CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS

No

Diameter

Berat Besi

mm

Kg / m1

4.0

0.13

5.0

0.12

5.5

No

BESI BETON SPIRAL

Diameter

Berat Besi

mm

Kg / m1

11

12

0.89

12

13

1.04

0.19

13

14

5.7

0.20

14

6.0

0.22

6.5

No.

Diameter

Berat Besi

mm

Kg / m1

10.00

0.62

13.00

1.04

1.21

16.00

1.58

16

1.58

19.00

2.23

15

19

2.23

22.00

2.98

0.31

16

22

2.98

25.00

3.85

8.0

0.40

17

23

3.26

29.00

5.19

9.0

0.53

18

25

3.85

32.00

6.31

10.0

0.62

19

28

4.83

36.00

7.99

10

11.0

0.75

20

31

5.93

21

32

6.31

MENGHITUNG BERAT BESI BETON DALAM 1 M3


1.

Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 12 x 12 cm
= ( 1 : 0.12 : 0.12 )

Besi 4 batang dia. 12

247.22 kg ( A)

66.67 kg ( B )

4 x

69,44 x 0,89 kg

Besi beugel dia. 8 jarak 20 mm = ( 69,44 : 0,20 ) x ( 4 x 0,12 ) x 0, 40 kg


BERAT BESI BETON UNTUK UKURAN 12 x 12 CM1 DALAM 1 M3 =
2.

313.89 kg/m3 ( A + B )

Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm
Panjang 1 m3 ukuran 15 x 15 cm
= ( 1 : 0.15 : 0.15 )

Besi 4 batang dia. 12

158.22 kg ( A)

71.11 kg ( B )

4 x

44,44 x 0,89 kg

Besi beugel dia. 8 jarak 20 mm = ( 44,44 : 0,20 ) x ( 4 x 0,15 ) x 0, 40 kg


BERAT BESI BETON UNTUK UKURAN 15 x 15 CM1 DALAM 1 M3 =
3.

4.

KOTA BANJAR

69.44 m1

44.44 m1

229.33 kg/m3 ( A + B )

Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 15 x 20 cm
= ( 1 : 0.15 : 0.20 )

Besi 4 batang dia. 12

118.67 kg ( A)

Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x 0, 40 kg =

155.56 kg ( B )

BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3

274.22 kg/m3 ( A + B )

4 x

33,33 x 0,89 kg

33.33 m1

Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm
Panjang 1 m3 ukuran 20 x 30 cm
= ( 1 : 0.20 : 0.30 )

16.67 m1

Besi 4 batang dia. 12

59.33 kg ( A)

Besi 2 batang dia. 10

= 2 x 16.67 x 0.62 kg

4 x

16,67 x 0,89 kg

73.57 kg ( B)

Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0.15 ) x (( 2 x 0.2 ) + ( 2 X 0,3 )) X 0,40 kg =

111.11 kg ( C )

BERAT BESI BETON UNTUK UKURAN 20 x 30 CM DALAM 1 M3

244.02 kg/m3 ( A + B + C )

Halaman : 1+114

Lampiran 1

DAFTAR BERAT BESI KANAL " C "

NO.

UKURAN BESI KANAL " C "

BERAT 6 M1

BERAT PER 1 M1
6.00

60

30

10

1.6

mm

9.80

kg

1.63

kg

60

30

10

2.3

mm

13.90

kg

2.32

kg

75

35

15

1.6

mm

12.50

kg

2.08

kg

75

35

15

2.3

mm

17.40

kg

2.90

kg

75

45

15

1.6

mm

14.00

kg

2.33

kg

75

45

15

2.3

mm

19.00

kg

3.17

kg

100

50

20

mm

21.40

kg

3.57

kg

100

50

20

2.3

mm

24.40

kg

4.07

kg

100

50

20

3.2

mm

33.00

kg

5.50

kg

10

125

50

20

mm

23.70

kg

3.95

kg

11

125

50

20

2.3

mm

27.10

kg

4.52

kg

12

125

50

20

3.2

mm

37.00

kg

6.17

kg

13

150

50

20

mm

26.10

kg

4.35

kg

14

150

50

20

2.3

mm

29.76

kg

4.96

kg

15

150

50

20

3.2

mm

40.56

kg

6.76

kg

16

150

65

20

mm

28.92

kg

4.82

kg

17

150

65

20

2.3

mm

33.00

kg

5.50

kg

18

150

65

20

3.2

mm

45.10

kg

7.52

kg

19

200

75

20

mm

35.52

kg

5.92

kg

20

200

75

20

2.3

mm

40.62

kg

6.77

kg

21

200

75

20

3.2

mm

55.62

kg

9.27

kg

KOTA BANJAR

Halaman :2+115

Lampiran 2

DAFTAR BERAT BESI IWF


NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

UKURAN IWF
100
125
148
150
175
198
200
248
250
298
300
346
350
396
400
446
450
500
588
600
700
800
900

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

50
60
100
75
90
99
100
124
125
149
150
174
175
199
200
199
200
200
300
200
300
300
300

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

5
6
6
5
5
4.5
5.5
5
6
6
6.5
6
7
7
8
8
9
10
12
11
13
14
16

BERAT 12 M1
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

7
8
9
7
8
7
8
8
9
8
9
9
11
11
13
12
14
16
20
17
24
26
28

mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

112.00
158.40
253.20
168.00
217.40
218.40
256.00
308.40
355.20
384.00
440.40
497.00
595.20
679.20
792.00
794.40
912.00
1,075.00
1,812.00
1,272.00
2,220.00
2,520.00
2,916.00

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

BERAT PER 1 M1
9.33
13.20
21.10
14.00
18.12
18.20
21.33
25.70
29.60
32.00
36.70
41.42
49.60
56.60
66.00
66.20
76.00
89.58
151.00
106.00
185.00
210.00
243.00

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

DAFTAR BERAT BESI SIKU " L "


NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

KOTA BANJAR

UKURAN BESI KANAL " L "


25
30
40
40
50
50
60
60
65
70
75
75
80
90
100
100
120
120
125
130
130

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

25
30
40
40
50
50
60
60
65
70
75
75
80
90
100
100
120
120
125
130
130

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

3
3
3
4
4
5
5
6
6
7
6
8
8
9
8
10
10
12
12
9
12

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
12
12
12
12
12

BERAT / BATANG
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

6.72
8.16
11.00
14.50
18.50
22.60
27.30
32.52
35.46
44.28
41.22
54.18
57.96
73.20
73.20
90.60
218.40
260.00
280.00
214.20
280.00

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

BERAT PER 1 M1
1.12
1.36
1.83
2.42
3.08
3.77
4.55
5.42
5.91
7.38
6.87
9.03
9.66
12.20
12.20
15.10
36.40
43.33
46.67
35.70
46.67

kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

Halaman : 3+116

Satuan Upah

DAFTAR SATUAN UPAH PEKERJA


NO.

JENIS PEKERJA BANGUNAN

HARGA UPAH
Rp.

SATUAN WAKTU

PEKERJA

27,500

1 ORANG/ HR/ 8 JAM

PEKERJA SETENGAH TERAMPIL

30,000

1 ORANG/ HR/ 8 JAM

PEKERJA TERAMPIL

31,500

1 ORANG/ HR/ 8 JAM

TUKANG GALI

34,000

1 ORANG/ HR/ 8 JAM

TUKANG BATU SETENGAH TERAMPIL

34,000

1 ORANG/ HR/ 8 JAM

TUKANG BATU TERAMPIL

36,500

1 ORANG/ HR/ 8 JAM

KEPALA TUKANG BATU

39,500

1 ORANG/ HR/ 8 JAM

TUKANG KAYU SETENGAH TERAMPIL

36,500

1 ORANG/ HR/ 8 JAM

TUKANG KAYU TERAMPIL

39,500

1 ORANG/ HR/ 8 JAM

10

KEPALA TUKANG KAYU

42,000

1 ORANG/ HR/ 8 JAM

11

TUKANG CAT / PELITUR SETENGAH TERAMPIL

36,500

1 ORANG/ HR/ 8 JAM

12

TUKANG CAT / PELITUR TERAMPIL

39,500

1 ORANG/ HR/ 8 JAM

13

KEPALA TUKANG CAT / PELITUR

42,000

1 ORANG/ HR/ 8 JAM

14

TUKANG BESI BETON SETENGAH TERAMPIL

36,500

1 ORANG/ HR/ 8 JAM

15

TUKANG BESI BETON TERAMPIL

39,500

1 ORANG/ HR/ 8 JAM

16

KEPALA TUKANG BESI BETON

43,500

1 ORANG/ HR/ 8 JAM

17

TUKANG BESI PROFIL SETENGAH TERAMPIL

38,000

1 ORANG/ HR/ 8 JAM

18

TUKANG BESI PROFIL TERAMPIL

42,000

1 ORANG/ HR/ 8 JAM

19

KEPALA TUKANG BESI PROFIL

47,500

1 ORANG/ HR/ 8 JAM

20

MANDOR

42,500

1 ORANG/ HR/ 8 JAM

21

OPERATOR MEKANIK

30,000

1 ORANG/ HR/ 8 JAM

22

PEMBANTU OPERATOR / MEKANIK

26,000

1 ORANG/ HR/ 8 JAM

23

OPERATOR ALAT BERAT TERLATIH

30,000

1 ORANG/ HR/ 8 JAM

24

SUPIR TRUK

45,000

1 ORANG/ HR/ 8 JAM

25

KENEK TRUK

30,000

1 ORANG/ HR/ 8 JAM

26

PENJAGA MALAM

26,000

1 ORANG/ HR/ 8 JAM

27

TUKANG ASPAL

35,000

1 ORANG/ HR/ 8 JAM

28

BURUH LAPANGAN TAK TERLATIH

27,500

1 ORANG/ HR/ 8 JAM

29

BURUH LAPANGAN KURANG TERLATIH

29,000

1 ORANG/ HR/ 8 JAM

30

BURUH LAPANGAN TERLATIH

31,000

1 ORANG/ HR/ 8 JAM

Daftar Analis TARKIM

Halaman : 4

Satuan Bahan

DAFTAR SATUAN HARGA BAHAN


JAWA BARAT
TAHUN 2008
NO.

JENIS BAHAN BANGUNAN

SAT

HARGA SAT.
Rp.

AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA

Pasir Urug

55,000.00

Sirtu

81,900.00

Pasir Teras

78,000.00

Pasir Pasang Kali

65,000.00

Pasir Beton

75,000.00

Abu Batu / Screen

130,000.00

Batu Gosok ( Apung )

kg

9,750.00

Screen

130,000.00

Batu Pecah Mesin 1/2

160,000.00

10

Batu Pecah Mesin 2/3

150,000.00

11

Batu Pecah Mesin 3/5

145,000.00

12

Batu Pecah Mesin 5/7

120,000.00

13

Batu Pecah Mesin 7/10

115,000.00

14

Batu Pecah Mesin 10/15

100,000.00

15

Batu Belah Pondasi 15/20

85,000.00

16

Batu Bronjol ( Untuk Bronjong )

78,000.00

17

Batu Koral Beton Kali ( Pecah Tangan )

125,500.00

18

Batu Tempel Hitam

117,000.00

19

Batu Pinggir Beton 10 x 20 x 35

bh

13,000.00

20

Batu Pinggir Beton 15 x 35 x 50 ( K -225 )

bh

27,500.00

21

Batu Telor

91,000.00

22

Batako kecil 8 x 10 x 20

bh

1,050.00

23

Batako Besar 8 x 20 x 30

bh

2,750.00

24

Con Blok 8 x 20 x 40 (Holowblock)

bh

2,600.00

25

Bata Merah Bakar Kelas I

bh

250.00

26

Bata Merah Bakar Kelas II

bh

240.00

27

Bata Merah Oven

bh

2,350.00

28

Roster Beton 20 x 20

bh

3,575.00

29

Roster Beton 30 x 30

bh

5,200.00

30

Grass Blok 20 x 20

bh

14,500.00

31

Grass Blok 30 x 30

bh

17,500.00

32

Paving Blok Natural

bh

750.00

33

Paving Blok Warna

bh

800.00

34

Paving Blok Natural 6 cm

26,000.00

35

Paving Blok Warna 6 cm

28,600.00

36

Paving Blok Natural 8 cm

27,000.00

37

a. Bentuk Hexagonal (1m2 = 27 bh)

bh

750.00

38

b. Bentuk Tiga Berlian (1m2 = 50 bh)

bh

650.00

39

c. Bentuk Segi Panjang (1m2 = 50 bh)

bh

650.00

Daftar Analisa TARKIM

Halaman : 5+1

Satuan Bahan

4
30,000.00

40

Paving Blok Warna 8 cm

41

Paving Blok Biasa

bh

750.00

42

Kanstin Paving Blok

bh

27,300.00

43

Semen PC Tiga Roda / 50 kg *M080

zak

50,000.00

44

Semen PC Tiga Roda

Kg

1,000.00

45

Semen Putih

zak

68,250.00

46

Kanstin Jalan ukuran Besar ( bina Marga ) 1 bh = 60 cm

bh

27,300.00

47

Readymix Beton K 300, tanpa pompa ( selang )

676,000.00

48

Readymix Beton K 225, tanpa pompa ( selang )

572,000.00

49

Readymix Beton K 175, tanpa pompa ( selang )

494,000.00

50

Kapur Pasang/ kapur tembok

88,700.00

51

Kapur Sirih

kg

850.00

52

Semen Warna

kg

5,000.00

53

Tanah Liat

29,000.00

54

Tanah Urug (dilokasi)

6,500.00

55

Rumput

6,900.00

56

Hollow Block 20

bh

1,750.00

57

Hollow Block 15

bh

1,600.00

58

Hollow Block 10

bh

1,300.00

59

Roster Terawang Keramik

bh

22,000.00

60

Batu Candi

m2

95,000.00

61

Batu Sikat 0,5 / 2 cm

m2

40,000.00

BAHAN FINISHING :

Plamir Tembok

kg

12,000.00

Cat Tembok ICI Eksterior ( BETON )

kg

27,300.00

Cat Tembok Kelas II

Kg

7,000.00

Cat Tembok ICI Interior ( PLAFOND DAN DINDING )

lt

20,475.00

Cat Tembok Vinilex

kg

11,500.00

Cat Dasar ICI untuk Interior ( 2 Pelapis )

lt

66,300.00

Cat Tembok Sanlex

kg

8,000.00

Cat Tahan Asam

kg

31,850.00

Cat Berkilat/Cat kayu

kg

38,000.00

10

Cat Jembatan *M090

kg

44,850.00

11

Plamir Kayu

kg

11,000.00

12

Pelapis Alkali ICI ( Cat Dasar Beton Ekterior )

lt

35,000.00

13

Cat Marka / Spotlight

kg

88,725.00

14

Water Profing Emulsion

kg

75,075.00

15

Water Profing Membrance

ml

57,330.00

16

Rool Cat Tembok

bh

20,475.00

17

Kape Tembok

bh

6,825.00

18

Kape Kayu

bh

5,000.00

19

Soligneum 1 blek

5 lt

45,500.00

20

Plincote

kg

26,000.00

21

Pengawetan Kayu

35,000.00

22

Pengopenan Kayu

477,750.00

LABURAN, PENGISI DAN ALATNYA

Daftar Analisa TARKIM

Halaman : 6+1

Satuan Bahan

4
9,750.00

23

Kwas 3"

bh

24

Kwas 2'

bh

6,500.00

25

Oker

kg

29,000.00

26

Oyan

bks

2,730.00

27

Oten (Pewarna Plitur )

bks

2,730.00

28

Spirtus

lt

8,200.00

29

Bahan Plitur Kripik ( Sirlak India )

kg

16,000.00

30

Dempul Lilin

kg

17,500.00

31

Dempul Plitur

kg

2,750.00

32

Dempul Halus / Imfra ( Wood Filler )

kg

27,300.00

33

Terpentin

lt

3,900.00

34

Tiner A

lt

11,050.00

35

Tiner B

lt

16,500.00

36

Kumpon

kg

16,250.00

37

Melamik

kg

37,375.00

38

Impra

kg

29,500.00

39

Dempul Plastik

kg

30,550.00

40

Dempul Duco

kg

24,000.00

41

Ampelas

lbr

2,000.00

42

Dempul Kayu Cap Kucing

kg

18,500.00

43

Meni Kayu / Besi

kg

15,600.00

44

Meni Sincromat

kg

20,000.00

45

Cat Kayu Sieve

kg

44,000.00

46

Cat Besi Sieve

kg

42,250.00

47

Cat Besi Duco Danaglos/ICI

kg

54,600.00

48

Cat Bron

kg

40,950.00

49

Sirlak

kg

50,000.00

50

Lem Fox

bh

13,000.00

BAHAN KAYU BERIKUT BAHAN JADINYA

Bambu Biasa

bt

5,200.00

Bambu 5 s.d 7

bt

7,000.00

Bambu 7 s.d 10

bt

12,500.00

Bambu Gombong

bt

22,500.00

Papan Terentang

950,000.00

Kayu Kamper Singkil / Kapur (K. Samarinda Klas II)

