Baraha Motor City Development (Pre-Contract Primary Infrastructure Design Consultancy Services)

Activity ID Activity Name Original Start Duration Finish Free Float Total August 2011 Float 14 21 1d 0d 0d 1d 0d 0d 0d 0d 0d 0d 0d 0d 0d 155d 183d 183d 183d 183d 213d 183d 155d 155d 155d 155d 181d 155d 164d 164d 164d 164d 164d 0d 0d 0d 0d 14d 18d 0d 0d 0d 48d 24d 21d Page 1 of 3 Fire Fighting System Solid Waste Management and integrated Cycle Gas Reticulation System Design criteria and feasibility Power demand conceptual sketches Water demand conceptual sketches Hydraulic Study Sewerage Network Surface Water Drainage System Start of Concept Design Coordination with Concerned Parties 31-Aug-11, INCEPTION PHASE Collection of Existing Data 11-Sep-11, DATA COLLECTION AND PRELIMINARY RESEARCH Coordination with Concerned Parties Verification of Existing Topo-Survey Report Verification of Existing Geotechnical Report Verification of Existing Traffic Impact Study Report Additional Studies and Site Investigation Completion of preliminary research 16-Nov-11, PROVISIONAL SERVICES 15-Oct-11, Topographic Survey (Optional) Coordination with Concerned Authorities Site topographic survey and Office data Processing Detailed Topo-Survey report Client Review/ Revisions/ Approval Approved Topo-Survey Report 16-Nov-11, Geotechnical Survey (Optional) Coordination with Concerned Authorities Site Geotechnical Investigations and Lab Works Geotechnical Investigation Report Client Review/ Revisions/ Approval Approved Geotechnical Report 06-Nov-11, Traffic Impact Study (TIS) (Optional) Coordination with Concerned Authorities TIS Study and Report Client Review/ Revisions/ Approval Approved Traffic Impact Study Report 25-Dec-11, CONCEPT DESIGN Commencement of Services Completion of All Deliverables September 2011 28 04 11 18 25 October 2011 02 09 16 23 30 November 2011 06 13 20 December 2011 27 04 11 18 25 01 January 2012 08 15 22 29 February 2012 05 12 19 26 March 2012 04 11 18 25 01 April 2012 08 15 22 29 May 2012 06 13 20

0d 0d Baraha Motor City Development (Pre-Contract 228d 21-Aug-11 15-May-12 Primary Infrastructure Design Consultancy Services)

15-May-12, Baraha Motor Cit

GENERAL SUPPORT SERVICES


GSS10 Commencement of Services GSS20 Coordination with Master Planner GSS30 Completion of All Deliverables

227d 21-Aug-11 0d 21-Aug-11 227d 21-Aug-11 0d 6d 21-Aug-11 6d 21-Aug-11

14-May-12

0d 0d

14-May-12, GENERAL SUPPO

14-May-12 14-May-12 31-Aug-11 31-Aug-11

0d 1d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 183d 0d 0d 0d 0d 0d 155d 0d 0d 0d 0d 164d 0d 0d

Coordination with Master Plan

INCEPTION PHASE
NCP10 Collection of Existing Data

9d 01-Sep-11 11-Sep-11 DATA COLLECTION AND PRELIMINARY RESEARCH R1000 R1010 R1020 R1030 R1040 R1050 Coordination with Concerned Parties Verification of Existing Topo-Survey Report Verification of Existing Geotechnical Report Verification of Existing Traffic Impact Study Report Additional Studies and Site Investigation Completion of preliminary research 9d 01-Sep-11 6d 01-Sep-11 6d 01-Sep-11 6d 01-Sep-11 3d 08-Sep-11 0d 73d 21-Aug-11 45d 21-Aug-11 45d 21-Aug-11 32d 21-Aug-11 7d 01-Oct-11 7d 09-Oct-11 0d 73d 21-Aug-11 73d 21-Aug-11 60d 21-Aug-11 7d 02-Nov-11 7d 10-Nov-11 0d 51d 08-Sep-11 51d 08-Sep-11 44d 08-Sep-11 7d 30-Oct-11 0d 90d 12-Sep-11 0d 12-Sep-11 90d 12-Sep-11 12d 12-Sep-11 52d 26-Sep-11 48d 26-Sep-11 48d 12-Sep-11 30d 07-Nov-11 30d 07-Nov-11 18d 26-Sep-11 42d 26-Sep-11 45d 26-Sep-11 Remaining Work Critical Remaining Work 25-Dec-11 25-Sep-11 24-Nov-11 20-Nov-11 06-Nov-11 11-Dec-11 11-Dec-11 16-Oct-11 13-Nov-11 16-Nov-11 11-Sep-11 07-Sep-11 07-Sep-11 07-Sep-11 11-Sep-11 11-Sep-11 16-Nov-11 15-Oct-11 15-Oct-11 29-Sep-11 08-Oct-11 15-Oct-11 15-Oct-11 16-Nov-11 16-Nov-11 01-Nov-11 09-Nov-11 16-Nov-11 16-Nov-11 06-Nov-11 06-Nov-11 29-Oct-11 06-Nov-11 06-Nov-11 25-Dec-11

