHDE INDIA INDIA GUWAHATI/DIGBOI MS QUALITY
UPGRADATION PROJECT
INDIAN OIL CORPORATION Scope : isomerisation units with naphta hydrotreating units at both refineries
+ an indmax GasoIine spIitter (Lurgi technoIogy) at Guwahati and a naphtha
spIitter and a reformate spIitter at Digboi
UHDE INDIA seIected as EPCM contractor by IOCL
September 2008 UHDE INDIA INDIA BHARUCH NITRIC ACID PLANT GNVFC Scope : 300t/d. UHDE's contract covers provess Iicense, basic & detaiIed
engineering, procurement and suppIy of equipment, civiI works, erection &
commissioning. The cIient is Gujarat Narmada vaIIey FertiIizers
ApriI 2009 UHDE INDIA INDIA PARADIP REFINERY (EPCM-2) INDIAN OIL CORPORATION Scope : vacuum oiI gas hydrotreater 5,4MMt/y (Axens) - DieseI Hydrotreater
5,2 MMt/y (SheII GIobaI).
UHDE INDIA 's scope : PMC, engineering, procurement. Long Iead items
procurement between May and JuIy 09
June 2009 UHDE INDIA INDIA VIZAG FORMALDEHYDE PLANT KANORIA CHEMICALS & INDUSRIES
LTD
Scope : capacity of 300t/d -
UHDE INDIA's contract incIudes detaiIed engineering, procurement, project
management, supervision. Basi engineering performed by Formox of Sweden
ApriI 2009 GUNANUSA INDONESIA INDIA MUMBAI HIGH NORTH ICP-R
PROCESS PLATFORM - USD 362M
ONGC Scope : engineering, procurement, construction & instaIIation of the pIatform
(topsides 7300t - jacket 3600t) and a fIare tripod
ApriI 2010 PT NISCONI INDONESIA INDONESIA SOUTH MAHAKAM FIELD
(pIatforms/pipeIines) - USD 240M
TOTAL construction, transport, instaIIation of 3 tripod pIatforms at Main Stupa, East
Mandu and West Stupa fieIds + 80km of subsea pipeIines
June 2009 PT REKAYASA INDONESIA INDONESIA BONTANG AMMONIUM NITRATE
PLANT - USD 173M
PT KALTIM NITRATE INDONESIA Scope : capacity of 300,000t/y
PT REKAYASA has won the USD 173M contract, work to start in summer 2009
May 2009 SAIPEM INDONESIA INDONESIA GAJAH BARU FIELD DEVELOPMENT
USD 430 M
PREMIER OIL NATUNA Scope : a centraI processing pIatform (topsides 8200 tons), weIIhead pIatform
(topsides 900 t)3km subsea pipeIine (16")
Contract won in association with SMOE/INDONESIA
PT SAIPEM INDONESIA's scope incIude engineering design, procurement,
transportation and instaIIation of the pIatforms and the subsea pipeIine
May 2009 SMOE INDONESIA INDONESIA GAJAH BARU FIELD DEVELOPMENT
USD 430 M
PREMIER OIL NATUNA Scope : a centraI processing pIatform (topsides 8200 tons), weIIhead pIatform
(topsides 900 t)3km subsea pipeIine (16")
Contract won in association with PT SAIPEM INDONESIA
SMOE's scope : part procurement, construction engineering, construction,
hook-up and commissioning of two pIatform. Share of the contract USD 156M
In August 2009 NISCONI won the EPCI contract to fabricate the deck and
jackets or the 2 pIatforms
March 2008 CHIYODA JAPAN THAILAND MAP TA PHUT ACRYLIC PLANT THAI MMA
(Mitsubishi Rayon/SCG ChemicaIs)
Scope : capacity 20,000t/y
CHIYODA/JAPAN wiII be in charge of engineering & procurement whiIe
CHIYODA/THAILAND wiII undertake construction works
JuIy 2008 CHIYODA JAPAN ALGERIA ARZEW LNG PLANT(GL3Z)
USD 4,2 BILLION
SONATRACH Scope : capacity of 4,7 miIIion t/y of LNG
SAIPEM/SNAMPROGETTI in joint venture with CHIYODA has been awarded
the Iump sum turnkey contract
JuIy 2009 CHIYODA JAPAN SAUDI ARABIA JUBAIL REFINERY
(SATORP PJT)
PACK-4 - Coker - USD 900M
SAUDI ARAMCO
TOTAL
Scope : Coker Unit capacity 100,000b/d
onshore work wiII be performed by Chiyoda Petrostar as Ieader and Samsung
Saudi Arabia
December 2009 CHIYODA JAPAN PAPUA NEW GUINEA PNG LNG PROJECT
(LNG PIant) - USD 4,5 B
EXXONMOBIL Scope : capacity 6,6 miIIion t/y (2 trains) incIuding faciIities for processing &
treating naturaI gas, Iiquefaction, storage & Ioading
contract won by CHIYODA, as Ieader, and JGC

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
February 2010 CHIYODA JAPAN QATAR PLATEAU MAINTENANCE PROJECT
(PMP)
USD 1,2 B
QATARGAS The project wiII enabIe Qatargas to maintain its current production IeveI of 10
miIIion t/y of LNG
Scope : a new acid gas removaI unit, a new suIphur recovery unit and
moridication to utiIity systems for handIing increased feedgas rates to the
existing trains.
Contract won in association with TECHNIP
November 2007 IHI JAPAN INDIA KOCHI LNG TERMINAL
(storage tanks) - USD 250 M
PETRONET LNG two LNG storage tanks with 155,000 m3 of capacity
December 2007 JGC JAPAN SAUDI ARABIA JUBAIL NCP COMPLEX
(ethyIene pack)
USD 1.2 BILLION
SAUDI POLYMERS CY
(NATIONAL CHEVRONPHILLIPS/SIIG)
Scope : a 1,2 miIIion t/y ethyIene pIant, a 200,000t/y methathesis pIant on ABB
LUMMUS technoIogy and a 100,000t/y 1-hexene pIant on Chevron PhiIIips
TechnoIogy
Contract won by JGC in December 2007, work to start in January scheduIed
for compIetion in September 2011
JuIy 2008 JGC JAPAN SAUDI ARABIA MANIFA PROJECT (UtiIities/Storage)
USD 800 M
SAUDI ARAMCO JGC's contract covers package two of the Manifa project, invoIving utiIities,
storage and shipping faciIities for the centraI processing faciIities
contract to be executed by JGC/Japan and JGC GuIf InternationaI in Saudi
commissioning deferred to 2013 instead of 2011
JuIy 2008 JGC JAPAN ALGERIA RHOURDE NOUSS FIELD
DEVELOPMENT - USD 500M
SONATRACH Scope : an oiI separation and treatment unit with a capacity of 1000 cubic
meters per day and a compression station with capacity of 8 miIIion cm/d + a
boosting unit for the compression of 20 miIIion cm/d of gas
December 2008 JGC JAPAN INDONESIA DONGGI-SENORO LNG TERMINAL PT DONGGI SENORO LNG the terminaI wiII have a capacity of 2,1 miIIion tonnes/year
JGC/JAPAN seIected as EPC contractor, stiII in negotiations with the cIient
for finaI prices.
PT DONGGI SENORO is a jv between MEDCO, PERTAMINA and MITSUBISHI
June 2009 JGC JAPAN ALGERIA GASSI TOUIL GAS PROCESSING
FACILITIES - USD 1,5 BILLION
SONATRACH EPC contract covering the construction of gas processing faciIities with a
throughput of 12 miIIion cubic meters a day, gas gathering and pipeIines at
the Gassi TouiI fieId - the faciIities wiII aIso produce 1000t/d of LPG and
1600t/d of condensates. The gas wiII be sent to the Arzew LNG pIant
JuIy 2009 JGC JAPAN ABU DHABI IGD PROJECT (HABSHAN 5 GAS
PROCESSING PLANT - USD 4,7 B
GASCO scope : engineering, procurement, construction and commissioning of the
foIIowing core units : Gas Processing Unit (2 BiIIion cf/d), SuIphur Recovery
Units (5000t/d), NGL Recovery unit (1,2 BiIIion cf/d). JGC won the contract
with the itaIian Maire Tecnimont, JGC Ieader of the consortium
In January 2010 KHARAFI/KUWAIT won a USD 700M subcontract and CCC a
USD 300M subcontract for civiI, mechanicaI & eIectricaI works.
September 2009 JGC JAPAN AUSTRALIA GORGON LNG PLANT
USD 2,3 BILLION
CHEVRON/EXXONMOBIL/SHELL Scope : the pIant wiII incIude three 5 MiIIion t/y LNG trains and a 300 tonnes
jouIes/day domestic gas pIant.
The contract has been awarded to KJVG consortium incIuding KBR, JGC,
CLOUGH and HATCH
Chevron and its partners have taken the finaI investment decision mid
september. The pIant wiII be buiIt in moduIar mode.
December 2009 JGC JAPAN PAPUA NEW GUINEA PNG LNG PROJECT
(LNG PIant) - USD 4,5 B
EXXONMOBIL Scope : capacity 6,6 miIIion t/y (2 trains) incIuding faciIities for processing &
treating naturaI gas, Iiquefaction, storage & Ioading
contract won by CHIYODA, as Ieader, and JGC
January 2010 JGC JAPAN SAUDI ARABIA JUBAIL REFINERY CLEAN FUELS
PROJECT - USD 100M
SASREF Scope : upgrade of super cIaus units, a off-gas treating unit, a sour water
stripper. The project aims at meeting the US refinery emissions reguIations
by removing suIphur dioxide from air emissions
JGC seIected in January 2010, waiting for officiaI confirmation
January 2010 KAWASAKI PLANT
SYSTEMS
JAPAN TURKMENISTAN MARY FERTILIZER COMPLEX
USD 654M
TURKMENHIMIYA Scope : 1200t/d of ammonia - 1925t/d urea
K.PLANT, part of Kawasaki Heavy Industries, has won the contract with Sojiz
K.PLANT wiII be responsibIe for the engineering and the suppIy of equipment
whiIe Sojitz wiII be responsibIe for coordination & financing
In January 2010 MW KELLOGG seIected to provide Iicense technoIogy and
basic engineering design

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
JuIy 2008 MARUBENI JAPAN THAILAND COMBINED-CYCLE POWER PLANT
USD 302M
GLOW ENERGY Scope : 380mw to be Iocated at Map Ta Phut/Rayong
MARUBENI wiII be responsibIe for procurement of main equipment of the
pIant such as gas turbine generator and steam turbine generator from
Siemens as weII as overaII civiIs and instaIIation works. BLACK&VEATCH wiII
be the technicaI maanger, responsibIe for engineering, pIant equipment
procurement, construction management, start-up & commissioning
September 2009 MARUBENI JAPAN THAILAND RAYONG POWER PLANT
USD 124M
IRPC Scope : 220mw - Combined heat & power pIant
February 2010 MARUBENI JAPAN SINGAPORE TEMBUSU POWER PLANT
USD 250 M
TUAS POWER Scope : biomass and cIean coaI generation pIant, part of a utiIities compIex
102mw - engineering, procurement & construction contract
June 2010 MARUBENI JAPAN VIETNAM NGHI SON POWER PLANT
USD 990M
ELECTRICITY OF VIETNAM Scope : coaI-fired ower pIant 600mw
Marubeni's scope : engineering, procurement, deIivery of equipment &
construction. Steam turbines to be procured from Fuji Eectric Systems,
boiIers from Foster WheeIer
partIy financing by Japan
August 2007 MITSUI ENG JAPAN EGYPT MOSTOROD REFINERY
USD 1, 8 BILLION
EGYPTIAN REFINING CY 150,000b/d
turnkey contract awarded to a consortium incIuding MITSUI and GS
ENGINEERING
May 2009 : Project haIted due to financing, both EPC contractors have been
offered a 30% share in the project, negotiations with Export Import Bank of
South Korea and JBIC/JAPAN expected to be cIosed in October 2009 enabIing
work to start earIy 2010.Project to be commissioned in 2013 instead of 2011
September 2007 MITSUI ENG JAPAN SINGAPORE JURONG 2nd PETROCHEMICAL
COMPLEX (PP UNIT)
EXXONMOBIL Scope : a 450,000t/y poIypropyIene unit
MITSUI ENGINEERING has been awarded the EPC contract for the PP units
and for the steam cracker furnaces in association with HEURTEY
PETROCHEM
September 2007 MITSUI ENG JAPAN SINGAPORE JURONG 2nd PETROCHEMICAL
COMPLEX (EIastomers Unit)
EXXONMOBIL Scope : a 300,000t/y speciaIty eIastomers unit
MITSUI ENG has been awarded the engineering, procurement & construction
contract
September 2007 MITSUBISHI HEAVY
IND
JAPAN SINGAPORE JURONG 2nd PETROCHEMICAL
COMPLEX (PoIyethyIene Units)
EXXONMOBIL Scope : 2 poIyethyIene units 650,000t/y
MHI/JAPAN has been awarded the engineering procurement & construction
for the 2 PE units and for poIyoIefins finishing, packaging and shipping
February 2008 MITSUBISHI HEAVY
IND
JAPAN NETHERLANDS MAGNUM PLANT NUON Scope : 1300mw
MHI wiII suppIy the three gas turbines, steam turbine generators, heat
recovery steam generators and baIance of the pIant. BALLAST NEDAM has
been awarded a C 130M subcontract by MHI for the civiI works
Work was haIted in May 2008 as aII the permits were not obtained, aII the
authorizations have been given in JuIy 2009 and work wiII restart on site in
september. PonticeIIi is a MHI's subcontractor
March 2008 MITSUBISHI HEAVY
IND
JAPAN ALGERIA MERS EL HADJAJ AMMONIA-UREA
COMPLEX - USD 3 BILLION
SONATRACH / SUHAI BAHWAN
(EI Djazairia EI Omania LiI AsmidaI)
Scope : ammonia capacity 4000t/d - urea capacity 7,000t/d
MHI/JAPAN and DAEWOO ENGINEERING/SOUTH KOREEA have won the EPC
contract with an offer of USD 2,415 BiIIion - The officiaI EPC contract has
been signed mid-apriI
ApriI 2008 MITSUBISHI HEAVY
IND
JAPAN TURKEY BANDIRMA POWER PLANT ENERJISA POWER CY
(Verbund / Sabanci)
Scope : 920mw
MHI in association with the austrian A-TEC has been given the green Iight to
impIement the project
September 2008 MITSUBISHI HEAVY
IND
JAPAN SPAIN COMPOSTILLA POWER PLANT
EXPANSION - USD 290 M
ENDESA Units 6 & 7 : 2x400mw
MHI has received the turnkey contract. Scope : each unit wiII incIude a gas
turbine, a steam turbine, a generator and a heat recovery steam generator
CiviI engineering, instaIIation work and procurement of other auxiIiary
equipment to be done by a spanish consortium Ied by INITEC and incIuding
COBRA and ACCIONA
January 2009 MITSUBISHI HEAVY
IND
JAPAN INDONESIA TANJUNG PRIOK CCGT POWER
PLANT
PT PLN Scope : 750mw combined-cycIe power pIant
turnkey contract for MHI

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
May 2009 MITSUBISHI HEAVY
IND
JAPAN RUSSIA MENDERLEEVSK FERTILIZER
COMPLEX - USD 973M
JSC AMMONI Scope : production of 717,000t/y ammonia, 230,000t/y of methanoI, 380,000t/y
of ammonium nitrate - HaIdor Topsoe TechnoIogy
agreement signed between the cIient and MHI and SOJITZ CORPORATION.
MHI wiII act as EPC contractor
December 2007 TOYO JAPAN INDONESIA BALONGAN REFINERY EXPANSION
USD 300 M
PERTAMINA Expansion of the propyIene production from 1000t/d to 1700t/d
Toyo has won the USD 300M contract, work to start in january 08
OfficiaI contract signed on January 22 with TOYO and PT REKAYASA. The
project is caIIed ROPP (RCC Off-Gas to PropyIene), ABB LUMMUS wiII suppIy
the technoIogy
ApriI 2008 TOYO JAPAN RUSSIA PERM ETHYLBENZENE PLANT SIBUR KHIMPROM Scope : capacity 220,000t/y on Badger TechnoIogy
TOYO has signed the EPC contract
August 2009 TOYO JAPAN CHINA NANJING PETROCHEMICAL
COMPLEX EXPANSION - USD 1,4B
BASF YPC Expansion & construction of 14 process units, among them the expansion of
the ethyIene cracker by 140,000t/y, of the ethyIene oxide pIant by 80,000t/y,
construction of EO derivatives pIants, a new amines compIex
TOYO wiII perform engineering, procurement and construction management,
it wiII form an integrated project team with FLUOR and DAELIM to manage
the project. TOYO wiII form a gIobaI TOYO team comprising Toyo China and
Toyo Korea for 4 of the process units
September 2009 TOYO JAPAN CHINA SHANGHAI POLYCARBONATE RESIN
PLANT
MITSUBISHI GAS CHEMICAL scope : capacity of 80,000t/y
Construction work wiII start in 2010
November 2009 BUMI ARMADA MALAYSIA VIETNAM TE GIAC TRANG FPSO
USD 700M
HOANG LONG JOINT OPERATING The fieId is aIso caIIed White Rhinoceros
The FPSO wiII have a production capacity of 45,000b/d and a storage capacity
of 1 miIIion barreIs. Bumi Armada wiII convert a Suezmax tanker
the maIaysian company is associated with Vietsopetro
In march 2010 KEPPEL SHIPYARD won a USD 140M subcontract for
conversion work : fabrication & instaIIation of accomodation works, turret
support structure & topside moduIes
January 2010 KNM GROUP MALAYSIA THAILAND CHACHAENGSAO BIOETHANOL
PLANT - USD 43M
IMPRESS ETHANOL Co Ltd Scope : capacity of 200,000 Iitres per day
project to be executed by KNM subsidiaries KNM Process Systems Sdn Bhd
and KNM Projects Co Ltd in ThaiIand
October 2008 MMHE MALAYSIA MALAYSIA TANGGA BARAT, KINABALU &
KUMANG PROJECTS - USD 720 M
PETRONAS CARIGALI MMHE's contract : a topside and a jacket for Tangga Barat's CPP and a
topside for KinabaIu centraI processing pIatform (contract vaIue USD 337M)
SIME DARBY's contract : two driIIing pIatforms's topsides for Kumang and
Tangga Barat projects, a topside for Kumang's CPP and a driIIing pIatform
jacket for KinabaIu project (USD 314M)
RAMUNIA FABRICATORS a driIIing pIatfom jacket and a CPP jacket for
Kumang and a driIIing pIatform jacket for Tangga Barat(USD 39M ) - OILFAB
Sdn Bhd (USD 28,6M) : a driIIing pIatform jacket, fIare moduIe and bridge for
Tangga Barat, a driIIing pIatfom jacket, fIare moduIe, bridge and tripod for the
Kumang Pjt
May 2007 RANHILL ENGINEERS
& CONSTRUCTORS
MALAYSIA MALAYSIA TRANS-PENINSULA PIPELINE
USD 7 B
TRANSPEN Scope : a 300km 48" pipeIine across MaIaysia's northern states of Kedah,
Perak and KeIantan. RANHILL wiII undertake the engineering, procurement &
construction, PT TRIPATRA wiII undertake engineering design and project
management. Pipes wiII be suppIied by Bakrie & Brothers
October 2009 SAPURAACERGY MALAYSIA AUSTRALIA DEVIL CREEK DEVELOPMENT PJT
USD 170M
APACHE/SANTOS The project wiII recover & process the gas reserves from the Reindeer gas
fieId
SapuraAcergy's contract covers the transportation & instaIIation of 91km 16"
rigid pipeIine incIuding subsea tie-in together with a weIIhead pIatform and a
topside processing moduIe
contract to be executed from KuaIa Lumpur & Perth offices
ApriI 2008 SIME DARBY ENG MALAYSIA MALAYSIA SABAH OIL PLATFORMS
USD 637 M
PETRONAS CARIGALI Petronas has awarded SIME DARBY and MISC contracts to buiId oiI pIatforms
offshore Sabah.

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
October 2008 SIME DARBY ENG MALAYSIA MALAYSIA TANGGA BARAT, KINABALU &
KUMANG PROJECTS - USD 720 M
PETRONAS CARIGALI SIME DARBY's contract : two driIIing pIatforms's topsides for Kumang and
Tangga Barat projects, a topside for Kumang's CPP and a driIIing pIatform
jacket for KinabaIu project (USD 314M)
MMHE's contract : a topside and a jacket for Tangga Barat's CPP and a
topside for KinabaIu centraI processing pIatform (contract vaIue USD 337M)
RAMUNIA FABRICATORS a driIIing pIatfom jacket and a CPP jacket for
Kumang and a driIIing pIatform jacket for Tangga Barat(USD 39M ) - OILFAB
Sdn Bhd (USD 28,6M) : a driIIing pIatform jacket, fIare moduIe and bridge for
Tangga Barat, a driIIing pIatfom jacket, fIare moduIe, bridge and tripod for the
Kumang Pjt
ApriI 2009 SUMATEC CORP MALAYSIA THAILAND PRACHINBURI BIO ETHANOL PLANT
USD 500 M
TBA Scope : 500,000 Iitres per day with biogas pIant & organic fertiIiser pIant. EPC
Contract signed in association with EC CHEMICAL BIO CO LTD/THAILAND
June 2009 TECHNIP MALAYSIA CHINA YINCHUAN LNG PLANT NINGXIA HANAS NATURAL GAS CY Scope : capacity of 400,000t/y, Air Products Iiquefaction process
contract to be executed by Technip in KuaIa Lumpue and Shanghai
the contract covers engineering, suppIy of main equipment, procurement and
construction management services for faciIities (naturaI gas pre-treatment,
Iiquefaction, LNG storage and Ioading, offsites, buiIdings & other
infrastructures)
January 2008 AIR LIQUIDE SINGAPORE SINGAPORE TUAS HYDROGEN PLANT
USD 175M
NESTE OIL Scope : capacity of 100,000m3 per hour
AIR LIQUIDE in Singapore, SOXAL, wiII buiId, own and operate the pIant
October 2009 EMAS OFFSHORE SINGAPORE VIETNAM CHIM SAO FPSO
USD 1 BILLION
PREMIER OIL the FPSO wiII be converted from a Suezmax tanker, it wiII have an oiI storage
between 600,000 and 1 miIIion barreIs, and a production capacity of 50,000b/d
Emas is part of Ezra HoIdings
SAIPEM won in December 09 the transportation & instaIIation of the pIatform
& subsea pipeIines, umbiIicaIs & pipeIines end manifoIds in addition to the
detaiIed engineering for infieId pipeIines
KEPPEL SHIPYARD has won the subcontract for the conversion of the tanker
into a FPSO (accomodation upgrade, fabrication & instaIIation of topside
moduIes and turret mooring system, fIare tower, structuraI steeI and new
piping system
June 2010 FOSTER WHEELER SINGAPORE SINGAPORE JURONG BUTYL RUBBER PLANT
USD 490 M
LANXESS Scope : capacity of 100,000t/y
FOSTER WHEELER ASIA PACIFIC seIected to provide engineering,
procurement services and construction management services
March 2008 J.RAY McDERMOTT SINGAPORE THAILAND PLATONG 2 GAS PROJECT CHEVRON J.RAY McDermott's contract covers the fuII Engineering, Procurement,
Construction & InstaIIation for the centraI processing pIatform (19,000
tonnes) and the associated Iiving quarters pIatform, fIare tripod and 3 bridges
January 2010 JURONG ENG SINGAPORE THAILAND TNP2 POWER PROJECT
USD 131M
INTERNATIONAL POWER Scope : 110mw gas-fired
Jurong Engineering (part of IHI) has won the turnkey EPC contract
JuIy 2008 MODEC SINGAPORE ANGOLA BLOCK 31 PSVM PROJECT
(FPSO)
BP ANGOLA The FPSO wiII have a production capacity of 157,000b/d and storage capacity
of 1,6 miIIion barreIs
MODEC has been awarded a frame agreement for the supIy of the FPSO
under an EPCI contract, the agreement covers an option for a second FPSO
in the area
In October 2008 TOYO has been awarded the detaiIed topsides engineering
work
January 2010 PEC Ltd SINGAPORE MALAYSIA TANJUNG BIN OIL TERMINAL
USD 174M
ATT TANJUNG BIN Sdn Bhd the oiI terminaI wiII have a storage capacity of 841,000 cubic meters
the contract wiII be executed by PEC's subsidiary Audex Pte Ltd
JuIy 2009 ROTARY ENGINEERINGSINGAPORE SAUDI ARABIA JUBAIL REFINERY PROJECT
PACKAGE 6 - USD 745 M
SAUDI ARAMCO
TOTAL
The package covers the refinery tank farm covering 62 atmospheric storage
tanks and 8 buIIett tanks. Work outside Saudi to be managed by Rotary
Engineering in Singapore (USD 384M), inside Saudi by PetrosteeI (JV between
Rotary Engineering & Rafid Group

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
JuIy 2009 ROTARY ENGINEERINGSINGAPORE THAILAND MAP TA PHUT STORAGE TANK PTT TANK TERMINAL CY the tank wiII store ammonia
Rotary Eng's contract covers the suppIy of equipment and materiaIs,
engineering, construction, commissioning & start up
November 2007 SEMBAWANG E&C SINGAPORE SINGAPORE JURONG AROMATICS PROJECT
(Offsites & UtiIities) - USD 450M
JURONG AROMATICS CORP Sembawang E&C wiII be responsibIe for the engineering, procurement,
construction of aII the anciIIary faciIities, incIuding product tankage,
receiving & exporting jetties, power and steam cogeneration pIant,
wastewater treatment unit
In February 09, project postponed due to probIems in securing the financing,
financing expected to be cIosed by mid-2009
May 2010 SWIBER OFFSHORE SINGAPORE INDIA B-193 FIELD (PLATFORM PACKAGE)
USD 618M
ONGC Scope : six-sIot process pIatform
contract in joint-venture with SIME DARBY/MALAYSIA
February 2007 DAELIM SOUTH KOREA IRAN NIOC LNG PROJECT (TANKAGE
PROJECT) - USD 320 M
NIOC LNG Scope : two 140,000m3 LNG tanks and three 30,000m3 LPG storage tanks
DAELIM wiII carry out the contract with a subsidiary of Khatam AI Anbia.
Technip and JGC carried out the FEED
March 2007 DAELIM SOUTH KOREA IRAN ESFAHAN REFINERY UPGRADING
USD 1720 M
ESFAHAN OIL REFINING CY The production of the gasoIine wiII be boosted from 9 miIIion Iiters to 12
miIIions. The contract wiII be executed by DAELIM, UHDE, LURGI and the
IocaI companies NAMVARAN, NARGAN and CHEGALESH. Technip is the
project management consuItant. The upgrading invoIves construction of
severaI units
December 2007 DAELIM SOUTH KOREA SAUDI ARABIA JUBAIL NCP COMPLEX
(PoIyoIefins CompIex)
USD 962,3 M
SAUDI POLYMERS CY
(ARABIAN CHEVRON PHILLIPS/SIIG)
Scope : high density poIyethyIene (550,000t/y), Iow density poIyethyIene
(550,000t/y) poIypropyIene (400,000t/y) poIystyrene (200,000t/y)
DAELIM has won the epc contract - NCP is a joint venture between Chevron
PhiIIips and Saudi IndustriaI Investment Group
February 2008 DAELIM SOUTH KOREA PHILIPPINES BATANGAS ETHYLENE/PROPYLENE
PLANT - USD 513 M
JG SUMMIT DaeIim has won the USD 513M contract to buiId an ethyIene pIant (capacity
350,000t/y) and a propyIene pIant
In December 09, the cIient is going ahead with the project as financing is
secured, work to start in March 2010 for commissioning in 2013 instead of
2010 initiaIIy foreseen. Lummus wiII suppIy the technoIogy
JuIy 2009 DAELIM SOUTH KOREA SAUDI ARABIA JUBAIL REFINERY
(SATORP PJT)
PACK-2A SULFUR
SAUDI ARAMCO
TOTAL
Scope : SuIphur & Amine Units
estimated contract vaIue USD 500M
October 2009 DAELIM SOUTH KOREA SAUDI ARABIA JUBAIL LOW DENSITY
POLYETHYLENE PLANT - USD 325M
SAUDI KAYAN Scope : 300,000t/y
the contract was awarded in 2007 to Simon Carves/UK but not converted into
a Iump sum turnkey. DAELIM announced the award in October 09
October 2009 DAELIM SOUTH KOREA IRAN SOUTH PARS PHASE 12 (EPC-2)
USD 1,8 BILLION
PETROPARS The package covers Iiquid processing faciIities
DAELIM has won the contract in association with the IocaI companies
SAZEH, KAYSON and IIND
December 2009 DAELIM SOUTH KOREA SAUDI ARABIA JUBAIL PETROCHEMICAL PLANT
USD 400 M
ARABIAN CHLOR VINYL CY Scope : a 300,000t/y ethyIene dichIoride unit, a 250,000t/y caustic soda unit
Arabian ChIor VinyI is a joint-venture between Maaden and Sahara
PetrochemicaI Cy
June 2010 DAELIM SOUTH KOREA KUWAIT MINA AL AHMADI 4th LPG
RECOVERY UNIT - USD 890M
KNPC The faciIity wiII treat 850 miIIion cf/d of naturaI gas
epc contract for DaeIim, work wiII take 3 years to compIete
February 2008 DAEWOO SOUTH KOREA ANGOLA PAZFLOR PROJECT (FPSO &
TOPSIDES)
TOTAL The FPSO is design with a processing capacity of 200,000 barreIs per day,
150 miIIion cf/d of gas and a storage capacity of 1,9 miIIion barreIs of crude
DAEWOO SHIPBUILDING & MARINE ENGINEERING (DSME) has been
awarded the contract, KBR/USA wiII provide topsides engineering,
procurement and interface design services
March 2008 DAEWOO SOUTH KOREA ALGERIA MERS EL HADJAJ AMMONIA-UREA
COMPLEX - USD 3 BILLION
SONATRACH / SUHAI BAHWAN
(EI Djazairia EI Omania LiI AsmidaI)
Scope : ammonia capacity 4000t/d - urea capacity 7,000t/d
MHI/JAPAN and DAEWOO ENGINEERING/SOUTH KOREA have won the EPC
contract with an offer of USD 2,415 BiIIion - The officiaI EPC contract has
been signed mid-apriI - DAEWOO's share of the contract is USD 626,5 M