5,850,000.00

Kayu Lokal Kelas II

1,950,000.00

Kayu Papan Lokal Kelas II

2,210,000.00

Kayu Papan Kamper

5,500,000.00

10

Kayu Balok Borneo Super

3,250,000.00

11

Kayu Papan Borneo Super

3,510,000.00

12

Kayu Balok Kamper

5,460,000.00

13

Kayu Balok Kruing

3,000,000.00

16

Kayu Balok Kamper Banjar

4,900,000.00

17

Kayu Papan Kamper Banjar

5,500,000.00

18

Kayu Balok Kamper Samarinda

5,460,000.00

19

Kayu Papan Kamper Samarinda

6,550,000.00

Daftar Analisa TARKIM

Halaman : 7+1

Satuan Bahan

20

Kayu Balok Rasamala

3,575,000.00

21

Kayu Balok jati

6,825,000.00

22

Kayu Papan Jati

7,825,000.00

28

Kayu Balok Albasiah

1,100,000.00

29

Kayu Papan Albasia

1,105,000.00

31

Kayu Papan Borneo

2,730,000.00

32

Dolken 8 s/d 10 uk.4m'

bt

58,500.00

33

Dolken 7 s/d 10

bt

26,000.00

34

List profil kamper 1 cm

m1

2,000.00

35

List profil kamper 2 cm

m1

2,400.00

36

List profil kamper 4 cm

m1

4,000.00

37

List profil kamper 5 cm

m1

4,400.00

38

List profil kamper 10 cm

m1

27,300.00

39

Pegangan Tangga profil Jati

m1

204,750.00

40

Pegangan Tangga profil Kamper

m1

81,900.00

41

Kayu Reng 2/3 Borneo

m1

1,300.00

42

Kayu Reng 2/3 Kamper Banjar

m1

1,950.00

43

Kayu Reng 3/4 Kamper Banjar

m1

2,850.00

44

Reng Kayu Kls II

m1

750.00

45

List profil Kayu Lokal KLs II 4 cm

m1

2,200.00

BAHAN PENUTUP RANGKA PLAFOND

Bahan plafond Enternit 4 mm

8,450.00

Bahan plafond hardpleks 5 mm 120 x 240

lbr

90,200.00

Bahan plafond Asbes Semen 5 mm

7,150.00

Gypsum 120 x 240 t = 9 mm ex DN

lbr

54,000.00

Gypsum 120 x 240 t = 9 mm ex Luar

lbr

60,000.00

Acustik Amstrong 60 x 120

lbr

101,400.00

GRC 120 x 240

lbr

BAHAN KAYU LAPIS

Triplek 3 mm 120 x 240

lbr

50,450.00

Triplek 4 mm 120 x 240

lbr

58,650.00

Triplek 4 mm Ukuran Pintu

lbr

34,850.00

Triplek 6 mm 120 x 240

lbr

103,400.00

Jabar Wood 4 mm

lbr

66,000.00

Plywood 18 mm 120 x 240

lbr

225,800.00

Plywood 4 mm 120 x 240

lbr

85,000.00

Plywood 3 mm 120 x 240

lbr

50,000.00

55,000.00

Plywood 3 mm ukuran Pintu

lbr

95,000.00

10

Plywood 4 mm ukuran Pintu

lbr

105,000.00

11

Bilik Bambu ( tanpa kulit )

4,800.00

12

Bilik Bambu ( dengan kulit )

10,900.00

13

Bilik Bambu Hitam Variasi

14,950.00

14

Wall Paper ( kls menengah )

36,800.00

15

Multiplek 9 mm 120 x 240

lbr

117,650.00

16

Multiplek 12 mm 120 x 240

lbr

156,900.00

Daftar Analisa TARKIM

Halaman : 8+1

Satuan Bahan

17

Multiplek 18 mm 120 x 240

lbr

180,450.00

18

Play Wood 18 mm 120 x 240

lbr

225,800.00

19

Teak Wood 3 mm 120 x 240

lbr

85,300.00

20

Teak Wood 4 mm 120 x 240

lbr

92,800.00

21

Teak Wood 3 mm 120 x 240 Ukuran Pintu

lbr

58,000.00

22

Teak Wood ukuran Pintu 4 mm

lbr

86,300.00

23

Tacon ( tahan bakar )

89,300.00

24

Supercon

47,700.00

25

Melamin 4 mm 120 x 240

lbr

62,800.00

26

Melamin TIK 4 mm

lbr

173,400.00

27

Formika 120 x 240

lbr

160,150.00

28

Formika Ukuran Pintu

lbr

94,000.00

BAHAN LANTAI DAN PELAPIS DINDING

Tegel PC 20 x 20

bh

800.00

Plin Tegel PC 10 x 20

bh

1,050.00

Tegel PC 30 x 30

bh

2,750.00

Plin Tegel PC 15 x 30

bh

1,200.00

Tegel Warna 20 x 20

bh

900.00

Plin Tegel Warna 10 x 20

bh

2,350.00

Tegel Warna 30 x 30

bh

2,850.00

Ubin Keramik 30 x 30 cm KW 1

dus

39,000.00

Ubin Keramik 20 x 20 cm KW 1

dus

37,000.00

10

Plin Tegel Warna 15 x 30

bh

3,400.00

11

Tegel Wafel PC 20 x 20

bh

800.00

12

Tegel Wafel Warna 20 x 20

bh

900.00

13

Tegel Badak PC 30 x 30

bh

2,350.00

14

Poslin 11 x 11 Warna Standar DN

34,700.00

15

Poslin 11 x 11 Warna Khusus DN

40,200.00

16

Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos

40,000.00

17

Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip

45,000.00

18

Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip

45,000.00

19

Keramik 20 x 20 (KM) KWI DN Putih Polos

40,950.00

20

Keramik 20 x 25 Dinding KM KWI DN Corak

43,000.00

21

Keramik 30 x 30 KW I DN putih polos

40,950.00

22

Keramik 30 x 30 KW I DN Warna/Corak / Anti Slip

47,450.00

23

Granito Tile Esenssza 40 x 40 polis

286,650.00

24

Granito Tile Esenssza 40 x 40 un polis

204,750.00

25

Granito Tile Esenssza 60 x 60 polis

300,300.00

26

Granito Tile Esenssza 60 x 60 un polis

218,400.00

27

Keramik 40 x 40 cm

dus

54,600.00

28

Keramik Mozaik 30 x 30 cm

dus

62,800.00

29

Vinyl Lantai standar

21,050.00

30

Karpet Kelas Baik LN

608,300.00

31

Karpet Kelas Sedang LN

237,500.00

32

Stairnosing keramik 10/20

bh

8,200.00

33

Stairnosing fiber

m'

14,550.00

Daftar Analisa TARKIM

Halaman : 9+1

Satuan Bahan

21,850.00

34

Taraso Kerang 30 x 30

35

Plin Taraso 10 x 30

bh

4,950.00

36

Granit Alam LN Ukuran Besar

1,597,000.00

37

Granit Alam LN Ukuran Kecil

1,228,500.00

38

Granit Alam DN Ukuran Besar

1,078,300.00

39

Granit Alam DN Ukuran Kecil

997,750.00

40

Marmer Alam Lampung Ukuran Besar

180,800.00

41

Marmer Alam Lampung Ukuran Kecil

122,800.00

42

Marmer Alam Citatah Ukuran Besar

477,700.00

43

Marmer Alam Citatah Ukuran Kecil

282,500.00

44

Marmer Sintetis

273,000.00

45

Bata Karawang

bh

6,750.00

46

Campuran untuk Kedap Air (AM)

ltr

24,700.00

47

Lantai Parket

320,000.00

48

Stepnozing

m'

14,400.00

49

Plint Keramik 5/20

bh

5,500.00

50

Keramik Lantai Antislip sekualitas Romance KW I Warna 33x33 cm

m2

60,000.00

51

Keramik Lantai sekualitas Romance KW I Warna 33x33 cm

m2

55,000.00

BAHAN SALURAN AIR KOTOR / BERSIH

Grafel 1/2 d.20 cm

m1

20,000.00

Grafel 1/2 d.30 cm

m1

30,000.00

Grafel 1/2 d.40 cm

m1

40,000.00

Buis Beton 20 cm ( 1 m' )

m1

40,000.00

Buis Beton 30 cm ( 1 m' )

bh

60,000.00

Buis Beton 40 cm ( 1 m' )

bh

80,000.00

Buis Beton 50 cm ( 1 m' )

bh

100,000.00

Buis Beton 60 cm ( 1 m' ) *M031

bh

120,000.00

Buis Beton 100 cm ( 0.50 m ) *M035

bh

200,000.00

10

Buis Beton 80 cm ( 0.50 m ) *M033

bh

160,000.00

11

Buis Tanah 10 cm ( 0.50 m )

bh

7,500.00

12

Buis Tanah 15 cm ( 0.50 m )

bh

10,500.00

13

Buis Tanah 20 cm ( 0.50 m )

bh

14,500.00

14

Buis Tanah 25 cm ( 0.50 m )

bh

17,500.00

15

Injuk

kg

12,000.00

BAHAN LOGAM DAN BAHAN JADINYA

Besi Beton U-24 Rata - Rata *M167'

kg

8,000.00

Besi Beton U-39 / U-32 Rata - Rata *M167

kg

9,000.00

Pagar BRC Lengkap Tiang ( Tanpa Pondasi )

82,300.00

Bondek

110,500.00

Ongkos Galfanis Besi

kg

5,500.00

Kawat Duri

m1

2,350.00

Kawat Pengikat

m1

5,200.00

Kawat Bronjong 4 mm

kg

6,750.00

Kawat Tembaga

kg

4,550.00

10

Baja Siku / Profil DN

kg

8,950.00

Daftar Analisa TARKIM

Halaman : 10+1

Satuan Bahan

11

Baja IWF DN SII

kg

9,250.00

12

Baja IWF Jepang

kg

10,900.00

13

Baja Kontruksi Jembatan *M165

kg

24,550.00

14

Kawat Beton *M168

kg

8,550.00

15

Kawat Bronjong 4 mm *M162

kg

6,500.00

16

Kawat Tembaga

kg

4,500.00

17

Baut Baja *M163

kg

20,400.00

18

Besi Galvanisir * M164

kg

34,000.00

19

Baja Tralis *M161

kg

14,000.00

20

Ram Nyamuk Hijau

9,500.00

21

Ram Kawat 1 x 1 cm

9,500.00

22

Ram Ayam

10,000.00

23

Kawat Kasa 1 x 1 cm ( Putih )

16,900.00

24

Kawat Harmonika 4 cm

21,450.00

25

Kawat Harmonika 2 cm

26,000.00

26

Kawat Las Listrik

kg

20,400.00

27

Wiremesh M8

31,200.00

28

Wiremesh M6

25,500.00

29

Timah

kg

32,000.00

30

Timah Hitam

kg

20,400.00

31

Ram Nyamuk Aluminium

11,050.00

32

Plat Srip 2 x 30 mm ( 6 m1)

bt

20,400.00

33

Plat Srip 3 x 30 mm ( 6 m1)

bt

26,500.00

34

Plat Alumunium 0.2 mm

62,150.00

Daftar Analisa TARKIM

Halaman : 11+1

Satuan Bahan

4
80,700.00

35

Plat Alumunium 0.3 mm

36

Plat Alumunium 0.4 mm

96,850.00

37

Plat Alumunium 0.5 mm

109,200.00

38

Plat Alumunium 0.6 mm

126,350.00

39

Plat Alumunium 0.1 mm

33,550.00

40

Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " )

m1

125,000.00

41

Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " )

m1

130,000.00

42

Kusen Alumunium 4" CA

m1

55,000.00

43

Daun Jendela Alumunium Natural ( Tanpa Kaca dan accessories )

40,500.00

44

Daun Jendela Alumunium Warna ( Tanpa Kaca dan accessories )

43,000.00

45

Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )

53,300.00

46

Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )

71,000.00

47

Handle Alumunium ( Tarikan Pintu Alumunium )

bh

68,250.00

48

Kait Angin alumunium

ps

81,900.00

49

Karet Asisoris Kusen / Pintu Alumunium

m1

4,000.00

50

Seng Plat BJLS 30 dia. 60 cm ( 100 m1 )

m1

21,850.00

51

Seng Plat BJLS 30 dia. 90 cm ( 100 m1 )

m1

27,300.00

52

Plat Besi Tipis 1 mm

kg

9,500.00

53

Plat Besi Tipis 0.5 mm

kg

10,150.00

54

Plat Besi 2 mm s/d 5 mm

kg

8,200.00

55

Plat Besi 6 mm s/d 10 mm

kg

8,200.00

56

Plat Besi 10 mm Ke atas

kg

8,200.00

57

Lem Kuning (aibond)

kg

36,800.00

58

Lem Fox

kg

13,000.00

59

Pintu Besi Baja

m2

400,000.00

60

Rolling door Besi

m2

400,000.00

61

Pintu Aluminium

m2

150,000.00

62

Pintu Swing 5mm

unt

825,000.00

63

Pintu Swing 8mm

unt

1,200,000.00

64

Teralis Besi strip

m2

80,000.00

65

Besi Teralis

m2

450,000.00

BAHAN KACA

Kaca Polos 2 mm

32,000.00

Kaca Polos 3 mm

34,000.00

Kaca Polos 5 mm

38,000.00

Kaca Polos Tebal 8 mm

66,000.00

Kaca Polos Tebal 12 mm

70,000.00

Kaca Rayband 5 mm ( ASAHI )

61,350.00

Kaca Rayband 8 mm ( ASAHI )

273,000.00

Kaca Rayband 12 mm ( ASAHI )

443,550.00

Kaca Patri Lokal Terpasang ( ASAHI )

716,550.00

10

Kaca Patri EX Luar negeri terpasang

2,934,750.00

11

Kaca 6 mm Gravir

1,225,800.00

12

Glass Block DN 20 x 20

bh

20,150.00

13

Glass Block 20 x 20 Ex LN

bh

68,250.00

Daftar Analisa TARKIM

Halaman : 12+1

Satuan Bahan

BAHAN PAKU DAN MUR BAUT

Paku 3 cm

kg

9,000.00

Paku 5 cm s/d 7 cm / Paku Reng - Usuk

kg

9,000.00

Paku 8 cm s/d 12 cm

kg

9,000.00

Paku 2 cm s/d 4 cm /Paku Tripleks - Bilik

kg

9,500.00

Paku 1/2 cm s/d 1 cm /Paku seng-Plat Poil

kg

9,800.00

Paku Baja Jembatan *M166

kg

14,000.00

Paku Beton 2 cm s/d 5 cm

kg

15,000.00

Paku Kait Lengkap

bh

650.00

Paku Cacing

kg

12,500.00

10

Paku Seng Glb. / Paku Asbes Glb.

kg

14,000.00

11

Paku Skrup

kg

6,750.00

12

Besi Beugel kuda - kuda

kg

9,500.00

13

Duk Angker

kg

9,500.00

14

Angker Mur Baut dia.19 / panjang 60 cm

bh

14,000.00

15

Mur Baut HTB dia. 19 s/d 16 (5 cm)

bh

4,700.00

16

Mur Baut Biasa dia.19 s/d 16 (5 cm)

bh

4,000.00

17

Piser dia. 12 s/d 20 cm

bh

3,400.00

BAHAN PERPIPAAN

1.

Besi Pipa untuk Hydrant BSP 1"

bt

83,700.00

Besi Pipa untuk Hydrant BSP 1,25"

bt

88,400.00

Besi Pipa untuk Hydrant BSP 1,5"

bt

95,950.00

Besi Pipa untuk Hydrant BSP 2"

bt

111,300.00

Besi Pipa untuk Hydrant BSP 2,5"

bt

341,250.00

Besi Pipa untuk Hydrant BSP 3"

bt

471,500.00

Besi Pipa untuk Hydrant BSP 4"

bt

668,100.00

Besi Pipa untuk Hydrant BSP 6"

bt

1,105,650.00

Hydrant

bh

210,000.00

10

Besi Pipa Hitam 1" t=2 mm

bt

74,350.00

11

Besi Pipa Hitam 2" t=2 mm

bt

133,750.00

12

Besi Pipa Hitam 3" t=2 mm

bt

238,800.00

13

Besi Pipa Hitam 4" t=2 mm

bt

307,000.00

14

Besi Pipa Hitam 6" t=2 mm

bt

409,500.00

15

Pipa GIP Medium A 1/2" ( 6 m1 )

bt

70,000.00

16

Pipa GIP Medium A 3/4" ( 6 m1 )

bt

85,300.00

17

Pipa GIP Medium A 1" ( 6 m1 )

bt

126,800.00

18

Pipa GIP Medium A 1 1/4" ( 6 m1 )

bt

164,700.00

19

Pipa GIP Medium A 1 1/2" ( 6 m1 )

bt

196,200.00

20

Pipa GIP Medium A 1 3/4"( 6 m1 )

bt

232,000.00

21

Pipa GIP Medium A 2" ( 6 m1 )

bt

286,600.00

22

Pipa GIP Medium A 2 1/2" ( 6 m1 )

bt

381,400.00

23

Pipa GIP Medium A 3" ( 6 m1 )

bt

464,000.00

24

Pipa GIP Medium A 4" ( 6 m1 )

bt

611,500.00

Daftar Analisa TARKIM

Halaman : 13+1

Satuan Bahan

25

Macam2 Sambungan GIP 1/2"

bh

4,000.00

26

Macam2 Sambungan GIP 3/4"

bh

5,200.00

27

Macam2 Sambungan GIP 1"

bh

8,200.00

28

Macam2 Sambungan GIP 1 1/4"

bh

10,000.00

29

Macam2 Sambungan GIP 11/2"

bh

11,500.00

30

Macam2 Sambungan GIP 13/4"

bh

17,200.00

31

Macam2 Sambungan GIP 2"

bh

23,800.00

32

Macam2 Sambungan GIP 2 1/2"

bh

34,000.00

33

Macam2 Sambungan GIP 3"

bh

40,950.00

34

Macam2 Sambungan GIP 4"

bh

47,700.00

35

Pipa PVC RUCIKA type AW 1/2"

bt

21,800.00

36

Pipa PVC RUCIKA type AW

3/4"

bt

30,700.00

37

Pipa PVC RUCIKA type AW

1"

bt

38,200.00

38

Pipa PVC RUCIKA type AW

1 1/4"

bt

53,200.00

39

Pipa PVC RUCIKA type AW

1 1/2"

bt

68,800.00

40

Pipa PVC RUCIKA type AW

2"

bt

94,100.00

41

Pipa PVC RUCIKA type AW

2 1/2"

bt

120,000.00

42

Pipa PVC RUCIKA type AW

3"

bt

180,200.00

43

Pipa PVC RUCIKA type AW

4"

bt

279,750.00

44

Pipa PVC RUCIKA type AW

6"

bt

539,100.00

45

Pipa PVC RUCIKA type AW

8"

bt

784,800.00

46

Pipa PVC MASPION ABU 1/2" (AW)

bt

12,750.00

47

Pipa PVC MASPION ABU 3/4" (AW)

bt

16,500.00

48

Pipa PVC MASPION ABU 1" (AW)

bt

22,500.00

49

Pipa PVC MASPION ABU 1 1/4" (AW)

bt

31,450.00

50

Pipa PVC MASPION ABU 1 1/2" (AW)

bt

40,450.00

51

Pipa PVC MASPION ABU 2" (AW)

bt

69,950.00

52

Pipa PVC MASPION ABU 2 1/2" (AW)

bt

83,850.00

53

Pipa PVC MASPION ABU 3" (AW)

bt

154,300.00

54

Pipa PVC MASPION ABU 4" (AW)

bt

204,750.00

55

Pipa PVC MASPION ABU 6" (AW)

bt

481,000.00

56

Pipa GI Diameter 0,5"

bt

35,000.00

57

Pipa GI Diameter 0,75"

bt

44,000.00

58

Pipa GI Diameter 1"

bt

51,900.00

59

Pipa GI Diameter 1,25"

bt

120,000.00

60

Pipa GI Diameter 1,5"

bt

130,000.00

61

Pipa GI Diameter 2"

bt

109,250.00

62

Pipa GI Diameter 2,5"