PROVISIONAL SERVICES
Topographic Survey (Optional)
TS100 Coordination with Concerned Authorities TS110 Site topographic survey and Office data Processing TS120 Detailed Topo-Survey report TS130 Client Review/ Revisions/ Approval TS140 Approved Topo-Survey Report

Geotechnical Survey (Optional)


GS100 Coordination with Concerned Authorities GS110 Site Geotechnical Investigations and Lab Works GS120 Geotechnical Investigation Report GS130 Client Review/ Revisions/ Approval GS140 Approved Geotechnical Report

Traffic Impact Study (TIS) (Optional)


TIS10 Coordination with Concerned Authorities TIS20 TIS Study and Report TIS30 Client Review/ Revisions/ Approval TIS40 Approved Traffic Impact Study Report

CONCEPT DESIGN
C1000 C1010 C1020 C1030 C1040 C1050 C1060 C1070 C1080 C1090 C1100 Start of Concept Design Coordination with Concerned Parties Design criteria and feasibility Power demand conceptual sketches Water demand conceptual sketches Hydraulic Study Sewerage Network Surface Water Drainage System Fire Fighting System Solid Waste Management and integrated Cycle Gas Reticulation System

0d 0d 14d 18d 0d 0d 0d 48d 24d 21d

Support Service Actual Work

Milestone Summary

Baraha Motor City Development (Pre-Contract Primary Infrastructure Design Consultancy Services)
Activity ID C1110 C1120 C1130 C1140 C1150 C1160 C1170 C1180 C1190 C1200 C1210 C1220 C1230 C1240 C1250 C1260 C1270 Activity Name District Cooling System Traffic Modeling and traffic generation Road Design, Hierarch and on-street parking Peripheral roads Storm water collection, ground water control and discharge system Telecommunication ducts and IT provisions Security and Data Management system Feasible connection of each utility to existing sources Civil works Lighting System Hard and Soft Landscaping Irrigation water distribution system Phasing Proposal of Infrastructure work and Packages High level cost estimate and cost plan Submission of Conceptual Design Review/Approval of Conceptual Design Receipt of Approved Concept Design Original Start Duration 48d 26-Sep-11 36d 26-Sep-11 48d 26-Sep-11 18d 21-Nov-11 52d 26-Sep-11 50d 26-Sep-11 48d 26-Sep-11 54d 26-Sep-11 55d 26-Sep-11 42d 26-Sep-11 42d 26-Sep-11 24d 14-Nov-11 60d 12-Sep-11 6d 12-Dec-11 0d 19-Dec-11 7d 19-Dec-11 0d 54d 26-Dec-11 0d 26-Dec-11 54d 26-Dec-11 36d 26-Dec-11 36d 26-Dec-11 42d 26-Dec-11 30d 08-Jan-12 30d 08-Jan-12 36d 26-Dec-11 30d 08-Jan-12 36d 26-Dec-11 36d 26-Dec-11 40d 26-Dec-11 36d 26-Dec-11 26-Feb-12 05-Feb-12 05-Feb-12 12-Feb-12 12-Feb-12 12-Feb-12 05-Feb-12 12-Feb-12 05-Feb-12 05-Feb-12 09-Feb-12 05-Feb-12 25-Dec-11 25-Dec-11 26-Feb-12 Finish 20-Nov-11 06-Nov-11 20-Nov-11 11-Dec-11 24-Nov-11 22-Nov-11 20-Nov-11 27-Nov-11 28-Nov-11 13-Nov-11 13-Nov-11 11-Dec-11 20-Nov-11 18-Dec-11 Free Float 18d 30d 0d 0d 14d 16d 18d 12d 11d 24d 0d 0d 18d 0d 0d 0d 0d 0d 0d 0d 6d 6d 0d 1d 1d 6d 1d 6d 0d 2d 6d 6d 0d 0d 0d 0d 0d 0d 0d 2d 1d 38d Total August 2011 Float 14 21 18d 30d 0d 0d 14d 16d 18d 12d 11d 24d 0d 0d 18d 0d 0d 0d 0d 0d 0d 0d 6d 