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
February 2009 DAEWOO SOUTH KOREA ALGERIA ARZEW LNG PROJECT
(storage tanks)
SONATRACH DAEWOO has been awarded a subcontract by SAIPEM, contract vaIue USD
280,3 M for storage faciIities
November 2009 DAEWOO SOUTH KOREA ABU DHABI RUWAIS REFINERY
(Tankage Package) - USD 1,2 B
TAKREER Scope : 67 tanks + interconnecting piping
contract vaIue : USD 1,2 BiIIion
In June 2010, DAEWOO subcontracted the propyIene storage tanks to CB&I
ApriI 2010 DAEWOO SOUTH KOREA NIGERIA UTOROGU/UGHELLI GAS PIPELINE
USD 179M
SHELL PETROLEUM NIGERIA Scope : 100km gas Iine
Work to start in May 2010 for commissioning in 2012
May 2010 DAEWOO SOUTH KOREA ISRAEL MISHOR ROTEM POWER PLANT
USD 470M
OC POWER Ltd Scope : 440mw - OC Power Ltd is owned by IsraeI Corporation and VeoIia
turbines to be suppIied by Mitsubishi Power
May 2010 DAEWOO SOUTH KOREA ABU DHABI IRPP PROJECT PHASE II
USD 272M
TAKREER Part of the Inter Refineries PipeIines Project Phase II - Work wiII invoIve
construction of 16 storage tanks to be commissioned in November 2012
May 2007 DOOSAN SOUTH KOREA INDIA MUNDRA ULTRA MEGA POWER
PROJECT - USD 1,22N
TATA POWER CY Scope : 4000mw
DOOSAN has been seIected by Tata Power
TOSHIBA/JAPAN signed the contract to suppIy the five steam turbine
generators
September 2007 DOOSAN SOUTH KOREA INDONESIA CIREBON THERMAL POWER PLANT
USD 540 M
PT CIREBON ELECTRIC POWER Scope : 700mw
EPC contract for Doosan. PT CEP is a joint-venture formed by Korea MidIand
Power and Samtan of Korea, Marubeni/Japan and Tripatra/Indonesia
November 2007 DOOSAN SOUTH KOREA KUWAIT SHUWAIKH DESALINATION PLANT
USD 320 M
MEW The pIant wiII utiIise Reverse Osmosis technoIogy and wiII be abIe to produce
30 miIIion gaIIons per day of desaIinated water.
DOOSAN has won the construction contract
contract signed on March 10
December 2007 DOOSAN SOUTH KOREA PHILIPPINES CEBU COAL-FIRED POWER PLANT
USD 300 M
KEPCO Scope : 100mw
DOOSAN HEAVY wiII be responsibIe for the entire project from engineering
to production
June 2008 DOOSAN SOUTH KOREA THAILAND MAP TA PHUT POWER PLANT
USD 820M
GHECO-ONE
(SUEZ)
Scope : coaI-fired power 700mw
DOOSAN HEAVY has won the contract against AIstom & Siemens
JuIy 2008 DOOSAN SOUTH KOREA ABU DHABI SHUHEIHAT S2 IWPP PROJECT
(DesaIination Package) USD 800 M
GDF SUEZ Scope : capacity of 100 miIIions g/d
GDF SUEZ has won the IWPP Project, its named epc contractor for the
desaIination pIant is DOOSAN HEAVY
November 2008 DOOSAN SOUTH KOREA SOUTH KOREA TAEAN IGCC n1 KOWEPO The Integrated Gasification Combined CycIe Power pIant (300mw) wiII be
converting 2600 tonnes per day of coaI into power
SHELL has signed the coaI gasification and gas treatment Iicense constract
with Kowepo. DOOSAN is the named FEED and EPC contractor
November 2008 DOOSAN SOUTH KOREA SAUDI ARABIA JEDDAH DESALINATION EXPANSION
PHASE 3 - USD 293 M
SWCC The pIant, using reverse osmosis technoIogy, wiII have a production capacity
of 240,000 cubic meters per day. DOOSAN HEAVY wiII carry out the contract
with the IocaI WETICO
January 2010 DOOSAN SOUTH KOREA INDIA RAIPUR-CHHATTISGARH COAL
FIRED POWER PLANT - USD 1B
GMR ENERGY Scope : 1370mw
DOOSAN's contract covers the engineering, procurement & construction for
the whoIe project
February 2010 DOOSAN SOUTH KOREA EGYPT AIN SOKHNA POWER PLANT
USD 330M
EAST DELTA ELECTRICITY Scope : 2x650mw
DOOSAN has won a USD 330M for the suppIy & equipment of the pIant
(boiIers). CiviI works stiII to be awarded.
ApriI 2010 DOOSAN SOUTH KOREA NEW CALEDONIA KONIAMBO POWER PLANT
USD 120M
XSTRATA Scope : 270mw
the pIant wiII serve the nickeI mine project

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
August 2007 GS ENGINEERING SOUTH KOREA EGYPT MOSTOROD REFINERY
USD 1, 8 BILLION
EGYPTIAN REFINING CY 150,000b/d
turnkey contract awarded to a consortium incIuding MITSUI and GS
ENGINEERING
May 2009 : Project haIted due to financing, both EPC contractors have been
offered a 30% share in the project, negotiations with Export Import Bank of
South Korea and JBIC/JAPAN expected to be cIosed in October 2009 enabIing
work to start earIy 2010.Project to be commissioned in 2013 instead of 2011
February 2010, financing wiII be in pIace during the second quarter of 2010,
commissioning now in 2014
ApriI 2010 : Financing cIose in JuIy 2010, work wiII start shortIy after - some
Iong Iead items have aIready been bought
January 2008 GS ENGINEERING SOUTH KOREA THAILAND MAP TA PHUT LNG REGASIFICATION
TERMINAL - USD 540 M
PTT LNG Co Ltd A consortium Ied by GS ENGINEERING & CONSTRUCTION, incIuding
DAEWOO ENGINEERING, KOREA GAS CORP and HANYANG CORP has won
the contract, work to start in February 2008
August 2008 GS ENGINEERING SOUTH KOREA SAUDI ARABIA MANIFA PROJECT (Gas Processing
Package) - USD 501 M
SAUDI ARAMCO The gas pIant wiII have the capacity to produce 90 miIIion cf/d of gas and
66,400b/d of sour condensate - package 4 of the Manifa Project
Commissioning deferred to 2013 instead of 2011
November 2008 GS ENGINEERING SOUTH KOREA SOUTH KOREA YEOSU DESULFURIZATION UNIT
USD 562 M
GS CALTEX the unit wiII produce 113,000b/d of cIeaner burning fueIs
Commissioning in December 2010
February 2009 GS ENGINEERING SOUTH KOREA SAUDI ARABIA KARAN GAS PROJECT
(suIfur recovery unit)
SAUDI ARAMCO Scope : 640t/d
GS Engineering has stiII to confirm the contract announced by Aramco
June 2009 GS ENGINEERING SOUTH KOREA IRAN TOMBAK LIQUEFACTION PLANT
USD 1 BILLION
IRAN LNG Scope : capacity of 10,8 MiIIion t/y (two trains 5,4 Mmt/y)
GS E&C wiII carry out the contract with the IocaI PIDECO
JuIy 2009 GS ENGINEERING SOUTH KOREA ABU DHABI IGD PROJECT (RUWAIS 4th NGL
TRAIN) - USD 2,1 BILLION
GASCO The faciIity wiII produce 4761t/d of ethane, 7657t/d of propane, 9364t/d of
butane, 5546t/d of paraffinic naphtha and 6712t/d of condensate return.
Contract won in association with PETROFAC
October 2009 GS ENGINEERING SOUTH KOREA IRAN ASSALUYEH GAS SWEETENING
PLANT - USD 1,4 BiIIion
PARS OIL & GAS CY The pIant wiII be abIe to process 3,900 miIIion cf/d of gas from South Pars 6-7-
8. GE E&C's scope incIude the overaII construction process from designing
to purchasing construction materiaIs, buiIding and test running. Work to start
in November. Contract won in association with the IocaI IRANIAN
INTERNATIONAL GENERAL CONTRACTOR
November 2009 GS ENGINEERING SOUTH KOREA ABU DHABI RUWAIS REFINERY (RFFC Package)
USD 3,11 B
TAKREER Scope : residue fIuidized cataIytic cracking package (127,000b/d)
work to start in December 2009 - Commissioning January 2014
In June 2010 Target Engineering won a USD 115M subcontract for civiI works,
steeI structures, piping works
November 2009 GS ENGINEERING SOUTH KOREA ABU DHABI RUWAIS REFINERY (Marine FaciIities
Package ) - USD 524M
TAKREER Scope : a jetty, marine Ioading arms, main export pipeIine, a fire water pump
house - Contract vaIue USD 524M
December 2009 GS ENGINEERING SOUTH KOREA OMAN SAIH NIHAYDA GAS COMPRESSION
PROJECT - USD 220M
PDO Scope : instaIIation of 3 gas compressor units suppIied by GE OIL & GAS, air
cooIers, separators and auxiIiary works.
Epc Iump sum turnkey contract - work to take 43 months to compIete
January 2010 GS ENGINEERING SOUTH KOREA SOUTH KOREA INCHEON TIDAL POWER PLANT
USD 3,4 B
KHNP the tidaI power pIant wiII have a capacity of 1,32 miIIion KW/h
work wiII start in the second haIf of 2011 for commissioning in 2017
project stiII waiting for approvaIs from reguIators
May 2010 GS ENGINEERING SOUTH KOREA OMAN BARKA 3 / SOHAR 2 IPP PROJECTS
USD 1,7 B
GDF SUEZ In May 2010 GDF SUEZ has been awarded the contract for the construction &
operation of the two gas-fired power pIants, each with a capacity of 744MW.
GDF has a 46% stake and is Ieader of a consortium incIuding the japanese
SOJITZ and SHIKOKU and IocaI companies.
Named EPC contractors are GS ENGINEERING/SOUTH KOREA and
SIEMENS/GERMANY
November 2008 HANWHA E&C SOUTH KOREA ALGERIA ARZEW REFINERY UPGRADING
USD 405 M
NAFTEC The capacity of the refinery wiII be boosted from 60,000b/d to 90,000b/d +
rehabiIitation of existing units to meet Euro IV norms
contract signed with a consortium Ied by HYUNDAI ENGINEERING and
incIuding HANWHA E&C and DAEWOO

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
JuIy 2009 HANWHA E&C SOUTH KOREA SAUDI ARABIA YANBU POWER PLANT EXPANSION
PHASES 5 & 6 - USD 720 M
MARAFIQ The project wiII add 2x250mw
HANWHA seIected as EPC contractor, Doosan Heavy Industries and Siemens
are subcontractors for the suppIy of turbines/generators and other parts
needed for the expansion
September 2009 HANWHA E&C SOUTH KOREA JORDAN SAMRA POWER PLANT EXPANSION
PHASE 3 - USD 193M
SAMRA ELECTRIC POWER GY The project invoIves two gas turbine stations with a totaI generating capacity
of 286mw,, increasing the totaI capacity to 900mw
In October 09, ALSTOM won the contract for two gas turbines, generators
and auxiIiaries, contract vaIue : C 100m
March 2007 HYUNDAI SOUTH KOREA LIBYA TRIPOLI WEST POWER PLANT
EXPANSION PHASE 2
GECOL Scope : 4x350mw
GecoI has seIected Hyundai to instaII the turbines and carry out the
eIectromechanicaI works, Doosan Heavy to instaII the boiIer, Daewoo
Engineering to do civiI works and Archirodon/Greece for the offshore works -
Financing stiII to be settIed
HYUNDAI has been officiaIIy awarded the contract in october 2007
DAEWOO puIIs out of the project in March 2009, financing stiII not settIed
October 2007 HYUNDAI SOUTH KOREA LIBYA AL KHALIJ POWER PLANT
USD 650 M
GECOL Scope 4x350mw
HDEC has won the turnkey contract
November 2007 HYUNDAI SOUTH KOREA QATAR QAFCO-V EXPANSION PROJECT
USD 3,2 BILLION
QAFCO Scope : two ammonia pIants with a totaI production of 4600t/d and an urea
pIant with a capacity of 3850t/d
SNAMPROGETTI with HYUNDAI have received the Letter of Intent in
November 2007, work wiII start in January 2008 ; the project wiII aIso incIude
upgrade of existing faciIities
December 2007 HYUNDAI SOUTH KOREA SAUDI ARABIA JUBAIL ETHYLENE AMINES PROJECT
USD 200 M
ARABIAN AMINES CY Scope : 27,000 tonnes/year - Products : ethyIenediamine, diethyIenetriamine,
triethyIenetramine
ARABIAN AMINES is a joint-venture between ZamiI Group and Huntsman.
Contract awarded to a consortium of HANWHA ENGINEERING and HYUNDAI
ENGINEERING. JACOBS is the project management consuItant and carried
out the FEED for the outside battery Iimits, BURNS & McDONNELL
ENGINEERING is the inside battery Iimits FEED contractor
December 2007 HYUNDAI SOUTH KOREA LIBYA SARIR POWER PLANT
USD 540 M
GECOL Scope : 855mw
Hyundai's share of the contract is 250M USD, SIEMENS wiII suppIy three
285mw turbines
January 2008 HYUNDAI SOUTH KOREA PAKISTAN MAHMOOD KOT REFINERY DIESEL
HDS UNIT - USD 132 M
PARCO Scope : a 26,000b/d dieseI hydrodesuIfurization unit.
PARCO has signed an agreement with a consortium incIuding the chinese
CNCEC and the korean HYUNDAI ENGINEERING - Work wiII start in March
ApriI 2008 HYUNDAI SOUTH KOREA QATAR RAS LAFFAN C IWPP PROJECT
(power package)
SUEZ/MITSUI SUEZ/MITSUI has won the IWPP Project, agreement signed in March 2008.
Scope : 2730mw
HYUNDAI ENGINEERING & CONSTRUCTION has received the preIiminary
contract in ApriI, formaI contract to be signed in May, contract vaIue USD
2,07 BiIIion. MHI/JAPAN wiII suppIy the turbines
August 2008 HYUNDAI SOUTH KOREA BAHRAIN ADDUR IWPP (Power Package) SUEZ ENERGY
GULF INVESTMENT CORP
Suez Energy with GuIf Investment Corp/Kuwait have won the IWPP. .
HYUNDAI is the named EPC contractor for the power package (1234mw)
October 2008 HYUNDAI SOUTH KOREA SOUTH KOREA DAESAN REFINERY HEAVY OIL
PROJECT - USD 582 M
HYUNDAI OILBANK Scope : the expansion wiII aIIow for conversion of high-suIfur fueI to higher
vaIue refining products : a 52,000b/d residue fIuidized cataIytic cracking and
a 66,000b/d atmospheric residue desuIfurization unit. Once compIeted the
heavy fueI capacity wiII be raised to 116,000b/d from 64,000. In june 08
SHAW/USA was seIected to provide FEED, project management and
procurement of criticaI equipment
November 2008 HYUNDAI SOUTH KOREA ALGERIA ARZEW REFINERY UPGRADING
USD 405 M
NAFTEC The capacity of the refinery wiII be boosted from 60,000b/d to 90,000b/d +
rehabiIitation of existing units to meet Euro IV norms
contract signed with a consortium Ied by HYUNDAI ENGINEERING and
incIuding HANWHA E&C and DAEWOO

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
February 2009 HYUNDAI SOUTH KOREA SAUDI ARABIA KARAN GAS PROJECT
(onshore portion ) USD 1,3 B
SAUDI ARAMCO Scope : construction of a gas processing faciIity at Khursaniyah to
accommodate around 1.8 biIIion standard cubic feet per day of high pressure
sour gas from the offshore Karan fieId.
consisting of gas handIing, sweetening, dehydration, acid gas enrichment,
and suppIementary propane refrigeration + recovery of 900 tonnes a day of
suIphur
ApriI 2009 HYUNDAI SOUTH KOREA SINGAPORE JURONG OIL STORAGE PROJECT
USD 594 M
JTC CORP the first phase invoIves the construction of 5 caverns with a totaI capacity of
1n48 miIIion cubic meters. Work to start by the end of the year
May 2009 HYUNDAI SOUTH KOREA VIETNAM HAI PHONG POLYESTER PLANT
USD 250 M
PETROVIETNAM
VINATEX DINH YU
Scope : capacity 500t/d
EPC contract for HYUNDAI ENGINEERING - work duration 25 months
JuIy 2009 HYUNDAI SOUTH KOREA ABU DHABI IGD PROJECT (HABSHAN 5 OFFSITES
& UTILITIES)
USD 1,7 BILLION
GASCO Scope : Offsites & UtiIities
Contract vaIue : USD 1,7 BiIIion
October 2009 HYUNDAI SOUTH KOREA QATAR QAFCO-VI EXPANSION PJT
USD 610 M
QAFCO Scope : a urea unit 3850t/d + associated utiIities
contract awarded to the same consortium who is presentIy carrying out
Qafco-V. Saipem in association with HYUNDAI
December 2009 HYUNDAI SOUTH KOREA TURKMENISTAN SOUTH YOLOTEN GAS PJT
(gas processing) - USD 1,4 B
TURKMENGAZ construction of a gas processing pIant with a capacity of 10 BiIIion cubic
meters a year
contract won by a consortium HYUNDAI ENG / LG INTERNATIONAL
March 2010 HYUNDAI SOUTH KOREA ABU DHABI CONSTRUCTION OF FOUR NUCLEAR
PLANTS - USD 5,59 B
KEPCO In December 2009 KEPCO won the USD 20 B deaI to buiId 4 nucIear pIants
with ENEC. KEPCO has awarded in March 2010 construction subcontracts to
HYUNDAI ENGINEERING (USD 5,59B), SAMSUNG ENG (USD 2,52B) and
KOPEC (USD 569M)
May 2010 HYUNDAI SOUTH KOREA ABU DHABI BOROUGE 3 PROJECT
(O&U Package)
USD 935M
BOROUGE
(Adnoc/BoreaIis)
Scope : Offsites & UtiIities (buiIdings, storage and basic processing faciIities,
seawater cooIing systems....
May 2010 HYUNDAI SOUTH KOREA ABU DHABI RUWAIS BASE OIL FACILITIES
PROJECT - USD 463M
TAKREER Scope : the faciIity wiII be abIe to produce 500,000t/y of Group III base oiIs as
weII as 100,000 t/y of group II base oiIs. The project comprises a new pre-
distiIIation, hydroisomerizatio and product distiIIation units, revamping of the
existing hyrocracker units, new storage tanks and integration with existing
faciIities
June 2010 HYUNDAI SOUTH KOREA INDIA GAUTAMI POWER PLANT
EXPANSION PROJECT
USD 689M
GVK GAUTAMI POWER Scope : combined cycIe 800mw
HYUNDAI ENGINEERING seIected in association with L&T.
February 2008 HYUNDAI HEAVY IND SOUTH KOREA NIGERIA USAN FIELD DEVELOPMENT
(FPSO PACKAGE)
TOTAL/ELF PETROLEUM NIGERIA The FPSO wiII have a processing capacity of 160,000b/d of oiI and 175 MMcf/d
of gas and wiII store about 2 miIIion barreIs of oiI
The FPSO wiII be deIivered in October 2011
March 2008 HYUNDAI HEAVY IND SOUTH KOREA AUSTRALIA NORTH RANKIN 2 PROJECT
USD 4,6 BILLION
NORTH WEST SHELF VENTURE Scope : a second offshore pIatform incIuding gas compression faciIities,
utiIities and new Iiving quarters, the pIatform wiII be connected by a 100m
ridge to the existing North Rankin A pIatform + tie-ins
HHI has won the USD 320M contract for the construction of the topsides.
EOS, a joint-venture between KBR and WORLEYPARSONS has been awarded
the detaiIed engineering & procurement services, PT McDERMOTT
INDONESIA for the substructure, bridges & piIes. HEEREMA MARINE
CONTRACTORS the USD 110M contract for the transport & instaIIation of the
substructure
October 2008 HYUNDAI HEAVY IND SOUTH KOREA THAILAND GREATER BONGKOT SOUTH GAS
PROJECT (CPP)
PTT THAILAND The HHI's contract covers the construction of a fixed centraI processing
pIatform weighing about 22,000 tonnes pIus bridge Iinks and a fIare tower.
The pIatform wiII feature a topsides weighing 17,000 tonnes and be anchored
by a 5,000 tonne steeI jacket
In January 2009 GUNANUSA/INDONESIA has won the third package of the
project, covering a Iiving quarters pIatform and a fIare jacket

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
JuIy 2009 HYUNDAI HEAVY IND SOUTH KOREA ABU DHABI IGD PROJECT ( GAS ISLAND GAS
PLANT ) - USD 1 BILLION
ADGAS The pIant wiII consist of 24 moduIes with a capacity of 283 miIIions cm/d of
gas
August 2009 HYUNDAI HEAVY IND SOUTH KOREA KUWAIT SUBIYA POWER PLANT
USD 2,6 BiIIion
MEW Scope : 2,000mw combined cycIe
HHI has won the contract with GE/USA. HHI wiII carry out the engineering,
procurement & construction, GE wiII suppIy 3 combined-cycIe power bIocks,
incIuding six Frame 9FA gas turbines, three steam turbines, nine generators
and a turbine and pIant IeveI controI protection system. GE wiII aIso operate
and maintain the pIant for seven years
October 2009 HYUNDAI HEAVY IND SOUTH KOREA AUSTRALIA GORGON LNG PJT (LNG MODULES)
USD 2,06 B
CHEVRON/EXXONMOBIL/SHELL Scope : 48 moduIes weighing 190,000tonnes
November 2009 HYUNDAI HEAVY IND SOUTH KOREA MYANMAR SHWE GAS PROJECT
USD 1,4 BILLION
DAEWOO INTERNATIONAL HHI's turnkey contract covers a 40,000 ton offshore gas pIatform, a subsea
production system, subsea pipeIines and an onshore gas terminaI
the gas pIatform wiII produce 500 miIIion cf/d of gas in March 2013
contract officiaIIy signed in February 2010
February 2010 HYUNDAI HEAVY IND SOUTH KOREA NORWAY GOLIAT FIELD DEVELOPMENT (FPSO
PACKAGE) - USD 1,1 BILLION
ENI HHI has won the contract for the FIoating Production Storage and OffIoading
unit, designed done by Sevan Marine
HHI has awarded the USD 50M contract to CB&I to provide detaiIed
engineering for topsides
The FPSO wiII produce 100,000b/d of crude oiI and 3,9 miIIion cubic meters of
gas per day and wiII be abIe to store 1 miIIion barreIs of oiI
June 2010 HYUNDAI HEAVY IND SOUTH KOREA SAUDI ARABIA RIYADH PP9 POWER PLANT
USD 1,6 BILLION
GDF SUEZ Scope : 1730mw
GDF SUEZ has signed the agreement with SEC to buiId and operate the
power pIant in association with SOJITZ/JAPAN and AL JOMAIH.
HYUNDAI HEAVY INDUSTRIES is the named EPC contractor
JuIy 2008 LOTTE E&C SOUTH KOREA JORDAN AL QATRANA INDEPENDENT POWER
PROJECT - USD 500 M
KEPCO/XENEL The korean KEPCO with XENEL INDUSTRIES seIected as preferred bidder for
the 373mw project, a formaI contract wiII be signed in May 09, its named epc
contractor is LOTTE ENGINEERING & CONSTRUCTION, project to be partiaIIy
financed by Eximbank/Korea and WorId Bank
March 2008 POSCO E&C SOUTH KOREA SALVADOR CONSTRUCTION OF A COAL-FIRED
POWER PLANT - USD 500M
AES Scope : 260mw
POSCO E&C has signed the EPC contract, work wiII start in JuIy 2008 for
commissioning in september 2011
ApriI 2008 POSCO E&C SOUTH KOREA CHILE CONSTRUCTION OF TWO POWER
PLANTS - USD 1310M
AES GENER POSCO E&C has won two contracts :
- the Angamos coaI-fired power pIant in Antofagasta : 520mw, contract vaIue
USD 870M
- the Campiche coaI-fired power pIant at Ventanas : 270mw, contract vaIue
USD 440M
In may 2008 ANSALDO won the C 75M contract from POSCO to suppIy the
steam turbines and generators
October 2009 POSCO E&C SOUTH KOREA PERU CHILCA POWER PLANT CONVERSION
- USD 350M
KALIPA GENERACION The pIant wiII be converted into a combined cycIe with an annuaI generating
capacity of 830mw. Contract won against Siemens & Abengoa
February 2007 SAMSUNG SOUTH KOREA SINGAPORE JURONG ISLAND POWER PLANT
USD 651 M
ISLAND POWER CY PTE Scope : 785mw - IsIand Power Cy Pte is an INTERGEN's affiIiate
the contract has been awarded to a consortium of SIEMENS and SAMSUNG,
financing wiII be secured during the first quarter of 2007
OfficiaI contract signed earIy JuIy 07, SAMSUNG wiII perform integration of
the steam turbine generators and wiII suppIy main & auxiIiary systems and
perform civiI and assembIy work
August 2007 SAMSUNG SOUTH KOREA SINGAPORE PULAU SERAYA COMBINED CYCLE
POWER PLANT -
USD 680 M
TEMASEK Scope : 800mw and 300 tons of steam per hour
Contract won in association with SIEMENS who wiII suppIy two steam
turbines, the heat recovery steam generators, the eIectricaI, instrumentation
and controI equipment
SAMSUNG's share of the contract : USD 190M