bt

300,250.00

63

Pipa GI Diameter 3"

bt

185,000.00

64

Pipa GI Diameter 4"

bt

272,300.00

65

Knie PVC Diameter 0,5"

bh

1,000.00

66

Knie PVC Diameter 0,75"

bh

1,400.00

67

Knie PVC Diameter 1"

bh

4,800.00

68

Knie PVC Diameter 2"

bh

19,900.00

Daftar Analisa TARKIM

Halaman : 14+1

Satuan Bahan

69

Knie PVC Diameter 3"

bh

35,900.00

70

Knie PVC Diameter 4"

bh

81,650.00

71

Tee PVC Diameter 0,5"

bh

1,400.00

72

Tee PVC Diameter 0,75"

bh

1,800.00

73

Tee PVC Diameter 1"

bh

3,600.00

74

Tee PVC Diameter 2"

bh

4,300.00

75

Tee PVC Diameter 3"

bh

5,950.00

76

Tee PVC Diameter 4"

bh

900.00

77

Kran Diameter 0,5"

bh

20,400.00

78

Fiet Kran Diameter 0,5"

bh

32,000.00

79

Fiet Kran Diameter 0,75"

bh

54,600.00

80

Fiet Kran Diameter 1"

bh

91,500.00

81

Fiet Kran Diameter 2"

bh

301,000.00

82

Fiet Kran Diameter 3"

bh

695,750.00

83

Fiet Kran Diameter 4"

bh

2,601,300.00

84

Macam2 Sambungan Paralon 1/2"

bh

5,400.00

85

Macam2 Sambungan Paralon 3/4"

bh

5,400.00

86

Macam2 Sambungan Paralon 1"

bh

14,900.00

87

Macam2 Sambungan Paralon 1 1/4"

bh

16,400.00

88

Macam2 Sambungan Paralon 1 1/2"

bh

16,400.00

89

Macam2 Sambungan Paralon 1 3/4"

bh

16,400.00

90

Macam2 Sambungan Paralon 2"

bh

17,000.00

91

Macam2 Samb. Paralon 2 1/2"

bh

17,000.00

92

Macam2 Samb. Paralon 3"

bh

41,000.00

93

Macam2 Samb. Paralon 4"

bh

47,800.00

94

Sambungan Pipa PVC Jenis AW 4 " TY

bh

28,000.00

95

Lem Paralon

bh

5,500.00

96

Solatip Leideng

gl

1,950.00

97

Pipa PVC 4" berlobang jenis AW

m1

26,600.00

BAHAN SANITAIR

Stop Kran 1/2 " KIT

bh

23,800.00

Stop Kran 3/4 " KIT

bh

27,300.00

Stop Kran 1 " KIT

bh

177,450.00

Stop Kran 1 1/2 " KIT

bh

245,700.00

Stop Kran 2 " KIT

bh

614,250.00

Stop Kran 2 1/2" KIT

bh

696,150.00

Stop Kran 3 " KIT

bh

61,300.00

Fiet kran 3/4"

bh

54,600.00

Fiet kran 1"

bh

71,000.00

10

Fiet kran 2"

bh

200,000.00

11

Fiet kran 3"

bh

431,300.00

12

Fiet kran 4"

bh

712,500.00

13

Lem Paralon

bh

5,400.00

Daftar Analisa TARKIM

Halaman : 15+1

Satuan Bahan

4
3,000.00

14

Double Neple 1/2 "

bh

15

Water Mur 1/2 "

bh

8,300.00

16

Gate Walve 1/2 "

bh

34,000.00

17

Saringan Air Lt KM Stainless Steel

bh

34,000.00

18

Apooer Bath Tube

bh

196,000.00

19

Kran stain less Lokal Kait

bh

36,000.00

20

Shower Dengan Tiang

bh

184,200.00

21

Shower Tanpa Tiang

bh

102,300.00

22

Kran Tembok Sun Eui dia. 1/2 "

bh

68,250.00

23

Kran Tembok ITAP dia. 1/2 "

bh

27,300.00

24

Kran Bebek Sun Eui 1/2 "

bh

122,850.00

25

Kran Bebek ITAP 1/2 "

bh

40,950.00

26

Kran Panas Dingin San Eui Standard

bh

170,500.00

27

Bath Cape Washteren

unit

1,633,800.00

28

Tempat Sabun Poslin

bh

34,000.00

29

Wastafel Lengkap TOTO LW 230

unit

941,850.00

30

Wastafel Lengkap INA

unit

511,800.00

31

Closet Duduk Poslin (INA) Lengkap

set

1,706,250.00

32

Closet Jongkok Poslin (INA)

bh

109,200.00

33

Closet Jongkok Teraso

bh

60,350.00

34

Closet Jongkok Poslin warna TOTO

unit

314,400.00

35

Closet Jongkok Standard Putih Poslin TOTO

unit

150,150.00

36

Closet Jongkok Lengkap Sistem Jet TOTO

unit

1,556,000.00

37

Closet Duduk Warna Standard TOTO C 240 Lengkap

unit

1,433,000.00

38

Wastafel Bulat Warna Standard Lengkap

unit

1,177,250.00

39

Closet Duduk Warna Standard lengkap INA

bh

1,098,750.00

40

Urinoar Lengkap TOTO Warna Standard lengkap

unit

1,276,200.00

41

Penyekat Poslin Urinoar TOTO

lbr

344,000.00

42

Kitchen Zink Stainless Standard Lokal ( 1 Lobang )

bh

160,000.00

43

Kitchen Zink Stainless Non Standard Franke ( 1 Lobang )

bh

200,000.00

44

Kitchen Zink Stainless Non Standard Franke ( 2 Lobang )

bh

225,000.00

45

Selotip

bh

1,300.00

46

Bak Mandi Teraso

bh

204,000.00

47

Bak Mandi Fiber Glass 60 x 6

bh

95,500.00

48

Floordrain stainless

bh

20,000.00

BAHAN PENUTUP ATAP

Atap Plastik Gelombang 80 x 180

lbr

18,000.00

Atap Fiber Glass Tipis 80 x 180 (gelombang)

lbr

32,500.00

Atap Fiber Glass Tebal 80 x 180 (gelombang)

lbr

64,000.00

Atap Aluminium Natural USR 26 ( JAINDO )

111,000.00

Atap Aluminium Warna USR 26 ( JAINDO )

127,500.00

Atap Asbes Gel. Kecil 4 mm 80 x 180

lbr

36,000.00

Bubung Asbes

lbr

22,000.00

Daftar Analisa TARKIM

Halaman : 16+1

Satuan Bahan

Atap Asbes Gel. 4 mm 90 x 180

lbr

40,000.00

Atap Asbes Gel. 5 mm 90 x 180

lbr

46,000.00

10

Atap Asbes Gel. Besar 5 mm 90 x 240

lbr

68,700.00

11

Atap Tegola Kubota, lengkap

387,600.00

13

Atap Tegola Kwalitas Sedang

200,000.00

14

Aluminium foile

6,000.00

15

Atap Genteng Plentong pres Bakar KW 1

bh

950.00

16

Atap Genteng Plentong pres Molen Oven KW1

bh

1,200.00

17

Atap Genteng Flam pres Molen Oven Jatiwangi

bh

750.00

18

Genting Morando

bh

1,600.00

19

Bubung Genteng pres Bulat Ex Jatiwangi

bh

3,500.00

20

Genteng Bubungan Ex Jatiwangi Segi Tiga

bh

2,800.00

21

Genteng Bubungan Beton

bh

3,300.00

22

Genteng Beton Warna 14,5/m2

bh

5,300.00

23

Genteng Beton Natural

bh

16,350.00

24

Genteng Metal ( Rainbow Roof )

170,550.00

25

Genteng Metal Hana

123,750.00

26

Nok Atas Metal ( Rainbow Roof )

m1

111,800.00

27

Nok Atas Metal Hana

m1

60,000.00

28

Nok Pinggir Metal ( Rainbow Roof )

m1

77,700.00

29

Nok Pinggir Hana

m1

60,000.00

30

Wall Flashing ( Rainbow Roof )

m1

77,700.00

31

Wall Flashing Hana

m1

60,000.00

32

Atap Genteng Beton Warna 14,5/m2

70,900.00

33

Genteng Beton Natural

16,350.00

34

Sirap Kelas I ( 80 / m2 )

bh

750.00

35

Sirap

136,500.00

36

Genteng Keramik

bh

6,100.00

37

Genteng Keramik Natural Intan 14,5 / m2

78,000.00

38

Genteng Keramik Glasur Standard 14,5 / m2

87,750.00

39

Genteng Keramik Glasur Special 14,5 / m2

93,000.00

40

Genteng Keramik Glasur Premium 14,5 / m2

104,650.00

41

Genteng Murando Natural 1m2 = 18 bh

bh

1,650.00

42

Genteng Murando Glasur 1m2 = 20 bh

bh

3,500.00

43

Genting Magas

bh

1,050.00

44

Genteng Super Roof Multicolor

148,000.00

45

Bubung Murando Natural

bh

2,800.00

46

Bubung Murando Glasur

bh

6,900.00

47

Bubungan Genteng Keramik

bh

6,650.00

48

Bubungan Genteng Palentong

bh

1,600.00

49

Bubungan Genteng Murando

bh

5,450.00

50

Bubungan asbes

bh

20,400.00

51

Bubungan Genting Flam

bh

1,700.00

52

Bubungan Genting Magas eks banjar

bh

1,950.00

Daftar Analisa TARKIM

Halaman : 17+1

Satuan Bahan

4
60,375.00

53

Bubungan Genteng Super Roof Multicolor

bh

54

Genteng Aspal

bh

55

Genteng Kodok

bh

2,000.00

56

Bubungan Genteng Kodok

bh

1,950.00

BAHAN MEKANIKAL

Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW )

unit

47,775,000.00

Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW )

unit

163,800,000.00

Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW )

unit

409,500,000.00

Presure Tank kap. 500 liter lengkap

unit

23,887,500.00

Hydran Box dalam Gedung (lengkap)

unit

4,231,500.00

Fire House 1.5 x 30 m + nose

unit

3,412,500.00

Exhouse Fan H 360 W 60 x 60 cm

unit

4,777,500.00

Exhouse Fan H 380 W CFM 55 x 55 cm

unit

4,231,500.00

Exhouse Fan H 100 W 40 x 40 cm

unit

819,000.00

10

AC Split 3 PK Setara TOSHIBA

unit

11,943,750.00

11

AC Split 2 PK Setara TOSHIBA

unit

8,872,500.00

12

AC Split 1 PK Setara TOSHIBA

unit

4,777,500.00

13

Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )

14

AC Split 1 PK Setara Canghong

unit

3,500,000.00

15

AC Split 2 PK Setara Canghong

unit

4,500,000.00

BAHAN ELEKTRIKAL

1.5

Kabel NYA 1x 1.5 Prima (1 rol = 50 m')

ROLL

48,300.00

Kabel NYA 1x 2.5 Prima (1 rol = 50 m')

ROLL

77,300.00

Kabel NYM 2 x 1.5 Prima (1 rol = 50 m')

m'

3,700.00

Kabel NYM 3 x 1.5 Prima (1 rol = 50 m')

m'

4,600.00

Kabel NYM 2 x 2.5 Prima (1 rol = 50 m')

m'

5,600.00

Kabel NYM 3 x 2.5 Prima (1 rol = 50 m')

m'

4,800.00

Kabel NYM 4 x 2.5 Prima (1 rol = 50 m')

m'

6,150.00

Kabel NYM 2 x 4

Prima (1 rol = 50 m')

m'

6,700.00

1 BTU

1,950.00

Kabel NYM 3 x 4

Prima (1 rol = 50 m')

m'

8,400.00

10

Kabel NYM 4 x 4

Prima (1 rol = 50 m')

m'

8,900.00

11

Kabel NYM 2 x 6

Prima (1 rol = 50 m')

m'

6,900.00

12

Kabel NYM 3 x 6

Prima (1 rol = 50 m')

m'

9,500.00

13

Kabel NYM 4 x 6

Prima (1 rol = 50 m')

m'

12,600.00

14

Kabel NYM 2 x 10 Prima (1 rol = 50 m')

m'

12,200.00

15

Kabel NYM 3 x 10 Prima (1 rol = 50 m')

m'

16,150.00

16

Kabel NYM 4 x 10 Prima (1 rol = 50 m')

m'

20,600.00

18

Kabel NYY 2 x 4

Prima (1 rol = 50 m')

m'

8,500.00

19

Kabel NYY 3 x 4

Prima (1 rol = 50 m')

m'

7,300.00

20

Kabel NYY 4 x 4

Prima (1 rol = 50 m')

m'

12,200.00

21

Kabel NYY 2 x 6

Prima (1 rol = 50 m')

m'

8,500.00

22

Kabel NYY 3 x 6

Prima (1 rol = 50 m')

m'

9,100.00

Daftar Analisa TARKIM

Halaman : 18+1

Satuan Bahan

4
11,350.00

23

Kabel NYY 4 x 6

Prima (1 rol = 50 m')

m'

24

Kabel NYY 2 x 10 Prima (1 rol = 50 m')

m'

9,800.00

25

Kabel NYY 3 x 10 Prima (1 rol = 50 m')

m'

13,500.00

26

Kabel NYY 4 x 10 Prima (1 rol = 50 m')

m'

16,500.00

27

Kabel NYY 4 x 16 Prima (1 rol = 50 m')

m'

375,700.00

28

Kabel Tembaga

Kg

33,800.00

29

Kabel Tik 2 10 mm

m'

4,200.00

30

NSFB FUJI EA - 100 A

bh

522,000.00

31

NSFB FUJI EA - 150 A

bh

1,350,000.00

32

Rumah Panel 30 x 60 cm (kosong)

unt

70,000.00

33

Skring Kas 2 grop Biasa

unt

106,200.00

34

Skring Kas 3 grop Biasa

unt

134,400.00

35

Skring Kas 5 grop Biasa

unt

282,500.00

36

MCB Mercury

bh

55,200.00

37

MCB 1 PAS

bh

31,200.00

38

MCB 3 PAS

bh

52,750.00

39

Tahanan 50 A Merk Fuji

bh

318,000.00

40

Saklar Tunggal Biasa

bh

3,600.00

41

Saklar Ganda Biasa

bh

6,000.00

42

Saklar Magnet 25 PK

bh

798,500.00

43

Saklar Broko Tunggal Standard ( 1 Phase )

bh

9,800.00

44

Saklar Broko Seri Standard ( 1 Phase )

bh

14,200.00

45

Stop Kontak Biasa

bh

6,000.00

46

Stop Kontak Putar

bh

19,750.00

47

Stop Kontak Broko Standard ( 1 Phase )

bh

14,000.00

48

Stop Kontak Broko 3 Phase ( Out Bow )

bh

54,600.00

49

Stop Kontak Broko 3 Phase ( In Bow )

bh

93,125.00

50

Stop Kontak Handle 3 Phase

bh

56,500.00

51

Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat )

ttk

61,500.00

52

Lampu pijar 25 Watt s/d 100 Watt

bh

4,950.00

53

Lampu Neon TL Philip 20 W

bh

11,000.00

54

Lampu Neon TL Philip 40 W

bh

15,200.00

55

Trapo TL 20 W ( Philip )

bh

20,500.00

56

Trapo TL 40 W ( Philip )

bh

22,550.00

57

Trapo TL 20 W ( Sinar )

bh

21,400.00

58

Trapo TL 40 W ( Sinar )

bh

20,350.00

59

Trapo Ballas

bh

241,375.00

60

Stater Neon Philip

bh

3,450.00

61

Stater Neon Biasa

bh

1,400.00

62

Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan )

bh

70,200.00

63

Down Light + SL 25 W

bh

185,500.00

64

Lampu SL Philip 25 W

bh

66,500.00

65

Lampu Sirkel TL 20 W Lengkap

bh

42,500.00

66

Lampu Mercuri 80 W

bh

86,000.00

Daftar Analisa TARKIM

Halaman : 19+1

Satuan Bahan

67

Lampu Mercuri 250 W

bh

157,000.00

68

Lampu Son 150 W

bh

160,000.00

69

Lampu Taman + Tiang + Lampu 1 Buah

bh

484,350.00

70

Lampu Baret 30 cm + Neon

bh

65,000.00

71

Lampu Neon Arcrilik 2 x 40 W lengkap

bh

14,150.00

72

Pentanahan Penangkal Petir

ttk

273,500.00

73

Pentanahan Panel

ttk

118,200.00

74

Pipa Penangkal Petir

bh

21,150.00

75

Box Sekering

set

81,250.00

76

Box Lampu Mercury

bh

30,300.00

77

Terminal Kabel

bh

18,150.00

78

Tangkai Box lampu 3 m

bh

278,000.00

79

Stainless steel

11,000.00

80

Capasitor

bh

70,000.00

81

Link Buckle

bh

4,500.00

82

Stoping Buckle

bh

1,750.00

83

Wed Clem

bh

12,000.00

84

Tiang Besi 7m

bh

1,741,000.00

85

Ignitor SN

bh

105,000.00

86

Tap Connector

bh

8,750.00

87

Foto Cell 6 Ampere

bh

100,000.00

BAHAN ALAT PENGANTUNG DAN KUNCI

Kunci Silinder ALFA untuk Pintu Alumunium

bh

204,750.00

Tarikan Pintu

bh

23,000.00

Kunci 2 Slaag ROYAL

bh

61,350.00

Rel Henderson Lengkap

bh

618,300.00

Rel Maraton I Pintu

unt

64,800.00

Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226

bh

192,000.00

Kunci 2 Slaag Ancor Asli

bh

88,600.00

Kunci 2 Slaag ISO

bh

102,300.00

Kunci KM Bulat Kualitas Biasa

bh

40,950.00

10

Kunci KM Bulat Sekwalitas ALFA

bh

26,900.00

11

Kunci 2 Slaag Silinder Utama Standard

bh

170,500.00

12

Kunci Gembok

bh

10,300.00

13

Kunci tanam Slaag Royal

bh

87,350.00

14

Kunci tanam Slaag Ancor

bh

68,250.00

15

Kunci 2 Slaag Kuda Terbang

bh

65,600.00

16

Kunci Jendela

bh

6,500.00

17

Espangolet

ps

51,200.00

18

Grendel Hitam Biasa 15 cm

bh

6,750.00

19

Grendel 15 cm

bh

10,900.00

20

Grendel 5 cm biasa

bh

2,700.00

21

Hak Angin Kait Jendela Biasa

ps

6,750.00

Daftar Analisa TARKIM

Halaman : 20+1

Satuan Bahan

22

Hak Angin Jendela Antik

ps

16,350.00

23

Hak Angin Sendok Stainless / Kuningan

bh

17,500.00

24

Nako Lengkap Tralis 1 Daun

dn

13,650.00

25

Sloot Pintu berikut Rantai

bh

23,800.00

26

Sloot Jendela Tunggal

bh

8,850.00

27

Engsel Pintu Biasa

bh

12,200.00

28

Engsel Pintu Unilon Standard

ps

18,300.00

29

Engsel Jendela Biasa

bh

7,400.00

30

Engsel Jendela Unilon

ps

8,850.00

31

Engsel Patrun

ps

5,450.00

32

Engsel Harmonika

m1

11,500.00

33

Engsel Floring

unit

450,000.00

34

Door Closer Kelas Standard ( Kelas Sedang )

unt

129,600.00

35

Door Closer Kelas Standard ( Kelas Baik )

unt

477,750.00

36

Door Closer Kelas Rendah

unt

109,200.00

37

Tarikan Almari Rata - rata

bh

9,500.00

38

Seng BJLS 30 lebar 60cm (1 rol 50 m' )

m1

23,900.00

39

Seng BJLS 30 lebar 90cm (1 rol 50 m' )

m1

30,700.00

40

Reiling Tangga Stainlessteel

m'