6d 0d 1d 1d 6d 1d 6d 6d 2d 6d 6d 0d 0d 0d 0d 18d 0d 0d 2d 1d 38d Page 2 of 3 Start of Detail Design Coordination with Concerned Parties Power demand Detailed sketches Portable Water Network Sewerage Network Start of Schematic/ Preliminary Design Coordination with Concerned Parties Schematic layout and assistance Attend value engineering Traffic Management System Limits of responsibility for the services Solid Waste Management and disposal/recycle Strategy for provision Mechanical and Electrical Systems Structural items of the works Construction logistics and Methodology Advice of Procurement of long lead Documentation for submission to Govt. or statutory authorities Detail Design briefs Estimates and updating the cost plan Submission of Schematic/ Preliminary Design Review and Approval of Schematic/ Preliminary Design Receipt of approved Schematic/ Preliminary Design 24-Apr-12, DETAIL DESIGN September 2011 28 04 11 18 25 October 2011 02 09 16 23 30 November 2011 06 13 20 December 2011 27 04 11 18 25 01 January 2012 08 15 22 29 February 2012 05 12 19 26 March 2012 04 11 18 25 01 April 2012 08 15 22 29 May 2012 06 13 20

District Cooling System Traffic Modeling and traffic generation Road Design, Hierarch and on-street parking Peripheral roads Storm water collection, ground water control and discharge system Telecommunication ducts and IT provisions Security and Data Management system Feasible connection of each utility to existing sources Civil works Lighting System Hard and Soft Landscaping Irrigation water distribution system Phasing Proposal of Infrastructure work and Packages High level cost estimate and cost plan Submission of Conceptual Design Review/Approval of Conceptual Design Receipt of Approved Concept Design 26-Feb-12, SCHEMATIC/ PRELIMINARY DESIGN

SCHEMATIC/ PRELIMINARY DESIGN


S1000 S1010 S1020 S1030 S1040 S1050 S1060 S1070 S1080 S1090 S1100 S1110 S1120 S1130 S1140 S1150 S1160 S1170 Start of Schematic/ Preliminary Design Coordination with Concerned Parties Schematic layout and assistance Attend value engineering Traffic Management System Limits of responsibility for the services Solid Waste Management and disposal/recycle Strategy for provision Mechanical and Electrical Systems Structural items of the works Construction logistics and Methodology Advice of Procurement of long lead Documentation for submission to Govt. or statutory authorities Detail Design briefs Estimates and updating the cost plan Submission of Schematic/ Preliminary Design Review and Approval of Schematic/ Preliminary Design Receipt of approved Schematic/ Preliminary Design

12d 06-Feb-12 19-Feb-12 6d 13-Feb-12 19-Feb-12 0d 20-Feb-12 7d 20-Feb-12 26-Feb-12 0d 26-Feb-12

DETAIL DESIGN
D1000 D1010 D1020 D1030 D1040 Start of Detail Design Coordination with Concerned Parties Power demand Detailed sketches Portable Water Network Sewerage Network

50d 27-Feb-12 24-Apr-12 0d 27-Feb-12 50d 27-Feb-12 24-Apr-12 30d 27-Feb-12 01-Apr-12 31d 27-Feb-12 02-Apr-12 30d 27-Feb-12 01-Apr-12