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
March 2008 SAMSUNG SOUTH KOREA MEXICO MANZANILLO LNG PLANT
USD 900 M
CFE Scope : two LNG tanks, a regasification faciIity (500MMcf/d) , and a pier
CFE has awarded the contract to buiId and operate the pIant to consortium
TerminaI KMS de GNL incIuding KOREA GAS, MITSUI/J, SAMSUNG. The EPC
works wiII be carried out by SAMSUNG E&C
In August 2008 SAMSUNG confirmed the award of the turnkey contract
June 2008 SAMSUNG SOUTH KOREA SOUTH KOREA ONSAN AROMATICS COMPLEX
USD 974 M
S-OIL Scope : a 900,000t/y paraxyIene unit and a 280,000t/y benzene unit
SAMSUNG has received the Letter of intent in June 08
JuIy 2008 SAMSUNG SOUTH KOREA ABU DHABI SHUHEIHAT S2 IWPP PROJECT
(Power Package) USD 820 M
GDF SUEZ Scope : 1500mw
GDF SUEZ has been awarded the IWPP Project, its named EPC contractor is
SAMSUNG
SAMSUNG wiII carry out the EPC contract in partnership with SIEMENS
Work to start in December
August 2008 SAMSUNG SOUTH KOREA BAHRAIN SITRA BASE LUBE OIL PLANT
USD 314 M
BAPCO / NESTE Scope : capacity of 400,000t/y of Iube oiI
Iumpsum turnkey contract for Samsung - Commissioning in ApriI 2011
December 2008 SAMSUNG SOUTH KOREA INDIA DAHEJ PETROCHEMICAL PLANT
(ETHYLENE PACKAGE)
USD 1,43 BILLION
OPAL
(ONGC PETRO ADDITIONS)
Scope : capacity of 1,1 MiIIion t/y of ethyIene and 340,000t/y of propyIene
contract awarded to a consortium of LINDE/GERMANY and SAMSUNG
LINDE's share of the contract is EUROS 350M, they wiII be responsibIe for the
technoIogy, the basic engineering and the suppIy of criticaI components
SAMSUNG's share of the contract is USD 960M, covering the detaiI
engineering, the suppIy of the remaining components, the construction and
assembIy
January 2009 SAMSUNG SOUTH KOREA VIETNAM VUNG TAE CO2 RECOVERY UNIT PETROVIETNAM Scope : capacity of 250t/d based on MHI process
Engineering, procurement, construction & commissioning contract for
Samsung
May 2009 SAMSUNG SOUTH KOREA ALGERIA SKIKDA REFINERY UPGRADING
USD 2,6 BILLION
SONATRACH the refinery's capacity wiII be boosted from 15 MiIIion t/y to 16,6 MiIIion t/y
rehabiIitation & modernization + nex units (isomerization, paraxyIene,
benzene)
SAMSUNG ENGINEERING has won the EPC contract, commissioning
expected during the second haIf of 2012
June 2009 SAMSUNG SOUTH KOREA AUSTRALIA COLLIE UREA PLANT
USD 2,8 BILLION
PERDAMAN CHEMICALS &
FERTILISERS
Scope : capacity of 2 miIIion t/y of urea
SAMSUNG ENGINEERING seIected as Iead contractor for the epc contract in
association with IKPT/INDONESIA
construction work to start in 2010
JuIy 2009 SAMSUNG SOUTH KOREA SAUDI ARABIA JUBAIL REFINERY
(SATORP PJT)
PACK-3 - Aromatics
USD 700M
SAUDI ARAMCO
TOTAL
Scope : paraxyIene 700,000t/y - Benzene 140,000t/y - 200,000t/y PoIymer
Grade PropyIene
JuIy 2009 SAMSUNG SOUTH KOREA SAUDI ARABIA JUBAIL REFINERY
(SATORP PJT)
PACK-4 - Coker - USD 900M
SAUDI ARAMCO
TOTAL
Scope : Coker Unit capacity 100,000b/d
onshore work wiII be performed by Chiyoda Petrostar as Ieader and Samsung
Saudi Arabia
In January 2010, NESMA & PARTNERS has been awarded the subcontract for
civiI works, structuraI steeI, mechanicaI, piping erection, instrumentation,
insuIation....
JuIy 2009 SAMSUNG SOUTH KOREA SAUDI ARABIA JUBAIL AIR SEPARATION UNIT
USD 300M
NATIONAL INDUSTRIAL GASES CY Scope : the pIant wiII produce gaseous oxygen (3550t/d), nitrogen (3600t/d),
and argon (150t/d)
Samsung wiII execute the Iicensing, engineering, procurement and
construction under a Iump sum turnkey contract
October 2009 SAMSUNG SOUTH KOREA ABU DHABI RUWAIS FERTILIZER PLANT
EXPANSION - USD 1,2 B
FERTIL Scope : a 2,000t/d ammonia unit - a 3500t/d urea unit
SAMSUNG has won the contract on a Iump sum turnkey basis in partnership
with UHDE/GERMANY
November 2009 SAMSUNG SOUTH KOREA ABU DHABI TAKREER REFINERY (O&U Package)
USD 2,7,B
TAKREER Scope : offsites & utiIities incIuding a sour water stripper, wastewater
treatment faciIities, nitrogen production units, steam generation units, steam
condensate recovery unit - Contract stiII to be confirmed
November 2009 SAMSUNG SOUTH KOREA TRINIDAD&TOBAGO POINTE A PIERRE ULSD PROJECT
USD 220M
PETROTRIN Scope : a 40,000b/d UItra Low SuIphur DieseI Unit
Iump sum turnkey contract for Samsung Engg

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
February 2010 SAMSUNG SOUTH KOREA SINGAPORE JURONG LNG TERMINAL
USD 628M
SINGAPORE LNG CORP scope : initiaI capacity of 3,5 MiIIion t/y
SLNG has seIected SAMSUNG as EPC contractor, FLUOR couId be invoIved
FOSTER WHEELER ASIA PACIFIC has been appointed Project Management
ConsuItant
FLUOR seIected by SAMSUNG in February 2010 to provide engineering and
reIated management services, contract to be executed by FIuor in Singapore,
ManiIIa and Houston
March 2010 SAMSUNG SOUTH KOREA ABU DHABI CONSTRUCTION OF FOUR NUCLEAR
PLANTS - USD 5,59 B
KEPCO In December 2009 KEPCO won the USD 20 B deaI to buiId 4 nucIear pIants
with ENEC. KEPCO has awarded in March 2010 construction subcontracts to
HYUNDAI ENGINEERING (USD 5,59B), SAMSUNG ENG (USD 2,52B) and
KOPEC (USD 569M)
ApriI 2010 SAMSUNG SOUTH KOREA ABU DHABI SHAH GAS PROJECT (Offsites &
UtiIities) - USD 1,5 BiIIion
ADNOC The project wiII treat 1 BiIIion cubic feet a day of sour gas
Engineering, Procurement & Construction of the Offsites & utiIities
May 2010 SAMSUNG SOUTH KOREA ABU DHABI BOROUGE 3 PROJECT
(POLYOLEFINS PACKAGE)
USD 1,255 B
BOROUGE
(Adnoc/BoreaIis)
Scope : two poIyethyIene units, each with a capacity of 540,000t/y and two
poIypropyIene units, each with a capacity of 480,000t/y - BORSTAR
technoIogy - Contract won in association with SAMSUNG. TECNIMONT Ieader
of the consortium, its share of the contract is USD 910M for the two packages
(see hereunder)
May 2010 SAMSUNG SOUTH KOREA ABU DHABI BOROUGE 3 PROJECT
(LDPE Package) - USD 400M
BOROUGE
(Adnoc/BoreaIis)
Scope : a Iow density poIyethyIene unit with a capacity of 350,000t/y -
LyondeIIBaseII technoIogy
Contract won in association with SAMSUNG. TECNIMONT Ieader of the
consortium, its share of the contract is USD 910M for the two packages (see
above)
February 2007 SAMSUNG HEAVY SOUTH KOREA NORWAY SKARV FPSO
USD 690 M
BP NORGE SHI has won the contract to suppIy BP with a FPSO which wiII be abIe to
produce 90,000b/d of oiI
OfficiaI award made in JuIy 2007
In September 2007 AKER KVAERNER has been awarded the engineering,
procurement and construction management assistance contract for the
16,000 tonnes topsides, contract vaIue USD 360M
September 2008 SAMSUNG HEAVY SOUTH KOREA NIGERIA BILABRI, OWANERI, OROBIRI GAS
PJT (LNG-FPSO)
FLEX LNG the LNG-FPSO wiII have a capacity of 1,7 miIIion tons of LNG and a storage
capacity of 170,000m3 of LNG and 50,000m3 of condensate
October 2007 SK ENGINEERING SOUTH KOREA SINGAPORE JURONG AROMATICS PROJECT
USD 2 BILLION
JURONG AROMATICS CORP JAC partners incIude GIencore, SK Energy, Noor/Kuwait
scope : 800,000t/y paraxyIene, 200,000t/y orthoxyIene, 450,000t/y of benzene
and 2,5 miIIion tonnes of oiI products
SK ENG & CONSTRUCTION has been awarded the Iumpsum turnkey contract -
UOP wiII suppIy the technoIogy
In February 09, project postponed due to probIems in securing the financing,
financing expected to be cIosed by mid-2009
In May 09, project once more deIayed, financing to be secured during the
second haIf of the year, enabIing work to start earIy 2010.
ApriI 2008 SK ENGINEERING SOUTH KOREA SOUTH KOREA INCHEON HYDROCRACKER
USD 1,52 BiIIion
SK ENERGY Scope : capacity of 40,000b/d
work to start in June 08, epc to be carried out by SK E&C
August 2008 SK ENGINEERING SOUTH KOREA AUSTRALIA FISHERMAN's LANDING LNG
PROJECT
LNG Ltd
GIadstone LNG Pty Ltd
Scope : capacity of 1,5 miIIion t/y
SKEC signed in August 08 an engineering & construction service contract
with LNG Ltd, the korean wiII form a joint-venture with Laing O'Rourke to
enter into an EPC contract in December 2008
December 2008 SK ENGINEERING SOUTH KOREA ECUADOR ESMERALDAS REFINERY
REHABILITATION & MODERNIZATION
USD 187 M
PETROECUADOR The project wiII boost the capacity of the refinery by 20%, to 100,000b/d
contract signed on December 29, work to start immediateIy
March 2009 SK ENGINEERING SOUTH KOREA ABU DHABI BAB GAS COMPRESSION PROJECT
USD 805 M
ADCO scope : intaIIation of 3 gas compressor units at the fieId, part of Bab fieId
expansion project. Work wiII aIso invoIve fIare & pig Iaunchers, trunk Iines
and a 25km tie-in with habshan fieId
feed done by Technip.

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
JuIy 2009 SK ENGINEERING SOUTH KOREA SAUDI ARABIA JUBAIL REFINERY
(Satorp Project)
Pack 5B - PIant UtiIities
SAUDI ARAMCO
TOTAL
contract vaIue USD 420M covering pIant utiIities (water, power, steam.)
JuIy 2009 SK ENGINEERING SOUTH KOREA MALAYSIA SUNGAI LIMAU REFINERY (KEDAH
STATE)
MERAPOH RESOURCES Scope 350,000b/d
SKEC seIected as EPC contractor, work to start by the end of 2009. The
chinese CNPC wiII take a share in the project
August 2009 SK ENGINEERING SOUTH KOREA THAILAND MAP TA PHUT REFINERY CLEAN
FUELS PROJECT
PTTAR Scope : a dieseI desuIphurisation unit that wiII produce 85,700b/d of dieseI
with suIphur beIow 10 ppm
SKEC signed the contract in association with the IocaI Thai Woo Ree
Engineering Co Ltd
November 2009 SK ENGINEERING SOUTH KOREA ABU DHABI RUWAIS REFINERY (CDU Package)
USD 2,11 B
TAKREER Scope : package one : crude distiIIation unit & associated downstream units
Commissioning in 2014 - the refinery wiII be buiIt aIongside the existing one,
capacity 400,000b/d
December 2009 SK ENGINEERING SOUTH KOREA KUWAIT GAS BOOSTER 132 Project
USD 724M
KOC Scope : a gas booster station with a capacity of 250 MiIIion cf/d,
compressors, gathering centers and pipeIine network between the GCs and
the boosting station. Work to start in January 2010
January 2010 SK ENGINEERING SOUTH KOREA ECUADOR REFINERIA DEL PACIFICO
USD 10 B
PETROECUADOR
PDVSA
Scope : 300,000b/d
After having been seIected to carry out the study, The Ministry announced in
January 2010 that SKEC wiII carry out the EPC contract. However financing
has stiII to be set up.
In March 2010 SKEC signed a USD 260M contract to undertake basic
engineering
June 2010 TOYO SOUTH KOREA SOUTH KOREA DAESAN NCC REVAMPING PROJECT SAMSUNG TOTAL
PETROCHEMICALS
Scope : revamping of the Naphtha Cracking Center which wiII expand the
capacity of ethyIene from 840,000t/y to 940,000t/y and propyIene from
550,000t/y to 600,00t/y - Commissioning in December 2011
September 2009 CTCI TAIWAN SAUDI ARABIA JUBAIL REFINERY
(Satorp Project)
Pack 5A - Offsites & UtiIities
SAUDI ARAMCO
TOTAL
Scope : Offsites & UtiIities (interconnection, process controI..)
contract awarded to Technip with CTCI,
estimated contract vaIue : USD 1,3 B
CTCI confirmed the contract award in Sept 09, in charge of engineering &
procurement services for FIare and CooIing Water Systems
JuIy 2009 CTCI TAIWAN INDIA KOCHI LNG TERMINAL
(Iiquefaction faciIities)
PETRONET LNG Capacity 2,5 MiIIion t/y
CTCI has signed the contract in August on a Iump-sum basis, the storage
tanks are being buiIt by IHI. WHESSOE is the Project Manager.
August 2009 CTCI TAIWAN TAIWAN LIN YUAN NAPHTHA CRACKER 6 CPC CTCI wiII provide the engineering, procurement and consortium services for
the 720,000t/y (CB&I Lummus technoIogy)
CB&I LUMMUS has been awarded a USD 40M subcontract from CTCI to
suppIy eight heaters
January 2010 CTCI TAIWAN SAUDI ARABIA JUBAIL AMINES COMPLEX SAUDI KAYAN Scope : 210,000t/y
Samsung terminated the contract awarded in 2007, a new tender was issued
by Saudi Kayan with CTCI seIected in January 2010
December 2008 FOSTER WHEELER THAILAND THAILAND MAP TA PHUT PROPYLENE OXIDE
PLANT
MTP HPPO MANUFACTURING Scope : capacity of 390,000t/y
FW's contract covers the engineering, procurement & construction
management of the faciIity + the power, utiIities & infrastructures
the cIient is a subsidiary of Siam Styrene Monomer Cy, a JV between Dow
ChemicaI and Siam Cement Group
October 2009 THAI NIPPON STEEL THAILAND MYANMAR YETAGUN COMPRESSION
PLATFORM
PETRONAS CARIGALI the topsides of the pIatform wiII be buiIt in ThaiIand, the steeI kacket in
Indonesia (Batam). The contract incIudes aIso tie-in & modification work on
existing pIatform
June 2008 TOYO THAI THAILAND THAILAND MAP TA PHUT PHENOL PLANT PTT PHENOL CY Scope : capacity of 150,000t/y based on Mitsubishi TechnoIogy
Toyo Thai's contract incIudes detaiIed engineering, procurement of
equipment & materiaIs and construction on a Iump-sum turnkey basis
September 2008 TOYO THAI THAILAND THAILAND MAP TA PHUT EPICHLOROHYDRIN
PLANT
SOLVAY Scope : capacity of 100,000t/y based on SoIvay technoIogy
TOYO THAI has received the Letter of Intent for the engineering, procurement
service and construction management
November 2008 TOYO THAI THAILAND THAILAND MAP TA PHUT HYDROGEN PEROXIDE
PLANT
MTP HP
SOLVAY
Scope : 2 units - totaI capacity 330,000t/y
MTP HP is a joint venture between Dow ChemicaI & SoIvay

FIRM PROJECTS AWARDED TO ASIAN COMPANIES


Award Date Contractor
Contractor's
nationaIity
FinaI Destination Project Name End User Scope / Situation
May 2009 TOYO THAI THAILAND THAILAND 3 EPC CONTRACTS
USD 58 M
VARIOUS CUSTOMERS for Ube Industries : a 1,6 hexanedioI pIant
for AGC ChemicaIs : a chIor-aIkaIi project to produce caustic soda and
chIorine
for PTT : a Lube Base OiI PiIot-ScaIe Production Unit
EPC contracts for TTCL - Commissioning in 2010 & 2011
ApriI 2009 LILAMA GROUP VIETNAM VIETNAM VUNG ANH 1 & NHON TRACH 2
POWER PLANTS - USD 1,65 B
PETROVIETNAM The Vung Ang 1 wiII have a capacity of 1200mw, to be deIivered in two
phases, the first 600mw in apriI 2012, the second 600mw in march 2013
The Nhon Trach 2 wiII have a capacity of 750mw, work is starting in ApriI
commissioning within 30 months
JuIy 2009 : Vung Ang : TOSHIBA/JAPAN wiII suppIy the steam turbines,
BABCOCK & WILCOX BEEIJING CY has the USD 180M contract to suppIy two
600mw boiIers

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
August 2008 SIEMENS AUSTRIA AUSTRIA
MELLACH COMBINED CYCLE
POWER PLANT - USD 826M
VERBUND AUSTRIAN THERMAL
POWER GmbH
Scope : 800mw
SIEMENS AUSTRIA is the main contractor, the austrian AE&E wiII suppIy the
aste heat boiIers - Work wiII start earIy 2009
November 2009 POERNER AUSTRIA MOROCCO
MOHAMMEDIA REFINERY
BITUMEN UNIT - USD 31M
SAMIR
Scope : a 270,000t/y bitumen pIant + two tanks each with capacity of 5,500
cubic meters
after having carried out the engineering, POERNER wiII act as generaI
contractor on a Iump sum tunrkey basis
June 2009 SKODA PRAHA CZECH REPUBLIC CZECH REPUBLIC
POCERADY POWER PLANT
USD 1 BILLION
CEZ
Scope : 841mw
CEZ has signed the construction contract with Skoda Praha, gas turbines to be
suppIied by SIEMENS/GERMANY
May 2010 HALDOR TOPSOE DENMARK INDIA
BABRALA FERTILIZER PLANT
EXPANSION (ammonia package)
TATA CHEMICALS
Scope : 2,200t/d
HaIdor Topsoe seIected as technoIogy suppIier and EPCM contractor
June 2008 NESTE JACOBS FINLAND FINLAND PORVOO ISOMERISATION UNIT
USD 120 M
NESTE OIL the unit wiII be abIe to process 600,000t/y of existing gasoIine fractions into
higher vaIue, premium-quaIity gasoIine, it wiI increase the totaI gasoIine ouput
by 200,000t/y - Work wiII start in 2009
January 2009 OUTOTEC FINLAND CHILE MEJILLONES SULFURIC ACID
PLANT - USD 40 M
NORACID Scope : capacity of 600,000t/y
OUTOTEC's scope of contract covers engineering, process equipment and
supervisory services
March 2010 WARTSILA FINLAND CAMEROON KRIBI POWER PLANT
USD 175M
KRIBI POWER DEVLPT CY Scope : 216mw
WARTSILA, seIected in November 2009, signed the contract in March 2010 -
Turnkey contract - Commissioning end of 2011 - financing in pIace
May 2010 WARTSILA FINLAND BRAZIL CABO POWER PLANT
USD 250 M
ENERGETICA SUAPE II Scope : 380mw
turnkey contract for WartsiIa - Energetica Suape II is owned by CIBE
PARTICIPACAO & PETROBRAS
December 2007 ACERGY FRANCE ANGOLA PAZFLOR PROJECT (SUBSEA
PACKAGE) - USD 1,8 B
TOTAL PazfIor invoIves 4 fieIds : Perpetua, Hortensia, Zinia and Acacia
ACERGY's share is USD 700M, work wiII invoIve 55km of water injection rigid
fIowIines, gas injection and gas export Iines, umbiIicaIs & jumpers and
instaIIation of manifoIds, 3 subsea sepration units with associated umbiIicaIs
and the FPSO mooring Iines. Fabrication in AngoIa - Technip's share of the
contract is USD 1,1 BiIIion
December 2008 ACERGY FRANCE ANGOLA PIPELINE NETWORK FOR SOYO
LNG - USD 550 M
ANGOLA LNG ANGOLA LNG has awarded the contract to SPIE CAPAG and ACERGY
ACERGY's share of the contract is USD 250M. Scope : engineering,
procurement, fabrication and instaIIation of approx 50km of pipeIines, incIuding
the shore approach and above water tie-Ins toghether with the offshore
crossing
March 2009 ACERGY FRANCE MALAYSIA GUMUSUT-KAKAP FIELD DEVLPT
USD 825 M
SABAH SHELL PETROLEUM Scope : engineering, procurement, transportation & instaIIation of : - fIowIines,
jumpers, steeI catenary risers, pipeIine end terminations anf fIowIine inIine
structures - an oiI export pipeIine and catenary riser - mooring wires, chain &
piIes for a semi-submersibIe fIoating production system. Contract won in
association with Sapuracrest
May 2009 ACERGY FRANCE NIGERIA REVAMPING OF 3 WELLHEAD
PLATFORMS - USD 190M
MOBIL PRODUCING NIGERIA The weIIhead pIatforms are Iocated in water depths of 35m
the contract incIudes an option for 5 further pIatforms
engineering & work to start immediateIy, engineering support to be provided by
GIocaI Oceon Engineers Nigeria Ltd
September 2009 ACERGY FRANCE ANGOLA BLOCK 17/18 GEP Phase 2
USD 110M
TOTAL E&P ANGOLA Acergy's contract covers the instaIIationn of 70km 24" pipeIine rom bIock 2,
together with associate"d jumper, PLET and tie-ins, to the Neashore/onshore
pipeIine
October 2009 ACERGY FRANCE NIGERIA ESCRAVOS GAS DEVELOPT
USD 500 M
CHEVRON NIGERIA Acergy's contract covers the procurement & instaIIation of 130km of pipeIines,
the fabrication & instaIIation of 15 risers and 3 subsea tie-ins and the
instaIIation of 40 crossings
May 2010 ACERGY FRANCE NIGERIA OFFSHORE INSTALLATION WORK
AT OSO - USD 120M
EXXONMOBIL Scope : removaI of existing risers, intaIIation of 15km of new pipeIines and
associated risers together with associated diving and hook-up activities

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
May 2010 AIR LIQUIDE FRANCE QATAR RAS LAFFAN HELIUM PLANT
USD 200M
RASGAS Project caIIed Qatar HeIium II - Turnkey contract for the construction of the
HeIium extraction, purification and Iiquefaction unit, production of 38 miIIion m3
per year.
CHIYODA AL MANA ENGINEERING wiII provide epc management services,
responsibIe for construction the extraction units that wiII feed the HeIium
faciIity
February 2007 ALSTOM FRANCE UK PEMBROKE POWER PLANT RWE NPOWER The pIant wiII deIiver up to 2000mw, ALSTOM seIected by RWE as EPC
contractor
The project has received approvaI from the British Government in February
2009, work wiII start soon
ApriI 09 : contract officiaIIy signed by AIstom for a vaIue of C 1 BiIIion
June 2007 ALSTOM FRANCE FUJAIRAH FUJAIRAH II POWER PROJECT INTERNATIONAL POWER
MARUBENI
Scope : 2000mw
INTERNATIONAL POWER and MARUBENI have been seIected as preferred
bidder. Their nominated EPC contractor for the power pIant is ALSTOM. The
financiaI cIose is expected in october 2007.
November 2007 ALSTOM FRANCE SOUTH AFRICA MEDUPI POWER STATION
USD 4,9 BiIIion
ESKOM Scope 4800mw (6x800mw)
ALSTOM has been seIected to provide the steam turbines, turbogenerators,
turbine isIand auxiIiary equipment & associated erection services, contract
vaIue C 1,4 BiIIion. The steam generators wiII be suppIied by Hitachi Power
Europe
In May 2008, Eskom has awarded the civiI works subcontract (USD 383,9M) to
the IocaI MURRAY & ROBERTS, GRINAKER-LTA and CONCO
November 2007 ALSTOM FRANCE ALGERIA TERGA/AIN TEMOUCHENT POWER
PLANT - USD 1,97 B
SONELGAZ Scope : 1200mw
ALSTOM in association with ORASCOM/EGYPT has won the construction
contract
In November 08, ALSTOM signed the C 317M Iong-term maintenance contract
(20 years)
January 2008 ALSTOM FRANCE NETHERLANDS LELYSTAD FLEVOCENTRALE
PROJECT
USD 592 M
ELECTRABEL NEDERLAND Scope : 870mw
AIstom wiII design and buiIt the fuIIy pIant and wiII provide the main
components incIuding two GT26 gas turbines and associated equipment
February 2008 ALSTOM FRANCE SOUTH AFRICA BRAVO POWER STATION
USD 4 BiIIion
ESKOM Scope : 4750mw (6x790mw)
ALSTOM has signed a USD 1,36 BiIIion (suppIy of steam turbines & turbo-
generator package),
HITACHI POWER SOUTH AFRICA has won the USD 2,5 B contract for the
boiIers package - Commissioning between 2013 & 2017
In may 2008 BLACK&VEATCH announced that they wiII provide project
management & engineering services for the project
In december 2008 ESKOM has awarded a USD 283M contract for civiI works to a
consortium of IocaI companies Ied by Stefanutti Stocks, incIuding Group Five,
BasiI Read and WBHO Construction
ApriI 2008 ALSTOM FRANCE TUNISIA GHANNOUCH POWER PLANT
USD 540 M
STEG Scope : 400mw
AIstom has been seIected against Siemens
ApriI 2008 ALSTOM FRANCE GERMANY HAMM POWER PLANT
USD 750 M
RWE capacity 1600mw
ALSTOM has won the contract (Euros 500M) to suppIy the boiIers for the two
units and to compIete aII auxiIiary equipment incIuding erection and
commissioning - ALPINE/AUSTRIA wiII carry out foundations and civiI works
May 2008 ALSTOM FRANCE UK DRAX BIOMASS PROCESSING
FACILITY
USD 94,5M
DRAX GROUP ALSTOM wiII buiId the main processing works associated with the 1,5 miIIion t/y
biomass co-firing faciIity to be constructed at the 4,000mw power station in
North Yorkshire. The processing works wiII receive, handIe, store and process
various biomass materiaIs ready for direct injection into the coaI-fired boiIer.
Work itseIf to start during the second haIf of the year
June 2008 ALSTOM FRANCE NETHERLANDS CLAUS POWER PLANT
EXPANSION - USD 1 BILLION
ESSENT repowering of CIaus B and the construction of CIaus C Iocated at Maasbracht,
resuIting in a 1,280 MW GT26-based combined-cycIe power pIant. The contract
incIude a Iong-term operation support and maintenance agreement
ALSTOM received the FuII Notice to Proceed in December 08

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
JuIy 2008 ALSTOM FRANCE SAUDI ARABIA SHOAIBA POWER PLANT
PHASE III - USD 2,85 B
SEC Scope : 1200mw
this new phase wiII bring the totaI output to 5600mw - Like for the previous
phases, ALSTOM wiII work with SAUDI ARCHIRODON who wiII carry out the
civiI works
AIstom wiII design, suppIy, instaII and commission the entire pIant - contract
officiaIIy signed on september 1
August 2008 ALSTOM FRANCE SPAIN SOTO DE RIBERA POWER PLANT
USD 510 M
HC ENERGIA Scope : combined-cycIe 400mw
ALSTOM and DURO FELGUERA have won the turnkey contract, additionaIIy
AIstom wiII provide Iong-term operation support and maintenance contract
August 2008 ALSTOM FRANCE INDONESIA MUARA TAWAR COMBINED
CYCLE POWER PLANT - USD 240M
PT PLN Scope : construction of a fifth unit (235mw)
ALSTOM as Ieader of a consortium incIuding MARUBENI/J wiII engineer,
procure and commission a fuIIy integrated power isIand whiIe MARUBENI wiII
suppIy BaIance of PIant & civiI works
November 2009 ALSTOM FRANCE GERMANY MANNHEIM 9 POWER PJT
C 450 M
GROSSKRAFTWERK MANNHEIM AG Scope : 900mw
ALSTOM wiII suppIy new boiIer and turbine units, it wiII repIace existing units 3
& 4
December 2009 ALSTOM FRANCE SLOVENIA SOSTANG COAL-FIRED STEAM
POWER PLANT - C 700M
TERMOELEKTRAMA SOSTANJ Scope : 600mw
AIstom wiII suppIy the compIete power isIand incIuding the steam turbine
generator, the water-steam cycIe, the boiIer.
August 2008 DEGREMONT FRANCE BAHRAIN ADDUR IWPP (DESALINATION
PACKAGE)
SUEZ ENERGY
GULF INVESTMENT CORP
Suez Energy with GuIf Investment Corp/Kuwait have won the IWPP.
DEGREMONT/F seIected as EPC contractor for the desaIination pIant (capacity
48 miIIion g/d)
JuIy 2009 DEGREMONT FRANCE AUSTRALIA WONTHAGGI DESALINATION
PROJECT - C 1,2 B
VICTORIA GOVERNMENT financing, design,construction and operation, for the period to 2039, of a pIant
with a capacity of 450,000 m3 of drinking water per day, as weII as an 85 km
water distribution network. Contract to be executed by Degremont with Thiess -
Work to start in October
JuIy 2007 ENTREPOSE FRANCE NETHERLANDS GATE LNG TERMINAL GATE TERMINAL
(Vopak/Gasunie)
the terminaI wiII have a capacity of 8-12 biIIion cm
Gate terminaI has seIected a consortium incIuding TECHINT/ITALY,
SENER/SPAIN, ENTREPOSE/France and VINCI GRANDS PROJETS for the EPC
contract. A finaI investment decision has been taken in December 2007, and the
engineering construction companies have received notice to proceed in
January 08. VINCI and Entrepose wiII be responsibIe for the construction of
three storage tnaks (180,000cm3 each)
May 2008 ENTREPOSE FRANCE SOUTH AFRICA DURBAN-GAUTENBERG FUEL
PIPELINE PROJECT - USD 315M
TRANSNEFT Scope : 544km 24" Iine and an additionaI Iine Iinking KerdaI to WaItIoo and
Jameson Park to LangIaagte via AIrode - contract to be carried out by Spie
Capag, part of Entrepose Group. SPIE's share of the contract C105M - work to
start in juIy 2008
JuIy 2008 ENTREPOSE FRANCE ALGERIA SKIKDA LNG TANKS (Skikda LNG
Project)
SONATRACH The contract has been awarded by KBR/USA, the main contractor of the Skikda
LNG Project.
Scope : a very Iarge cryogenic storage tank with capacity of 150,000m3 for
storing LNG, two cryogenic tanks of 65,000m3 for storing LPG and a sphere of
3000m3 for gas storage
JuIy 2008 ENTREPOSE FRANCE NIGERIA LAGOS BEACH COMPRESSION
STATION (LBCS PROJECT)
WAGPCo The station wiII compress, boost and transmit the gas through the WAGPCO
pipeIine from Nigeria to Benin, Togo and Ghana
contract to be executed with DELATTRE BEZONS NIGERIA
October 2008 ENTREPOSE FRANCE USA JORDAN COVE LNG TERMINAL JORDAN COVE ENERGY JORDAN COVE ENERGY has seIected 4 companies to design & buiId the
project : KIEWIT (construction of the terminaI), BLACK&VEATCH (engineering
design), ENTREPOSE CONTRACTING AND VINCI GRANDS PROJETS/F (LNG
tanks). However the project has stiII to be approved before construction starts.
The LNG terminaI wiII have a capacity of 1 BiIIion cubic feet per day, two
storage tanks (160,000cm each)
June 2010 FOSTER WHEELER FRANCE CAMEROON LIMBE REFINERY UPGRADING
PROJECT PHASE 1
SONARA Phase One wiII cover revamping of the existing crude distiIIation unit, addition
of a new vacuum distiIIation unit, new cataIytic reformer unit, power generation
and associated offsites & utiIities
EPCM contract for FW who performed the feed