160,000.00

BAHAN PENGIKAT UNTUK KONTRUKSI JALAN

Hotmix Jadi berikut alat dan bahan bakar ( T = 5 cm => 9 m2 )

ton

546,000.00

Aspal ( ESO ) 1 Drum 150 Kg

kg

5,100.00

Aspal Curah

kg

3,650.00

Aspal RC 70 ( Cilacap )

kg

4,875.00

Aspal Bitumen * M061

kg

4,875.00

As Buton *M062

kg

1,500.00

Minyak Fluk *M063

Lt

6,375.00

Minyak Aspal *M064

Lt

1,550.00

Minyak Tanah *M065

Lt

3,000.00

BAHAN PENGHISAP AIR SUMUR DALAM

Pompa Kodok

unit

171,000.00

Pompa Dragon Tegal

unit

155,700.00

Pompa Dragon Asli

unit

341,250.00

Mesin Pompa Air 100 W - Sanyo

unit

1,149,300.00

Mesin Pompa Air 150 W - Sanyo

unit

1,684,400.00

Pompa Zet pump 250 W - Sanyo

unit

5,812,300.00

Pompa Zet pump 450 W - Sanyo

unit

6,882,500.00

Pompa Submersible kap. 150 liter/menit 3 kW

unit

25,252,500.00

Gear Pump kap. 60 liter/menit

unit

12,332,500.00

10

Deep Well dengan kelengkapannya kap. 150 liter/menit

unit

211,575,000.00

11

Hand Oil Pump

unit

4,299,750.00

Daftar Analisa TARKIM

Halaman : 21+1

Satuan Bahan

BAHAN PENAMPUNG AIR

Tangki Air Fiber Glass 0.5 m3 ( Excel )

bh

450,000.00

Tangki Air Fiber Glass 1 m3 ( Excel )

bh

700,000.00

Tangki Air Fiber Glass 2 m3 ( Excel )

bh

1,500,000.00

Bak Taraso WC 40 x 40

bh

27,500.00

Bak KM Taraso 60 x 60

bh

67,500.00

BIAYA QUALITY CONTROL , IZIN - IZIN, PENGUKURAN


DAN BIAYA PENYAMBUNGAN

Penyambungan Listrik PLN

1w

dihitung

IMB Bertingkat Rata - rata (Rumah )

dihitung

IMB Bertingkat Rata - rata (Kantor)

dihitung

IMB tidak bertingkat Rata - rata (Rumah / Kantor)

dihitung

IMB Bertingkat Rata - rata (untuk Usaha)

dihitung

IMB tidak bertingkat Rata - rata (untuk Usaha)

dihitung

Sondir Rata - rata

1 ttk

dihitung

Pengukuran Site + Patok

dihitung

Biaya Tes Jalan ( quality control )

ttk

dihitung

10

Biaya Tes 1 Macam Beton

1 spl

dihitung

11

Biaya Pengujian Bahan Agregat

1 spl

dihitung

12

Biaya Pengujian Listrik + gambar + trafo & Adm

1 watt

dihitung

13

Izin Sumur Artesis Lengkap

unit

dihitung

14

Penyambungan PDAM untuk rumah

unit

dihitung

15

Geolistrik

1 ttk

dihitung

16

Geolistrik

1 ttk

dihitung

ALAT TUKANG.

Palu 0,5 kg

bh

25,000.00

Cangkul

bh

27,500.00

Singkup

bh

33,500.00

Sekrop

bh

42,000.00

Pengki

bh

2,100.00

Linggis

bh

25,000.00

Rool Meter 30 meter ( Bahan Plastik )

bh

55,000.00

Rool Meter 5 meter ( Bahan Besi )

bh

12,250.00

Selang Plastik untuk Water Pas dia. 0.5 cm

bh

1,200.00

10

Water Pas Alumuniumm 60 cm

bh

62,000.00

STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK


TRUK, KENDARAAN RODA 4 & LAINNYA

Sewa Mesin Gilas 8 Ton s/d 10 ton

hari

184,275.00

Tirud Roller 3 Jam / hari

hari

202,600.00

Tamdam Roller 6 - 8 Ton 5 Jam / hr

hari

300,000.00

Tamdam Roller 8 - 10 Ton 5 Jam / hr

hari

282,000.00

Daftar Analisa TARKIM

Halaman : 22+1

Satuan Bahan

Roller Viberator - Ped 1 Ton 4 Jam /hr

hari

258,000.00

Roller Viberator - Self 7 Ton 5 Jam /hr

hari

307,000.00

Roller 3 Wheeled - 8 Ton 5 Jam /hr

hari

178,000.00

Roller Pneumatic 8 - 15 Ton 5 Jam /hr

hari

307,000.00

Loader Wheeled 5 Jam /hr

hari

430,000.00

10

Sewa Kran 30 Ton

hari

2,211,000.00

11

Sewa Exavator Backhoe 5 Jam /hari

hari

645,000.00

12

Sewa Draklint

jam

153,000.00

13

Whell Loader

jam

184,000.00

14

Buldozer 4 Jam /hr

hari

706,000.00

15

Ecavator Hydr 1 m3

hari

675,000.00

16

Backu

hari

104,000.00

17

Motor Grader 5 Jam /hr

jam

644,000.00

18

Pheumatic Drill Hammer 3 Jam / hr

hari

215,000.00

19

Vibro Roller

hari

184,000.00

20

Stone Crusher

hari

215,000.00

21

AMP

hari

276,000.00

22

Teractor Equament 2 Jam /hr

hari

92,000.00

23

Screning Plent 5 Jam /hr

hari

368,000.00

24

Asphal Finisher

hari

276,000.00

25

Asphal Melting Kalte

hari

153,500.00

26

Asphal Spayer

hari

123,000.00

27

Asphal MIxing Plant

hari

276,000.00

28

Sprayer,Self - Prop. 10001 4 Jam/hr

hari

307,000.00

29

Stamper, Viberator Plate 3 Jam /hari

hari

245,000.00

30

Crusher / SCR

hari

921,000.00

31

Concrete Mixer 0.125 m3

hari

73,000.00

32

Concrete Mixer 0.5 m3

hari

105,000.00

33

Concrete Viberator

hari

73,000.00

34

Pick Up

hari

215,000.00

35

Dump Truck 3.5 Ton

hari

307,000.00

36

Dump Truck 5 Ton 4 Jam /hr

hari

368,500.00

37

Flatbed Truck 3.5 Ton

hari

294,800.00

38

Truck 3/4 ( Colt Disel )

hari

307,000.00

39

Truck Fuso

hari

737,000.00

40

Mesin Las Listrik 18 pk 8 jam

hari

122,800.00

41

Mesin Pompa Air 3 "

hari

92,000.00

42

Stamper 8 Jam

hari

98,300.00

43

Compresor Air

hari

92,000.00

44

Pump Water ( 5 cm ) 30 m3 / hari

hari

61,400.00

45

Trailler, Towed 1 Ton 3 Jam/hr

hari

61,400.00

46

Water Tank Truck 2 Jam/hr

hari

184,300.00

BAHAN BAKAR DAN PELUMAS

Minyak Tanah

Kapur Bakar *M081

101,650.00

Kayu Bakar *M070

45,000.00

Bahan Bakar Residu

lt

Daftar Analisa TARKIM

lt

3,250.00

650.00

Halaman : 23+1

Satuan Bahan

Minyak Solar

lt

5,500.00

Bensin Premium

lt

5,850.00

Plus Oil

lt

1,050.00

Minyak Pelumas

lt

23,800.00

Elpiji / botol

10

Asitilin / botol

15 kg

81,900.00

15.1 kg

11

69,550.00

Angin ( 02 ) / botol

btl

44,300.00

12

Kawat Las Listrik

kg

13,650.00

13

Karbit

kg

6,750.00

14

Aspal

15

Aspal Kemas Pand Grade 60/70

772

Pintu Air Sorong 50 x 50 cm

773

Pintu Air Double Stang 1 x 2 Meter

774

Pintu Air Double Stang 1,5 x 2 Meter

775

Pintu Air Double Stang 1 x 2,5 Meter

776

Pintu Air Double Stang 1,5 x 2,5 Meter

777

Pintu Air Stang Tunggal 1x 1,5 Meter

778

Pintu Air Stang Tunggal 0,5 x 1 Meter

ltr

4,875.00

Drum

583,450.00

BAHAN FASILITAS LALU LINTAS

Rambu Jalan Uk. 45 x 45 cm

bh

305,000.00

Rambu Jalan Uk. 60 x 60 cm

bh

465,800.00

Rambu Jalan Uk. 70 x 70 cm

bh

617,650.00

RPPJ Uk. 105 x 140 cm

bh

1,781,250.00

RPPJ Uk. 120 x 160 cm

bh

2,139,500.00

Pagar Pengaman Jalan

bh

605,600.00

Marka Jalan (Road Marking) Uk. 0,2 x 12 cm

27,300.00

Paku Marka uk. 2 x 10 x 10 cm

bh

233,750.00

Paku Marka uk. 2 x 10 x 12 cm

bh

242,200.00

10

Apill (Trafic Light)-Simpang Tiga

unit

101,124,000.00

11

Apill (Trafic Light)-Simpang Empat

unit

120,601,000.00

12

Lampu Peringatan (Warning Light)

unit

54,315,000.00

13

Patok Tikungan (dilineator) bahan plastik

bh

399,200.00

14

Patok Tikungan (dilineator) pipa besi

bh

300,300.00

15

Cermin Tikungan

unit

4,692,000.00

16

Kerucut Lalu Lintas Uk. 90 cm

bh

315,650.00

17

Kerucut Lalu Lintas Uk. 75 cm

bh

332,600.00

18

Kerucut Lalu Lintas Uk. 60 cm

bh

315,600.00

19

Timbangan Portable

unit

637,105,200.00

20

Peralatan PKB otomatik

unit

7,556,145,800.00

21

Peralatan PKB semi otomatik

unit

4,800,597,000.00

22

Peralatan Uji Pemeriksaan dan Pengawasan Kb di Jalan

unit

4,275,343,800.00

Daftar Analisa TARKIM

Halaman : 24+1

Halaman : 25+3

Harga Satuan Pekerjaan

HARGA SATUAN PEKERJAAN


NO.

URAIAN

JUMLAH

A.01.06

1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK

28,540.00

A.01.07

1 M2 PEMBUATAN DIREKSI KEET DAN LOS BAHAN

212,950.00

A.01.10

1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN

5,360.00

A.01.12

1 M3 BONGKARAN BETON BERTULANG

A.01.13

1 M3 BONGKARAN DINDING TEMBOK BATA MERAH

21,710.00

A.01.16

1 M2 PAPAN NAMA PROYEK

75,500.00

A.02.01

1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M

13,970.00

A.02.02

1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M

18,340.00

A.02.03

1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 3 M

25,640.00

A.02.04

1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 4 M

32,950.00

A.02.05

1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 5 M

40,250.00

A.02.06

1 M3 GALIAN TANAH KERAS SEDALAM 1 METER

21,800.00

A.02.07

1 M3 GALIAN TANAH CADAS SEDALAM 1 METER

43,650.00

A.02.08

1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METER

28,770.00

A.02.09

1 M2 PEKERJAAN STRIPING TANAH SETINGGI 1 METER

A.02.10

1 M3 PEMBUANGAN TANAH SEJAUH 150 METER

A.02.11

1 M3 URUGAN TANAH KEMBALI

A.02.12

1 M3 PEMADATAN TANAH

10,470.00

A.02.13

1 M3 URUGAN PASIR

82,140.00

A.02.14

1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 3 PS : 7 TL

A.02.15

1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TL

97,730.00

A.02.16

1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TS

137,330.00

A.02.17

1 M3 PEMASANGAN LAPISAN IJUK

A.02.18

1 M3 URUGAN SIRTU

A.02.19

1 M2 PEMBUATAN JALAN SEMENTARA, TEBAL 25 CM

67,800.00

A.02.20

1 M3 PEKERJAAN GALIAN TANAH SUMURAN MAX KEDALAMAN 10 M'

35,950.00

A.02.22

1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)

37,810.00

A.02.23

1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH

10,890.00

A.03.02

1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 Ps

499,130.00

A.03.03

1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps

431,780.00

A.03.04

1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps

391,380.00

A.03.05

1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps

363,400.00

A.03.13

1 M3 PASANG PONDASI BATU KOSONG

171,160.00

A.03.14

1 M3 PASANG PONDASI SUMURAN DIAMETER 100 CM

A.03.15

1 M3 PASANG PONDASI SIKLOP 40% BATU KALI

564,960.00

A.03.16

1 M1 PEMBUATAN TIANG PANCANG (40 X 40) CM, BETON BERTULANG

636,530.00

A.03.17

1 M1 PEMBUATAN TIANG PANCANG (35 X 35) CM, BETON BERTULANG

470,300.00

A.03.18

1 M3 PASANGAN BATU BRONJONG

182,180.00

A.03.20

1 M3 PASANGAN BATU TEMPEL+ SIARAN

166,850.00

A.03.21

1 M3 PASANGAN BATU HITAM

184,670.00

A.04.05

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps

97,380.00

A.04.09

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps

56,130.00

Trotoarisasi dan
Penataan Alun-alun Langensari

217,240.00

1,740.00
17,940.00
6,690.00

101,310.00

21,070.00
116,830.00

1,117,010.00

Halaman : 26+3

Harga Satuan Pekerjaan

A.04.10

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps

51,230.00

A.04.11

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps

48,290.00

A.04.12

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps

46,430.00

A.04.18

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.20)

76,700.00

A.04.19

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.15)

68,340.00

A.04.20

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.10)

59,300.00

A.04.25

1 M2 PASANGAN DINDING DINDING ROSTER/TERAWANG (12X11X24)

A.04.27

1 M2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU

30,190.00

A.05.02

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIAN

23,360.00

A.05.03

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM

21,260.00

A.05.04

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM

19,920.00

A.05.05

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM

19,050.00

A.05.13

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 20 MM + ACIAN

33,840.00

A.05.14

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 20 MM

30,230.00

A.05.15

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 20 MM

28,040.00

A.05.16

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM

26,510.00

A.05.19

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM + ACIAN

36,010.00

A.05.20

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 25 MM

33,450.00

A.05.21

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 25 MM

31,170.00

A.05.22

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 25 MM

29,550.00

A.05.23

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 30 MM + ACIAN

43,830.00

A.05.24

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 30 MM

39,170.00

A.05.25

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 30 MM

36,330.00

A.05.26

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 30 MM

33,040.00

A.05.31

1 M2 PASANGAN PLESTERAN SKONING 1 Pc : 2 Ps, TEBAL 15 MM

A.05.34

1 M2 PASANGAN PLESTERAN CIPRAT, 1 Pc : 2 Ps

17,860.00

A.05.35

1 M2 PASANGAN PLESTERAN SIAR ADUKAN 1 Pc : 2 Ps

13,540.00

A.05.36

1 M2 ACIAN PC

A.06.01

1 M2 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATI

9,203,970.00

A.06.02

1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAMPER BANJAR

6,874,720.00

A.06.03

1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAYU LOKAL KLS II

3,305,220.00

A.06.04

1 M2 PASANGAN PINTU KLAMP KAYU KAYU LOKAL KLS II

146,440.00

A.06.05

1 M2 PASANGAN PINTU PANEL KAYU JATI

488,810.00

A.06.06

1 M2 PASANGAN PINTU PANEL KAYU KAMPER BANJAR

386,510.00

A.06.07

1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II

241,750.00

A.06.08

1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATI

416,870.00

A.06.09

1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAMPER BANJAR

327,360.00

A.06.10

1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAYU LOKAL KLS II

200,690.00

A.06.11

1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU JATI

722,450.00

A.06.12

1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU KAMPER BANJAR

558,770.00

A.06.13

1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU LOKAL KLS II

327,150.00

A.06.14

1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI

375,880.00

A.06.15

1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR

325,750.00

A.06.16

1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS II

254,820.00

A.06.17

1 M2 PASANGAN JALUSI MATI KUSEN KAYU JATI

623,760.00

A.06.18

1 M2 PASANGAN JALUSI MATI KUSEN KAYU KAMPER

470,310.00

Trotoarisasi dan
Penataan Alun-alun Langensari

887,790.00

6,370.00

13,820.00

Halaman : 27+3

Harga Satuan Pekerjaan

A.06.19

1 M2 PASANGAN JALUSI MATI KUSEN KAYU LOKAL KLS II

253,170.00

A.06.20

1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS II

276,820.00

A.06.21

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU JATI

379,980.00

A.06.22

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR

329,860.00

A.06.23

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU LOKAL KLS II

258,930.00

A.06.24

1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKAP, RANGKA KAYU JATI

488,310.00

A.06.25

1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKA KAYU KAMPER BANJAR

438,180.00

A.06.26

1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKA KAYU LOKAL KLS II

345,250.00

A.06.27

1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI

420,270.00

A.06.28

1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER BANJAR (DIVERNIS)

378,950.00

A.06.29

1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU LOKAL KLS II (DIVERNIS)