Support Service Actual Work

Remaining Work Critical Remaining Work

Milestone Summary

Baraha Motor City Development (Pre-Contract Primary Infrastructure Design Consultancy Services)
Activity ID D1050 D1060 D1070 D1080 D1090 D1100 D1110 D1120 D1130 D1140 D1150 D1160 D1170 D1180 Activity Name Surface Water Drainage System Fire Fighting System Design of Internal and Peripheral Roads Telecommunication ducts and IT Detailing Security and Data Management system Connection of each utility to existing sources Civil works Lighting System Hard and Soft Landscaping Irrigation water distribution system Quantity Takeoff, cost estimate and cash flow forecast Submission of Detail Design Review and Approval of Detail Design Receipt of Approved Detail Design Original Start Duration Finish Free Float 38d 4d 0d 2d 0d 2d 2d 0d 0d 0d 0d 0d 24-Apr-12 24-Apr-12 14-May-12 0d 0d 0d 0d 14-May-12 07-May-12 07-May-12 07-May-12 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d Total August 2011 Float 14 21 38d 4d 0d 2d 0d 2d 2d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d 0d September 2011 28 04 11 18 25 October 2011 02 09 16 23 30 November 2011 06 13 20 December 2011 27 04 11 18 25 01 January 2012 08 15 22 29 February 2012 05 12 19 26 March 2012 04 11 18 25 01 April 2012 08 15 22 29 May 2012 06 13 20

30d 27-Feb-12 01-Apr-12 28d 27-Feb-12 29-Mar-12 32d 27-Feb-12 03-Apr-12 30d 27-Feb-12 01-Apr-12 32d 27-Feb-12 03-Apr-12 30d 27-Feb-12 01-Apr-12 30d 27-Feb-12 01-Apr-12 32d 27-Feb-12 03-Apr-12 14d 27-Feb-12 13-Mar-12 18d 14-Mar-12 03-Apr-12 6d 04-Apr-12 0d 11-Apr-12 14d 11-Apr-12 0d 17d 25-Apr-12 0d 25-Apr-12 17d 25-Apr-12 11d 25-Apr-12 11d 25-Apr-12 11d 25-Apr-12 0d 08-May-12 7d 08-May-12 14-May-12 0d 14-May-12 10-Apr-12

Surface Water Drainage System Fire Fighting System Design of Internal and Peripheral Roads Telecommunication ducts and IT Detailing Security and Data Management system Connection of each utility to existing sources Civil works Lighting System Hard and Soft Landscaping Irrigation water distribution system Quantity Takeoff, cost estimate and cash flow forecast Submission of Detail Design Review and Approval of Detail Design Receipt of Approved Detail Design

TENDER AND CONTRACT DOCUMENT


T1000 T1010 T1020 T1030 T1040 T1050 T1060 T1070 Start in Preparation of Tender Documents Coordination with Concerned Parties Bill of Quantities Specifications and Drawings Contract Conditions and Other Contract Documents Submission of Tender Documents Review/Revisions/Approval of Tender Documents Receipt of Approved Tender Documents

14-May-12, TENDER AND CO Start in Preparation of Tender Documents Coordination with Concerned Bill of Quantities Specifications and Drawings

Contract Conditions and Other Con Submission of Tender Documents Review/Revisions/Approval of

Receipt of Approved Tender D

1 CONSULTANT SUPPORT POST DELIVERABLESd 15-May-12 15-May-12 PD100 Start of Post Deliverable Services PD110 Assists in selecting tenderers on technical basis 0d 15-May-12 1d 15-May-12 15-May-12 1d 15-May-12 15-May-12 1d 15-May-12 15-May-12 1d 15-May-12 15-May-12 1d 15-May-12 15-May-12

15-May-12, CONSULTANT S

Start of Post Deliverable Serv Assists in selecting tenderers

PD120 Review technical queries at tender stage PD130 Evaluate and prepare evaluation report PD140 Assist in negotiations with tenderers PD150 Assist in preparation and issuance of contract documentation and Contract procurement PD160 Completion of Post Deliverable Services

Review technical queries at te

Evaluate and prepare evaluat

Assist in negotiations with tend

Assist in preparation and issua

0d

15-May-12

0d

0d

Completion of Post Deliverabl

Support Service Actual Work

Remaining Work Critical Remaining Work

Milestone Summary

Page 3 of 3