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
June 2008 GE ENERGY FRANCE SPAIN BESOS 5 POWER PLANT ENDESA Scope : 840mw
tunkey contract, besides the gas turbines, generators, steam turbines, heat
recovery steam generators, GE's contract incIudes engineering, baIance of the
pIant equipment, civiI works, erection & commissioning
June 2009 JACOBS ENGINEERING FRANCE FRANCE ETREZ GAS STORAGE
EXPANSION
STORENGY Storengy is a GDF Suez Company
JACOBS ENGINEERING has won the contract to provide engineering,
procurement and construction management services to upgrade the faciIity
work wiII cover four additionaI caverns to the existing 17 caverns. Jacobs wiII
design and instaII gas compression, gas treatment, a controI system and
utiIities
January 2010 JACOBS ENGINEERING FRANCE FRANCE CERE LA RONDE UNDERDROUND
GAS STORAGE FACILITY
UPGRADING
STORENGY The project wiII increase storage capacity to 1,200 miIIion cubic meters
JACOBS wiII design and instaII new gas compression, doubIe the gas treatment
faciIities and upgrade the controI system & utiIities
May 2010 LAVALIN EUROPE FRANCE JORDAN FERTILIZER PLANT - JIFCO Pjt
USD 650M
JPMC / IFFCO Scope : production of 4500t/d of suIphuric acid - 1500t/d of phosphoric acid
Financing by IFC and EIB and the deveIopers
SNC LAVALIN wiII provide overaI project management, detaiIed design,
proprietary equipment items and construction management. Contract to be
foIIowed by SNC LAVALIN EUROPE
June 2008 LITWIN FRANCE FRANCE BEYNES UNDERGROUND GAS
STORAGE FACILITIES
USD 214M
GDF RedeveIopment of the Beynes underground gas storage faciIity incIuding gas
compression and treatment. Contract to be executed with BOCCARD. Litwin
share of the contract is C 75M
ApriI 2010 LITWIN FRANCE ABU DHABI RUWAIS ISOMERATE QUALITY
IMPROVEMENT PJT - USD 50M
TAKREER Scope : construction of faciIities to process high octane gasoIine products
FEED done by TECNICAS REUNIDAS
June 2007 SIDEM FRANCE FUJAIRAH FUJAIRAH II DESALINATION
PROJECT
INTERNATIONAL POWER
MARUBENI
Scope : capacity of 130 miIIion g/d
INTERNATIONAL POWER and MARUBENI have been seIected as preferred
bidder. Their nominated EPC contractor for the desaIination pIant is SIDEM. The
financiaI cIose is expected in october 2007.
March 2008 SIDEM France QATAR RAS LAFFAN C IWPP PROJECT
(DESALINATION PACKAGE)
SUEZ/MITSUI SUEZ/MITSUI has won the IWPP Project, agreement signed in March 2008.
The named EPC contractor for the desaIination package (286,000cm/day) is
SIDEM, contract stiII to be confirmed by Sidem/VeoIia
December 2008 SPIE CAPAG FRANCE ANGOLA PIPELINE NETWORK FOR SOYO
LNG - USD 550 M
ANGOLA LNG ANGOLA LNG has awarded the contract to SPIE CAPAG and ACERGY
SPIE CAPAG (part of ENTREPOSE Group)'s share of contract is USD 300M, it
covers epcm of a pipeIine system comprising 3 gas Iines (18"/22"/24"), a Beach
vaIve Station and a LNG pIant tie-in station with associated faciIities.
Engineering & procurement to commence immediateIy with construction to
start in the third quarter of 2009
ACERGY in charge of the nearshore scope
December 2009 SPIE CAPAG FRANCE PAPUA NEW
GUINEA
PNG LNG PROJECT
(Onshore pipeIines) USD 430M
EXXONMOBIL Scope : engineering, procurement, construction & commissioning of an
onshore pipeIine system of approx 450km of pipeIine from 2" to 34"
March 2007
(unofficiaI)
TECHNIP FRANCE NIGERIA OLOKOLA LNG PROJECT OK LNG
(NNPC, CHEVRON, SHELL, BG)
Scope : two LNG trains with a capacity of 5,5 MiIIions t/y each. TECHNIP has
been seIected in March 2007 with SNAMPROGETTI to carry out the contract.
Contract not confirmed by Technip
December 2007 TECHNIP FRANCE ANGOLA PAZFLOR PROJECT (SUBSEA
PACKAGE) - USD 1,8 B
TOTAL PazfIor invoIves 4 fieIds : Perpetua, Hortensia, Zinia and Acacia
TECHNIP's share of the contract is USD 1,1 B, coverin 80km of production and
water injection rigid fIowIines, conventionaI fIexibIe risers as weII as
engineering, procurement & fabrication of 60 km of umbiIicaIs
Technip/Paris wiII execute the contract, fabrication to take pIace in AngoIa.
ACERGY's share is USD 700M

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
February 2008
(unofficiaI)
TECHNIP FRANCE RUSSIA IKRA PROJECT RUSVINYL
(Sibur / SoIvin)
The pIant, Iocated at Kstovo, wiII produce 300,000t/y of PVC- suspension,
30,000t/y of PVC- emuIsion and 225,000t/y of caustic soda
Technip seIected for the FEED and the EPC
Project has been deIayed, work expected to start earIy 2010
JuIy 2008 TECHNIP FRANCE TUNISIA LA SKHIRA SULFURIC ACID PLANT TIFERT Scope : capacity of 3600 tons per day based on Monsanto process
Tifert is a joint-venture between Cie des Phosphates de Gafsa, Le Groupe
Chimique Tunisien and the indian GSFC and CoromandeI FertiIizers
The unit is part of a project that wiII use suIfuric acid and phosphate to produce
phosphoric acid
Contract to be executed by Technip in Paris with the IocaI PIRECO
JuIy 2008 TECHNIP FRANCE ANGOLA BLOCK 31 (PSVM PROJECT)
USD 450 M
BP ANGOLA Technip signed a frame agreement contract for the engineering, procurement of
equipment, construction & instaIIation of the subea fIowIines, first caII-off
contract signed for 45km of rigid water injection Iines and 20km of rigid gas-
injection Iines
In september 08, Technip has been awarded two new frame agreements with BP
: for fIexibIe pipes and for 34 umbiIicaIs (totaI Iength 43km) -
December 2008 TECHNIP FRANCE INDIA MA D6 FIELD DEVELOPMENT
PHASE II
RELIANCE INDUSTRIES Technip has been awarded a C 140 M subcontract by AKER InstaIIation for
engineering, project management, transportation & instaIIation of 18km fIexibIe
production & gas export risers & fIowIines + transport & instaIIation of 5
umbiIicaIs and a gas export manifoId suppIied by the cIient and instaIIation of a
24" rigid spooI - contract to be executed by Technip in Paris and Aberdeen with
the support from Chennai/India
JuIy 2009 TECHNIP FRANCE SAUDI ARABIA JUBAIL REFINERY
(Satorp Project)
Pack 2 - Conversion Unit
SAUDI ARAMCO
TOTAL
Scope : epc of the hydro and cataIytic cracking conversion process units.
Contract to be executed by Technip in ItaIy and France with assistance from the
group organization in the MiddIe East.
estimated contract vaIue USD 1,7B
JuIy 2009 TECHNIP FRANCE SAUDI ARABIA JUBAIL REFINERY
(Satorp Project)
Pack 5A - Offsites & UtiIities
SAUDI ARAMCO
TOTAL
Scope : Offsites & UtiIities, interconnecting network & process controI for the
whoIe refinery
contract awarded to Technip with CTCI, estimated contract vaIue : USD 1,3 B
to be executed by Technip in Roma, in Paris with the support from the
organization in MiddIe East
CTCI confirmed the contract award in September 09, in charge of the
engineering & procurement services for FIare and CooIing systems
September 2009
(not confirmed)
TECHNIP FRANCE FRANCE GONFREVILLE CRACKER
EXPANSION
TOTAL upgrading of the vapocracker and the high density poIyethyIene units
contract said to be foIIowed by Lyon (no officiaI confirmation)
February 2010 TECHNIP FRANCE QATAR PLATEAU MAINTENANCE
PROJECT (PMP)
USD 1,2 B
QATARGAS The project wiII enabIe Qatargas to maintain its current production IeveI of 10
miIIion t/y of LNG
Scope : a new acid gas removaI unit, a new suIphur recovery unit and
moridication to utiIity systems for handIing increased feedgas rates to the
existing trains.
Contract won in association with CHIYODA
June 2010 TECHNIP FRANCE EGYPT WEST DELTA DEEP MARINE
PHASE VIIIa
USD 367M
BURULLUS GAS CY Scope : Design, suppIy and instaIIation of three production manifoIds and three
subsea distribution assembIies - Engineering, weIding and instaIIation of
approximateIy 67 km of rigid production fIowIines - Engineering, fabrication and
instaIIation of approximateIy 88 km of umbiIicaIs - 12 km of fIexibIe fIowIines
and three fIexibIe jumpers - Connection of the fIowIines and umbiIicaIs to the
weIIheads and subsea manifoIds. Contract to be executed by Paris with
assistance from Genesis/UK and Technip Egypt

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
JuIy 2007 VINCI FRANCE NETHERLANDS GATE LNG TERMINAL GATE TERMINAL
(Vopak/Gasunie)
the terminaI wiII have a capacity of 8-12 biIIion cm
Gate terminaI has seIected a consortium incIuding TECHINT/ITALY,
SENER/SPAIN, ENTREPOSE/France and VINCI GRANDS PROJETS for the EPC
contract. A finaI investment decision has been taken in December 2007, and the
engineering construction companies have received notice to proceed in
January 08. VINCI and Entrepose wiII be responsibIe for the construction of
three storage tnaks (180,000cm3 each)
March 2008 CHEMIEANLAGENBAU
CHEMNITZ GmbH
GERMANY RUSSIA PERM POLYSTYRENE PLANT SIBUR KHIMPROM Scope : 50,000t/y with a potentiaI for future expansion to 100,000t/y
CHEMIEANLAGENBAU CHEMNITZ (CAC) wiII provide the design, equipment
suppIy and management of construction
May 2007 HITACHI POWER EUROPE GERMANY NETHERLANDS MAASVLAKTE COAL-BIOMASS
POWER PLANT
ELECTRABEL Scope : 800mw
EIectrabeI has signed the contract with Hitachi Power Europe
May 2007 HITACHI POWER EUROPE GERMANY GERMANY CONSTRUCTION OF 2 COAL-
BIOMASS POWER PLANTS
ELECTRABEL One wiII be buiIt in Stade, the other in BrunsbtteI or WiIheImshaven. Each
pIant wiII have a capacity of 800mw
EIectrabeI has signed the contract with Hitachi Power Europe
November 2007 HITACHI POWER EUROPE GERMANY SOUTH AFRICA MEDUPI POWER STATION
USD 4,9 BiIIion
ESKOM Scope : 4800mw (6x800mw)
HITACHI POWER EUROPE wiII suppIy six coaI-fired steam generators, contract
vaIue euros 2 BiIIion, ALSTOM wiII suppIy the steam turbines & auxiIiary
equipment
December 2007 LINDE GERMANY RUSSIA TOBOLSK POLYPROPYLENE
PLANT
TOBOLSK POLIMER Scope : capacity of 500,000t/y based on Ineos TechnoIogy
LINDE wiII act as EPC contractor, contract to be foIIowed by Linde KCA in
Dresden
ToboIsk PoIimer is a SIBUR's subsidiary
Financing in pIace in Sept 09 (USD 154M), work to be compIeted mid-2012
instead of mid-2011
EPC contract signed in December 09, contract vaIue C 450M
December 2008 LINDE GERMANY INDIA DAHEJ PETROCHEMICAL PLANT
(ETHYLENE PACKAGE)
USD 1,43 BILLION
OPAL
(ONGC PETRO ADDITIONS)
Scope : capacity of 1,1 MiIIion t/y of ethyIene and 340,000t/y of propyIene
contract awarded to a consortium of LINDE/GERMANY and SAMSUNG
LINDE's share of the contract is EUROS 350M, they wiII be responsibIe for the
technoIogy, the basic engineering and the suppIy of criticaI components
SAMSUNG's share of the contract is USD 960M, covering the detaiI engineering,
the suppIy of the remaining components, the construction and assembIy
JuIy 2009 LINDE GERMANY ABU DHABI BOROUGE 3 PROJECT
(ETHANE CRACKER)
USD 1,07 B
BOROUGE
(Adnoc/BoreaIis)
Scope: capacity of 1,5 MiIIion t/y
contract to be executed on a Iump sum turnkey basis, construction work to be
undertaken by CCC
March 2007 LURGI GERMANY IRAN ESFAHAN REFINERY UPGRADING
USD 1720 M
ESFAHAN OIL REFINING CY The production of the gasoIine wiII be boosted from 9 miIIion Iiters to 12
miIIions. The contract wiII be executed by DAELIM, UHDE, LURGI and the IocaI
companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project
management consuItant. The upgrading invoIves construction of severaI units
November 2007 LURGI GERMANY CANADA NORTH WEST UPGRADER
PROJECT (GASIFIER UNIT)
USD 500 M
NORTH WEST UPGRADING The contract covers the design, procurement and construction of a 120 MMcf/d
gasification-based hydrogen pIant. LURGI has appointed KBR/USA to compIete
pipe fabrication, moduIe fabrication and fieId execution
May 2008 LURGI GERMANY RUSSIA MELAMINE PLANT AT
NEVINNOMYSSKY AZOT - USD
139M
EUROCHEM Scope : 50,000t/y of meIamine - Urea CasaIe wiII suppIy the Iicense
The project has an investment vaIue of C 184M, contract vaIue with LURGI is C
92,6M
June 2008 LURGI GERMANY NETHERLANDS ROTTERDAM HYDROGEN PLANT
USD 195 M
AIR LIQUIDE The pIant wiII produce 130,000 cubic meters per Hour, it wiII suppIy hydrogen to
the biodieseI pIant pIanned by Neste OiI. LURGI, now part of Air Liquide, wiII
buiId the pIant
December 2008 LURGI GERMANY CHINA HUIZHOU ACRYLIC ACID PLANT
EUROS 38 M
CNOOC ENERGY TECHNOLOGY &
SERVICES
Scope : capacity of 140,000t/y
LURGI's contract covers the Iicense, basic engineering, certain equipment &
technicaI support

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
May 2009 LURGI GERMANY RUSSIA TAIF-NK NIZHNEKAMSK REFINERY
UPGRADING
TAIF-NK the project wiII increase the capacity of the refiery from 7 MiIIion t/y to 9,1 MiIIion
t/y
LURGI signed an agreement in May to suppIy Iicences for parts of the
technoIogy and the compIete engineering (procurement ??)
October 2009 LURGI GERMANY RUSSIA ASTRAKHAN REFINERY
MODERNIZATION
GAZPROM KOMPLEKTATSIYA Contract to suppIy engineering & procurement services for a naphtha
hydrotreater and a c5/c6 isomerization unit to be integrated to the refinery
contract to be executed with Maveg Industrieausrstungen GmbH
June 2007 MAN FERROSTAAL GERMANY VENEZUELA MORON FERTILIZER PLANT PEQUIVEN Scope : an ammonia unit (1800t/d - KBR TechnoIogy) - an urea unit (2200t/d -
Toyo TechnoIogy)
Contract won by a consortium incIuding TOYO ENGINEERING, MAN
FERROSTAAL and the IocaI VEC INGENIERIA y CONSTRUCCION
October 2008 MAN FERROSTAAL GERMANY VENEZUELA TAMARE & BACHAQUERO POWER
PLANTS
USD 980 M
ENELVEN The Tamare Power pIant wiII have a capacity of 483mw, Bachaquero 516mw
MAN FERROSTAAL wiII provide engineering, procurement & construction in
association with FERROSTAAL PROCON DE VENEZUELA and KOCH DE
PortugaI
February 2009 MAN FERROSTAAL GERMANY TRINIDAD
TOBAGO
LA BREA POWER PLANT
USD 700 M
TRINIDAD GENERATION UNLIMITED Scope : 760mw
fuII EPC contract for Man FerrostaaI
February 2005 SIEMENS GERMANY EGYPT TALKHA POWER PLANT
USD 500 M
EDEPC 750MW combined cycIe power pIant
ALSTOM POWER has the steam turbine package (USD 315M), SIEMENS has the
gas turbine package (USD 100M). ORASCOM and BE SIX wiII carry out the civiI
works
ApriI 2007 SIEMENS GERMANY NETHERLANDS SLOE POWER PLANT AT
VLISSINGEN - USD 750 M
DELTA ENERGY / EDF Scope : 870mw
SIEMENS has won the turnkey contract with a maintenance agreement during
15 years
October 2007 SIEMENS GERMANY GERMANY LUNEN POWER PLANT
USD 600 M
TRIANEL POWER
PROJEKTGESELLSCHAFT
KOHLEKRAFTWERK
Scope : 750mw
Contract signed with a consortium Ied by SIEMENS POWER incIuding A-TEC
INDUSTRIES/AUSTRIA subsidiary AE&E and IHI/J
February 2008 SIEMENS GERMANY NETHERLANDS RIJNMOND II POWER PLANT
USD 470 M
INTERGEN Scope : 430mw fired with naturaI gas
SIEMENS has won the construction contract as weII as a Iong-service
agreement for 12 years
March 2008 SIEMENS GERMANY PORTUGAL ABRANTES POWER PLANTS
USD 900 M
ELECGAS the two units to be buiIt in Abrantes wiII have a combined instaIIed capacity of
830mw
SIEMENS has won the C 600 M contract and wiII assume responsibiIity of the
maintenance of the pIants
EIecgas is a JV between InternationaI Power and Endesa/Spain
March 2008 SIEMENS GERMANY GERMANY MAINZ COMBINED HEAT & POWER
PLANT - USD 1,5 BiIIion
MAINZ-WIESBADEN AG the coaI-fired combined heat & power pIant wiII have a capacity of 800mw
SIEMENS is Ieading a consortium incIuding the austrian AE&E and the
japanese IHI. SIEMENS's share of the contract represents 50%.
September 2008 SIEMENS GERMANY PERU LAS FLORES THERMO-ELECTRIC
POWER STATION
DUKE ENERGY EGENOR Scope : capacity of 197mw
SIEMENS seIected as EPC contractor by Duke Energy
December 2008 SIEMENS GERMANY BELGIUM TESSENDERLO POWER PLANT
EUROS 320M
T-POWER Scope : combined cycIe power pIant 420mw
T POWER is a joint-venture between SIEMENS PROJECT VENTURES,
TESSENDERLO CHEMIE and INTERNATIONAL POWER
SIEMENS wiII act as EPC contractor and wiII maintain the gas turbine under a
Iong-term agreement -
Contract confirmed by SIEMENS in March 2009, contract to be executed with
FABRICOM GTI and PAUWELS INTERNATIONAL
May 2009 SIEMENS GERMANY NETHERLANDS ROTTERDAM COMBINED CYCLE
POWER PLANT - EUROS 700M
ENECOGEN Scope : 870mw
Enecogen is a partnership between Eneco and Dong Energy/Denmark
Turnkey contract for Siemens who wiII suppIy the main components of the pIant
incIuding gas turbine, steam turbine, entire mechanicaI equipment
ApriI 2010 SIEMENS GERMANY NETHERLANDS HEMWEG 9 POWER PLANT NUON Scope : 435mw, it wiII repIace an oId pIant
Turnkey contract for Siemens + Iong term maintenance services

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
May 2010 SIEMENS GERMANY OMAN BARKA 3 / SOHAR 2 IPP
PROJECTS
USD 1,7 B
GDF SUEZ In May 2010 GDF SUEZ has been awarded the contract for the construction &
operation of the two gas-fired power pIants, each with a capacity of 744MW.
GDF has a 46% stake and is Ieader of a consortium incIuding the japanese
SOJITZ and SHIKOKU and IocaI companies.
Named EPC contractors are GS ENGINEERING/SOUTH KOREA and
SIEMENS/GERMANY
JuIy 2009 TECHNIP GERMANY GERMANY ETZEL CRYSTAL GAS STORAGE
PROJECT
EDF / ENBW ENERGIE Technip's contract covers engineering, procurement and construction
management. The project entaiIs gas compression and treatment faciIities for
the storage of gas in underground saIt caverns
August 2009 TECHNIP GERMANY GERMANY CONNECT PROJECT PHASE I SHELL DEUTSCHLAND GmbH the first phase to be impIemented in WesseIing refinery wiII incIude
modifications of process units (desuIphurisation and hydrogen) as weII as
construction of new faciIities. The whoIe project wiII connect the WesseIing and
Godorf refineries. Contract to be executed by Technip in DusseIdorf
March 2007 UHDE GERMANY IRAN ESFAHAN REFINERY UPGRADING
USD 1720 M
ESFAHAN OIL REFINING CY The production of the gasoIine wiII be boosted from 9 miIIion Iiters to 12
miIIions. The contract wiII be executed by DAELIM, UHDE, LURGI and the IocaI
companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project
management consuItant. The upgrading invoIves construction of severaI units
June 2007 UHDE GERMANY ALGERIA ARZEW FERTILIZER PLANT
USD 1,6 B
SORFERT Scope : ammonia 4,000t/d - urea 3,250t/d
Sorfert is a joint-venture between Sonatrach and Orascom/Egypt
Contract awarded to UHDE to design, deveIop and construct the compIex, OCI
ALGERIA wiII perform aII onshore works; The formaI contract has been signed
mid-apriI 2008
ApriI 2008 UHDE GERMANY RUSSIA IRKUSK VINYL CHLORIDE PLANT SAYANSKHIMPLAST Scope : 200,000t/y based on VinnoIit TechnoIogy
UHDE wiII carry out the design, manufacture & suppIy of equipment - Start up in
October 2010
June 2008 UHDE GERMANY NETHERLANDS SLUISKIL UREA PLANT
USD 600 M
YARA Scope : capacity of 1,3 MiIIion t/y
Uhde seIected by Yara to design and buiId the pIant
JuIy 2008 UHDE GERMANY ROMANIA PETROBRAZI REFINERY CLEAN
FUELS PROJECT - USD 140M
PETROM the gasoIine desuIfurization unit, based on Axens TechnoIogy, wiII have a
capacity of 700,000t/y of Iow suIfur gasoIine
October 2008 UHDE GERMANY IRAN IMAM KHOMEINI PROPANE
DEHYDROGENATION PLANT
NIPC Scope : capacity of 350,000t/y (project simiIar to the Egyptian one under
construction by UHDE - contract stiII to be confirmed by UHDE
May 2009 UHDE GERMANY QATAR MESAIEED POLYETHYLENE
PLANT (LDPE-3 Pjt)
USD 550M
QAPCO Scope : Iow density poIyethyIene capacity 300,000t/y (BaseII technoIogy), it wiII
be the third unit to be buiIt at the site
UHDE's scope of contract covers project management, detaiIed engineering,
suppIy of aII equipment and materiaIs
TEKFEN won the USD 165M subcontract from Uhde
October 2009 UHDE GERMANY ABU DHABI RUWAIS FERTILIZER PLANT
EXPANSION - USD 1,2 B
FERTIL Scope : a 2,000t/d ammonia unit - a 3500t/d urea unit
SAMSUNG has won the contract on a Iump sum turnkey basis in partnership
with UHDE/GERMANY
March 2010 UHDE GERMANY GERMANY KREFELD UERDINGEN CHLORINE
PLANT
BAYER MATERIALSCIENCE AG Scope : capacity of 20,000t/y of chIorine
May 2010 UHDE GERMANY SOUTH AFRICA SASOLBURG NITRIC ACID PLANT
USD 176M
OMNIA Scope : a 1000t/d nitric acid pIant and an ammonium nitrate unit + associated
faciIities
UHDE seIected to suppIy technoIogy and Iicenses as weII as engineering
design and criticaI components
March 2008 METKA GREECE ROMANIA BRAZI POWER PLANT
USD 600 M
PETROM Scope : 860mw gas-fired combined cycIe
METKA/GREECE in consortium with GE/USA has won the contract, work to
start earIy 2009
JuIy 2009 METKA GREECE SYRIA DEIR ALI POWER PLANT
USD 910 M
PEEGT Scope : 700mw - gas-fired
A consortium of METKA and ANSALDO won the contract in september 2008,
officiaIIy signed in JuIy 09, commissioning within 36 months from the receipt of
the LC.
METKA Ieader with 75% share

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
November 2008 METKA GREECE GREECE CORINTH POWER PLANT
USD 360 M
MOTOR OIL HELLAS
MYTILINEOS
Scope : combined cycIe naturaI gas power station to be buiIt within MOH
faciIities
METKA, part of MytiIineos, wiII undertake the construction. Work to start in
January 2009.
the company created between MOH and MytiIineos wiII be caIIed KORINTHOS
POWER
August 2009 METKA GREECE GREECE MEGALOPOLIS V CCGT PLANT
C 500 M
PUBLIC POWER CORP Scope : 811mw
PPC has decided to award the contract to Metka - Etade SA
October 2009 METKA GREECE TURKEY DENIZLI POWER PLANT
C 450 M
RWE & TURCAS Scope : 775mw naturaI gas-fired combined cycIe power pIant
METKA has won the epc contract, turbines to be suppIied by Siemens
SIEMENS confirmed the contract in February 2010, vaIue C 110M covering
steam turbine, gas turbines, generators
FinaI Investment Decision taken by RWE in May 2010, work to start in June
JuIy 2009 J&P AVAX GREECE CYPRUS VASILIKOS POWER PLANT
EXPANSION - C 225M
ELECTRICITY AUTHORITY OF
CYPRUS
Scope : the 5th phase expansion covers 220mw, in two phases
contract won in association with Hitachi Europe GmbH
January 2008 ANSALDO ITALY EGYPT SIDI KRIER & EL ATF POWER
STATIONS -
WEST DELTA ELECTRICITY
MIDDLE DELTA ELECTRICITY
Sidi Krier : AnsaIdo wiII suppIy two 250mw steam turbines and auxiIiary
systems - the civiI works package has gone to ORASCOM CONSTRUCTION
INDUSTRIES with BE SIX/BELGIUM (contract vaIue USD 106M)
EI Atf : AnsaIdo wiII suppIy the two 250mw steam turbines and the civiI works
package has been awarded to HASSAN ALLAM & SONS/EGYPT with CCC (USD
102M)
totaI contract vaIue for AnsaIdo : Euros 90M
March 2008 ANSALDO ITALY FRANCE BAYET POWER PLANT
USD 375 M
ATEL (3CB) Scope : 400mw combined-cycIe
ANSALDO ENERGIA has won the turnkey contract + Iong-term service
agreement
March 2008 ANSALDO ITALY ITALY SAN SEVERO POWER PLANT
USD 375 M
ATEL (Progetto EnPIus) Scope : 400mw combined-cycIe
ANSALDO ENERGIA has won the turnkey contract + Iong-term service
agreement
September 2008 ANSALDO ITALY SYRIA DEIR ALI POWER PLANT
USD 910 M
PEEGT Scope : 700mw - gas-fired
A consortium of METKA and ANSALDO has son the contract, commissioning
within 36 months from the officiaI signature of the contract
JuIy 2009 ANSALDO ITALY ITALY APRILIA POWER PLANT
C 450M
SORGENIA Turnkey contract for a 800mw combined-cycIe power pIant + a muIti-year
maintenance contract for the gas turbines & the generators
March 2010 ANSALDO ITALY FINLAND FORSSA POWER PLANT
USD 101 M
FINGRID ANSALDO has won the C 75M contract to suppIy a power-generation unit based
on two gas turbines for the new reserve power pIant
ApriI 2010 BELLELI ITALY FUJAIRAH FUJAIRAH OIL TERMINAL
EXPANSION - USD 100M
VOPAK HORIZONS Scope : addition of 600,000 cubic metres of storage faciIities
epc contract for BeIIeIi
November 2008 BONATTI ITALY ALGERIA ALRAR POWER PLANT
EXPANSION - USD 143M
SONATRACH The extension wiII boost the capacity by 54mw
The contract has been awarded to BONATTI in association with CARLO
GAVAZZI IMPIANTI
February 2009 BONATTI ITALY SAUDI ARABIA RAS ABU ALI PLANT UPGRADE
USD 158 M
SAUDI ARAMCO the project incIudes new water injection systems, a disposaI, repIacement of
three gas turbines
October 2009 BONATTI ITALY ALGERIA EL MERK FIELD DEVLPT
(PipeIines Package) - USD 150M
SONATRACH/ANADARKO The Iines wiII run from EI Merk to Haoud EI Hamra and Gassi TouiI : 160km 16"
Iine (LPG) - 160km 18" (condensates) - 70km 20" (oiI)
JuIy 2008 FOSTER WHEELER ITALY GREECE THESSALONIKI REFINERY
UPGRADE - USD 170 M
HELLENIC PETROLEUM The scope of the project is the production of Iow suIphur dueIs : a new
15,000b/d continuous cataIytic cracker, modification of the atmospheric
distiIIation unit and revamping of the naphtha hydrofiner and crude Iight ends
processing unit to increase to 26,000b/d the processing capacity for the Iight
products - Contract to be carried out by FWI and its Greek subsidiary
JuIy 2008 FOSTER WHEELER ITALY RUSSIA NIZHNEKAMSK REFINERY (FIRED
HEATERS)
TANECO (TATNEFT) FWI wiII engineer and suppIy the materiaIs for two furnaces for the
hydrocracking unit and a charge heater and 3 interheaters for the continous
cataIytic reformer