308,010.00

A.06.30

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI

556,720.00

A.06.31

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU KAMPER BANJAR

579,360.00

A.06.32

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU LOKAL KLS II

413,660.00

A.06.33

1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU JATI

9,928,270.00

A.06.34

1 M2 PASANG KONSTRUKSI KUDA - KUDA KAYU KAMPER BANJAR

6,389,020.00

A.06.35

1 M2 PASANGAN KONSTRUKSI KUDA - KUDA KAYU KAYU LOKAL KLS II

2,819,520.00

A.06.36

1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KRUING

4,090,020.00

A.06.37

1 M3 PASANG KASO + RENG GENTENG PALENTONG KAYU KAMPER

77,760.00

A.06.38

1 M3 PASANG KASO + RENG GENTENG PALENTONG KAYU KAYU LOKAL KLS II

44,530.00

A.06.39

1 M3 PASANG KASO + RENG GENTENG BETON KAYU KAYU LOKAL KLS II

43,110.00

A.06.40

1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAMPER BANJAR

A.06.41

1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAYU LOKAL KLS II

46,650.00

A.06.42

1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU JATI

110,310.00

A.06.43

1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAMPER

84,900.00

A.06.44

1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAYU LOKAL KLS II

44,970.00

A.06.45

1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU JATI

66,990.00

A.06.46

1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU KAMPER BANJAR

56,260.00

A.06.47

1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU LOKAL KLS II

30,210.00

A.06.48

1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU JATI

A.06.49

1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU KAMPER BANJAR

A.06.50

1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU LOKAL KLS II

A.06.51

1 M2 PASANG LISPLANG UKURAN 2 x (3 x 20) cm, KAYU KAMPER BANJAR

107,550.00

A.06.52

1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU KAMPER BANJAR

62,460.00

A.06.53

1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU LOKAL KLS II

31,820.00

A.06.54

1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER BANJAR

A.06.55

1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAYU LOKAL KLS II

A.06.56

1 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR

182,260.00

A.06.57

1 M2 PASANG DINDING PEMISAH POLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR

276,230.00

A.06.58

1 M2 PASANG POLYWOOD TEBAL 4 mm, UNTUK DINDING

A.06.59

1 M1 PASANG LIST PLAFOND PROFIL KAYU KAMPER BANJAR 4/4 CM

6,230.00

A.06.60

1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4

4,150.00

A.06.61

1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II LAPIS ALUMUNIUM

330,520.00

A.07.01

1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr

490,330.00

A.07.05

1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr

490,880.00

A.07.13

1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr

669,660.00

Trotoarisasi dan
Penataan Alun-alun Langensari

102,510.00

108,580.00
80,450.00
40,640.00

182,260.00
85,570.00

70,110.00

Halaman : 28+3

Harga Satuan Pekerjaan

A.07.25

1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR

9,920.00

A.07.28

1 m2 PASANG BEKISTING UNTUK PONDASI

75,150.00

A.07.29

1 m2 PASANG BEKISTING UNTUK SLOOF

31,880.00

A.07.30

1 m2 PASANG BEKISTING UNTUK KOLOM

40,000.00

A.07.31

1 m2 PASANG BEKISTING UNTUK BALOK

169,670.00

A.07.32

1 m2 PASANG BEKISTING UNTUK LANTAI

340,870.00

A.07.33

1 m2 PASANG BEKISTING UNTUK DINDING

380,240.00

A.07.34

1 m2 PASANG BEKISTING UNTUK TANGGA

212,070.00

A.07.35

1 M3 MEMBUAT BETON DENGAN MUTU K 225

824,940.00

A.07.36

1 M3 MEMBUAT BETON DENGAN MUTU K 275

845,570.00

A.07.37

1 M2 PASANG TANGGA PENGECORAN

A.07.38

1 M3 MEMBUAT PONDASI BETON BERTULANG (150 kg BESI + BEKISTNG)

2,370,890.00

A.07.47

1 M3 MEMBUAT SLOOF 10/15 (202 Kg Besi + Bekesting)

3,098,860.00

77,150.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM


A.07.48

1 M3 MEMBUAT SLOOF 12/15 (257,778 Kg Besi + Bekesting)

3,504,620.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM


A.07.49

1 M3 MEMBUAT SLOOF 12/15 (170.78 Kg Besi + Bekesting)

2,739,040.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM


A.07.50

1 M3 MEMBUAT SLOOF 15/20 (180,8889 Kg Besi + Bekesting)

2,730,760.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM


A.07.51

1 M2 PAS. LANGIT-LANGIT BILIK

2,167,570.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM


A.07.52

1 M3 MEMBUAT KOLOM 12/12 (314.0964 Kg Besi + Bekesting)

4,036,690.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM


A.07.53

1 M3 MEMBUAT KOLOM 12/12 (208.864 Kg Besi + Bekesting)

3,110,640.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM


A.07.54

1 M3 MEMBUAT KOLOM 15/15 (211,5556 Kg Besi + Bekesting)

3,292,350.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM


A.07.55

1 M3 MEMBUAT KOLOM 15/15 (139.550 Kg Besi + Bekesting)

2,658,700.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM


A.07.56

1 M3 MEMBUAT KOLOM 15/20 (180,8889 Kg Besi + Bekesting)

2,949,550.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM


A.07.57

1 M3 MEMBUAT KOLOM 15/20 (116.889 Kg Besi + Bekesting)

2,386,350.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM


A.07.59

1 M3 MEMBUAT KOLOM 20/20 (142,333 Kg Besi + Bekesting)

2,573,790.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM


A.07.60

1 M3 MEMBUAT KOLOM 20/20 (91.334 Kg Besi + Bekesting)

2,125,000.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM


A.07.61

1 M3 MEMBUAT KOLOM 25/25 (99.6267 Kg Besi + Bekesting)

2,088,580.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM


A.07.62

1 M3 MEMBUAT KOLOM 30/30 (74,67 Kg Besi + Bekesting)

1,663,410.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM


A.07.63

1 M3 MEMBUAT KOLOM 40/25 (211.7300 Kg Besi + Bekesting)

2,212,340.00

DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM


A.07.64

1 M3 MEMBUAT RING BALK 10/15 (202 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM

Trotoarisasi dan
Penataan Alun-alun Langensari

3,147,480.00

Halaman : 29+3

Harga Satuan Pekerjaan

1
A.07.65

2
1 M3 MEMBUAT RING BALK 10/15 (202 Kg Besi + Bekesting)

3
3,147,480.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM


A.07.66

1 M3 MEMBUAT BALOK 12/15 (217.7900 Kg Besi + Bekesting)

3,383,670.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM


A.07.67

1 M3 MEMBUAT RING BALK 15/15 (211,5556 Kg Besi + Bekesting)

3,037,090.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM


A.07.68

1 M3 MEMBUAT RING BALK 15/15 (139.550 Kg Besi + Bekesting)

2,403,440.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM


A.07.69

1 M3 MEMBUAT RING BALK 15/20 (180,8889 Kg Besi + Bekesting)

2,767,220.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM


A.07.70

1 M3 MEMBUAT RING BALK 15/20 (116,889 Kg Besi + Bekesting)

2,204,020.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM


A.07.71

1 M3 MEMBUAT RING BALK 15/25 (151,8222 Kg Besi + Bekesting)

2,511,440.00

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM


A.07.72

1 M3 MEMBUAT RING BALK 15/25 ( 97.423 Kg Besi + Bekesting)

2,032,720.00

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM


A.07.73

1 M3 MEMBUAT RING BALK 15/25 (175,5556 Kg Besi + Bekesting)

2,720,290.00

DENGAN TULANGAN 5 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM


A.07.75

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm

2,515,650.00

A.07.76

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm

3,050,090.00

A.07.77

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm

2,754,780.00

A.07.78

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm

4,411,500.00

A.07.79

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.16-17.5CM DAN DIA. 10-12.5 cm TEBAL 20 cm

2,766,580.00

A.08.02

1 M2 PASANG ATAP GENTENG PALENTONG

41,150.00

A.08.03

1 M2 PASANG ATAP GENTENG MORANDO NATURAL (18 BH)

40,120.00

A.08.05

1 M2 PASANG BUBUNG GENTENG PALENTONG

41,030.00

A.08.06

1 M2 PASANG BUBUNG GENTENG MORANDO NATURAL

44,550.00

A.08.11

1 M2 PASANG ATAP ASBES GELOMBANG (1,80 x 0,90m) x 5 mm

56,030.00

A.08.12

1 M2 PASANG ATAP ASBES GELOMBANG (0,80 x 1,80m) x 5 mm

18,350.00

A.08.13

1 M2 PASANG ATAP ASBES GELOMBANG (0,90m x 1,80m) x 4 mm

36,620.00

A.08.14

1 M' PASANG NOK ASBES GELOMBANG , 4 mm

31,200.00

A.08.30

1 M2 PASANG ATAP GENTENG BETON

50,800.00

A.09.02

1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm

14,430.00

A.09.24

1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mm

27,930.00

A.10.01

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK

A.10.02

MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN

A.10.04

MEMASANG 1 BUAH URINOIR

A.10.05

MEMASANG 1 BUAH WASTAFEL

739,570.00

A.10.06

MEMASANG 1 BUAH BAK MANDI TRASO VOLUME 0,3 M3

331,470.00

A.10.07

MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3

229,450.00

A.10.08

MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3

389,190.00

A.10.09

MEMASANG 1 BUAH BADKIP PORSELEN

A.10.16

MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM

219,590.00

A.10.17

MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CM

196,530.00

A.10.18

MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CM

300,860.00

Trotoarisasi dan
Penataan Alun-alun Langensari

1,388,090.00
167,060.00
1,905,210.00

2,203,690.00

Halaman : 30+3

Harga Satuan Pekerjaan

A.10.19

MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5"

4,250.00

A.10.20

MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75"

30,890.00

A.10.21

MEMASANG 1 M' PIPA GALVANIS DIAMETER 1"

42,680.00

A.10.22

MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5"

66,780.00

A.10.23

MEMASANG 1 M' PIPA GALVANIS DIAMETER 3"

142,880.00

A.10.24

MEMASANG 1 M' PIPA GALVANIS DIAMETER 4"

187,560.00

A.10.25

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"

12,970.00

A.10.26

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75"

16,760.00

A.10.27

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1"

19,960.00

A.10.28

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5"

33,000.00

A.10.29

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2"

45,620.00

A.10.30

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5"

54,820.00

A.10.31

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"

85,080.00

A.10.32

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"

127,520.00

A.10.33

MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL

211,500.00

A.10.35

MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"

22,840.00

A.10.36

MEMASANG 1 BH FLOOR DRAIN

22,360.00

A.10.37

1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA ( KANTOR TYPE BESAR )

6,553,860.00

A.10.38

1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA ( KANTOR TYPE KECIL )

4,090,320.00

A.10.39

1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)

2,413,310.00

A.10.40

1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGAN

111,080.00

A.10.41

1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN

124,530.00

A.11.01

1 KG PASANG RANGKA ATAP BAJA

A.11.08

1 M2 PASANG ROLLING DOOR

537,250.00

A.11.09

1 M2 PASANG PINTU ALUMINIUM

244,180.00

A.11.12

1 M2 PASANG TERALIS BESI

173,060.00

A.11.17

1 M2 PASANG JENDELA NAKO DAN TRALIS

A.11.18

1 M2 PASANG TALANG DATAR, SENG BJLS 28

75,330.00

A.11.19

1 M2 PASANG TALANG MIRING, SENG BJLS 28

109,150.00

A.11.20

1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28

102,570.00

A.11.21

1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 24

102,570.00

A.12.02

1 BUAH PASANG KUNCI TANAM BIASA

117,150.00

A.12.03

1 BUAH PASANG KUNCI TANAM KAMAR MANDI

A.12.04

1 BUAH PASANG KUNCI SILINDER

A.12.05

1 BUAH PASANG ENGSEL PINTU

18,610.00

A.12.06

1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU

12,940.00

A.12.09

1 BUAH PASANG KAIT ANGIN

14,620.00

A.12.10

1 BUAH PASANG DOOR CLOSER

A.12.11

1 BUAH PASANG KUNCI SELOT

A.12.12

1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER

A.12.14

1 BUAH PASANG REL PINTU DORONG

A.12.16

1 M2 PASANG KACA, TEBAL 3 MM

48,340.00

A.12.17

1 M2 PASANG KACA, TEBAL 5 MM

53,180.00

A.12.18

1 M2 PASANG KACA, TEBAL 8 MM

87,780.00

A.12.19

1 M2 PASANG KACA BURAM, TEBAL 12 MM

A.12.24

1 M2 PASANG KACA PATRI, TEBAL 5 MM

Trotoarisasi dan
Penataan Alun-alun Langensari

14,930.00

31,990.00

65,610.00
245,690.00

166,570.00
17,030.00
49,310.00
100,090.00

342,330.00
53,180.00

Halaman : 31+3

Harga Satuan Pekerjaan

A.12.25

1 KG PEK. ERECTION KONST KUDA-KUDA BESI

A.12.26

1 KG PEKERJAAN BAJA IWF EX DN

14,630.00

A.12.27

1 KG PEKERJAAN BAJA EX JAPAN

16,770.00

A.12.28

1 KG PEK. KONSTRUKSI BESI SIKU / PROFIL EX. DN

16,770.00

A.12.29

1 Titik PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL = KAWAT 4 MM

1,950.00

A.12.30

1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BOR

3,570.00

A.12.31

1 M2 PEKERJAAN BONDEX

A.12.32

1 M2 PEKERJAAN WIREMESH M8

A.12.33

1 M1 PEK.PAGAR DEPAN TRALIS STANDARD

983,510.00

A.12.34

1 M1 PEK. PAGAR BELAKANG / SAMPING

394,430.00

A.13.02

1 M2 PASANG LANTAI TEGEL BADAK ABU-ABU UKURAN 30X30 CM

A.13.09

1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40X40 CM

A.13.42

1 M2 PASANG LANTAI KERAMIK 10 X 20 CM

97,990.00

A.13.44

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM

97,990.00

A.13.45

1 M2 PASANG LANTAI KERAMIK 25 X 25 CM

95,790.00

A.13.46

1 M2 PASANG LANTAI KERAMIK 15 X 20 CM

97,990.00

A.13.47

1 M2 PASANG LANTAI KERAMIK 33 X 33 CM

108,990.00

A.13.48

1 M2 PASANG LANTAI KERAMIK 33 X 33 CM ANTISLIP

114,490.00

A.13.49

1 M2 PASANG LANTAI KERAMIK 10 X 33 CM

108,990.00

A.13.51

1 M2 PASANG LANTAI MARMER

267,010.00

A.13.56

1 M2 PASANG LANTAI PARQUET JATI

416,180.00

A.13.58

1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH

91,210.00

A.13.59

1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA

97,260.00

A.13.62

1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNA

99,850.00

A.13.63

1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNA

101,110.00

A.13.66

1 M2 PASANG DINDING KERAMIK 10 X 20 CM,

99,850.00

A.13.68

1 M2 PASANG DINDING KERAMIK 20 X 20 CM,

86,760.00

A.13.69

1 M2 PASANG DINDING KERAMIK 10 X 20 CM,

A.13.70

1 M2 PASANG DINDING MARMER

297,650.00

A.13.74

1 M2 PASANG DINDING BATU TEMPEL

184,060.00

A.13.75

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS

A.13.76

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP

100,690.00

A.13.77

1 M2 PASANG LANTAI KERAMIK 40 X 40 CM

108,550.00

A.13.78

1 M2 PASANG DINDING KERAMIK 20 X 25 CM,

97,650.00

A.13.82

1 M2 PASANG PLINT KAYU 2 X 10 CM

30,310.00

A.13.83

1 M2 PASANGAN PAVING BLOCK WARNA (6 CM)

67,510.00

A.13.84

1 M2 PASANGAN PAVING BLOCK WARNA (8 CM)

69,060.00

A.13.85

1 M2 PASANGAN BATU CANDI

A.13.86

1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM)

64,620.00

A.13.87

1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM)

65,730.00

A.14.07

1 M2 PENGECATAN BIDANG KAYU LAMA

21,610.00

A.14.08

1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP

31,180.00

A.14.12

1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER

3,550.00

A.14.14

1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

8,030.00

A.14.15

1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

5,480.00

A.14.19

1 M2 PEMASANGAN WALL PAPER

8,840.00

Trotoarisasi dan
Penataan Alun-alun Langensari

760.00

138,380.00
43,970.00

54,600.00
341,470.00

86,280.00

93,540.00

141,280.00

Halaman : 32+3

Harga Satuan Pekerjaan

A.14.21

1 M2 PLITURAN BIDANG KAYU (BIASA)

22,760.00

A.14.24

1 M2 PENGECATAN PLAFOND DAN DINDING (INTERIOR ICI)

36,020.00

A.14.25

1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x)

14,250.00

A.14.26

1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x)

14,250.00

A.14.28

1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x)

9,480.00

A.14.29

1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x)

13,480.00

A.14.30

1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI

25,920.00

A.14.31

1 M2 PENGECATAN BESI (3X)

27,680.00

A.14.32

1 M2 PENGECATAN BIDANG KAYU LAMA BERCAT

20,220.00

A.14.33

1 M2 PENGECATAN DINDING (LAMA)

Trotoarisasi dan
Penataan Alun-alun Langensari

7,860.00

Halaman : 33+3

Harga Satuan Pekerjaan

Trotoarisasi dan
Penataan Alun-alun Langensari

Analisa Satuan Pekerjaan

ANALISA SATUAN PEKERJAAN


STANDAR NASIONAL INDONESIA
TAHUN 2008
NO.

URAIAN

KOEF

SAT.

HARGA SAT.

JUMLAH

6=(3x5)

A.01.06

1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK


BAHAN :
Kayu 5/7 Albasiah

0.0100

m3

1,100,000.00

11,000.00

Paku Biasa 2"-5"

0.0200

Kg

9,000.00

180.00

Kayu Papan 3/20 Kayu Albasiah

0.0070

1,105,000.00

7,735.00

Jumlah Bahan

18,915.00

UPAH :
Pekerja

0.1000

Oh

27,500.00

2,750.00

Tukang Kayu

0.1000

Oh

36,500.00

3,650.00

Kepala Tukang

0.0100

Oh

42,000.00

420.00

Mandor

0.0050

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

25,947.50

Keuntungan Max. 10 %

A.01.10

212.50
7,032.50

2,594.75

Jumlah Total

28,542.25

Dibulatkan

28,540.00

1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


BAHAN :
Jumlah Bahan
UPAH :
Pekerja

0.1000

Oh

27,500.00

2,750.00

Mandor

0.0500

Oh

42,500.00

2,125.00

Jumlah Pekerja

4,875.00

Jumlah Bahan + Pekerja

4,875.00

Keuntungan Max. 10 %

487.50

Jumlah Total

5,362.50

Dibulatkan

5,360.00

Daftar Analisa TARKIM

Halaman : 34+29

Analisa Satuan Pekerjaan

1
A.01.07

6=(3x5)

1 M2 PEMBUATAN DIREKSI KEET DAN LOS BAHAN


BAHAN :
Kayu Albasiah

0.0800

1,100,000.00

88,000.00

Paku 4 - 7

0.2500

kg

9,000.00

2,250.00

Seng Glb BJLS 28 ( 80 x 180 cm )

0.6200

lbr

23,900.00

14,818.00

Triplex 3 mm

0.5000

lbr

50,450.00

25,225.00

PC (50 kg)

0.1000

zak

50,000.00

5,000.00

Pasir pasang

0.2500

65,000.00

16,250.00

70.0000

bh

240.00

16,800.00

Bata merah
Jumlah Bahan

168,343.00

UPAH :
Ongkos Pasang

0.1500

ls

168,343.00

Jumlah Pekerja

25,251.45

Jumlah Bahan + Pekerja

193,594.45

Keuntungan Max. 10 %

A.01.12

25,251.45

19,359.45

Jumlah Total

212,953.90

Dibulatkan

212,950.00

1 M3 BONGKARAN BETON BERTULANG


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

6.6670

Oh

27,500.00

Mandor

0.3330

Oh

42,500.00

14,152.50

Jumlah Pekerja

197,495.00

Jumlah Bahan + Pekerja

197,495.00

Keuntungan Max. 10 %

A.01.13

183,342.50

19,749.50

Jumlah Total

217,244.50

Dibulatkan

217,240.00

1 M2 BONGKARAN DINDING TEMBOK BATA MERAH


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.6667

Oh

27,500.00

Mandor

0.0330

Oh

42,500.00

18,334.25
1,402.50

Jumlah Pekerja

19,736.75

Jumlah Bahan + Pekerja

19,736.75

Keuntungan Max. 10 %

1,973.68

Jumlah Total

21,710.43

Dibulatkan

21,710.00

Daftar Analisa TARKIM

Halaman : 35+29

Analisa Satuan Pekerjaan

1
A.01.16

6=(3x5)

1 M2 PAPAN NAMA PROYEK


BAHAN :
Kayu Albasiah, Balok

0.0420

1,100,000.00

46,200.00

Paku 4 - 7

0.2500

kg

9,000.00

2,250.00

Pengecatan Kayu

1.0000

ls

6,460.00

6,460.00

Jumlah Bahan

54,910.00

UPAH :
Penulisan

0.1250

Oh

54,910.00

Ongkos Pasang

0.1250

Oh

54,910.00

6,863.75

Jumlah Pekerja

13,727.50

Jumlah Bahan + Pekerja

68,637.50

Keuntungan Max. 10 %

A.02.01

6,863.75

6,863.75

Jumlah Total

75,501.25

Dibulatkan

75,500.00

1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.4000

Oh

27,500.00

11,000.00

Mandor

0.0400

Oh

42,500.00

1,700.00

Jumlah Pekerja

12,700.00

Jumlah Bahan + Pekerja

12,700.00

Keuntungan Max. 10 %

A.02.02

1,270.00

Jumlah Total

13,970.00

Dibulatkan

13,970.00

1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.5260

Oh

27,500.00

14,465.00

Mandor

0.0520

Oh

42,500.00

2,210.00

Jumlah Pekerja

16,675.00

Jumlah Bahan + Pekerja

16,675.00

Keuntungan Max. 10 %

1,667.50

Jumlah Total

18,342.50

Dibulatkan

18,340.00

Daftar Analisa TARKIM

Halaman : 36+29

Analisa Satuan Pekerjaan

1
A.02.03

6=(3x5)

1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 3 M


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.7350

Oh

27,500.00

Mandor

0.0730

Oh

42,500.00

3,102.50

Jumlah Pekerja

23,315.00

Jumlah Bahan + Pekerja

23,315.00

Keuntungan Max. 10 %

A.02.04

20,212.50

2,331.50

Jumlah Total

25,646.50

Dibulatkan

25,640.00

1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 4 M


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.9440

Oh

27,500.00

25,960.00

Mandor

0.0940

Oh

42,500.00

3,995.00

Jumlah Pekerja

29,955.00

Jumlah Bahan + Pekerja

29,955.00

Keuntungan Max. 10 %

A.02.05

2,995.50

Jumlah Total

32,950.50

Dibulatkan

32,950.00

1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 5 M


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

1.1530

Oh

27,500.00

31,707.50

Mandor

0.1150

Oh

42,500.00

4,887.50

Jumlah Pekerja

36,595.00

Jumlah Bahan + Pekerja

36,595.00

Keuntungan Max. 10 %

3,659.50

Jumlah Total

40,254.50

Dibulatkan

40,250.00

Daftar Analisa TARKIM

Halaman : 37+29

Analisa Satuan Pekerjaan

A.02.06

1 M3 GALIAN TANAH KERAS SEDALAM 1 METER

6=(3x5)

BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.6250

Oh

27,500.00

Mandor

0.0620

Oh

42,500.00

2,635.00

Jumlah Pekerja

19,822.50

Jumlah Bahan + Pekerja

19,822.50

Keuntungan Max. 10 %

A.02.07

17,187.50

1,982.25

Jumlah Total

21,804.75

Dibulatkan

21,800.00

1 M3 GALIAN TANAH CADAS SEDALAM 1 METER


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

1.2500

Oh

27,500.00

34,375.00

Mandor

0.1250

Oh

42,500.00

5,312.50

Jumlah Pekerja

39,687.50

Jumlah Bahan + Pekerja

39,687.50

Keuntungan Max. 10 %

A.02.08

3,968.75

Jumlah Total

43,656.25

Dibulatkan

43,650.00

1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METER


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.8230

Oh

27,500.00

22,632.50

Mandor

0.0830

Oh

42,500.00

3,527.50

Jumlah Pekerja

26,160.00

Jumlah Bahan + Pekerja

26,160.00

Keuntungan Max. 10 %

2,616.00

Jumlah Total

28,776.00

Dibulatkan

28,770.00

Daftar Analisa TARKIM

Halaman : 38+29

Analisa Satuan Pekerjaan

1
A.02.09

6=(3x5)