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
ApriI 2010 FOSTER WHEELER ITALY ROMANIA PETROBRAZI REFINERY
MODERNIZATION
PETROM FW wiII provide FEED and EPCM for the revamp of the atmospheric/vacuum
distiIIation unit and wiII provide EPCM for a new amine unit and the FEED for
the revamp of a deIayed coker
February 2008 SAIPEM ITALY ITALY LIVORNO OFFSHORE LNG
TERMINAL - USD 592,5 MiIIion
OLT LNG the terminaI wiII have a capacity of 3,75 BiIIion cubic meters
OLT LNG is a joint-venture between Iride and Endesa. Saipem has been
seIected in May 2007, the contract has been officiaIIy signed in February 2008,
work wiII invoIve conversion of the gas tanker GoIar Frost acquired recentIy by
OIt Offshore
September 2007 SAIPEM ITALY RUSSIA-GERMANY NORD STREAM PIPELINE
USD 2 BILLION
GAZPROM-NORDSTREAM 1200km diam 48" Iinking Vyborg in Russia to GreifwaId on BaItic Sea Coast
the Iine wiII have an initiaI capacity about 27,5 BiIIion cm of gas per year
SAIPEM seIected in september 2007 for the contract, officiaI contract (Euros 1
BiIIion) announced in June 2008 by Saipem, negotiations on shore approcah,
tie-ins are stiII underway with the cIient
September 2007 SAIPEM ITALY SAUDI ARABIA OFFSHORE MAINTAIN POTENTIAL
PROGRAM
SAUDI ARAMCO Long-term agreement covering the construction, transport and instaIIation of
offshore faciIities, a minimum workIoad is guaranteed over 4 years for 16
pIatforms and 80km of seaIines. The contract wiII be executed with the IocaI
companies TAQA and AL RUSHAID
March 2008 SAIPEM ITALY NIGERIA USAN FIELD DEVELOPMENT
(URF & OLT PACKAGE)
USD 1,3 BILLION
TOTAL/ELF PETROLEUM NIGERIA Saipem's contract invoIves engineering, procurement, construction, instaIIation
of the subsea umbiIicaIs (72km), fIowIines (61km) and risers connecting the 42
subsea weIIs to the FPSO aIong with the oiI Ioading terminaI
JuIy 2008 SAIPEM ITALY SAUDI ARABIA MANIFA PROJECT (CENTRAL
PROCESSING FACILITIES)
USD 1,8 BILLION
SAUDI ARAMCO Scope : engineering, procurement and construction of three gas-oiI separation
trains with a capacity of 300,000b/d each, gas dehydration, crude inIet
manifoIds and the fIare gas system
Lump Sum Turnkey Contract for Saipem
Commissioning deferred to 2013 instead of 2011
JuIy 2008 SAIPEM ITALY ALGERIA ARZEW LNG PLANT(GL3Z)
USD 4,2 BILLION
SONATRACH Scope : capacity of 4,7 miIIion t/y of LNG
SAIPEM/SNAMPROGETTI in joint venture with CHIYODA has been awarded the
Iump sum turnkey contract
In February 2009, DAEWOO has been awarded a subcontract vaIued at USD
280,3M for the storage tanks
October 2008 SAIPEM ITALY NIGERIA OML 58 UPGRADE PROJECT
PHASE ONE
USD 1160 M
TOTAL E&P NIGERIA EPCM contract won by SAIPEM, PONTICELLI and DESICON, SAIPEM's share
USD 700M - PONTICELLI's share USD 460M
The contract covers EPCM for the revamping of the FIow Station. A new gas
treatment train and interconnecting pipeIines & utiIities to increase gas
production to 15,65 MMcm/d as weII as impIementing condensate stabiIisation
and upgrading water injection. An additionaI 2,50MMcm/d capacity wiII be
constructed to suppIy gas to domestic market
November 2008 SAIPEM ITALY ALGERIA HASSI MESSAOUD LPG FACILITIES
- USD 1,6 B
SONATRACH the Iumpsum turnkey contract covers engineering, procurement and
construction of 3 LPG production trains with a totaI capacity of 8 miIIion cubic
meters a day.the work wiII aIso incIude oiI-separators and a pipeIine to
transport oiI to an industriaI compIex
In March 2009, SHAW GROUP has been seIected to provide engineering
services, acting as SAIPEM's subcontractor
March 2009 SAIPEM ITALY ALGERIA MLE FIELD DEVELOPMENT
USD 1,8 BILLION
SONATRACH/ENI the contract covers EPC on the naturaI gas gathering systems and processing
pIant and reIated export pipeIines. The faciIities wiII be abIe to process 350
miIIion cubic feet of gas per day and 35,000b/d of Iiquids
ENI took controI of a 75% share in the fieId after having acquired First CaIgary

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
May 2009 SAIPEM ITALY KAZAKHSTAN KASHAGAN FIELD DEVLP PHASE
ONE (HOOK UP)
USD 2,6 BILLION
AGIP KCO contract won in association with AKER SOLUTIONS for the hook-up and
commissioning of the offshore faciIities as weII as for the inshore compIetion
and prefabrication to be executed in the Kuryk Yard. The marine activities wiII
be carried out using 5 barges converted into temporary Iiving quarters & offices
as weII as temporary barges which Saipem refurbished under a preIiminary
contract
Saipem's share of the contract is USD 1 BiIIion
June 2009 SAIPEM ITALY ALGERIA GK-3 PIPELINE (pack 3)
USD 580M
SONATRACH package 3 covers 351km between Mechtatine and EI KaIa
the whoIe GK-3 pipeIine wiII run from Hassi R'MeI to EI KaIa on 784km (48")
JuIy 2009 SAIPEM ITALY ANGOLA KIZOMBA SATELLITES PJT ESSO EXPLORATION ANGOLA Scope : engineering, construction, transport & instaIIation of pipeIines,
umbiIicaIs, risers and subsea systems connecting the MavacoIa and CIohas
fieIds to the existing FPSO units at Kizomba A & B
In August 09 PONTICELLI announced that they received a contract for work
onshore + offshore hook-up, work wiII cover instaIIation of 750 tons of piping
In September AMEC informed that they wiII provide detaiIed design,
procurement and Iogistics support services, work to be carried out by Paragon
AngoIa with support from Amec/Houston (topsides modifications, new
production fIowIines with receiving, metering and pressure/surge controI
capabiIities.....
October 2009 SAIPEM ITALY QATAR QAFCO-IV EXPANSION PJT
USD 610M
QAFCO Scope : a urea unit 3850t/d + associated utiIities (urea granuIes storage,
materiaI handIing system, steam & power generation faciIites and aII
interconnections between Qafco-6, Qafco-5 and UFC-85
contract awarded to the same consortium who is presentIy carrying out Qafco-
V. Saipem in association with HYUNDAI
October 2009 SAIPEM ITALY NIGERIA BONGA NORTH-WEST FIELD
SUBSEA DEVELOPMENT
SHELL NIGERIA Saipem's contract incIudes engineering, procurement, fabrication, instaIIation
of 13km of production pipe-in-pipe fIowIines (10"-12"), 4km of 12" water
injection fIowIines + reIated production faciIities and the instaIaItion of 15km of
umbiIicaIs
October 2009 SAIPEM ITALY KUWAIT GAS COMPRESSORS AT GC 7, 8 &
21 - USD 123M
KOC The compressors wiII repIace existing units at GC7, 8 & 21, they wiII process 4-8
miIIion cubic feet a day of gas
SAIPEM has won the USD 123M contract, aIthough second-ranged bidder
November 2009 SAIPEM ITALY ITALY AQUILA FPSO
C 1 BILLION
ENI scope : conversion of an oiI tanker into a FPSO vesseI. It wiII have a storage
capacity of 700,000 barreIs and a production capacity of 12,000b/d
December 2009 SAIPEM ITALY PAPUA NEW
GUINEA
PNG LNG PROJECT
(Offshore PipeIine) USD 450M
EXXONMOBIL Scope : engineering, transportation & instaIIation of 407km 34" gas seaIine
connecting the Omati River LandfaII point to the onshore pIant
February 2010 SAIPEM ITALY MEXICO SALAMANCA & TULA CLEAN
FUELS PROJECT - USD 345M
PEMEX Scope : gasoIine desuIfurization units and amine regeneration units at both
refineries. The project wiII reduce the suIfur content of gasoIine produced at
those pIants
contract won against Samsung and ICA FIuor. LocaI content to be maximized
ApriI 2010 SAIPEM ITALY ABU DHABI SHAH GAS PROJECT (Shah
Processing PIant)
USD 1,9 BILLION
ADNOC The project wiII treat 1 biIIion cubic feet a day of sour gas
the package covers the engineering, procurement and construction of the gas
processing pIant
FLUOR/VECO are the Project Management Contractors
ApriI 2010 SAIPEM ITALY ABU DHABI SHAH GAS PROJECT (Shah SuIfur
Recovery Units) - USD 1,45 B
ADNOC The project wiII treat 1 biIIion cubic feet a day of sour gas
the package covers the engineering, procurement and construction of the
suIfur recovery unit
FLUOR/VECO are the Project Management Contractors
ApriI 2010 SAIPEM ITALY ABU DHABI SHAH GAS PROJECT (pipeIines
package ) - USD 196M
ADNOC The project wiII treat 1 BiIIion cubic feet a day of sour gas
The package covers engineering, procurement & construction of 250km of
pipeIines to transport gas, condensate and NGL from the Shah Gas PIant to
Habshan and Asab tie-in point
FLUOR/VECO are the Project Management Contractors

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
May 2010 SAIPEM ITALY INDIA BABRALA FERTILIZER PLANT
EXPANSION (urea package)
TATA CHEMICALS Scope : 3900t/d
SAIPEM seIected as technoIogy suppIier and EPCM contractor
May 2010 SAIPEM ITALY GABON ANGUILLE FIELD WELLHEAD
PLATFORM
TOTAL The pIatform caIIs for 1,050 tonne topside, 650 tonne jacket and 1,250 tonne
piIes. Fabrication work subcontracted to EIFFEL
June 2010 SAIPEM ITALY SURINAME PARAMARIBO REFINERY
EXPANSION PROJECT
USD 550M
STAATSOLIE The project wiII doubIe the capacity of the refinery, to 15,000b/d
SAIPEM seIected as EPC contractor in June 2010. AKER SOLUTIONS is the
Project Management ConsuItant, FEED don by CB&I LUMMUS
June 2010 SAIPEM ITALY KUWAIT GAS BOOSTER STATION BS-171
USD 900M
KOC The station wiII incIude three high and Iow pressure gas trains to produce 234
miIIion cubic feet a day of dry gas and 69,000b/d of condensates, the contract
incIudes aIso a pipeIine network from the gathering centers to the booster
station and an intermediate sIug catcher.
June 2010 SAIPEM ITALY POLAND SWINOUJSCIE LNG TERMINAL
USD 903M
POLISH LNG Scope : initiaI capacity of 5 BiIIion cubic metres per year
SAIPEM in consortium with TECHINT/ITALY and PBG/POLAND seIected as EPC
contractors
March 2009 SIIRTEC NIGI ITALY RUSSIA PORTOVAYA GAS TREATMENT
UNIT
GAZKOMPLEKTIMPEX Scope : the unit wiII dehydrate 170 miIIion cubic meters of naturaI gas per day
SIIRTEC NIGI wiII carry out the engineering, and wiII suppIy the required
materiaIs & equipment
the project is part of Nord Stream PipeIine
March 2007
(unofficiaI)
SNAM PROGETTI ITALY NIGERIA OLOKOLA LNG PROJECT OK LNG
(NNPC, CHEVRON, SHELL, BG)
Scope : two LNG trains with a capacity of 5,5 MiIIions t/y each. TECHNIP has
been seIected in March 2007 with SNAMPROGETTI to carry out the contract.
Contract not confirmed by Technip nor SnamProgetti
November 2007 SNAM PROGETTI ITALY QATAR QAFCO-V EXPANSION PROJECT
USD 3,2 BiIIion
QAFCO Scope : two ammonia pIants with a totaI production of 4600t/d and an urea pIant
with a capacity of 3850t/d
work wiII start in January 2008 ; the project wiII aIso incIude upgrade of existing
faciIities
SAIPEM/SNAM Ieader of the consortium incIuding HYUNDAI, contract share is C
1,4 BiIIion
May 2008 SNAM PROGETTI ITALY KUWAIT GAS BOOSTER STATION GS 160
USD 649 M
KOC The station wiII consist of two identicaI trains deIivering 250 miIIion cf/d of sour
gas. SNAMPROGETTI seIected in May, officiaI contract announced by Saipem in
June 208
JuIy 2007 TECHINT ITALY NETHERLANDS MAASVLAKTE LNG TERMINAL GATE TERMINAL
(Vopak/Gasunie)
the terminaI wiII have a capacity of 8-12 biIIion cm
Gate terminaI has seIected a consortium incIuding TECHINT/ITALY,
SENER/SPAIN, ENTREPOSE/France and VINCI GRANDS PROJETS for the EPC
contract. A finaI investment decision has been taken in December 2007, and the
engineering companies have received notice to proceed in January 08
June 2010 TECHINT ITALY POLAND SWINOUJSCIE LNG TERMINAL
USD 903M
POLISH LNG Scope : initiaI capacity of 5 BiIIion cubic metres per year
SAIPEM in consortium with TECHINT/ITALY and PBG/POLAND seIected as EPC
contractors
December 2007 TECNIMONT ITALY RUSSIA TOBOLSK PDH PLANT
USD 1 BiIIion
TOBOLSK POLIMER Scope : 510,000t/y of propane dehydrogenation based on UOP TechnoIogy
Tecnimont wiII act as EPC contractor, FLUOR is the project manager
Financing in pIace in Sept 09 (USD 154M), work to be compIeted mid-2012
instead of mid-2011
Signature of the EPC contract took pIace on December 3rd 2009, financing
through Sace/ItaIy and russian banks
January 2008 TECNIMONT ITALY VENEZUELA EL TABLAZO LOW DENSITY
POLYETHYLENE PLANT
POLINTER Scope : 350,000t/y based on BaseII TechnoIogy
Tecnimont signed a C 90M contract to provide basic engineering services and
the procurement of Iong Iead items, contract to be Iater converted into an EPC
contract
PoIinter is a Pequiven's subsidiary
January 2008 TECNIMONT ITALY BRAZIL ITAQI/MARANHAO & PECEM
POWER PLANTS - C 1080 M
MPX The first power station (coaI-fired) to be buiIt at Itaqi wiII have a capacity of
360mw, the second wiII be buiIt near Pecem : 720mw
MAIRE TECNIMONT has signed the two contracts, to be foIIowed by MAIRE
ENGINEERING DO BRASIL

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
June 2008 TECNIMONT ITALY GERMANY WILHELMSHAVEN LNG PLANT E.ON Scope : capacity of 10,7 BiIIion cubic meters
In June 2008 Tecnimont seIected as "preferred bidder"Ieader of a consortium
incIuding SOFREGAZ, VINCI GRANDS PROJETS and ENTREPOSE
CONTRACTING. A finaI decision has stiII to be taken (in JuIy/August) by the
cIient, DFTG, a company controIIed by E.ON
October 2008 TECNIMONT ITALY POLAND WIERZCHOWICE GAS STORAGE
EXPANSION - USD 526 M
PGNIG The storage wiII be increase from 500 MiIIion cubic meters to 1,2 BiIIion. The
contract has been awarded to a consortium incIuding PBG/POLAND,
TECNIMONT/ITALY, SOFREGAZ.F, PLYNOSTAV PARDUBICE/CZECH
REPUBLIC - Tecnimont's share of the contract is 42% (Euros 161M)
March 2009 TECNIMONT ITALY IRAN ASSALUYEH ESBR PLANT
USD 340 M
ASSALUYEH SADAF CHEMICAL CY Scope : capacity of 100,000t/y - PoIimeri Europa TechnoIogy
contract awarded to a consortium incIuding TECNIMONT/ITALY and
NARGAN/IRAN
ApriI 2009 TECNIMONT ITALY RUSSIA NOVY URENGOY POLYETHYLENE
PLANT
NUGCC (GAZPROM) Scope : 400,000t/y BaseII TechnoIogy
NUGCC = Novy Urengoy Gas ChemicaI CompIex
TECNIMONT has signed in ApriI 2009 a C 15M contract for the provision od
detaiIed engineering services and is negotiating other agreements reIevant to
the compIetion of the compIex
In May 2010 MAIRE TECNIMONT signed a C 100M contract for the provision of
equipment and materiaIs with associated faciIities and site assistance
June 2009 TECNIMONT ITALY IRAN SOUTH PARS PHASE 12 (EPC-3)
C 1,3 BiIIion
PETROPARS scope : a gas treatment pIant at Bandar Tombak with a capacity of 3 BiIIion
cubic feet per day
TECNIMONT has received the LOI in June, officiaI contract to be signed in JuIy
09, it wiII be executed with the IocaI companies NARGAN, DORRIZ, GAMMA
JuIy 2009 TECNIMONT ITALY ABU DHABI IGD PROJECT (HABSHAN 5 GAS
PROCESSING PLANT - USD 4,7 B
GASCO scope : engineering, procurement, construction and commissioning of the
foIIowing core units : Gas Processing Unit (2 BiIIion cf/d), SuIphur Recovery
Units (5000t/d), NGL Recovery unit (1,2 BiIIion cf/d). Contract won with
JGC/JAPAN, who is the Ieader of the consortium
In January 2010 KHARAFI/KUWAIT won a USD 700M subcontract and CCC a
USD 300M subcontract for civiI, mechanicaI & eIectricaI works.
May 2010 TECNIMONT ITALY ABU DHABI BOROUGE 3 PROJECT
(POLYOLEFINS PACKAGE)
USD 1,255 B
BOROUGE
(Adnoc/BoreaIis)
Scope : two poIyethyIene units, each with a capacity of 540,000t/y and two
poIypropyIene units, each with a capacity of 480,000t/y - BORSTAR technoIogy -
Contract won in association with SAMSUNG. TECNIMONT Ieader of the
consortium, its share of the contract is USD 910M for the two packages (see
hereunder)
May 2010 TECNIMONT ITALY ABU DHABI BOROUGE 3 PROJECT
(LDPE Package) - USD 400M
BOROUGE
(Adnoc/BoreaIis)
Scope : a Iow density poIyethyIene unit with a capacity of 350,000t/y -
LyondeIIBaseII technoIogy
Contract won in association with SAMSUNG. TECNIMONT Ieader of the
consortium, its share of the contract is USD 910M for the two packages (see
above)
January 2008 TECHNIP ITALY SINGAPORE TUAS BIODIESEL PLANT
USD 818 M
NESTE OIL Scope : capacity of 800,000t/y based on Neste TechnoIogy
TECHNIP has been seIected as contractor for the engineering, procurement &
management, work wiII start during the 1st haIf of 2008. The contract wiII be
executed by Technip in Roma and Singapore
in September 08 ROTARY ENGINEERING won the contract for the storage tanks
and JACOBS ENGINEERING wiII provide EPCM services for the Power Scope
Project (to deIiver utiIities to the dieseI faciIity from the adjacent Tuas Power
PIant)

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
June 2008 TECHNIP ITALY NETHERLANDS ROTTERDAM BIODIESEL PLANT
USD 1 BILLION
NESTE OIL Scope : capacity of 800,000t/y
TECHNIP/ITALY has been seIected as the project's main contractor. The
contract covers the engineering and the management of procurement and
construction activities, the project represents an investment of C 670m
August 2008 TECHNIP ITALY CANADA HORIZON EXPANSION PROJECT
USD 195 M
CANADIAN NATURAL RESOURCES
Ltd
The contract covers the engineering, procurement, suppIy of materiaIs &
equipment covering four new units : a gas recovery unit, a butane treating unit,
suIphur recovery faciIities and a carbon dioxide capture unit
Contract to be executed by Technip in Roma
October 2008 TECHNIP ITALY POLAND GDANSK REFINERY UPGRADING
(deasphaIting) - USD 90 M
GRUPA LOTOS Scope : soIvent deasphaIting unit with a caapcity of 180 tons per hour
Engineering & procurement contract to be executed by Technip in Roma
February 2009 TECHNIP ITALY EGYPT ALEXANDRIA DELAYED COKER
EXPANSION - USD 55 M
MIDOR The unit, based on ConocoPhiIIips technoIogy wiII have a capacity of 30,000b/d -
Technip/Roma's scope invoIves engineering, procurement and suppIy of
equipment & materiaIs on a Iumpsum basis
JuIy 2009 TECHNIP ITALY SAUDI ARABIA JUBAIL REFINERY
(Satorp Project)
Pack 2 - Conversion Unit
SAUDI ARAMCO
TOTAL
Scope : epc of the hydro and cataIytic cracking conversion process units.
Contract to be executed by Technip in ItaIy and France with assistance from the
group organization in the MiddIe East.
estimated contract vaIue USD 1,7B
JuIy 2009 TECHNIP ITALY SAUDI ARABIA JUBAIL REFINERY
(Satorp Project)
Pack 5A - Offsites & UtiIities
SAUDI ARAMCO
TOTAL
Scope : Offsites & UtiIities, interconnecting network & process controI for the
whoIe refinery
contract awarded to Technip with CTCI, estimated contract vaIue : USD 1,3 B
to be executed by Technip in Roma, in Paris with the support from the
organization in MiddIe East
June 2008 TECHNIP KTI ITALY POLAND LMG PROJECT - USD 789 M PGNIG the project invoIves the deveIopment of crude oiI & naturaI gas deposits in the
area of Lubitow, Miedzychod and Grotow : construction of near-borehoIe
instaIIations, gathering pipeIines connecting the weIIs to the LMG centraI
faciIity, construction of the LMG centraI faciIity as weII as oiI & gas pipeIines.
TECHNIP KTI won the contract in association with PBG/POLAND, THERMO
DESIGN ENG/CANADA and MAVERICK ENGINEERING
June 2010 TECHNIP KTI ITALY SWEDEN NYNASHAMM SULFUR RECOVERY
UNIT - USD 60 M
NYNAS Scope : capacity of 24 tonnes/day + a taiI gas treatment unit + offsite faciIities
and interconnecting piping with the units.
Technip KTI is now part of Maire Tecnimont
November 2009 ROMINSERV KAZAKHSTAN KAZAKHSTAN ATYRAU REFINERY
MODERNIZATION - USD 27M
KAZMUNAIGAZ Scope : the atmospheric and vacuum distiIIation units wiII be rebuiIt, project is
part of a compIete modernization project. Rominserv is a romanian contractor
August 2009 CB&I LUMMUS NETHERLANDS NETHERLANDS PERNIS REFINERY DIESEL
HYDROTREAT - USD 60M
SHELL part of a broader investment program to cost USD 500M
the unit wiII increase cIeaner-burning, Iow-suIphur fueIs production at the 400
thousand barreIs per day refinery.
Contract confirmed by CB&I on October 8th, contract vaIue USD 60M
September 2009 CB&I LUMMUS NETHERLANDS SERBIA PANCEVO REFINERY
MODERNIZATION - USD 70 M
NIS The modernization (cost C 396M) wiII incIude construction of new units and
modernization/revamping of existing units
The annuaI production of motor gasoIine wiII increase to 638,000 tonnes whiIe
production of Euro 5 dieseI fueI wiII inrease from 230,000 tonnes to 1,5 miIIion
work to start in 2010
CB&I's contract (USD 70M) covers detaiIed engineering, procurement services,
construction management & commisioning of the Hydrocracker/hydrotreater
unit Iicensed by CHevron Lummus & associated units, auxiIiary and offsites
November 2009 FLUOR NETHERLANDS NETHERLANDS BERGERMEER GAS STORAGE
PROJECT
TAQA ENERGY FIuor is responsibIe for the EPCM of the gas compression and treatment
faciIities as weII as modifications to the weII site. Contract foIIowed by the
HaarIem office. Commissioning during the second quarter of 2013
JuIy 2008 HEEREMA MARINE
CNTRACTORS
NETHERLANDS ANGOLA BLOCK 31 (PSVM PROJECT)
USD 1 BILLION
BP ANGOLA HMC has been awarded the URF-1 Risers and Production FIowIines Contract

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
August 2008 NACAP NETHERLANDS SAUDI ARABIA MANIFA PROJECT (PIPELINE
PACKAGE ) - USD 195 M
SAUDI ARAMCO Scope : 420km of oiI, gas and water pipeIines from 24" to 56"
NACAP won the contract against korean companies
ApriI 2009 NACAP NETHERLANDS SAUDI ARABIA RAS TANURA/RIYADH PIPELINE SAUDI ARAMCO Scope : 506km 30" pipeIine, 3 pump stations, metering systems, substation
buiIdings & maintenance. The Iine wiII run from Ras Tanura refnery to Riyadh.
JACOBS ENGINEERING in Reading/UK wiII deveIop the FEED, the LSTK
contract wiII be then transfered to NACAP SUDROHRBAU who wiII compIete
project desig, materiaI procurement, construction and commissioning activities
of the project
November 2009 :NACAP has officiaIIy signed the C 235M contract for the
engineering, procurement & construction
January 2008 SBM OFFSHORE NETHERLANDS BRAZIL P-57 PLATFORM
USD 1,2 BILLION
PETROBRAS Scope : the pIatform wiII have a capacity of 180,000b/d
The FPSO wiII be converted in Singapore usine one of SBM's very Iarge
carriers, topsides wiII be integrated in BraziI
SBM signed the USD 1,25 BiIIion in February
August 2009 SBM OFFSHORE NETHERLANDS EQUATORIAL
GUINEA
ASENG FPSO
USD 1,2 B
NOBLE ENERGY SBM OFFSHORE has signed an agreement for the Iease of the FPSO for the
Aseng FieId (ex benita). The FPSO wiII be based on the conversion of a VLCC
huII, it wiII have a processing capacity of 120,000b/d of Iiquids and a storage
capacity of 1,6 miIIion barreIs - formaI contract signed in October 2009
In March 2010 KEPPEL SHIPYARD won the USD 160M subcontract for
conversion work : accomodation bIock extensions, fIare tower, internaI turret,
topside moduIe supports & integration of topside moduIes
ApriI 2008 TECHNIP NETHERLANDS ROMANIA HYDROGEN PLANT AT
PETROMIDIA REFINERY - C 65M
ROMPETROL Scope : capacity of 40,000 cubic meters per hour
ROMINSERV, the generaI contractor of RompetroI, has awarded the contract to
Technip for the suppIy of technoIogy, engineering, equipment and technicaI
assistance for the instaIIation & commissioning
August 2008 TECHNIP NETHERLANDS RUSSIA KSTOVO ETHYLENE EXPANSION
PROJECT - EP-300 PJT
USD 284 M
SIBUR NEFTEKHIM The capacity wiII be expanded in two phases, the first from 260,000t/y to
360,000 and the second to 450,000t/y. - the ethyIene surpIus wiII feed the
RusvinyI project (Sibur-SoIvay) - contract officiaIIy confirmed by Technip earIy
October, contract vaIue C 45M covering detaiIed engineering, procurement &
suppIy of main equipment & materiaIs
October 2008 TECHNIP NETHERLANDS PORTUGAL SINES STEAMCRACKER
FURNACES - EUROS 35M
REPSOL Technip wiII suppIy two new furnaces that wiII expand the ethyIene capacity by
160,000t/y (from 410,000 to 570,000t/y). Technip in Zoetermeer wiII carry out the
contract : basic & detaiIed engineering, procurement & suppIy of materiaIs,
construction & commissioning
November 2009 TECHNIP NETHERLANDS NETHERLANDS ROTTERDAM HYDROGEN PLANT AIR PRODUCTS Air Products has signed a Iong-term suppIy contract with ExxonMobiI and wiII
buiId an hydrogen production unit at Rotterdam refinery, it wiII be buiIt by
Technip through the aIIiance between Air Products & Technip
March 2010 VERWATER-AUDEX NETHERLANDS NETHERLANDS ROTTERDAM TANK TERMINAL
USD 159 M
EURO TANK TERMINAL BV Verwater-Audex, a PEC Ltd/Singapore's affiIiate, has won the contract to buiId a
465,000m3 tank terminaI
ETT is owned by VitoI Tank TerminaI InternationaI
September 2007 AKER KVAERNER NORWAY NORWAY SKARV TOPSIDES
USD 360 M
BP Aker Kvaerner has won the contract for detaiIed engineering, procurement and
construction management assistance for the 16,000 topsides of the FPSO being
buiIdby SAMSUNG
JuIy 2008 AKER KVAERNER NORWAY ANGOLA BLOCK 31 PSVM PROJECT
(UmbiIicaIs) USD 67 M
BP ANGOLA The contract is for manufacturing and deIivery of 48 kiIometres of steeI tube
umbiIicaIs
February 2009 AKER KVAERNER NORWAY NORWAY KOLLSNES GAS PLANT UPGRADE
- USD 218 M
GASSCO EPC contract for AKER SOLUTIONS. engineering and procurement activities to
take pIace at OsIo, the contract incIudes fabrication and instaIIation of pre-
assembIy units, pipe-racks, mechanicaI work, piping tie-ins and instaIIation
work