1 M2 PEKERJAAN STRIPING TANAH SETINGGI 1 METER


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.0500

Oh

27,500.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

1,587.50

Jumlah Bahan + Pekerja

1,587.50

Keuntungan Max. 10 %

A.02.10

1,375.00

158.75

Jumlah Total

1,746.25

Dibulatkan

1,740.00

1 M3 PEMBUANGAN TANAH SEJAUH 150 METER


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.5160

Oh

27,500.00

14,190.00

Mandor

0.0500

Oh

42,500.00

2,125.00

Jumlah Pekerja

16,315.00

Jumlah Bahan + Pekerja

16,315.00

Keuntungan Max. 10 %

A.02.11

1,631.50

Jumlah Total

17,946.50

Dibulatkan

17,940.00

1 M3 URUGAN TANAH KEMBALI


BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.1920

Oh

27,500.00

5,280.00

Mandor

0.0190

Oh

42,500.00

807.50

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

6,087.50
```````````````````

6,087.50
608.75

Jumlah Total

6,696.25

Dibulatkan

6,690.00

Daftar Analisa TARKIM

Halaman : 39+29

Analisa Satuan Pekerjaan

1
A.02.12

6=(3x5)

1 M3 PEMADATAN TANAH
BAHAN :
Jumlah Bahan

UPAH :
Pekerja

0.3000

Oh

27,500.00

8,250.00

Mandor

0.0300

Oh

42,500.00

1,275.00

Jumlah Pekerja

9,525.00

Jumlah Bahan + Pekerja

9,525.00

Keuntungan Max. 10 %

A.02.13

952.50

Jumlah Total

10,477.50

Dibulatkan

10,470.00

1 M3 URUGAN PASIR
BAHAN :
Pasir Urug

1.2000

55,000.00

Jumlah Bahan

66,000.00

66,000.00

UPAH :
Pekerja

0.3000

Oh

27,500.00

8,250.00

Mandor

0.0100

Oh

42,500.00

425.00

Jumlah Pekerja

8,675.00

Jumlah Bahan + Pekerja

74,675.00

Keuntungan Max. 10 %

A.02.14

7,467.50

Jumlah Total

82,142.50

Dibulatkan

82,140.00

1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 3 PS : 7 TL


BAHAN :
Pasir Urug

0.3300

55,000.00

18,150.00

Kapur Padam

0.1090

88,700.00

9,668.30

Tanah Liat

0.7630

29,000.00

22,127.00

Jumlah Bahan

49,945.30

UPAH :
Pekerja

0.8330

Oh

27,500.00

22,907.50

Tukang Batu

0.4160

Oh

34,000.00

14,144.00

Kepala Tukang

0.0400

Oh

39,500.00

1,580.00

Mandor

0.0830

Oh

42,500.00

3,527.50

Jumlah Pekerja

42,159.00

Jumlah Bahan + Pekerja

92,104.30

Keuntungan Max. 10 %
Jumlah Total
Dibulatkan

Daftar Analisa TARKIM

9,210.43
101,314.73
101,310.00

Halaman : 40+29

Analisa Satuan Pekerjaan

1
A.02.15

6=(3x5)

1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TL


BAHAN :
Kapur Padam

0.2000

88,700.00

17,740.00

Tanah Liat

1.0000

29,000.00

29,000.00

Jumlah Bahan

46,740.00

UPAH :
Pekerja

0.8330

Oh

27,500.00

22,907.50

Tukang Batu

0.4160

Oh

34,000.00

14,144.00

Kepala Tukang

0.0410

Oh

39,500.00

1,619.50

Mandor

0.0810

Oh

42,500.00

3,442.50

Jumlah Pekerja

42,113.50

Jumlah Bahan + Pekerja

88,853.50

Keuntungan Max. 10 %

A.02.16

8,885.35

Jumlah Total

97,738.85

Dibulatkan

97,730.00

1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TS


BAHAN :
Kapur Padam

0.2000

88,700.00

17,740.00

Pasir Pasang

1.0000

65,000.00

65,000.00

Jumlah Bahan

82,740.00

UPAH :
Pekerja

0.8330

Oh

27,500.00

22,907.50

Tukang Batu

0.4160

Oh

34,000.00

14,144.00

Kepala Tukang

0.0410

Oh

39,500.00

1,619.50

Mandor

0.0810

Oh

42,500.00

3,442.50

Jumlah Pekerja

42,113.50

Jumlah Bahan + Pekerja

124,853.50

Keuntungan Max. 10 %

A.02.17

12,485.35

Jumlah Total

137,338.85

Dibulatkan

137,330.00

1 M3 PEMASANGAN LAPISAN IJUK


BAHAN :
Injuk

1.2000

12,000.00

Jumlah Bahan

14,400.00

14,400.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Mandor

0.0150

Oh

42,500.00

637.50

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

4,762.50
19,162.50
1,916.25

Jumlah Total

21,078.75

Dibulatkan

21,070.00

Daftar Analisa TARKIM

Halaman : 41+29

Analisa Satuan Pekerjaan

1
A.02.18

6=(3x5)

1 M3 URUGAN SIRTU
BAHAN :
Sirtu

1.2000

81,900.00

Jumlah Bahan

98,280.00

98,280.00

UPAH :
Pekerja

0.2500

Oh

27,500.00

6,875.00

Mandor

0.0250

Oh

42,500.00

1,062.50

Jumlah Pekerja

7,937.50

Jumlah Bahan + Pekerja

106,217.50

Keuntungan Max. 10 %

A.02.19

10,621.75

Jumlah Total

116,839.25

Dibulatkan

116,830.00

1 M2 PEMBUATAN JALAN SEMENTARA, TEBAL 25 CM


BAHAN :
Batu Belah

0.2750

85,000.00

23,375.00

Kerikil

0.0300

125,500.00

3,765.00

Pasir Urug

0.0500

55,000.00

Jumlah Bahan

2,750.00
29,890.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Mandor

0.1000

Oh

42,500.00

4,250.00

Jumlah Pekerja

31,750.00

Jumlah Bahan + Pekerja

61,640.00

Keuntungan Max. 10 %

A.02.20

6,164.00

Jumlah Total

67,804.00

Dibulatkan

67,800.00

1 M3 PEKERJAAN GALIAN TANAH SUMURAN MAX KEDALAMAN 10 M'


BAHAN :

Jumlah Bahan

UPAH :
Pekerja

1.1500

Oh

27,500.00

31,625.00

Mandor

0.0250

Oh

42,500.00

1,062.50

Jumlah Pekerja

32,687.50

Jumlah Bahan + Pekerja

32,687.50

Keuntungan Max. 10 %

3,268.75

Jumlah Total

35,956.25

Dibulatkan

35,950.00

Daftar Analisa TARKIM

Halaman : 42+29

Analisa Satuan Pekerjaan

1
A.02.22

6=(3x5)

1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)


BAHAN :
Tanah Urug (didatangkan)

1.2000

6,500.00

Jumlah Bahan

7,800.00

7,800.00

UPAH :
Pekerja

0.4500

Oh

27,500.00

12,375.00

Mandor

0.0450

Oh

42,500.00

1,912.50

Alat Bantu (sewa Stamper)

0.1250

Oh

98,300.00

12,287.50

Jumlah Pekerja

26,575.00

Jumlah Bahan + Pekerja

34,375.00

Keuntungan Max. 10 %

A.02.23

3,437.50

Jumlah Total

37,812.50

Dibulatkan

37,810.00

1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH


BAHAN :
Lempengan Rumput Biasa (Teki)

1.2000

6,900.00

Jumlah Bahan

8,280.00
8,280.00

UPAH :
Pekerja Setengah Terampil

0.0400

org

30,000.00

1,200.00

Mandor

0.0100

org

42,500.00

425.00

Jumlah Pekerja

1,625.00

Jumlah Bahan + Pekerja

9,905.00

Keuntungan Max. 10 %

A.03.02

990.50

Jumlah

10,895.50

Dibulatkan

10,890.00

1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 Ps


BAHAN :
Batu Belah 15/20
Semen Portland
Pasir Pasang

1.1000

85,000.00

93,500.00

267.0000

Kg

1,000.00

267,000.00

0.4270

65,000.00

27,755.00

Jumlah Bahan

388,255.00

UPAH :
Pekerja

1.5000

Oh

27,500.00

41,250.00

Tukang Batu

0.6000

Oh

34,000.00

20,400.00

Kepala Tukang

0.0600

Oh

39,500.00

2,370.00

Mandor

0.0350

Oh

42,500.00

1,487.50

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

65,507.50
453,762.50
45,376.25

Jumlah Total

499,138.75

Dibulatkan

499,130.00

Daftar Analisa TARKIM

Halaman : 43+29

Analisa Satuan Pekerjaan

1
A.03.03

6=(3x5)

1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps


BAHAN :
Batu Belah 15/20
Semen Portland
Pasir Pasang

1.1000

85,000.00

93,500.00

202.0000

Kg

1,000.00

202,000.00

0.4850

65,000.00

31,525.00

Jumlah Bahan

327,025.00

UPAH :
Pekerja

1.5000

Oh

27,500.00

41,250.00

Tukang Batu

0.6000

Oh

34,000.00

20,400.00

Kepala Tukang

0.0600

Oh

39,500.00

2,370.00

Mandor

0.0350

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

392,532.50

Keuntungan Max. 10 %

A.03.04

1,487.50
65,507.50

39,253.25

Jumlah Total

431,785.75

Dibulatkan

431,780.00

1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps


BAHAN :
Batu Belah 15/20
Semen Portland
Pasir Pasang

1.1000

85,000.00

93,500.00

163.0000

Kg

1,000.00

163,000.00

0.5200

65,000.00

Jumlah Bahan

33,800.00
290,300.00

UPAH :
Pekerja

1.5000

Oh

27,500.00

41,250.00

Tukang Batu

0.6000

Oh

34,000.00

20,400.00

Kepala Tukang

0.0600

Oh

39,500.00

2,370.00

Mandor

0.0350

Oh

42,500.00

1,487.50

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

65,507.50
355,807.50
35,580.75

Jumlah Total

391,388.25

Dibulatkan

391,380.00

Daftar Analisa TARKIM

Halaman : 44+29

Analisa Satuan Pekerjaan

1
A.03.05

6=(3x5)

1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps


BAHAN :
Batu Belah 15/20
Semen Portland
Pasir Pasang

1.1000

85,000.00

93,500.00

136.0000

Kg

1,000.00

136,000.00

0.5440

65,000.00

35,360.00

Jumlah Bahan

264,860.00

UPAH :
Pekerja

1.5000

Oh

27,500.00

41,250.00

Tukang Batu

0.6000

Oh

34,000.00

20,400.00

Kepala Tukang

0.0600

Oh

39,500.00

2,370.00

Mandor

0.0350

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

330,367.50

Keuntungan Max. 10 %

A.03.13

1,487.50
65,507.50

33,036.75

Jumlah Total

363,404.25

Dibulatkan

363,400.00

1 M3 PASANG AANSTAMPING BATU KOSONG


BAHAN :
Batu Belah 15/20

1.2000

85,000.00

Pasir Urug

0.3000

55,000.00

Jumlah Bahan

102,000.00
16,500.00
118,500.00

UPAH :
Pekerja

0.7800

Oh

27,500.00

21,450.00

Tukang Batu

0.3900

Oh

34,000.00

13,260.00

Kepala Tukang

0.0390

Oh

39,500.00

1,540.50

Mandor

0.0200

Oh

42,500.00

850.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

37,100.50
155,600.50
15,560.05

Jumlah Total

171,160.55

Dibulatkan

171,160.00

Daftar Analisa TARKIM

Halaman : 45+29

Analisa Satuan Pekerjaan

1
A.03.14

6=(3x5)

1 M3 PASANG PONDASI SUMURAN DIAMETER 100 CM


BAHAN :
Besi Beton

75.0000

Kg

8,000.00

600,000.00

202.0000

Kg

1,000.00

202,000.00

Pasir Beton

0.3200

75,000.00

24,000.00

Koral Beton

0.4900

125,500.00

61,495.00

Kawat Beton

0.8000

Kg

8,550.00

6,840.00

Semen Portland

Jumlah Bahan

894,335.00

UPAH :
Pekerja

3.0000

Oh

27,500.00

82,500.00

Tukang Batu

0.8500

Oh

34,000.00

28,900.00

Kepala Tukang

0.0850

Oh

39,500.00

3,357.50

MAndor

0.1500

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

1,015,467.50

Keuntungan Max. 10 %

A.03.15

6,375.00
121,132.50

101,546.75

Jumlah Total

1,117,014.25

Dibulatkan

1,117,010.00

1 M3 PASANG PONDASI SIKLOP 40% BATU KALI


BAHAN :
Batu Belah 15/20

0.4500

85,000.00

38,250.00

280.0000

Kg

1,000.00

280,000.00

Pasir Beton

0.4500

75,000.00

33,750.00

Koral Beton

0.6700

125,500.00

84,085.00

Semen Portland

Jumlah Bahan

436,085.00

UPAH :
Pekerja

2.3800

Oh

27,500.00

65,450.00

Tukang Batu

0.3000

Oh

34,000.00

10,200.00

Kepala Tukang

0.0300

Oh

39,500.00

1,185.00

Mandor

0.0160

Oh

42,500.00

680.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

77,515.00
513,600.00
51,360.00

Jumlah Total

564,960.00

Dibulatkan

564,960.00

Daftar Analisa TARKIM

Halaman : 46+29

Analisa Satuan Pekerjaan

1
A.03.16

6=(3x5)

1 M1 PEMBUATAN TIANG PANCANG (40 X 40) CM, BETON BERTULANG


BAHAN :
Pasir Urug Darat

0.0190

55,000.00

1,045.00

Pasir Beton

0.0940

75,000.00

7,050.00

Koral Beton

0.1500

125,500.00

18,825.00

Semen Portland

60.5000

Kg

1,000.00

60,500.00

Besi Beton

45.0000

Kg

8,000.00

360,000.00

Kawat Beton

0.9000

Kg

8,550.00

7,695.00

Kayu Kaso 5/7 Lokal Kelas II

0.0320

1,950,000.00

62,400.00

Paku

0.1200

Kg

9,000.00

1,080.00

Minyak Bekisting

0.0900

Lt

23,800.00

2,142.00

Plamir Tembok

0.2400

Kg

12,000.00

2,880.00

Jumlah Bahan

523,617.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Batu

0.6700

Oh

34,000.00

22,780.00

Kepala Tukang

0.0670

Oh

39,500.00

2,646.50

Mandor

0.0500

Oh

42,500.00

2,125.00

Jumlah Pekerja

55,051.50

Jumlah Bahan + Pekerja

578,668.50

Keuntungan Max. 10 %

A.03.17

57,866.85

Jumlah Total

636,535.35

Dibulatkan

636,530.00

1 M1 PEMBUATAN TIANG PANCANG (35 X 35) CM, BETON BERTULANG


BAHAN :
Pasir Urug Darat

0.0160

55,000.00

880.00

Pasir Beton

0.0800

75,000.00

6,000.00

Koral Beton

0.1250

125,500.00

15,687.50

Semen Portland

49.0000

Kg

1,000.00

49,000.00

Besi Beton

34.0000

Kg

8,000.00

272,000.00

Kawat Beton

0.7000

Kg

8,550.00

5,985.00

Kayu Kaso 5/7

0.0270

1,100,000.00

29,700.00

Paku

0.1200

Kg

9,000.00

1,080.00

Minyak Bekisting
Plamir Tembok
Jumlah Bahan

0.0900
0.2000

Lt
Kg

23,800.00
12,000.00

2,142.00
2,400.00
384,874.50

Pekerja

0.8000

Oh

27,500.00

22,000.00

Tukang Batu

0.5000

Oh

34,000.00

17,000.00

Kepala Tukang

0.0500

Oh

39,500.00

1,975.00

Mandor

0.0400

Oh

42,500.00

UPAH :

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

1,700.00
42,675.00
427,549.50
42,754.95

Jumlah Total

470,304.45

Dibulatkan

470,300.00

Daftar Analisa TARKIM

Halaman : 47+29

Analisa Satuan Pekerjaan

1
A.03.18

6=(3x5)

1 M3 PASANGAN BATU BRONJONG


BAHAN :
Batu Kali (Batu Bulat) Bronjol

1.2000

78,000.00

93,600.00

Kawat Bronjong

3.5000

kg

6,750.00

23,625.00

Jumlah Bahan

117,225.00

UPAH :
Pekerja

1.5000

Oh

27,500.00

41,250.00

Pekerja terampil

0.2000

Oh

31,500.00

6,300.00

Mandor

0.0200

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

165,625.00

Keuntungan Max. 10 %

A.03.20

850.00
48,400.00

16,562.50

Jumlah Total

182,187.50

Dibulatkan

182,180.00

1 M3 PASANGAN BATU TEMPEL+ SIARAN


BAHAN :
Batu Tempel

1.1000

m2 ###

117,000.00

128,700.00

Semen Portland

6.0000

Kg

1,000.00

6,000.00

Pasir Pasang

0.0310

65,000.00

2,015.00

Jumlah Bahan

136,715.00

UPAH :
Pekerja

0.1875

Oh

27,500.00

5,156.25

Tukang Batu

0.2250

Oh

34,000.00

7,650.00

Kepala Tukang Batu

0.0375

Oh

39,500.00

1,481.25

Mandor

0.0160

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

151,682.50

Keuntungan Max. 10 %

A.03.21

680.00
14,967.50

15,168.25

Jumlah Total

166,850.75

Dibulatkan

166,850.00

1 M3 PASANGAN BATU HITAM


BAHAN :
Batu Hitam
Semen Portland
Pasir Pasang

1.0500

m2

117,000.00

122,850.00

11.7500

Kg

1,000.00

11,750.00

0.0350

65,000.00

Jumlah Bahan

2,275.00
136,875.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang Batu

0.0350

Oh

39,500.00

1,382.50

Mandor

0.0160

Oh

42,500.00

680.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

31,012.50
167,887.50
16,788.75

Jumlah Total

184,676.25

Dibulatkan

184,670.00

Daftar Analisa TARKIM

Halaman : 48+29

Analisa Satuan Pekerjaan

1
A.04.05

6=(3x5)

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm
Semen Portland
Pasir Pasang

140.0000

bh

240.00

33,600.00

22.2000

Kg

1,000.00

22,200.00

0.1020

65,000.00

6,630.00

Jumlah Bahan

62,430.00

UPAH :
Pekerja

0.6500

Oh

27,500.00

17,875.00

Tukang Batu

0.2000

Oh

34,000.00

6,800.00

Kepala Tukang

0.0200

Oh

39,500.00

790.00

Mandor

0.0150

Oh

42,500.00

637.50

Jumlah Pekerja

26,102.50

Jumlah Bahan + Pekerja

88,532.50

Keuntungan Max. 10 %

A.04.09

8,853.25

Jumlah Total

97,385.75

Dibulatkan

97,380.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

240.00

16,800.00

Semen Portland

18.9500

Kg

1,000.00

18,950.00

0.0380

65,000.00

2,470.00

Pasir Pasang
Jumlah Bahan

38,220.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Batu

0.1000

Oh

34,000.00

3,400.00

Kepala Tukang

0.0100

Oh

39,500.00

395.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

12,807.50

Jumlah Bahan + Pekerja

51,027.50

Keuntungan Max. 10 %

5,102.75

Jumlah Total

56,130.25

Dibulatkan

56,130.00

Daftar Analisa TARKIM

Halaman : 49+29

Analisa Satuan Pekerjaan

1
A.04.10

6=(3x5)

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

240.00

16,800.00

Semen Portland

14.3700

Kg

1,000.00

14,370.00

0.0400

65,000.00

2,600.00

Pasir Pasang
Jumlah Bahan

33,770.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Batu

0.1000

Oh

34,000.00

3,400.00

Kepala Tukang

0.0100

Oh

39,500.00

395.00

Mandor

0.0050

Oh

42,500.00

12,807.50

Jumlah Bahan + Pekerja

46,577.50

Keuntungan Max. 10 %

A.04.11

212.50

Jumlah Pekerja

4,657.75

Jumlah Total

51,235.25

Dibulatkan

51,230.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

240.00

16,800.00

Semen Portland

11.5000

Kg

1,000.00

11,500.00

0.0430

65,000.00

Pasir Pasang
Jumlah Bahan

2,795.00
31,095.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Batu

0.1000

Oh

34,000.00

3,400.00

Kepala Tukang

0.0100

Oh

39,500.00

395.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

12,807.50

Jumlah Bahan + Pekerja

43,902.50

Keuntungan Max. 10 %

4,390.25

Jumlah Total

48,292.75

Dibulatkan

48,290.00

Daftar Analisa TARKIM

Halaman : 50+29

Analisa Satuan Pekerjaan

1
A.04.12

6=(3x5)

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps


BAHAN :
Bata Merah 5 x 11 x 22 cm

70.0000

bh

240.00

16,800.00

Semen Portland

9.6800

Kg

1,000.00

9,680.00

Pasir Pasang

0.0450

65,000.00

2,925.00

Jumlah Bahan

29,405.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Batu

0.1000

Oh

34,000.00

3,400.00

Kepala Tukang

0.0100

Oh

39,500.00

395.00

Mandor

0.0050

Oh

42,500.00

12,807.50

Jumlah Bahan + Pekerja

42,212.50

Keuntungan Max. 10 %

A.04.18

212.50

Jumlah Pekerja

4,221.25

Jumlah Total

46,433.75

Dibulatkan

46,430.00

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.20)


BAHAN :
Hollow Block (HB.20)

12.5000

bh

1,750.00

21,875.00

Semen Portland

13.5000

Kg

1,000.00

13,500.00

Pasir Pasang

0.0480

65,000.00

3,120.00

Besi Beton Polos

1.9500

Kg

8,000.00

15,600.00

Jumlah Bahan

54,095.00

UPAH :
Pekerja

0.3500

Oh

27,500.00

9,625.00

Tukang Batu

0.1500

Oh

34,000.00

5,100.00

Kepala Tukang

0.0150

Oh

39,500.00

592.50

Mandor

0.0075

Oh

42,500.00

318.75

Jumlah Pekerja

15,636.25

Jumlah Bahan + Pekerja

69,731.25

Keuntungan Max. 10 %

6,973.13

Jumlah Total

76,704.38

Dibulatkan

76,700.00

Daftar Analisa TARKIM

Halaman : 51+29

Analisa Satuan Pekerjaan

1
A.04.19

6=(3x5)

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.15)


BAHAN :
Hollow Block (HB.15)

12.5000

bh

1,600.00

20,000.00

Semen Portland

10.4500

Kg

1,000.00

10,450.00

Pasir Pasang

0.0380

65,000.00

2,470.00

Besi Beton Polos

1.9500

Kg

8,000.00

15,600.00

Jumlah Bahan

48,520.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Batu

0.1200

Oh

34,000.00

4,080.00

Kepala Tukang

0.0120

Oh

39,500.00

474.00

Mandor

0.0060

Oh

42,500.00

13,609.00

Jumlah Bahan + Pekerja

62,129.00

Keuntungan Max. 10 %

A.04.20

255.00

Jumlah Pekerja

6,212.90

Jumlah Total

68,341.90

Dibulatkan

68,340.00

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.10)


BAHAN :
Hollow Block (HB.10)

12.5000

bh

1,300.00

16,250.00

Semen Portland

7.5000

Kg

1,000.00

7,500.00

Pasir Pasang

0.0270

65,000.00

1,755.00

Besi Beton Polos

1.9500

Kg

8,000.00

15,600.00

Jumlah Bahan

41,105.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Batu

0.1000

Oh

34,000.00

3,400.00

Kepala Tukang

0.0100

Oh

39,500.00

395.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

12,807.50

Jumlah Bahan + Pekerja

53,912.50

Keuntungan Max. 10 %

5,391.25

Jumlah Total

59,303.75

Dibulatkan

59,300.00

Daftar Analisa TARKIM

Halaman : 52+29

Analisa Satuan Pekerjaan

1
A.04.25

6=(3x5)

1 M2 PASANGAN DINDING DINDING ROSTER/TERAWANG (12X11X24) KERAMIK


BAHAN :
Roster/Terawang

36.0000

bh

22,000.00

792,000.00

Semen Portland

0.1280

Kg

1,000.00

128.00

Pasir Pasang

0.0350

65,000.00

2,275.00

Jumlah Bahan

794,403.00

UPAH :
Pekerja

0.3000

Oh

27,500.00

8,250.00

Tukang Batu

0.1000

Oh

34,000.00

3,400.00

Kepala Tukang

0.0100

Oh

39,500.00

395.00

Mandor

0.0150

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

807,085.50

Keuntungan Max. 10 %

A.04.27

637.50
12,682.50

80,708.55

Jumlah Total

887,794.05

Dibulatkan

887,790.00

1 M2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU


BAHAN :
Bilik Bambu

1.5000

m2

4,800.00

7,200.00

Kayu 5/7

0.0140

1,100,000.00

15,400.00

Paku Biasa 2"-5"

0.0120

Kg

9,000.00

108.00