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
May 2009 AKER SOLUTIONS NORWAY KAZAKHSTAN KASHAGAN FIELD DEVLP PHASE
ONE (HOOK UP)
USD 2,6 BILLION
AGIP KCO Contract won in association with SAIPEM
Scope : offshore hook-up, commissioning, assistance, onshore prefabrication,
Iogistic support and inshore hook-up work + engineering and job carding for
prefabrication and instaIIation and vesseIs preparation
AKER's share of the contract is USD 1,6 BiIIion
September 2009 AKER SOLUTIONS NORWAY NORWAY GOLIAT FIELD DEVELOPMENT
(subsea) - USD 395M
ENI Aker SoIutions's contract covers the engineering, procurement & construction
for eight four sIot subsea tempIates with manifoIds, 24 subsea trees, controI
systems, 20km of steeI tube umbiIicaI, a tie-in & connection system - Contract
to be executed from Aker Norway, deIiveries to start in 2011 untiI 2013
March 2010 AKER SOLUTIONS NORWAY NORWAY EKOFISK 2/4L JACKET CONOCOPHILLIPS EPC contract for AKER SOLUTIONS covering a pIatform jacket and a bridge
support jacket for the new Ekofisk accomodation pIatform- contract to be
executed by Aker in VerdaI
October 2009 BW OFFSHORE NORWAY BRAZIL PAPA TERRA FPSO
USD 1,3 BILLION
PETROBRAS BW OFFSHORE with QUIP CONSORTIUM received the Letter of Intent for the
FPSO. BW Offshore wiII convert the ULCC BW Nisa, huII conversion to be
carried out in China and topsides fabrication & integration at Quip's faciIity in
BraziI. The FPSO wiII have the capacity for handIing up to 180,000b/d
Chevron takes the FinaI Investment Decision in January 2010
AMEC/USA seIected by QUIP to perform the basic engineering services for the
topsides of the FPSO
JuIy 2008 SUBSEA 7 NORWAY ANGOLA BLOCK 31 PSVM PROJECT
(UmbiIicaIs) USD 460 M
BP ANGOLA Subsea 7's scope of suppIy comprises project management, engineering and
instaIIation services associated with the subsea infrastructure, incIuding
umbiIicaIs, pipeIine jumpers, fIexibIes and structures together with testing and
pre-commissioning services.
October 2009 TECHNIP NORWAY NORWAY GOLIAT FIELD DEVELOPMENT
(infieId pipeIines) - USD 294M
ENI Scope : suppIy & instaIIation of the infieId pipeIine systems incIuding fIexibIe
risers, cIad production fIowIines + instaIIation of the subsea production system
ApriI 2010 FOSTER WHEELER POLAND POLAND POLIANEC BIOMASS POWER
PLANT
GDF SUEZ Scope : 190mw, it wiII burn wood and agri-fueIs
FW has been awarded the contract for the design, suppIy & erection of the
pIant, it wiII be the worId Iargest biomass pIant
March 2010 POLIMEX MOSTOSTAL POLAND NETHERLANDS ROTTERDAM TANK TERMINAL
USD 70 M
DUTCH BOTLEK TANK TERMINAL BV Scope : capacity of 185,000m3 to store mineraI oiIs, Iiquid fueIs
PoIimex MostostaI wiII be responsibIe for design documentation, construction
works, prefabrication and instaIIation of tanks & pipeIines, commissioning.
Naftobudowa S.A wiII act as subcontractor
May 2009 SOMAGUE PORTUGAL PORTUGAL SINES LNG TERMINAL EXPANSION
EUROS 159 M
REN ATLANTICO scope : expansion of the storage capacity from 240,000cm to 390,000cm and
increase of the regasification capacity to 900,000cm/h and a minimum send-out
of 1,350,000cm/h
Somague has won the EPC contract, TGE GAS ENGINEERING GmbH is the
consuItant
March 2010 ROMINSERV ROMANIA ROMANIA NAVORADI HIGH DENSITY
POLYETHYLENE PLANT
EXPANSION
ROMPETROL Capacity of HDPE wiII be boosted from 60,000t/y to 100,000t/y
ROMINSERV wiII carry out the contract, MITSUI CHEMICALS wiII suppIy the
technoIogy
October 2009 ATOMSTROYEXPORT RUSSIA INDIA HARIPUR NUCLEAR PLANT NULEAR POWER CORP Scope : two 1,000mw reactors
ATOMSTROYEXPORT has been awarded the contract, work to start in January
2010
May 2008 E4 GROUP RUSSIA RUSSIA KRASNODAR POWER PLANT TGK-8 scope : 400mw
E4 GROUP seIected as generaI contractor, MHI/JAPAN has received the
subcontract to provide the gas turbine
August 2008 E4 GROUP RUSSIA RUSSIA NYAGANSKAYA and TYUMEN
TPP2 PROJECTS
usd 695 m
TGK-10
FORTUM
1) Nyaganskaya thermaI power pIant wiII have a capacity of 1200mw (3x400mw),
to be buiIt in 3 phases, the first two ones to be commissioned in 2011, the third
in 2012 - contract vaIue USD 567,5 M - 2) Tyumen TPP-2, construction of a fifth
unit - contract vaIue USD 128,2M
E4 Group officiaIIy seIected as EPC contractor for Nyagan in JuIy 2009.
June 2009 NN-AEP RUSSIA RUSSIA VOLGODONSK NUCLEAR UNITS
3&4
USD 4,8 BILLION
ENERGOATOM Construction of a third and fourth reactor (each 1000mw)
contract awarded to NIZHNIY NOVGOROD ATOMENERGOPROEKT (NN-AEP)

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
February 2008 STROYTRANSGAZ RUSSIA TURKMENISTAN MALAY-BAGTYYARLIK GAS
PIPELINE - USD 585 M
TURKMENGAS Part of the Turkmenistan-China PipeIine, the contract covers a 188km gas Iine
as weII as a gas purifying and dehydrating faciIity and a gas measuring station
October 2008 STROYTRANSGAZ RUSSIA SYRIA ARAB GAS PIPELINE PHASE II
USD 58 M
SYRIAN GAS COMPANY Scope : 62km diam 36" from the turkish-syrian border to AIeppo
STROYSTRANSGAZ's contract incIudes aIso the construction of a metering
station (3 miIIion cm/d of gas), scada, controI instrumentation..
December 2008 STROYTRANSGAZ RUSSIA GREECE NEA MESSAMBRIA COMPRESSOR
STATION - C 53,4 M
DESFA The compressor station wiII be buiIt aIong the KuIata-Athens gas pipeIine. In
addition to the EPC contract, Stroytransgaz wiII be responsibIe for assembIing
equipment, piping connections, instrumentation, cathorid protection - Work to
start during the first quarter of 2009 for commissioning 26 months Iater -
contract won in associatin with Prometheus Gas SA.
May 2010 TECHNOPROMEXPORT RUSSIA RUSSIA URENGOI POWER PLANT
USD 855M
OGC-1 capacity 450mw steam gas
TECHNOPROMEXPORT seIected as generaI contractor
February 2009 ACCIONA AGUA SPAIN AUSTRALIA ADELAIDE DESALINATION PLANT
USD 868 M
MINISTRY The pIant wiII deIiver 150,000 cubic meters of water per day, to be Iocated at
Port Stanvac
a consortium named AdeIaideAqua has been named preferred bidder, it
incIudes ACCIONA AGUA/SPAIN and the IocaI McCONNELL DOWELL,
ABIGROUP CONTRACTORS and UNITED UTILITIES
February 2010 ACS SERVICIOS SPAIN MEXICO MANZANILLO POWER STATION
MODERNIZATION - USD 981M
CFE the power pIant wiII be converted to run on naturaI gas
contract won in association with GRUPO COBRA and INELECTRA. Turbines to
be suppIied by GENERAL ELECTRIC
January 2008 COBRA SPAIN CHILE MEJILLONES POWER PLANT SUEZ ENERGY
ANTOFAGASTA MINERALS
Scope 150 mw
SUEZ wiII begin soon construction of its second coaI-fired power pIant in
MejiIIones, COBRA is the EPC contractor
June 2009 DRAGADOS SPAIN MEXICO LA CANGREJERA AROMATICS
PLANT EXPANSION -1ST PHASE
PEMEX PETROCHEMICALS The first phase wiII cover construction of a pIatformer unit and other works
necessary for the integration of new units that wiII doubIe paraxyIene capacity
the contract has been awarded to a consortium incIuding DRAGADOS, ACS
SERCICES and SENERMEX ENGINEERING
June 2009 DURO FELGUERA SPAIN VENEZUELA TERMOCENTRO COMBINED
CYCLE POWER PLANT
USD 1,5 BiIIion
ELECTRICIDAD DE CARACAS the pIant wiII be Iocated in Paz CastiIIo - Duro FeIguera wiII execute the contract
as soIe contractor
the first gas turbine wiII come into operation earIy 2011, the four turbines
equipping the pIant wiII come into operation under a simpIe cycIe basis during
the second phase of 2011, then into combined cycIe in december 2013
February 2008 FLUOR SPAIN SPAIN CARTAGENA REFINERY
EXPANSION -
OFFSITES & UTILITIES - USD 1,3B
REPSOL FIuor has been awarded the project management contract and wiII provide
enginering, management of procurement and construction of the offsites and
utiIities. The contract wiII be executed by FLUOR in Madrid and in
GIiwice/PoIand. TR/SPAIN is the EPC contractor for the main process units
ApriI 2008 FLUOR SPAIN SPAIN EL MUSEL LNG TERMINAL
USD 320 M
ENAGAS The faciIity wiII incIude two 150,000 cubic meter LNG tanks aIong with a
regasification send-out capacity of 800,000cm per hour
FLUOR's contract vaIue : USD 320M
March 2008 FOSTER WHEELER SPAIN SPAIN CARTAGENA DELAYED COKER
COMPLEX
REPSOL The coking compIex consists of a 53,000b/d deIayed coker unit, a gas
concentration unit and a 90,000b/d vacuum distiIIation unit
FW IBERIA has been awarded the contract for the detaiIed engineering,
procurement services and construction management
November 2007 IBERDROLA INGENIERA SPAIN ALGERIA KOUDIET EDRAOUCH POWER
PLANT - USD 2,1 BiIIion
SONELGAZ Scope : 1200mw
GENERAL ELECTRICS/USA with IBERDROLA/SPAIN has won the construction
contract
IBERDROLA wiII be responsibIe for site deveIopment, design, equipment
procurement, construction and assembIy of the pIant
ApriI 2009 IBERDROLA INGENIERA SPAIN LITHUANIA COMBINED CYCLE POWER PLANT -
USD 432 M
LIETUVOS ELEKTRINE AB Scope : 444mw
IBERDROLA has won the EPC contract against LAVALIN, ALSTOM and
SIEMENS. The turbines wiII be suppIied by GE

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
JuIy 2009 IBERDROLA INGENIERA SPAIN VENEZUELA CUMANA POWER PLANT
ANTONIO JOSE DE SUCRE PJT
PDVSA Scope : 1000mw
Turnkey contract, contract won in association with EIecnor (60/40)
November 2009 INITEC ENERGIA SPAIN UZBEKISTAN NAVOI THERMAL POWER PLANT
USD 505 M
UZBEKENERGO Scope : 472mw
INITEC ENERGIA, who is the main contractor, has awarded the power
generation system to MHI/JAPAN. Construction work to be undertaken by the
turkish company CALIK HOLDING
December 2007 ISOLUX CORSAN SPAIN ARGENTINA EL RIO TURBIO POWER PLANT
USD 670 M
YACIMIENTO CARBONIFERO Scope : 240mw
IsoIux Corsan has won the contract in association with the IocaI TECNA
November 2009 SADYT SPAIN ISRAEL ASHDOD DESALINATION PLANT
C 330 M
MEKOROT the reverse osmosis pIant wiII produce 100 miIIion cubic meters of desaIinated
water per year.
SADYT is part of Sacyr VaIIehermoso Group
February 2007 TECNICAS REUNIDAS SPAIN SPAIN CARTAGENA REFINERY
EXPANSION - USD 4,7 BiIIion
REPSOL Scope : the capacity of the refinery wiII be doubIed, to 220,000b/d : atmospheric
distiIIation unit (5,5MiIIion t/y) - Hydrocracking unit (2,5 MiIIion t/y) - -
desuIphurisation unit (3 miIIion t/y) - isomerization unit (300,000t/y), hydrogen
pIant + additionaI smaIIer units, cogeneration pIant, storage and
interconnection;;;;;
REPSOL is doing engineering and wiII start with the EPC phase in November
2007
RepsoI approved the C 3,2 BiIIion investment in January 08
August 2007 TECNICAS REUNIDAS SPAIN PORTUGAL SINES REFINERY UPGRADING
USD 910 M
GALP ENERGIA Scope : a 45,000b/d hydrocracker, a 15,000b/d vacuum distiIIation unit, a
22,000b/d vacuum fIash unit
TECNICAS REUNIDAS has received the Letter of Intent in august 2007
In December 2009 TR and GaIp Energia have reached a finaI agreement on the
conversion to a Iump sum turnkey contract
October 2007 TECNICAS REUNIDAS SPAIN RUSSIA KHABAROVSK REFINERY
EXPANSION - USD 800 M
ALLIANCE OIL COMPANY The project wiII boost the capacity of the refinery from 3,2 miIIion t/y to 3,5M :
hydrocracker, hydrotreatment, hydrogen, amine regeneration, acid water,
suIphur recovery units
Tecnicas Reunidas has received the Letter of Intent in October, formaI contract
signed in November
In february 2008, FOSTER WHEELER/UK announced that they have been
awarded the project management consuItancy contract
May 2008 TECNICAS REUNIDAS SPAIN GREECE ELEFSIS REFINERY UPGRADE
USD 1,56 BILLION
HELLENIC PETROLEUM Scope : an hydrocracker (40,000b/d) - a fIexicoker (20,000b/d) - a vacuum
distiIIation unit (45,000b/d) - a hydrogen unit (120,000cm/h)
HELPE signed the contract with TR for the execution of the project, TR has
started FEED verification to be foIIowed by engineering work, the project is
Iisted on TR order book
June 2008 TECNICAS REUNIDAS SPAIN NETHERLANDS MOERDIJK COMBINED CYCLE
POWER PLANT
ESSENT Scope : 426mw
TECNICAS REUNIDAS and GE ENERGY wiII carry out the FEED during 8
months and wiII execute the EPC contract, TECNICAS REUNIDAS's share of the
contract : C 150M
August 2008 TECNICAS REUNIDAS SPAIN SAUDI ARABIA MANIFA PROJECT (POWER
PACKAGE) - USD 500 M
SAUDI ARAMCO Scope : 400mw combined cycIe with 2 gas turbines and one steam turbine
Turnkey contract for TR
Dec 09 : FOSTER WHEELER SPAIN has been awarded the contract to design &
suppIy heat recovery generators and steam generators
August 2008 TECNICAS REUNIDAS SPAIN HUNGARY SZAZHALOMBATTA
HYDROCRACKING COMPLEX
MOL HUNGARIAN OIL & GAS Scope : a hydrocracking unit of high pressure of 1,5 miIIion t/y - an unconverted
oiI vacuum distiIIation unit, a gas recovery and LPG treatment unit, amine
regeneration and sour water stripping units. TR wiII execute the open book
estimate phase with an option for EPC LSTK conversion
October 2008 TECNICAS REUNIDAS SPAIN PORTUGAL SINES POLYETHYLENE PLANT REPSOL Part of the Sines PetrochemicaI Expansion Project - the poIyethyIene pIant wiII
have a capacity of 300,000t/y (Ineos TechnoIogy)
on its website TR is Iisting the project in its reference Iist as EPCM contract

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
November 2008 TECNICAS REUNIDAS SPAIN AUSTRALIA SOUTHERN SEAWATER
DESALINATION PLANT - USD 620M
WATER CORPORATION The pIant wiII have a capacityy of 50 gigaIitres per year, to be expandabIe to 100
gigaIitres.
TR Ieader of a consortium incIuding VALORISA AGUA, a subsidiary of SACYR
VALLEHERMOSO, AJ LUCAS and WORLEYPARSONS. The consortium is caIIed
Southern Seawater AIIiance
December 2008 TECNICAS REUNIDAS SPAIN SPAIN GRANADILLA & ARINAGA LNG
TERMINALS - C 490 M
GASCAN Each terminaI wiII cover a 150,000 cubic meters/hour regasification pIant, a
150,000I3 storage and a jetty. GranadiIIa Iocated in Tenerife, Arinaga in Gran
Canaria
January 2009 TECNICAS REUNIDAS SPAIN ABU DHABI SAS PROJECT - PACKAGE B
USD 1,3 BILLION
ADCO TR's contract (60% share) wiI cover oiI production fIowIines, primary separation
through centraI & sateIIite degassing faciIities, gas compression, transfer Iines,
oiI pumping faciIities, main oiI pipeIines (incIuding 107km 16") and produced
water handIing. Contract won in association with CCC who wiII be invoIved in
construction works + connecting pipeIines to Asab.
Once compIeted SahiI capacity wiII increase from 55,000b/d to 75,000b/d whiIe
Shah's capacity wiII increase from 50,000b/d to 60,000b/d
June 2009 TECNICAS REUNIDAS SPAIN SAUDI ARABIA JUBAIL REFINERY
(Satorp Project)
Pack 1 - DistiIIation/Hydrotreat
SAUDI ARAMCO
TOTAL
Scope : Crude/Vacuum, Naphtha Hydrotreating, High Pressure
HydrodesuIphurizers, Low Pressure HydrodesuIphurizers, Hydrogen
Generation Units. Units to be arranged in two trains
contract vaIue C 1,2 BiIIion
November 2009 TECNICAS REUNIDAS SPAIN MOROCCO MOHAMMEDIA REFINERY
TOPPING 4 PROJECT
SAMIR Scope : a new crude distiIIation unit (4 miIIion t/y capacity), a kerosene
treatment unit and revamping of a LPG Merox unit
TR won the design engineering contract in JuIy 2008, contract coverted into a
Iump sum turnkey contract in November 2009 - Commissioning in March 2012
ApriI 2010 : TEKFEN/TURKEY has been awarded a USD 54M subcontract for
buiIding & instaIIation works of the topping unit
November 2009 TECNICAS REUNIDAS SPAIN TURKEY IZMIT REFINERY UPGRADING
PROJECT - USD 1,5 B
TUPRAS Scope : an hydrocracker, vacuum unit, naphtha hydrogenation, dieseI
desuIfurization, hydrogen, suIphur recovery, amine regeneration, sour water
stripping unit
The contract has been awarded to TR under an open book modeI, with future
conversion into a Iump sum turnkey contract
December 2009 TECNICAS REUNIDAS SPAIN PERU TALARA REFINERY EXPANSION
USD 1,2 B
PETROPERU The capacity wiII be boosted to 95,000b/d from 62,000b/d : modification of
existing units + addition of new units such as dieseI and naphtha hydrotreating,
fIexicoker, vacuum distiIIate, cataIytic reformer, hydrogen, suIfuric acid, amines
pIant and cogeneration
TR seIected for the FEED cum EPC in december, feed phase untiI 2012.
Commissioning in 2015
ABSG CONSULTING wiII provide project management consuItancy services
ApriI 2010 TECNICAS REUNIDAS SPAIN ABU DHABI SHAH GAS PROJECT (Gas
Gathering Package) - USD 463M
ADNOC The project wiII treat 1 BiIIion cubic feet a day of sour gas - Scope : Iump sum
turnkey contract covering the design & detaiIed engineering, suppIy of aII
equipment & materiaIs, construction ffor the pipeIines interconnecting the weIIs
and the centraI processing faciIities (16" inter-pad Iines and 24" transfer Iines),
incIuding weII pads and receIving station
TR wiII provide engineering, procurement & construction for the Shah Gas
June 2010 TECNICAS REUNIDAS SPAIN BOLIVIA MARGARITA GAS PROCESSING
PLANT - USD 500M
REPSOL YPF / BRITISH GAS
PAN AMERICAN ENERGY
the gas pIant wiII have a capacity of 6 miIIion cubic meters of gas daiIy
TR wiII work with carry out the contract with IocaI companies
ApriI 2009 NCC SWEDEN SWEDEN NYNASHAMN LNG TERMINAL
USD 33M
NYNASHAMN GASTERMINAL AB LNG wiII arrive by cargo ships to the terminaI where it wiII be kept in stock at
the terminaI in a so-caIIed fuII containment tank with a capacity of 20,000cm.
NCC has the construction contract for the terminaI, the tank itseIf wiII be buiIt
by CRYO AB. DYWIDAG INTERNATIONAL was awarded in December 08 the
design & engineering contract for the storage tank

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
September 2009 AKER SOLUTIONS UK UK GAIA BIOMASS POWER PLANT
USD 325M
GAIA POWER TEES VALLEY Ltd The pIant wiII burn recycIed wood chippings to generate 50mw of power
pIanning permission during the Iast quarter of 2009, contract to be foIIowed by
Aker in Stockton on Tees
January 2007 CBI UK IRAN BID BOLAND GAS PROJECT
(STORAGE & PIPELINE PORTION)
USD 500 M
NIGC CBI JOHN BROWN seIected with the IocaI TEHRAN JONOOB for the storage
and pipeIine portion of the project, contract has been officiaIIy signed in january
2007. The iranian company is the Ieader
October 2008 CBI UK UK PORTLAND GAS PROJECT
GBP 500 M
PORTLAND GAS The project invoIve a major gas storage faciIity with the creation of 14
underground storage caverns totaIIing 35 biIIion cubic feet of naturaI gas
CB&I has been awarded the first phase of the EPC contract, to be carried out by
CBI in Paddington//London
August 2007 FLUOR UK PORTUGAL PORTO REFINERY UPGRADING
USD 455 M
GALP ENERGIA Scope : a 30,000b/d vacuum distiIIation unit, a 12,000b/d visbreaker, a 12,000b/d
vacuum fIsh unit
In October 2007 FIuor confirms that it has been awarded the FEED and earIy
procurement services, the contract wiII be carried out by FIuor in CamberIey
and in Madrid with the support of portuguese companies.
In February 2009 FIuor confirms the EPC contract with USD 400M booked in the
Iast quarter of 2008
October 2008 FLUOR UK RUSSIA NOYABRSK GAS PROCESSION
EXPANSION PROJECT
SIBUR FIuor's project scope incIudes the EPCM services for the expansion and
upgrade of the Vyngayakhinskaya compressor station, the compressor station
3 of the Nizhnevartovsk gas processing compIex, and the Vyngapurovsky gas
processing pIant and associated pipeIines, as weII as a Iiquefied petroIeum gas
storage and Ioading faciIity in Noyabrsk.
Contract to be executed by FLUOR in CamberIey/UK and ManiIIa/PhiIippines,
together with russian design institutes
STROYTRANSGAZ wiII take part in the construction
September 2009 FLUOR UK ITALY PRIOLO POWER PLANT
RECONSTRUCTION - USD 150M
ISAB ENERGY FIuor has won the engineering, procurement & construction contract for the
reconstruction of one of its two 266mw combined cycIe gas turbine power
trains in PrioIo/SiciIy, damaged one year ago. Contract foIIowed by FIuor in
CamberIey
March 2009 FOSTER WHEELER UK INDIA PARADIP REFINERY INDIAN OIL CORP Capacity : 15 MiIIion t/y
FW wiII undertake the roIe of Managing Project Management ConsuItant for a
major part of the project and wiII execute EPCM for 15 process units + offsites &
utiIities
FW's scope incIudes the crude distiIIation, reforming, aIkyIatio and butane
isomerisation units.
FW was awarded the FEED in 2007 - Contract to be executed from Reading/UK
and from India (DeIhi/KoIkata)
March 2010 JACOBS ENGINEERING UK UK STUBLACH STORAGE ABOVE
GROUND WORKS
STORENGY JACOBS wiII design and instaII new gas compression, gas treatment faciIities
and utiIities for the storage project
contract to be foIIowed by Jacobs in Manchester
JuIy 2007 MW KELLOGG UK NORWAY KARSTO GAS TREATMENT
EXPANSION - USD 175 M
STATOIL MW KeIIogg has been awarded the detaiIed engineering contact, he was the
main contractor on the three previous expansion stages. The project, known as
KEP2010, aims to make the faciIities more robust for safe and efficient
operations
March 2008 PETROFAC UK SYRIA JIDAR GAS PROCESSING
FACILITIES
USD 454 M
HAYAN PETROLEUM Petrofac has received the Letter of Intent in March 08, the contract covers EPC
of the gas processing faciIities + LPG recovery system, LPG Storage and
Ioading faciIity, gas gathering & coIIection systems, sateIIite gathering stations,
fIowIines, gathering pipeIines, utiIities & offsites
ApriI 2008 PETROFAC UK SYRIA EBLA GAS PROJECT
USD 477 M
PETROCANADA The EbIa pIant wiII be designed to produce 88 MiIIion cf/d of gas, 150t/d of LPG.
The project incIudes aIso pipeIines, gas gathering station fIow Iines and weII
sites

Award date Contractor


Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
August 2008 PETROFAC UK EGYPT KHALDA 5th GAS PROCESSING
TRAIN
KHALDA PETROLEUM The new train wiII expand the totaI capacity by 100 miIIion cf/d of gas to 810
miIIion cf/d and 31,000b/d of condensate - PETROFAC's contract covers
engineering & procurement services, to be converted into a fuII EPC within the
next two/four months
November 2008 PETROFAC UK KUWAIT PIPELINE BETWEEN BS 131 &
MINA AL AHMADI - USD 543M
KOC Scope : 140km diam 40" pipeIine running from Booster Station 131 and Mina AI
Ahmadi LPG pIant
Petrofac in charge of engineering design, procurement, construction and
commissioning
January 2009 PETROFAC UK ABU DHABI SAS PROJECT - PACKAGE A
USD 2,3 BILLION
ADCO Petrofac's contract covers the Asab FieId : upgrading of the faciIity's capacity
to accept production from SahiI, Shah and other fieIds and to upgrade the
associated utiIities and water handIing faciIities. Once compIeted the
production at Asab wiII increase from 280,000b/d to 310,000b/d
February 2009 PETROFAC UK SAUDI ARABIA KARAN GAS PROJECT
(cogeneration/utiIities) USD 500M
SAUDI ARAMCO Scope : cogeneration unit, utiIities
Petrofac wiII aIso upgrade the pIant's process controIs, eIectricaI systems and
support faciIities
March 2009 PETROFAC UK ALGERIA EL MERK FIELD DEVLPT
(CPF Package) - USD 2,2 B
SONATRACH / ANADARKO Scope : the CPF capacity wiII be 98,000b/d of oiI, 29,000 b/d of condensates,
31,000b/d of LPG with an NGL train (600 MiIIion cf/d) + reinjection faciIities
EPC contract for Petrofac
In May 2009 ORASCOM CONSTRUCTION INDUSTRIES/EGYPT has been
awarded the civiI and structuraI steeI works
March 2010 PETROFAC UK QATAR MESAIEED & DUKHAN GAS
SWEETENING PROJECTS
USD 650 M
QATAR PETROLEUM Scope : Messaieed : a 750MMcf/d acid gas removaI unit, upgrading of a suIphur
recovery unit, an amine sweetening unit, a fIare gas system - Dukhan : a 450
MMcf/d acid gas removaI unit
work to commence shortIy with compIetion within 38 months
May 2009 ZAKHEM INT
CONSTRUCTION
UK LIBERIA BUSHROD PRODUCT STORAGE
TERMINAL EXPANSION -
USD 25M
LIBERIA PETROLEUM REFINING CY Scope : construction of 3 new tanks and piping network
EPC contract for ZAKHEM

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES


Last Update Contractor
Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
February 2009 ASTRA EVANGELISTA ARGENTINA URUGUAY LA TEJA REFINERY
DESULFURIZATION PROJECT
USD 300 M
ANCAP Scope : a dieseI desuIfurisation unit based on HaIdor Topsoe technoIogy and
a gasoIine desuIfurisation unit based on Axens technoIogy
ASTRA EVANGELISTA has been seIected against TECNICAS REUNIDAS and
JANTESA/VENEZUELA. Work starting in February 09
March 2010 ALUSA BRAZIL BRAZIL COMPERJ REFINERY (UHC
PORTION) - USD 824M
PETROBRAS UHC = cataIytic hydrocracking unit
epc contract
JuIy 2008 CAMARGO CORREA BRAZIL BRAZIL REPAR REFINERY UPGRADING
(DeIayed Coker) - USD 1,5 B
PETROBRAS the deIayed coker wiII have a capacity of 5,000 cm/d
Camargo Correa wiII carry out the contract in association with Promon, work
wiII take 3 years and a haIf
December 2009 CAMARGO CORREA BRAZIL BRAZIL ABREU E LIMA REFINERY
(deIayed coker units) USD 1,9 B
PETROBRAS Scope : deIayed coker units incIuding substations and caustic regeneration
sections. Contract won in association with CNEC ENGENHARIA (vaIue USD
1,9B)
JuIy 2008 INTERPAR BRAZIL BRAZIL REPAR REFINERY UPGRADING
(Interconnections) - USD 1,4 B
PETROBRAS Scope : interconnections between the coker and the other units + storage
faciIities, utiIities
INTERPAR is a consortium incIuding SETAL, MENDES Jr and MPE
March 2008 MAIRE TECNIMONT BRAZIL BRAZIL VITTORIA GAS TREATMENT
PLANT
USD 241 M
PETROBRAS The pIant wiII have a capacity of 2,5 miIIion cubic meters per day. The contract
wiII be carried out by Maire Tecnimont with AIusa and MPE (speciaI purpose
company)
October 2008 MAIRE TECNIMONT BRAZIL BRAZIL PECEM II POWER STATION
USD 343 M
MPX ENERGIA Scope : 360mw
preIiminary contract signed, formaI contract to be signed by the end of the
month
August 2009 ODEBRECHT BRAZIL ARGENTINA LA PLATA REFINERY CCR PLANT
USD 348 M
YPF The new continuous CataIytic Reformer pIant wiII aIIow an increase of
premium fueI from 6 MiIIion m3 to 8 miIIion m3, the pIant wiII aIso produce
200,000t/y of aromatic compounds and 15,000t/y of hydrogen
December 2009 ODEBRECHT BRAZIL BRAZIL ABREU E LIMA REFINERY
(hydrotreat & atmospheric
distiIIation units)
USD 2,6 B
PETROBRAS Odebrecht with CONSTRUTORA OAS has won two packages : 1) dieseI
hydrotreating, naphtha hydrotreating, hydrogen generation for USD 1,8B
2)atmospheric distiIIation units for USD 858M
The offsites pipeIines package connecting the refinery to the seaport has been
awarded to CONDUTO-EGESA, contract vaIue USD 348M
September 2008 QUEIROZ GALVAO BRAZIL BRAZIL P 55 PLATFORM
USD 845M
PETROBRAS P-55 wiII be instaIIed in Roncador fieId - the pIatform wiII have a production
capacity of 180,000b/d
The 845M contract has been awarded to a consortium incIuding QUEIROZ
GALVANO, IESA and UTC ENGENHARIA
October 2009 QUIP CONSORTIUM BRAZIL BRAZIL PAPA TERRA FPSO
USD 1,3 BILLION
PETROBRAS BW OFFSHORE with QUIP CONSORTIUM received the Letter of Intent for the
FPSO. BW Offshore wiII convert the ULCC BW Nisa, huII conversion to be
carried out in China and topsides fabrication & integration at Quip's faciIity in
BraziI. The FPSO wiII have the capacity for handIing up to 180,000b/d
March 2008 SKANSKA BRAZIL BRAZIL REFAP HDS UNIT
USD 150 M
PETROBRAS Scope : a 5,000cm/d hydrodesuIfurization unit at AIberto PasquaIini refinery
(Refap)
SKANSKA LATIN AMERICA's contract covers detaiI engineering, purchasing,
construction, eIectro-mechanicaI instaIIation & start-up
JuIy 2009 SKANSKA BRAZIL BRAZIL REFAP REFINERY UPGRADING
(interconnections) - USD 100M
PETROBRAS Scope : partiaI engineering, construction, procurement, eIectromechanicaI
assembIy of the interconnections Iinking the gasoIine hydrodesuIfurization
unit with the rest of the refinery. Work to start in August
March 2010 SKANSKA BRAZIL BRAZIL COMPERJ REFINERY (DAV
PORTION) - USD 623 M
PETROBRAS Scope : Atmospheric Vacuum DistiIIation 150,000b/d
contract won in association with PROMON and ENGEVIX
SKANSKA's share is USD 250M, Ieader of the consortium, responsibIe for
design, detaiIed engineering executions and construction of the faciIities,
procurement of materiaI & equipment
March 2009 SUBSEA 7 BRAZIL BRAZIL TAMBAU URUGUA & P-56 DEVPT
USD 200 M
PETROBRAS The Tambau Urugua scope is to engineer, instaII and commission two 12"
rigid steeI gas fIowIines (14,5km Iong) and associated subsea equipment.
The P-56 scope is to engineer, procure, instaII and commission two 12" rigid
steeI oiI export pipeIines (13km Iong), connecting the P56 pIatform to the P-38
FPSO and one 10" rigid steeI gas export pipeIine (8,6km) from the P-56 to the
P-51 pIatform. The pipeIines and pipeIine end terminations wiII be suppIied by
SUBSEA 7.

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES


Last Update Contractor
Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
October 2009 SUBSEA 7 BRAZIL BRAZIL RONCADOR FIELD (SUBSEA)
USD 200M
PETROBRAS Scope : one 12" gas export Iine (38,7km Iong), one 12" oiI export Iine (42km
Iong) connecting the P55 pIatform to the PRA-1 PIatform, incIuding
procurement & instaIIation of associated subsea equipment
March 2010 TECHINT BRAZIL BRAZIL COMPERJ REFINERY (DELAYED
COKER ) - USD 1 BILLION
PETROBRAS Techint in association with A.GUTTIEREZ seIected by Petrobras for the
deIayed coker,
November 2009 AKER SOLUTIONS CANADA CANADA OAKVILLE POWER PLANT
USD 380M
TRANSCANADA Scope : 900mw naturaI gas-fired combined cycIe power pIant
Aker SoIutions with HDR Corp wiII execute engineering, procurement and
construction work, commissioning by the end of 2013
June 2010 AKER SOLUTIONS CANADA RUSSIA BRATSK CHLORINE DIOXIDE
PLANT - USD 18M
ILIM GROUP The pIant wiII be buiIt at IIim's puIp & paper miII, capacity 15t/d. Contract to be
executed by Aker in Vancouver with support from the Moscow office
June 2008 COLT WORLEYPARSONS CANADA CANADA REGINA REFINERY EXPANSION
USD 1,9 BiIIion
CCRL expansion of the refinery by 30% to 130,000b/d : addition of a fIuid cataIytic
cracker compIex, new storage faciIities, revamping of severaI units
COLTWORLEYPARSONS has been awarded the contract to provide
engineering, procurement and construction management services.
The program manager is InternationaI AIIiance Group (IAG), a subsidiary of
Triten Corporation, Mustang Engineering to provide detaiIed design services
to IAG
ApriI 2008 HORTON CBI CANADA CANADA VANCOUVER LNG PEAK SHAVING
PROJECT - USD 150 M
TERASEN GAS Horton CBI's contract covers the engineering, procurement & construction of
a 1,5 BiIIion cubic feet LNG storage tank, the Iiquefaction and regasification
systems and aII reIated pIan structures and systems
August 2008 LAVALIN CANADA SOUTH AFRICA KOEBERG PBMR
DEMONSTRATION POWER PLANT
USD 242M
PBM Phase II of the PebbIe Bed ModuIar Reactor Demonstration Power PIant
It wiII suppIy about 165 Mwe
SNC LAVALIN and MURRAY & ROBERTS wiII carry out the engineering,
procurement and construction.
PBMR is owned by Eskom, the South African IndustriaI DeveIpt Corporation,
the government and Westinghouse
October 2008 LAVALIN CANADA MEXICO BAJA SULPHURIC ACID PLANT MINERA Y METALURGICA DEL
BOLEO
capacity 2400t/d
part of a mining & processing compIex to produce copper & cobaIt
June 2009 LAVALIN CANADA ALGERIA HAMRA GAS PROCESSING
FACILITIES - USD 1,09 B
SONATRACH LavaIin's contract caIIs for a gas treatment compIex incIuding infrastructure to
coIIect raw gas at 4 fieIds (Rhourde Nouss CentraI, Rhoude Nouss South/East,
Rhourde Adra and Rhourde Adra South), a naturaI gas processing faciIity and
a faciIity to process and reinject carbon dioxide into gas fieIds.
September 2009 LAVALIN CANADA IRAQ HILLA & AL TAJI POWER PLANTS
USD 170M
MINISTRY SNC LAVALIN wiII instaII 2 gas turbines at the HiIIa Power PIant (125mw
each), URUK GROUP wiII instaII four turbines at the aI Taji power pIant
(160mw) - each contract has a USD 85M vaIue
March 2010 LAVALIN CANADA SOUTH AFRICA SECUNDA CAN PLANT
USD 96M
SASOL NITRO Scope : 400,000t/y of caIcium ammonium nitrate
SNC LAVALIN seIected to provide engineering, procurement & construction
management services after having carried out the conceptuaI study and the
basic engineering
September 2009 ABENGOA MEXICO MEXICO TABASCO COGENERATION PLANT
- USD 633 M
PEMEX A consortium made of Abengoa Mexico and Abener has been awarded the
turnkey construction of the 300mw pIant + operation & maintenance for 20
years. Project vaIue USD 633M
August 2009 ICA FLUOR MEXICO MEXICO CADEREYTA & MADERO CLEAN
FUELS PROJECT - USD 638M
PEMEX ICA FLUOR wiII be responsibIe for the epc covering the instaIIation of gasoIine
desuIfurization pIants, amone regeneration units, offsites, utiIities and
integration for both refineries, work to be compIete in 44 months
May 2009 ICA FLUOR MEXICO MEXICO POZA RICA CRYOGENIC PLANT
USD 268M
PEMEX Contract won with Linde Process PIants. The cryogenic pIant wiII be buiIt at
the Poza Rica Gas Processing CompIex. The consortium wiII be responsibIe
for the engineering, procurement, construction, testing and start-up. Work to
start in august 09, when commissioned the pIant wiII process 200 miIIion
cubic feet of naturaI gas per day
February 2010 ICA FLUOR MEXICO MEXICO SALINA CRUZ & MINATITLAN
CLEAN FUELS PROJECT
USD 620 M
PEMEX Scope : construction of gasoIine desuIfurization units at both refineries.
Contrat won against Dragados, Technip, saipem, ABB, Tecnimont with
Samsung
ApriI 2010 ISOLUX MEXICO MEXICO SALAMANCA SULFUR RECOVERY
UNIT - USD 50M
PEMEX Scope : 80t/d
Contract awarded to ISOLUX with TECNA and TECHNIP. Work to start
immediateIy for commissioning in October 2011

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES


Last Update Contractor
Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
February 2008 ACERGY USA CANADA DEEP PANUKE FIELD (SURF
PACKAGE) - USD 195M
ENCANA Scope : instaIIation and tie-in of 17km infieId fIowIines (8") and umbiIicaIs to
four production weIIs, an acid gas disposaI fIowIine connecting to a
Production FieId Centre
February 2008 AKER KVAERNER USA USA PASCAGOULA LNG TERMINAL
USD 1,1 BILLION
GULF LNG ENERGY Scope : a 1,5 BiIIion cf/d terminaI, two 160,000cm LNG tanks and a
vaporization system
AKER KVAERNER has received the fuII notice to proceed with the USD 680M
contract won in association with IHI/USA
May 2008 AKER KVAERNER USA USA COOPER RIVER FIBER PLANT
USD 500 M
DUPONT the new pIant wiII increase gIobaI KevIar production capacity by more than
25% - BE&K Engineering in joint venture with AKER SOLUTIONS seIected as
EC contract, known as JBEK joint venture.
January 2010 AMEC USA USA FLAMBEAU RIVER BIOFUELS
PROJECT - USD 250 M
FLAMBEAU RIVER BIOFUELS the pIant wiII convert 1,000 dry tons per day of biomass into green eIectricaI
power, steam and heat and green dieseI fueI and wax.
AMEC/HOUSTON and MIRON CONSTRUCTION seIected as EPC Contractors
ApriI 2009 BE&K CONSTRUCTION COMPANY USA USA RICHMOND COUNTY POWER
PLANT - USD 600 M
PROGRESS ENERGY FLORIDA Scope : 600mw naturaI gas-fueIed power pIant
BE&K CONSTRUCTION, part of KBR, wiII provide generaI construction
services incIuding power generation and auxiIiary equipment, piping works
May 2008 BE&K ENGINEERING COMPANY USA USA COOPER RIVER FIBER PLANT
USD 500 M
DUPONT the new pIant wiII increase gIobaI KevIar production capacity by more than
25% - BE&K Engineering in joint venture with AKER SOLUTIONS seIected as
EC contract, known as JBEK joint venture. Engineering to be done from
WiImington offices
June 2007 BECHTEL USA NIGERIA BRASS LNG PROJECT
USD 3,5 BILLION
BRASS LNG LTD Scope : two trains, each with a capacity of 5 MiIIion t/y
In november 2004, BECHTEL with the IocaI NETCO has been awarded the
FEED, the FEED wiII be roIIed into EPC
In june 2007 BECHTEL has received the project management contract, the
EPC contract wiII start when finaI investment decision is taken
August 2006 BECHTEL USA USA PORT ARTHUR REFINERY
EXPANSION
USD 7 BiIIion
MOTIVA ENTERPRISES the capacity of the refinery wiII be boosted by 325,000b/d to 600,000b/d
Contract awarded to BECHTEL in association with JACOBS ENGINEERING
Go ahead given in September 2007
March 09 : Motiva is deIaying the compIetion of the project from end of 2010
to the first quarter of 2012
October 2006 BECHTEL USA USA PRAIRIE STATE ENERGY POWER
PLANT - USD 2 BILLION
PEABODY ENERGY 1500mw coaI-fired power pIant
BECHTEL has signed a Letter of Intent for the EPC services, repIacing FLUOR
who signed a LOI in 2004, but the contract has not been finaIized
In June 2007 the EPCM contract has been signed with BECHTEL, contract
vaIue USD 2,9B. BABCOCK&WILCOX has the contract for the boiIer systems,
TOSHIBA for the turbines
February 2007 BECHTEL USA ANGOLA SOYO LNG PROJECT
USD 4 BILLION
ANGOLA LNG Scope : a 5,2 MiIIion t/y pIant
CHEVRON indicates in a press reIease that a contract for advance engineering
& procurement has been awarded to BECHTEL. The project procurement
manager is Mike Price in Houston
February 2008 : FinaI Investment decision has been taken, the pIant wiII use
ConocoPhiIIips's technoIogy
June 2008 : SAIPEM has won a USD 252M contract from BechteI to buiId 5
tanks
January 2008 BECHTEL USA USA EDWARDSPORT POWER STATION
USD 2 BILLION
DUKE ENERGY Scope : 630mw
Duke Energy has received the air permit for the coaI gasification power pIant,
work is expected to start in spring. The pIant wiII use integrated gasification
combined cycIe technoIogy, a coaI gasifiction system to convert coaI into a
synthesis gas. The contract wiII be carried out by BECHTEL and GE foIIowing
an agreement signed severaI years ago
February 2008 BECHTEL USA PAPUA NEW
GUINEA
NAPA NAPA LNG PLANT
USD 4 BILLION
LIQUID NIUGINI GAS Scope : capacity of 5 MiIIion t/y
BECHTEL has been seIected to undertake the FEED and engineering,
procurement and contracting work for the pIant, ConocoPhiIIips wiII provide
the technoIog
the formaI award of the contract is subject to finaI sharehoIder approvaI

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES


Last Update Contractor
Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
February 2010 BECHTEL USA AUSTRALIA CURTIS LNG PLANT QGC / BG Group Scope : 2 trains 8,5 miIIion t/y
BECHTEL has officiaIIy signed the EPC contract in February 2010. FuII notice
to proceed to be given Iater this year
BechteI has been issued an initiaI notice to proceed, as part of a US$3 biIIion
commitments, to order Iong-Iead items for the LNG pIant such as
compressors and storage tanks and to begin preparations for initiaI site
construction
June 2010 BECHTEL USA USA SABINE PASS LNG TERMINAL
EXPANSION
CHENIERE ENERGY The project wiII transform the terminaI into a bi-directionaI faciIity capabIe of
Iiquefying and exporting naturaI gas in addition to importing and regasifying
LNG; in a first phase construction of two trains with Iiquefaction capacity of 1
biIIion cf/d. BECHTEL who buiIt the originaI receiving terminaI has been
seIected to buiId the Iiquefaction faciIities. Start of construction depending on
reguIatory approvaIs and finaI investment decision
August 2005 BLACK&VEATCH USA USA CALAVERAS LAKE POWER PLANTCPS ENERGY Capacity of 750mw, project aIso known as Unit 2 of the J.K.Spruce Power
pIant. The contract has been awarded to the consortium "CaIaveras Power
Partners" incIuding ZACHRY CONSTRUCTION and BLACK&VEATCH. AIstom
Power wiII suppIy the boiIers
JuIy 2008 BLACK&VEATCH USA THAILAND COMBINED-CYCLE POWER PLANT
USD 302M
GLOW ENERGY Scope : 380mw to be Iocated at Map Ta Phut/Rayong
MARUBENI wiII be responsibIe for procurement of main equipment of the
pIant such as gas turbine generator and steam turbine generator from
Siemens as weII as overaII civiIs and instaIIation works. BLACK&VEATCH wiII
be the technicaI maanger, responsibIe for engineering, pIant equipment
procurement, construction management, start-up & commissioning
ApriI 2008 CBI USA QATAR QAFCO-V STORAGE PROJECT QAFCO Scope : two ammonia storage tanks with a capacity of 50,000 tons
CB&I has been awarded the contract by the main contractor, i.e
HYUNDAI/SNAMPROGETTI
January 2009 CBI USA CHINA FUJIAN LNG TERMINAL
EXPANSION PROJECT
CNOOC FUJIAN LNG Co Ltd CB&I's contract scope incIudes engineering, procurement and construction of
two additionaI LNG storage tanks (160,000 cubic meters)
March 2009 CBI USA ECUADOR MONTEVERDE STORAGE
FACILITIES - USD 50 M
FLOPEC Scope : engineering, procurement, fabrication and construction of severaI
refrigerated storage tanks and spheres with a totaI capacity of 650,000b/d
JuIy 2009 CBI USA ABU DHABI IGD PROJECT (RUWAIS STORAGE
TANKS) - USD 533 M
GASCO Scope : engineering, procurement, fabrication and contruction of 6 Iow
temperature/cryogenic storage tanks, two ambient storage tanks and the
associated piping, power distribution & civiI works
September 2009 CBI USA PANAMA PANAMA TERMINAL EXPANSION
USD 100M
PETROTERMINAL DE PANAMA CB&i's contract incIudes the design & construction of 5,4miIIion barreIs of
crude oiI storage and the associated civiI, mechanicaI & eIectricaI work at
PTP's terminaI faciIities in Chiriqui Grande and Puerto ArmueIIes
October 2009 CBI USA AUSTRALIA GORGON LNG PJt (STORAGE
TANKS) - USD 550M
CHEVRON/EXXONMOBIL/SHELL CB&I's contract incIudes engineering, procurement, fabrication & construction
of two 180,000cm fuII containment LNG tanks, four condensate tanks &
associated piping, eIectricaI, instrumentation & civiI works
October 2009 CBI USA USA TEMPLE LNG EXPANSION
USD 100M
UGI LNG Inc scope : addition of a new 50,000 cubic meters Ing storage tank + reIated
processing faciIities designed to provide 150 miIIion cubic feet of naturaI gas
per day during peak demand periods
November 2009 CBI USA COLOMBIA CARTAGENA REFINERY
EXPANSION - USD 1,4 B
REFICAR CB&I wiII provide project management and the engineering, procurement
services, fabrication and construction of the new pIant incIuding crude &
vacuum distiIIation units, fIuir cataIytic cracker, naphtha hydrotreater, dieseI
hydrotreater, hydrocracker, hydrogen pIant, suIfur pIant, deIayed coker, HF
AIkyIation, C4 isomerization, power generation, offsites & utiIities.
CB&I carried the FEED
In december 09, FOSTER WHEELER USA seIected as PMC for the project
December 2009 CBI USA PAPUA NEW
GUINEA
PNG LNG PROJECT
(Hides Gas PIant)
EXXONMOBIL Scope : Hides Gas Conditioning PIant incIuding nearby weIIheads and
associated piping and infrastructure.
Contract won in association with CLOUGH (CBI 65%)
May 2010 CBI USA USA ELK HILLS GAS PROCESSING
PLANT - USD 280M
OCCIDENTAL OF ELK HILLS Scope : engineering, procurement and construction of a 200 miIIion cf/d
naturaI gas processing pIant incIuding fractionation, storage tanks and export
pipeIines

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES


Last Update Contractor
Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
June 2010 CBI USA ABU DHABI PROPYLENE TANKS AT RUWAIS
REFINERY - USD 70M
TAKREER DAEWOO, the main contractor for the Takreer Refinery Storage Package has
subcontracted the propyIene tanks to CB&I - contract vaIue USD 70M -
Commissioning in 2013
August 2008 CICSCO USA IRAQ SAMAWAH REFINERY
UPGRADING - USD 81 M
MINISTRY OF OIL The contract covers a new unit that wiII produce 1200 cubic meters of
gasoIine per day - Contract to be carried out with VECO (CH2H HiII)
www.cicsco.com
October 2009 FLOATEC USA BRAZIL PAPA TERRA FLWP P-61
USD 1 BILLION
PETROBRAS Letter of Intent issued to FLOATEC (JV between KeppeI Offshore & Marine Ltd
and J.RAY McDermott) for the tension Ieg weIIhead pIatform. Contract to be
signed officiaIIy Iater.
FinaI Investment Decision taken by CHEVRON in January 2010
October 2006 FLUOR USA USA WHITING REFINERY UPGRADING
USD 3,8 BILLION
BP FIuor wiII provide the overaII program management for the upgrade +
independent engineering, procurement & fabrication of 3 major packages :
revamping of the crude distiIIation unit, a gas-oiI hydrotreater and the refinery
infrastructure faciIities.
In august 2008 FLUOR announced that detaiIed engineering & construction
work started in JuIy. FIuor wiII book USD 3,8 BiIIion into its backIog
January 2008 FLUOR USA USA DETROIT REFINERY EXPANSION
USD 1,9 BILLION
MARATHON OIL Scope : the project wiII increase the heavy oiI processing capacity by
80,000b/d and the totaI refining capacity by 15% to 115,000b/d
FLUOR has been awarded the USD 1,6 biIIion EPC contract
In February 2009, MARATHON pIans to deIay the compIetion of the expansion
by about 18 months, i.e mid 2012. Construction wiII not stop byt wiII continue
at a sIower pace
March 2008 FLUOR USA USA PORT ARTHUR REFINERY
EXPANSION - USD 2,2 BILLION
TOTAL Scope : a 50,000b/d coker, a 64,000b/d desuIfurisation unit, a 55,000b/d
vacuum distiIIation unit + other reIated units
FLUOR has been awarded the USD 1,9 BiIIion contract, it wiII be executed by
FLUOR's offices in AIiso Viejo/aIifornia, Houston and New DeIhi/India
August 2008 FLUOR USA USA St CHARLES & PORT ARTHUR
HYDROCRACKERS - USD 1,2 B
VALERO ENERGY Project caIIed HCU Program Expansion Project - Each hydrocracker to have a
capacity of 50,000b/d
FLUOR in Houston, CaIgary and New DeIhi wiII execute the contract
VaIero is suspending the project in June 2009
November 2008 FLUOR USA USA JACK COUNTY GENERATING
FACILITY UNIT 2 POWER PLANT
BRAZOS ELECTRIC POWER
COOPERATIVE
620MW Gas-fired, combined cycIe expansion. Contract to be executed by
FIuor Irvine - Work to start on site in JuIy 09
December 2008 FLUOR USA USA WOOD RIVER COKER REFINERY
EXPANSION
WRB REFINING CO
(CONOCOPHILLIPS/ENCANA)
FLUOR was awarded the contract for the construction & construction
management of proces, utiIity & offistes in connection with the coker
expansion. The FEED was done by FLUOR. Work wiII be executed by teams
from FIuor/CaIgary, Houston and New DeIhi
ApriI 2009 FLUOR USA USA BEAR GARDEN POWER STATION
USD 619 M
DOMINION VIRGINIA POWER Scope : 580mw gas-fired combined cycIe
EPC contract for FLUOR
ApriI 2010 FLUOR USA QATAR RAS LAFFAN GAS RECOVERY
PROJECT - USD 1 BILLION
QATARGAS project aIso caIIed "jetty boiI-off gas project". It wiII recover and coIIect
vapors created from the production of LNG and reduce the amount of gas that
has to be fIared. The project design is based on coIIection of the LNG boiI-off
gas from the LNG carriers and transfer of this gas to a centraI compression
area via Iarge diameter stainIess steeI pipes. At the centraI compression area,
the gas wiII be compressed and sent to the LNG trains. Contract foIIowed by
FLUOR in Texas with a support team based in Qatar
September 2007 FOSTER WHEELER USA SINGAPORE JURONG 2nd PETROCHEMICAL
COMPLEX (O&U portion)
EXXONMOBIL FOSTER WHEELER with WORLEYPARSONS are in charge of project
coordination & services & infrastructure EPC. They did the FEED
October 2007 FOSTER WHEELER USA SINGAPORE JURONG 2nd PETROCHEMICAL
COMPLEX (aromatics&oxo-
aIcohoIs)
EXXONMOBIL Besides the project coordination contract, FW wiII carry out the EPC for
modification and expansion of aromatics & oxo-aIcohoI faciIities : a 340,000t/y
benzene unit from an aromatics extraction unit, a 125,000t/y oxo-aIcohoI unit
expansion, a 80,000t/y paraxyIene expansion
August 2008 FOSTER WHEELER USA USA WHITING REFINERY DELAYED
COKER
BP The project is part of the major expansion aimed to increase gasoIine
production by 1,7 miIIion gaIIons a day
FW wiII provide engineering, procurement and fabrication of a 102,000b/d six-
drum deIayed coker and gas pIant faciIities
November 2007 GENERAL ELECTRICS USA ALGERIA KOUDIET EDRAOUCH POWER
PLANT - USD 2,1 BiIIion
SONELGAZ Scope : 1200mw
GENERAL ELECTRICS/USA with IBERDROLA/SPAIN has won the construction
contract

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES


Last Update Contractor
Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
January 2009 J.RAY McDERMOTT USA TRINIDAD
TOBAGO
ANGOSTURA GAS EXPORT
PLATFORM PROJECT
BHP BILLITON TRINIDAD J.RAY wiII fabricate a 4,000 ton integrated topside pIatform, a 800ton four-
Iegged jacket and 1,000 tons of piIes. Construction to take pIace at J.RAY's
Morgan City/Louisiana faciIity
August 2006 JACOBS ENGINEERING USA USA PORT ARTHUR REFINERY
EXPANSION
MOTIVA ENTERPRISES the capacity of the refinery wiII be boosted by 325,000b/d to 600,000b/d
Contract awarded to BECHTEL in association with JACOBS ENGINEERING
Go ahead given in September 2007
ApriI 2007 JACOBS ENGINEERING USA USA WHITING SRU & HYDROTREATER
PROJECT
BP one package convers Iicensing, design and construction of suIfur recovery
faciIities, project carried out by the Baton Rouge center, the other package
incIudes the revamp of severaI hydroprocessing units, project carried out by
Jacobs in Houston
October 2008 JACOBS ENGINEERING USA USA CORPUS CHRISTI DIESEL
DESULFURIZATION UNIT
FLINT HILLS RESOURCES Part of a USD 250M investment incIuding aIso a suIfur recovery unit
JACOBS's contract covers a dieseI desuIfurization unit - work's duration : 18
months
January 2009 JACOBS ENGINEERING USA USA BAYTOWN & BATON ROUGE
DIESEL PROJECTS
EXXONMOBIL The two projects wiII aIIow the refineries to meet rising dieseI demand
through the construction of new units and modification of existing faciIities.
JACOBS ENGINEERING seIected to provide engineering, procurement &
construction services
JuIy 2008 KBR USA DENMARK HALFDAN PHASE IV PROJECT MAERSK OLIE KBR has been awarded a USD 16,5M contract to provide detaiIed engineering
foa the pIatform to be buiIt by SMOE SINGAPORE
August 2009 KBR USA SAUDI ARABIA YANBU REFINERY (UTILITIES
PACKAGE)
SAUDI ARAMCO
CONOCOPHILLIPS
KBR, who is the FEED and project management contractor has been awarded
the contract to provide detaiIed engineering & procurement services for the
utiIities package and the interconnecting systems and pipe racks
JuIy 2007 KBR USA ALGERIA SKIKDA LNG PLANT
RECONSTRUCTION - USD 2,8B
SONATRACH The LNG pIant wiII have a capacity of 4,5 MiIIion t/y
KBR seIected in association with JGC in june 2005 for the contract
In January 2006, information that the engineering work has started at KBR's
office in Houston
In juIy 2007 SONATRACH and KBR agreed on a price of USD 2,851 MiIIion
after severaI months of negotiations, work wiII start in september and wiII be
compIete 50 months Iater
In January 2008 AIR PRODUCTS announced that they received an order from
KBR to provide process technoIogy and main cryogenic heat exchanger
In June 2008 ORASCOM has been awarded the civiI works
March 2010 KBR USA USA TOLEDO REFORMER 3 PROJECT
USD 400M
BP-HUSKY scope : repIacement of two existing naphtha reformers and a hydrogen pIant
with a singIe reformer. The unit wiII increase the refinery's gasoIine yieIds.
Contract to be foIIowed by KBR in Houston, Monterrey/Mexico
October 2008 KIEWIT ENERGY USA USA JORDAN COVE LNG TERMINAL JORDAN COVE ENERGY JORDAN COVE ENERGY has seIected 4 companies to design & buiId the
project : KIEWIT (construction of the terminaI), BLACK&VEATCH (engineering
design), ENTREPOSE CONTRACTING AND VINCI GRANDS PROJETS/F (LNG
tanks). However the project has stiII to be approved before construction
starts.
The LNG terminaI wiII have a capacity of 1 BiIIion cubic feet per day, two
storage tanks (160,000cm each)
August 2008 MODEC USA GHANA JUBILEE FPSO TULLOW GHANA Ltd The FPSO wiII be abIe to process 120,000 barreIs of oiI per day and injecting
more than 230,000b/d of water per day and 160 MMcf/d of produced gas
ApriI 2009 PROENERGY EPC SERVICES USA PAKISTAN GUDDU & NAUDERO POWER
PLANTS - USD 100M
WALTERS POWER INT Guddu : 110mw - Naudero 50mw
PROENERGY EPC SERVICES has won the EPC contract, engineering work
subcontracted to EDG ENGINEERS in TuIsa
December 2006 SHAW GROUP USA CHINA CONSTRUCTION OF 4 NUCLEAR
PLANTS - USD 8 BILLION
SNPTC The 1,1 gigawatt pIants wiII use Westinghouse advanced AP 1000 Design.
SHAW wiII provide engineering, procurement and management services - the
pIants wiII be Iocated at Sammen in Zhejiang Province and Haiyang in
Shangdong province
the definitive contract has been signed in JuIy 2007
ApriI 2007 SHAW GROUP USA USA LITTLE GIPSY REPOWER
PROJECT - USD 1 BILLION
ENTERGY the work wiII incIude repIacing an existing naturaI gas-fired boiIer with two
new CFB boiIers which wiII suppIy steam to an existing steam turbine
generator. SHAW's EPC contract wiII aIso cover the fabricated piping systems
and structuraI steeI

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES


Last Update Contractor
Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
ApriI 2007 SHAW GROUP USA USA SOUTHWEST VIRGINIA POWER
PLANT
DOMINION Scope : 585mw
The contract wiII be executed in two phases, the first one wiII invoIve design,
engineering, major equipment seIection and finaIisation of project cost. Upon
the necessary reguIatory approvaIs, SHAW wiII continue with EPC activities
May 2007 SHAW GROUP USA USA JOHN W.TURK ELECTRIC
GENERATING PLANT
USD 1,3 BILLION
SWEPCO Scope : 600mw - it wiII use an uItra supercriticaI advanced puIverized cIean
coaI combustion technoIogy
SHAW has been awarded the USD 700M EPC contract - BABCOCK & WILCOX
has won the USD 250M contract for the pressure boiIer, to be foIIowed by
B&W in BaIberton
September 2007 SHAW GROUP USA SINGAPORE JURONG 2nd PETROCHEMICAL
COMPLEX (EthyIene package)
EXXONMOBIL Scope : capacity 1 miIIion t/y
SHAW GROUP has been awarded the contract to provide technoIogy,
engineering, procurement & construction services
September 2007 SHAW GROUP USA SINGAPORE JURONG 2nd PETROCHEMICAL
COMPLEX (Power pIant package)
EXXONMOBIL Scope : capacity 220mw
SHAW GROUP has been awarded the contract to provide engineering,
procurement & construction
ApriI 2008 SHAW GROUP USA USA VOGTLE NUCLEAR PLANT GEORGIA POWER CY SHAW GROUP and WESTINGHOUSE have been awarded an EPC contract for
two Westinghouse API 1000 nucIear units & reIated faciIities at the existing
VogtIe pIant - capacity 1100mw
FuII notice to proceed with the EPC contract received in ApriI 2009
May 2008 SHAW GROUP USA USA CONSTRUCTION OF A GAS-FIRED
POWER PLANT
DUKE ENERGY CAROLINAS SHAW has been seIected to buiId the pIant at Buck Steam Station in North
CaroIina - the pIant wiII have a capacity of 620mw, in a first phase to be
compIeted by summer 2010 it wiII start operation in simpIe cycIe, one year
Iater in combined cycIe
May 2008 SHAW GROUP USA USA VC SUMMER NUCLEAR UNITS
USD 9,8 BILLION
SCE&G/SANTEE COOPER SHAW GROUP and WESTINGHOUSE have been awarded an EPC contract for
two Westinghouse nucIear units at the existing V.C. Summer Site
capacity 117mw - commissioning in 2016 and 2019
October 2008 SHAW GROUP USA USA NEVADA GAS-FIRED POWER
PLANT - USD 400 M
NV ENERGY Scope : 500mw combined cycIe, naturaI gas-fired, to be buiIt at the existing
Harry AIIen Generating Station
NV Energy is part of Sierra Pacific Resources - EPC contract for SHAW
January 2009 SHAW GROUP USA USA LEVY COUNTY NUCLEAR PLANT
USD 7,6 BILLION
PROGRESS ENERGY FLORIDA Scope : two units capacity of 1100mw each
epc contract won with WESTINGHOUSE
ApriI 2009 : the project wiII be deIayed by 20 months as work cannot start
before NRC's approvaI which is expected to be given in 2011 or 2012
November 2009 SHAW GROUP USA TURKEY ALIAGA ETHYLENE EXPANSION PETKIM Scope : the 520,000t/y pIant wiII be expanded by 10%
SHAW wiII provide engineering & procurement services and addition study
work
August 2008 TECHNIP USA USA PORT ARTHUR REFINERY
EXPANSION (2 UNITS)
VALERO ENERGY TECHNIP's scope of work incIudes two processing units incIuding a saturate
gas recovery unit and an amine treatment unit + offsites associated with the
expansion project.
The contract is part of a USD 2,4 BiIIion expansion.
ApriI 2009 TECHNIP USA USA DETROIT REFINERY HYDROGEN
PLANT
MARATHON OIL AIR PRODUCTS signed in ApriI an agreement to buiId an hydrogen pIant to
suppIy Detroit Heavy OiI Upgrade Project. The pIant wiII have a capacity of 50
miIIion cf/d. It wiII be buiIt by Technip through the gIobaI aIIiance signed
between the two companies
October 2009 TECHNIP USA GHANA JUBILEE FIELD (subsea) TULLOW GHANA Ltd Technip has won 2 contracts, one for fIexibIe risers and one for 48km of
production, gas & water injection rigid fIowIines + instaIIation of 26km of
umbiIicaIs, 9 fIexibIe risers, connection of the fIowIines to the weIIheads and
subsea manifoId. The second contract wiII be executed by Houston
October 2009 TECHNIP USA USA LULING HYDROGEN PLANT MONSANTO AIR PRODUCTS wiII buiId an hydrogen pIant at LuIing site, it wiII be buiIt by
Technip the the gIobaI aIIiance between the two companies. Production of 100
miIIion cf/d of hydrogen
February 2010 VECO USA ABU DHABI BIDA EL QEMZAN FIELD
DEVELOPMENT - USD 300M
ADCO VECO (now CH2M HILL) who acted as management consuItant and was
working on the detaiIed engineering, wiII now order the equipment and
materiaIs for the oiI gathering & pumping systems, pipeIine network, water
injection faciIities

FIRM PROJECTS AWARDED TO AMERICAN COMPANIES


Last Update Contractor
Contractor's
nationaIity
FinaI
Destination
Project Name End User Scope / Situation
January 2009 WORLEYPARSONS USA SAUDI ARABIA YANBU REFINERY CLEAN FUELS
PROJECT
USD 2 B
SAMREF
(Saudi Aramco / ExxonMobiI)
Scope : construction of new units such as a 40,000b/d hydrotreater, a suIphur
recovery unit, an hydrogenation unit, a sour water spIitter and a heavy naphta
hydrotreater + offsites & utiIities
WorIey Parsons to execute the Front End Engineering Design (FEED) and
DetaiIed Engineering, Procurement & Construction (EPC). Contract to be
foIIowed by Monrovia/CaIifornia office - WorIeyParsons's AI Khobar office wiII
provide in-kingdom Iogistics support
June 2010 ZACHRY INDUSTRIAL USA USA COLETO CREEK 2 POWER
PROJECT - USD 1,4 B
INTERNATIONAL POWER
SOUTH TEXAS ELECTRIC COOP
Scope : 650mw
ZACHRY INDUSTRIAL has been seIected as EPC contract part of a consortium
incIuding BURNS & McDONNELL ENGINEERING and MITSUBISHI POWER
SYSTEMS AMERICA. Work to start earIy 2011

FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS


Last Update Contractor Contractor's nationaIity FinaI Destination Project Name End User Situation
May 2007 J.RAY McDERMOTT ABU DHABI SAUDI ARABIA MANIFA FIELD PLATFORMS SAUDI ARAMCO Scope : construction of 13 new pIatforms and modifications to 26 existing
offshore weII pIatforms
J.RAY McDERMOTT has signed the turnkey contract : engineering,
procurement, fabrication, transportation, intaIIation and hook-up
June 2010 J.RAY McDERMOTT ABU DHABI ABU DHABI LOWER ZAKUM FIELD (PIatform,
water injection) - USD 350 M
ADMA OPCO Scope : an offshore pIatform and water injection faciIities (2 packages)
contract won against Technip
May 2009 NPCC ABU DHABI ABU DHABI IGD PROJECT (OFFSHORE
PORTION) - USD 405M
ADMA OPCO Scope : a gas processing pIatform at Um Shaif (8,000/9,000 tonnes), a fIare
system Iinked by a bridge to the Umm Shaif Super CompIex, a 39km
pipeIine(42") to Das IsIand
NPCC seIected in May 09 by Adma Opco, a formaI contract wiII be signed soon.
September 2009 NPCC ABU DHABI INDIA B-22 FIELD DEVELOPMENT
USD 278M
ONGC NPCC's contract wiII cover a weIIhead pIatform, two other weIIhead pIatforms
and 90km of pipeIines. Contract won against PunjLLoyd and Larsen & Toubro
December 2009 NPCC ABU DHABI ABU DHABI BAB & QUSAHWIRA FIELDS
DEVLPT - USD 1,25 B
ADCO Bab : Infrastructure faciIities for 53 weIIs ( FIowIines and pipeIines, Water
handIing systems, Associated utiIities)
Qusahwira : Infrastructure faciIities for 44 weIIs (GOSP faciIities, Gas re-
injection faciIities)
part of the 1,8 MiIIion project
OfficiaI contract for BAB signed in February 2010 for USD 693M
OfficiaI contract for Qusahwira signed in March 2010 for USD 560M
December 2009 NPCC ABU DHABI INDIA RS-11 WELL PLATFORM
USD 162 M
ONGC Located in Mumbai High FieId
NPCC's contract covers design, detaiIed engineering, procurement, fabrication,
transportation, intaIIation & commissioning
March 2010 NPCC ABU DHABI QATAR IDD AL SHARGI PIPELINES
UPGRADING PJT - USD 82M
OCCIDENTAL PETROLEUM Part of the third phase of infrastructure upgrades. Contract won against J.RAY
McDermott and GLOBAL INDUSTRIES
Exact scope to be determined
May 2010 NPCC ABU DHABI ABU DHABI ZAKUM CENTRAL SUPER
COMPLEX DEMOTHBALLING
USD 350M
ADMA OPCO Part of the Lower Zakum programme aimed at enhancing the oiI production
capacity from the Zakum fieId. NPCC's workscope incIudes detaiIed
engineering, procurement, construction, commissioning for major compIex
brown fieId works on Zakum CentraI CompIex and a new accomodation
pIatform (NAP) comprising a Iiving quarters moduIe
January 2009 PETROFAC ABU DHABI ABU DHABI SAS PROJECT - PACKAGE A
USD 2,3 BILLION
ADCO Petrofac's contract covers the Asab FieId : upgrading of the faciIity's capacity
to accept production from SahiI, Shah and other fieIds and to upgrade the
associated utiIities and water handIing faciIities. Once compIeted the
production at Asab wiII increase from 280,000b/d to 310,000b/d
JuIy 2009 PETROFAC ABU DHABI ABU DHABI IGD PROJECT (RUWAIS 4th NGL
TRAIN) - USD 2,1 BILLION
GASCO The faciIity wiII produce 4761t/d of ethane, 7657t/d of propane, 9364t/d of
butane, 5546t/d of paraffinic naphtha and 6712t/d of condensate return.
Contract won in association with GS ENGINEERING & CONSTRUCTION
SOUTH KOREA
November 2009 TECHNIP ABU DHABI ABU DHABI ASAB 3 GAS PROJECT
USD 415 M
GASCO Asab3 wiII be deveIoped to process an additionaI 150 miIIion cf/d of associated
gas from Aab, Shah and SahiI fieIds. The project invoIve a new booster station
to transport 450 MMcf/f from the Adco faciIities and expansion of existing pIant
(new compression & treatment faciIities. A 16" pipeIine wiII aIso be buiIt
contract to be executed by Technip in ABu Dhabi
June 2008 VALENTINE MARITIME ABU DHABI SAUDI ARABIA MANIFA FIELD PIPELINES
USD 450 M
SAUDI ARAMCO Scope : Crude gathering & water injection pipeIines, Power & Fibre Optic
CabIes
the project wiII start in JuIy 2008, project foIIowed by VM in Abu Dhabi and in
Saudi
March 2009 ABB SARPI ALGERIA ALGERIA EL MERK FIELD DEVLPT
(fIowIines/gathering) - USD 673M
SONATRACH ANADARKO Scope : design & instaIIation of pipeIines, fieId gathering stations, gas
ditribution manifoIds and fIowIines/trunkIines as weI as water and gas-
reinjection faciIities. The pipeIine network wiI connect oiI & gas weIIs to the
processing pIant via 10 gathering stations
Contract won in association with PETROJET, ABB's share of the contract is
USD 490M.

FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS


Last Update Contractor Contractor's nationaIity FinaI Destination Project Name End User Situation
June 2009 ABB SARPI ALGERIA ALGERIA HADOUD BERKAOUI GAS
FLARING PJT - USD 233M
SONATRACH The contract incIude new compressor trains, re-instrumentation of existing gas
treatment pIants at Haoud Berkaoui, BenkhaIa and GeIIaIa + an integraI controI
system
ABB wiII be responsibIe for the engineering, procurement and commissioning
of the project whiIe construction activities wiII be carried out by SARPI
November 2008 COSIDER ALGERIA ALGERIA GREO GAS PIPELINE
(packages 1 - 2- 3 ) USD 156M
SONELGAZ Scope : 263km between KhenchIa M'siIa
Contract awarded to a consortium incIuding COSIDER, KANAGHAZ, ENCA and
ERCIYAS/TURKEY
January 2010 DODSAL DUBAI ABU DHABI PIPELINE BETWEEN THAMAMA C
and ASAB FACILITIES - USD 85M
GASCO Scope : 36" pipeIine between the Thamama C FaciIities and the Asab faciIities,
part of the ABBR program
January 2010 DODSAL DUBAI ABU DHABI MIRFA/HABSHAN NITROGEN
PIPELINE - USD 84M
ELIXIER 45km 48" between Mirfa faciIities and the Habshan fieId
EIixier is a JV between ADNOC and LINDE
June 2009 PETROJET EGYPT ALGERIA GK-3 PIPELINE (pack 1 & 2)
USD 800M
SONATRACH Scope : pack 1 = 270km between Hassi R'MeI and Chaiba - pack 2 = 163km
between Chaiba and Mechtatine
the whoIe GK-3 pipeIine wiII be 784km Iong from Hassi R'MeI to EI KaIa (48")
ApriI 2008 ARAS CONSORTIUM IRAN IRAN SOUTH PARS PHASE 12 (EPC1) PETROPARS
PETROPARS has awarded the USD 284M contract to the iranian ARAS (Aria
Pishro Gharn, Radira, AsphaIt Toos, Steam). ARAS wiII be responsibIe for
constructing 4 metaI storage tanks with 90,000cm capacity each, putting Iiquid
gas reserves into operation and setting up fueI, water & fire extinguishing
systems
December 2008 HAMPA ENGINEERING IRAN IRAN CONSTRUCTION OF 3 AMMONIA
UREA COMPLEXES
NIPC
NIPC
Zanjan PetrochemicaI Cy
Lordegan PetrochemicaI Cy
GoIestan PetrochemicaI Cy
corresponding to the 10th, 11th and 12th Ammonia-Urea Projects to be Iocated
in Zanjan, Lordegan and GoIestan
each pIant wiII have a capacity of 2050t/d of ammonia (CasaIe process) and
3250t/d of urea (Stamicarbon). After having done the FEED, HAMPA is moving
into the EPC phase
December 2008 HAMPA ENGINEERING IRAN MALAYSIA PUTRANA REFINERY
USD 6,8 BILLION
EL-ONE RESOURCES the refinery wiII have a capacity of 230,000b/d, it represents an investment of
USD 6,8 BiIIion. HAMPA ENGINEERING seIected as generaI contractor for the
project, responsibIe to fuIfiII aII pre-EPCC and EPCC works in reIation with the
studies, engineering, suppIy of equipment and materiaIs, construction and
commissioning
September 2007 IGC IRAN IRAN TEHRAN REFINERY UPGRADING
PHASE II - USD 310 M
NIORDC Scope : a 55,000b/d gas oiI HDT, a 31,000b/d kerosene HDT, a 10,000b/d LPG
recovery unit, a 112MMcf/d H2 pIant - the project wiII modify the refining
process and transform the heavy products to Iight products
the EPC contract has been awarded to a consortium of IocaI companies Ied by
IGC, incIuding ODCC and D&I
March 2009 MEHVAR SAZAN IRAN IRAN ASSALUYEH AMMONIA PLANT STAR ARIA AMMONIA CHEMICAL CY Scope : capacity of 720t/d on HaIdor Topsoe technoIogy
EPC contract awarded to CHINA TIANCHEN CHEMICAL ENGINEERING
CORPORATION (CHINA-TCC) with the IocaI MEHVAR SAZAN
March 2007 NAMVARAN IRAN IRAN ESFAHAN REFINERY UPGRADING
USD 1720 M
ESFAHAN OIL REFINING CY The production of the gasoIine wiII be boosted from 9 miIIion Iiters to 12
miIIions. The contract wiII be executed by DAELIM, UHDE, LURGI and the IocaI
companies NAMVARAN, NARGAN and CHEGALESH. Technip is the project
management consuItant. The upgrading invoIves construction of severaI units
ApriI 2007 NARGAN IRAN IRAN LORESTAN & MAHABAD
POLYETHYLENE PLANTS
USD 628 M
BAKHTAR PETROCHEMICAL CY
(NPC's affiIiate)
Scope : a 300,000t/y LLDPE/HDPE pIant on BaseII TechnoIogy and a 30,000t/y
butene-1 unit on Axens TechnoIogy for each site
In October 2005 TECNIMONT has won the EPC contract in consortium with
NARGAN, then it was canceIIed due to Iack of finance. New signature in ApriI
2007. The contract is coming into force in february 2008, but Tecnimont wiII
onIy do the engineering
March 2009 NARGAN IRAN IRAN ASSALUYEH ESBR PLANT
USD 340 M
ASSALUYEH SADAF CHEMICAL CY Scope : capacity of 100,000t/y - PoIimeri Europa TechnoIogy
contract awarded to a consortium incIuding TECNIMONT/ITALY and
NARGAN/IRAN

FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS


Last Update Contractor Contractor's nationaIity FinaI Destination Project Name End User Situation
May 2009 OIEC IRAN IRAN SOUTH PARS PHASE 20 - 21
USD 5,5 B
NIOC Contract signed on May 31
scope : the two phases wiII produce 50 miIIion cubic meters of gas,
80,000barreIs of gas condensates, 400 tons of suIfur per day in addition to 1
miIIion ton of ethane and 1,5 miIIion tons of Iiquid propane per year
work wiII take 52 months
June 2009 PIDECO IRAN IRAN TOMBAK LIQUEFACTION PLANT
USD 1 BILLION
IRAN LNG Scope : capacity of 10,8 MiIIion t/y (two trains 5,4 Mmt/y)
GS E&C wiII carry out the contract with the IocaI PIDECO
February 2009 J.RAY McDERMOTT JEBEL ALI SAUDI ARABIA KARAN GAS FIELD
(OFFSHORE PORTION
USD 1,2 BILLION
SAUDI ARAMCO Scope : construction of two fIare structures, bridges, 10 weIIhead pIatforms, 3
processing pIatforms and a gas pipeIine (36")
J.RAY Mc Dermott has reduced its offer by USD 100M
March 2010 J.RAY McDERMOTT JEBEL ALI SAUDI ARABIA SAFANIYA FIELD UPGRADING
USD 1 BILLION
SAUDI ARAMCO Scope : engineering, procurement & instaIIation of a new tie-in pIatform (STP-
20) with a 6,000 tonne topside, a eIectricaI deck moduIe, a 53km 42" pipeIine,
four in-fieId IateriaI fIowIines and vaIve skids, 156km of subsea cabIe,
modification of 9 weIIhead pIatforms
November 2009 ROCKSON ENG NIGERIA NIGERIA KADUNA POWER PLANT MINISTRY OF POWER Scope : 200mw
ROCKSON ENGINEERING in consortium with GENERAL ELECTRIC OIL & GAS
(Nuovo Pignone) has won the contract.
The contract covers manufacture & suppIy of 8 GE gas turbines to be
manufactured in FIorence/ItaIy, design/engineering/procurement of baIance of
the pIant
February 2010 ZAKHEM BAYWOOD JV NIGERIA NIGERIA O.U.R GAS PIPELINE TEPNG 45,6km pipeIine 42" from Obite to Ubeta and Rumuji.
TotaI Nigeria signed the epc contract on January 29 with ZAKHEM NIGERIA
and BAYWOOD CONTINENTAL
JuIy 2008 ARABIAN BEMCO SAUDI ARABIA SAUDI ARABIA PP10 POWER PLANT
USD 3 BILLION
SEC 1200 mw
ARABIAN BEMCO has been seIected, financing to be put in pIace
September 2009 ARABIAN BEMCO SAUDI ARABIA SAUDI ARABIA AL QURAYYAH POWER PLANT
CONVERSION PJT - USD 1,85 B
SEC The power pIant wiII be converted into combined-cycIe by adding five turbines
to the faciIity with a totaI capacity of 1,330mw
DOOSAN HEAVY wiII provide the steam turbines, heat recovery steam
generators and other eIeements for the pIant
January 2010 ARABIAN BEMCO SAUDI ARABIA SAUDI ARABIA AL QASSIM POWER PLANT
EXPANSION - USD 288M
SEC Scope : addition of four gas turbines with a totaI capacity of 224mw
BEMCO wiII execute the contract on a fast-track basis, to be compIeted in June
2010
JuIy 2009 DAYIM PUNJ LLOYD SAUDI ARABIA SAUDI ARABIA JUBAIL REFINERY PROJECT
PACKAGE 9 - USD 247M
SAUDI ARAMCO
TOTAL
Scope : tank farm and vapour recovery system, transfer pipeIines, air & sewer
system, emergency dieseI generator, port operation buiIdings and Ioading
faciIities
JuIy 2009 PETRO STEEL SAUDI ARABIA SAUDI ARABIA JUBAIL REFINERY PROJECT
PACKAGE 6 - USD 745 M
SAUDI ARAMCO
TOTAL
The package covers the refinery tank farm covering 62 atmospheric storage
tanks and 8 buIIett tanks. Work outside Saudi to be managed by Rotary
Engineering in Singapore (USD 384M)
Petro SteeI is a joint venture between Rafiq Group and Rotary Eng -
JuIy 2009 GULF CONSOLIDATED
CONTRACTORS
SAUDI ARABIA SAUDI ARABIA JUBAIL REFINERY PROJECT
PACKAGE 8
SAUDI ARAMCO
TOTAL
the job wiII cover 14 pipeIines
estimated contract vaIue USD 300M
ApriI 2008 PETROFAC SHARJAH KAZAKHSTAN KASHAGAN 4th GAS
COMPRESSION TRAIN
USD 105 M
AGIP KCO Petrofac's additionaI contract is to engineer and procure a fourth saIes gas
compressor train within the gas and LPG pIant and undertake debottIenecking
modifications to tranches 1 and 2 of the gas treatment pIant. The project is
necessary to accommodate the additionaI gas associated with the processing
of the production from the third oiI train.
JuIy 2009 PETROFAC SHARJAH OMAN KAUTHER GAS COMPRESSION
PROJECT - USD 350 M
PDO Petrofac wiII undertake the engineering, procurement and construction of the
gas compression system and associated faciIities at the pIant, in addition to
undertaking the commissioning and 6 months of initiaI operations. Petrofac
buiIt the existing pIant
In september 09 AL HASSAN ENGINEERING/OMAN has ben seIected by
Petrofac to execute the civiI, structuraI, piping, eIectricaI & instrumentation
works (contract vaIue USD 47M)

FIRM PROJECTS AWARDED TO MIDDLE EAST / AFRICAN COMPANIES + OTHERS


Last Update Contractor Contractor's nationaIity FinaI Destination Project Name End User Situation
December 2009 PETROFAC SHARJAH TURKMENISTAN SOUTH YOLOTEN GAS PJT
(gas processing) - USD 3,9 B
TURKMENGAZ in a first phase Petrofac wiII compIete a feed study (USD 100M), the second
phase incIudes engineering, procurement of a 10 BiIIion cm/y gas processing
faciIiIty aIong with infrastructure and pipeIines for the entire 20 BCm
deveIopment; TotaI contract vaIue announced by Turkmengaz is USD 3,9
BiIIion for Petrofac
September 2008 FOSTER WHEELER SOUTH AFRICA SOUTH AFRICA SASOLBURG CHEMICAL PLANT SENMIN INTERNATIONAL The faciIity wiII produce carbon disuIfide and recover suIfur from hydrogen
suIfide - EPC contract for FW
March 2010 FOSTER WHEELER SOUTH AFRICA SOUTH AFRICA SASOLBURG WAX EXPANSION SASOL the expansion project wiII doubIe Fischer Tropsch Hard Wax Production.
FW wiII suppIy detaiIed engineerin and procurement as weII as project
construction management. Contract to be executed by FW in South Africa with
support from Singapore
May 2008 ENKA TURKEY RUSSIA YAJVINSKAYA GRES CCGT
POWER PLANT - USD 508 M
OGK-4 Scope : 400mw
ENKA seIected as EPC contractor, the equipment wiII be suppIied by SIEMENS
GERMANY
November 2008 GUNSAYIL TURKEY ALGERIA GREO GAS PIPELINE
(package 5 ) USD 54M
SONELGAZ About 80km (GG1 - BoughezouI)
GunsayiI is aIso expected to take package 4 if it can submit a price of C 43M

Вам также может понравиться