List Kayu 2/4

0.0030

2,400.00

Jumlah Bahan

7.20
22,715.20

UPAH :
Pekerja

0.1000

Oh

27,500.00

2,750.00

Tukang Batu

0.0500

Oh

34,000.00

1,700.00

Kepala Tukang

0.0050

Oh

39,500.00

197.50

Mandor

0.0020

Oh

42,500.00

85.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

4,732.50
27,447.70
2,744.77

Jumlah Total

30,192.47

Dibulatkan

30,190.00

Daftar Analisa TARKIM

Halaman : 53+29

Analisa Satuan Pekerjaan

1
A.05.02

6=(3x5)

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIAN


BAHAN :
Semen Portland

8.5200

Kg

1,000.00

8,520.00

Pasir Pasang

0.0170

65,000.00

1,105.00

Jumlah Bahan

9,625.00

UPAH :
Pekerja

0.2000

Oh

27,500.00

5,500.00

Tukang Batu

0.1500

Oh

34,000.00

5,100.00

Kepala Tukang

0.0150

Oh

39,500.00

592.50

Mandor

0.0100

Oh

42,500.00

11,617.50

Jumlah Bahan + Pekerja

21,242.50

Keuntungan Max. 10 %

A.05.03

425.00

Jumlah Pekerja

2,124.25

Jumlah Total

23,366.75

Dibulatkan

23,360.00

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIAN


BAHAN :
Semen Portland

6.4800

Kg

1,000.00

6,480.00

Pasir Pasang

0.0190

65,000.00

1,235.00

Jumlah Bahan

7,715.00

UPAH :
Pekerja

0.2000

Oh

27,500.00

5,500.00

Tukang Batu

0.1500

Oh

34,000.00

5,100.00

Kepala Tukang

0.0150

Oh

39,500.00

592.50

Mandor

0.0100

Oh

42,500.00

11,617.50

Jumlah Bahan + Pekerja

19,332.50

Keuntungan Max. 10 %

A.05.04

425.00

Jumlah Pekerja

1,933.25

Jumlah Total

21,265.75

Dibulatkan

21,260.00

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIAN


BAHAN :
Semen Portland

5.2000

Kg

1,000.00

5,200.00

Pasir Pasang

0.0200

65,000.00

1,300.00

Jumlah Bahan

6,500.00

UPAH :
Pekerja

0.2000

Oh

27,500.00

5,500.00

Tukang Batu

0.1500

Oh

34,000.00

5,100.00

Kepala Tukang

0.0150

Oh

39,500.00

592.50

Mandor

0.0100

Oh

42,500.00

425.00

Jumlah Pekerja

11,617.50

Jumlah Bahan + Pekerja

18,117.50

Keuntungan Max. 10 %

1,811.75

Jumlah Total

19,929.25

Dibulatkan

19,920.00

Daftar Analisa TARKIM

Halaman : 54+29

Analisa Satuan Pekerjaan

1
A.05.05

6=(3x5)

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN


BAHAN :
Semen Portland

4.3200

Kg

1,000.00

4,320.00

Pasir Pasang

0.0220

65,000.00

1,430.00

Jumlah Bahan

5,750.00

UPAH :
Pekerja

0.2000

Oh

27,500.00

5,500.00

Tukang Batu

0.1500

Oh

34,000.00

5,100.00

Kepala Tukang

0.0150

Oh

36,500.00

547.50

Mandor

0.0100

Oh

42,500.00

11,572.50

Jumlah Bahan + Pekerja

17,322.50

Keuntungan Max. 10 %

A.05.13

425.00

Jumlah Pekerja

1,732.25

Jumlah Total

19,054.75

Dibulatkan

19,050.00

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 20 MM + ACIAN


BAHAN :
Semen Portland
Pasir Pasang

14.2800

Kg

1,000.00

14,280.00

0.0230

65,000.00

1,495.00

Jumlah Bahan

15,775.00

UPAH :
Pekerja

0.2500

Oh

27,500.00

6,875.00

Tukang Batu

0.2000

Oh

34,000.00

6,800.00

Kepala Tukang

0.0200

Oh

39,500.00

790.00

Mandor

0.0125

Oh

42,500.00

531.25

Jumlah Pekerja

14,996.25

Jumlah Bahan + Pekerja

30,771.25

Keuntungan Max. 10 %

A.05.14

3,077.13

Jumlah Total

33,848.38

Dibulatkan

33,840.00

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 20 MM + ACIAN


BAHAN :
Semen Portland
Pasir Pasang

10.8000

Kg

1,000.00

10,800.00

0.0260

65,000.00

1,690.00

Jumlah Bahan

12,490.00

UPAH :
Pekerja

0.2500

Oh

27,500.00

6,875.00

Tukang Batu

0.2000

Oh

34,000.00

6,800.00

Kepala Tukang

0.0200

Oh

39,500.00

790.00

Mandor

0.0125

Oh

42,500.00

531.25

Jumlah Pekerja

14,996.25

Jumlah Bahan + Pekerja

27,486.25

Keuntungan Max. 10 %

2,748.63

Jumlah Total

30,234.88

Dibulatkan

30,230.00

Daftar Analisa TARKIM

Halaman : 55+29

Analisa Satuan Pekerjaan

1
A.05.15

6=(3x5)

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 20 MM + ACIAN


BAHAN :
Semen Portland

8.6800

Kg

1,000.00

8,680.00

Pasir Pasang

0.0280

65,000.00

1,820.00

Jumlah Bahan

10,500.00

UPAH :
Pekerja

0.2500

Oh

27,500.00

6,875.00

Tukang Batu

0.2000

Oh

34,000.00

6,800.00

Kepala Tukang

0.0200

Oh

39,500.00

790.00

Mandor

0.0125

Oh

42,500.00

14,996.25

Jumlah Bahan + Pekerja

25,496.25

Keuntungan Max. 10 %

A.05.16

531.25

Jumlah Pekerja

2,549.63

Jumlah Total

28,045.88

Dibulatkan

28,040.00

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM + ACIAN


BAHAN :
Semen Portland

7.2900

Kg

1,000.00

7,290.00

Pasir Pasang

0.0280

65,000.00

1,820.00

Jumlah Bahan

9,110.00

UPAH :
Pekerja

0.2500

Oh

27,500.00

6,875.00

Tukang Batu

0.2000

Oh

34,000.00

6,800.00

Kepala Tukang

0.0200

Oh

39,500.00

790.00

Mandor

0.0125

Oh

42,500.00

531.25

Jumlah Pekerja

14,996.25

Jumlah Bahan + Pekerja

24,106.25

Keuntungan Max. 10 %

A.05.19

2,410.63

Jumlah Total

26,516.88

Dibulatkan

26,510.00

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM + ACIAN


BAHAN :
Semen Portland
Pasir Pasang

15.5000

Kg

1,000.00

15,500.00

0.0130

65,000.00

845.00

Jumlah Bahan

16,345.00

UPAH :
Pekerja

0.3000

Oh

27,500.00

8,250.00

Tukang Batu

0.2000

Oh

34,000.00

6,800.00

Kepala Tukang

0.0200

Oh

39,500.00

790.00

Mandor

0.0130

Oh

42,500.00

552.50

Jumlah Pekerja

16,392.50

Jumlah Bahan + Pekerja

32,737.50

Keuntungan Max. 10 %

3,273.75

Jumlah Total

36,011.25

Dibulatkan

36,010.00

Daftar Analisa TARKIM

Halaman : 56+29

Analisa Satuan Pekerjaan

1
A.05.20

6=(3x5)

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 25 MM + ACIAN


BAHAN :
Semen Portland
Pasir Pasang

11.7500

Kg

1,000.00

11,750.00

0.0350

65,000.00

2,275.00

Jumlah Bahan

14,025.00

UPAH :
Pekerja

0.3000

Oh

27,500.00

8,250.00

Tukang Batu

0.2000

Oh

34,000.00

6,800.00

Kepala Tukang

0.0200

Oh

39,500.00

790.00

Mandor

0.0130

Oh

42,500.00

16,392.50

Jumlah Bahan + Pekerja

30,417.50

Keuntungan Max. 10 %

A.05.21

552.50

Jumlah Pekerja

3,041.75

Jumlah Total

33,459.25

Dibulatkan

33,450.00

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 25 MM + ACIAN


BAHAN :
Semen Portland

9.4800

Kg

1,000.00

9,480.00

Pasir Pasang

0.0380

65,000.00

2,470.00

Jumlah Bahan

11,950.00

UPAH :
Pekerja

0.3000

Oh

27,500.00

8,250.00

Tukang Batu

0.2000

Oh

34,000.00

6,800.00

Kepala Tukang

0.0200

Oh

39,500.00

790.00

Mandor

0.0130

Oh

42,500.00

552.50

Jumlah Pekerja

16,392.50

Jumlah Bahan + Pekerja

28,342.50

Keuntungan Max. 10 %

A.05.22

2,834.25

Jumlah Total

31,176.75

Dibulatkan

31,170.00

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 25 MM + ACIAN


BAHAN :
Semen Portland

7.9400

Kg

1,000.00

7,940.00

Pasir Pasang

0.0390

65,000.00

2,535.00

Jumlah Bahan

10,475.00

UPAH :
Pekerja

0.3000

Oh

27,500.00

8,250.00

Tukang Batu

0.2000

Oh

34,000.00

6,800.00

Kepala Tukang

0.0200

Oh

39,500.00

790.00

Mandor

0.0130

Oh

42,500.00

552.50

Jumlah Pekerja

16,392.50

Jumlah Bahan + Pekerja

26,867.50

Keuntungan Max. 10 %

2,686.75

Jumlah Total

29,554.25

Dibulatkan

29,550.00

Daftar Analisa TARKIM

Halaman : 57+29

Analisa Satuan Pekerjaan

1
A.05.23

6=(3x5)

1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 30 MM + ACIAN


BAHAN :
Semen Portland
Pasir Pasang

18.6500

Kg

1,000.00

18,650.00

0.0350

65,000.00

2,275.00

Jumlah Bahan

20,925.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Kepala Tukang

0.0250

Oh

39,500.00

987.50

Mandor

0.0150

Oh

42,500.00

18,925.00

Jumlah Bahan + Pekerja

39,850.00

Keuntungan Max. 10 %

A.05.24

637.50

Jumlah Pekerja

3,985.00

Jumlah Total

43,835.00

Dibulatkan

43,830.00

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 30 MM + ACIAN


BAHAN :
Semen Portland
Pasir Pasang

14.1500

Kg

1,000.00

14,150.00

0.0390

65,000.00

2,535.00

Jumlah Bahan

16,685.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Kepala Tukang

0.0250

Oh

39,500.00

987.50

Mandor

0.0150

Oh

42,500.00

637.50

Jumlah Pekerja

18,925.00

Jumlah Bahan + Pekerja

35,610.00

Keuntungan Max. 10 %

A.05.25

3,561.00

Jumlah Total

39,171.00

Dibulatkan

39,170.00

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 30 MM + ACIAN


BAHAN :
Semen Portland
Pasir Pasang

11.3800

Kg

1,000.00

11,380.00

0.0420

65,000.00

2,730.00

Jumlah Bahan

14,110.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Kepala Tukang

0.0250

Oh

39,500.00

987.50

Mandor

0.0150

Oh

42,500.00

637.50

Jumlah Pekerja

18,925.00

Jumlah Bahan + Pekerja

33,035.00

Keuntungan Max. 10 %

3,303.50

Jumlah Total

36,338.50

Dibulatkan

36,330.00

Daftar Analisa TARKIM

Halaman : 58+29

Analisa Satuan Pekerjaan

1
A.05.26

6=(3x5)

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 30 MM + ACIAN


BAHAN :
Semen Portland

8.1900

Kg

1,000.00

8,190.00

Pasir Pasang

0.0450

65,000.00

2,925.00

Jumlah Bahan

11,115.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Kepala Tukang

0.0250

Oh

39,500.00

987.50

Mandor

0.0150

Oh

42,500.00

18,925.00

Jumlah Bahan + Pekerja

30,040.00

Keuntungan Max. 10 %

A.05.31

637.50

Jumlah Pekerja

3,004.00

Jumlah Total

33,044.00

Dibulatkan

33,040.00

1 M2 PASANGAN PLESTERAN SKONING 1 Pc : 2 Ps, TEBAL 15 MM


BAHAN :
Semen Portland

0.5000

Kg

1,000.00

500.00

Pasir Pasang

0.0020

65,000.00

130.00

Jumlah Bahan

630.00

UPAH :
Pekerja

0.0570

Oh

27,500.00

1,567.50

Tukang Batu

0.0380

Oh

34,000.00

1,292.00

Kepala Tukang

0.0380

Oh

39,500.00

1,501.00

Mandor

0.0190

Oh

42,500.00

5,168.00

Jumlah Bahan + Pekerja

5,798.00

Keuntungan Max. 10 %

A.05.34

807.50

Jumlah Pekerja

579.80

Jumlah Total

6,377.80

Dibulatkan

6,370.00

1 M2 PASANGAN PLESTERAN CIPRAT, 1 Pc : 2 Ps


BAHAN :
Semen Portland

4.3200

Kg

1,000.00

4,320.00

Pasir Pasang

0.0160

kg

65,000.00

1,040.00

Jumlah Bahan

5,360.00

UPAH :
Pekerja

0.2500

Oh

27,500.00

6,875.00

Tukang Batu

0.1000

Oh

34,000.00

3,400.00

Kepala Tukang

0.0100

Oh

39,500.00

395.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

10,882.50

Jumlah Bahan + Pekerja

16,242.50

Keuntungan Max. 10 %

1,624.25

Jumlah Total

17,866.75

Dibulatkan

17,860.00

Daftar Analisa TARKIM

Halaman : 59+29

Analisa Satuan Pekerjaan

1
A.05.35

6=(3x5)

1 M2 PASANGAN PLESTERAN SIAR ADUKAN 1 Pc : 2 Ps


BAHAN :
Semen Portland

4.3200

Kg

1,000.00

4,320.00

Pasir Pasang

0.0160

kg

65,000.00

1,040.00

Jumlah Bahan

5,360.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Batu

0.0700

Oh

34,000.00

2,380.00

Kepala Tukang

0.0070

Oh

39,500.00

276.50

Mandor

0.0040

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

12,311.50

Keuntungan Max. 10 %

A.05.36

170.00
6,951.50

1,231.15

Jumlah Total

13,542.65

Dibulatkan

13,540.00

1 M2 ACIAN PC
BAHAN :
P.C (50 kg)

0.0800

zak

50,000.00

Jumlah Bahan

4,000.00
4,000.00

UPAH :
Pekerja setengah trampil

0.1430

org

30,000.00

4,290.00

Tk. batu setengah trampil

0.1070

org

34,000.00

3,638.00

Kep. Tukang batu

0.0105

org

39,500.00

414.75

Mandor

0.0053

org

42,500.00

223.13

Jumlah Pekerja

8,565.88

Jumlah Bahan + Pekerja

12,565.88

Keuntungan Max. 10 %

A.06.01

1,256.59

Jumlah

13,822.46

Dibulatkan

13,820.00

1 M2 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATI


BAHAN :
Kayu Jati, Balok

1.1000

6,825,000.00

Jumlah Bahan

7,507,500.00
7,507,500.00

UPAH :
Pekerja

6.0000

Oh

27,500.00

165,000.00

15.0000

Oh

36,500.00

547,500.00

Kepala Tukang

3.0000

Oh

42,000.00

126,000.00

Mandor

0.5000

Oh

42,500.00

21,250.00

Tukang Kayu

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

859,750.00
8,367,250.00
836,725.00

Jumlah Total

9,203,975.00

Dibulatkan

9,203,970.00

Daftar Analisa TARKIM

Halaman : 60+29

Analisa Satuan Pekerjaan

1
A.06.02

6=(3x5)

1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Balok

1.1000

4,900,000.00

Jumlah Bahan

5,390,000.00
5,390,000.00

UPAH :
Pekerja

6.0000

Oh

27,500.00

165,000.00

15.0000

Oh

36,500.00

547,500.00

Kepala Tukang

3.0000

Oh

42,000.00

126,000.00

Mandor

0.5000

Oh

42,500.00

Tukang Kayu

Jumlah Pekerja
Jumlah Bahan + Pekerja

6,249,750.00

Keuntungan Max. 10 %

A.06.03

21,250.00
859,750.00

624,975.00

Jumlah Total

6,874,725.00

Dibulatkan

6,874,720.00

1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II , Balok

1.1000

1,950,000.00

Jumlah Bahan

2,145,000.00
2,145,000.00

UPAH :
Pekerja

6.0000

Oh

27,500.00

165,000.00

15.0000

Oh

36,500.00

547,500.00

Kepala Tukang

3.0000

Oh

42,000.00

126,000.00

Mandor

0.5000

Oh

42,500.00

21,250.00

Tukang Kayu

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

859,750.00
3,004,750.00
300,475.00

Jumlah Total

3,305,225.00

Dibulatkan

3,305,220.00

Daftar Analisa TARKIM

Halaman : 61+29

Analisa Satuan Pekerjaan

1
A.06.04

6=(3x5)

1 M2 PASANGAN PINTU KLAMP KAYU KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II, Papan

0.0360

2,210,000.00

79,560.00

Paku Biasa 2"-5"

0.0500

Kg

9,000.00

450.00

Jumlah Bahan

80,010.00

UPAH :
Pekerja

0.3500

Oh

27,500.00

9,625.00

Tukang Kayu

1.0500

Oh

36,500.00

38,325.00

Kepala Tukang

0.1050

Oh

42,000.00

4,410.00

Mandor

0.0180

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

133,135.00

Keuntungan Max. 10 %

A.06.05

765.00
53,125.00

13,313.50

Jumlah Total

146,448.50

Dibulatkan

146,440.00

1 M2 PASANGAN PINTU PANEL KAYU JATI


BAHAN :
Kayu Jati, Papan

0.0400

7,825,000.00

Jumlah Bahan

313,000.00
313,000.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Kayu

2.5000

Oh

36,500.00

91,250.00

Kepala Tukang

0.2500

Oh

42,000.00

10,500.00

Mandor

0.0500

Oh

42,500.00

2,125.00

Jumlah Pekerja

131,375.00

Jumlah Bahan + Pekerja

444,375.00

Keuntungan Max. 10 %

A.06.06

44,437.50

Jumlah Total

488,812.50

Dibulatkan

488,810.00

1 M2 PASANGAN PINTU PANEL KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper , Papan

0.0400

5,500,000.00

Jumlah Bahan

220,000.00
220,000.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Kayu

2.5000

Oh

36,500.00

91,250.00

Kepala Tukang

0.2500

Oh

42,000.00

10,500.00

Mandor

0.0500

Oh

42,500.00

2,125.00

Jumlah Pekerja

131,375.00

Jumlah Bahan + Pekerja

351,375.00

Keuntungan Max. 10 %

35,137.50

Jumlah Total

386,512.50

Dibulatkan

386,510.00

Daftar Analisa TARKIM

Halaman : 62+29

Analisa Satuan Pekerjaan

1
A.06.07

6=(3x5)

1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II , Papan

0.0400

2,210,000.00

Jumlah Bahan

88,400.00
88,400.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Kayu

2.5000

Oh

36,500.00

91,250.00

Kepala Tukang

0.2500

Oh

42,000.00

10,500.00

Mandor

0.0500

Oh

42,500.00

131,375.00

Jumlah Bahan + Pekerja

219,775.00

Keuntungan Max. 10 %

A.06.08

2,125.00

Jumlah Pekerja

21,977.50

Jumlah Total

241,752.50

Dibulatkan

241,750.00

1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATI


BAHAN :
Kayu Jati , Papan

0.0350

7,825,000.00

Jumlah Bahan

273,875.00
273,875.00

UPAH :
Pekerja

0.8000

Oh

27,500.00

22,000.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0400

Oh

42,500.00

1,700.00

Jumlah Pekerja

105,100.00

Jumlah Bahan + Pekerja

378,975.00

Keuntungan Max. 10 %

A.06.09

37,897.50

Jumlah Total

416,872.50

Dibulatkan

416,870.00

1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper , Papan

0.0350

5,500,000.00

Jumlah Bahan

192,500.00
192,500.00

UPAH :
Pekerja

0.8000

Oh

27,500.00

22,000.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0400

Oh

42,500.00

1,700.00

Jumlah Pekerja

105,100.00

Jumlah Bahan + Pekerja

297,600.00

Keuntungan Max. 10 %

29,760.00

Jumlah Total

327,360.00

Dibulatkan

327,360.00

Daftar Analisa TARKIM

Halaman : 63+29

Analisa Satuan Pekerjaan

1
A.06.10

6=(3x5)

1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II , Papan

0.0350

2,210,000.00

Jumlah Bahan

77,350.00
77,350.00

UPAH :
Pekerja

0.8000

Oh

27,500.00

22,000.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0400

Oh

42,500.00

105,100.00

Jumlah Bahan + Pekerja

182,450.00

Keuntungan Max. 10 %

A.06.11

1,700.00

Jumlah Pekerja

18,245.00

Jumlah Total

200,695.00

Dibulatkan

200,690.00

1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU JATI


BAHAN :
Kayu Jati , Papan

0.0640

7,825,000.00

Jumlah Bahan

500,800.00
500,800.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Kayu

3.0000

Oh

36,500.00

109,500.00

Kepala Tukang

0.3000

Oh

42,000.00

12,600.00

Mandor

0.1500

Oh

42,500.00

6,375.00

Jumlah Pekerja

155,975.00

Jumlah Bahan + Pekerja

656,775.00

Keuntungan Max. 10 %

A.06.12

65,677.50

Jumlah Total

722,452.50

Dibulatkan

722,450.00

1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper , Papan

0.0640

5,500,000.00

Jumlah Bahan

352,000.00
352,000.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Kayu

3.0000

Oh

36,500.00

109,500.00

Kepala Tukang

0.3000

Oh

42,000.00

12,600.00

Mandor

0.1500

Oh

42,500.00

6,375.00

Jumlah Pekerja

155,975.00

Jumlah Bahan + Pekerja

507,975.00

Keuntungan Max. 10 %

50,797.50

Jumlah Total

558,772.50

Dibulatkan

558,770.00

Daftar Analisa TARKIM

Halaman : 64+29

Analisa Satuan Pekerjaan

1
A.06.13

6=(3x5)

1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II , Papan

0.0640

2,210,000.00

Jumlah Bahan

141,440.00
141,440.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Kayu

3.0000

Oh

36,500.00

109,500.00

Kepala Tukang

0.3000

Oh

42,000.00

12,600.00

Mandor

0.1500

Oh

42,500.00

155,975.00

Jumlah Bahan + Pekerja

297,415.00

Keuntungan Max. 10 %

A.06.14

6,375.00

Jumlah Pekerja

29,741.50

Jumlah Total

327,156.50

Dibulatkan

327,150.00

1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI


BAHAN :
Kayu Jati , Papan

0.0196

7,825,000.00

153,370.00

Paku Biasa 1/2" - 1"

0.0300

kg

9,000.00

270.00

Lem Kayu

0.3000

lt

13,000.00

3,900.00

Plywood 4' x 3' x 4 mm

1.0000

lbr

85,000.00

Jumlah Bahan

85,000.00
242,540.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0300

Oh

42,500.00

1,275.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

99,175.00
341,715.00
34,171.50

Jumlah Total

375,886.50

Dibulatkan

375,880.00

Daftar Analisa TARKIM

Halaman : 65+29

Analisa Satuan Pekerjaan

1
A.06.15

6=(3x5)

1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper , Papan

0.0196

5,500,000.00

107,800.00

Paku Biasa 1/2" - 1"

0.0300

kg

9,000.00

270.00

Lem Kayu

0.3000

lt

13,000.00

3,900.00

Plywood 4' x 3' x 4 mm

1.0000

lbr

85,000.00

85,000.00

Jumlah Bahan

196,970.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0300

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

296,145.00

Keuntungan Max. 10 %

A.06.16

1,275.00
99,175.00

29,614.50

Jumlah Total

325,759.50

Dibulatkan

325,750.00

1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II , Papan

0.0196

2,210,000.00

43,316.00

Paku Biasa 1/2" - 1"

0.0300

kg

9,000.00

270.00

Lem Kayu

0.3000

lt

13,000.00

3,900.00

Plywood 4' x 3' x 4 mm

1.0000

lbr

85,000.00

Jumlah Bahan

85,000.00
132,486.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0300

Oh

42,500.00

1,275.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

99,175.00
231,661.00
23,166.10

Jumlah Total

254,827.10

Dibulatkan

254,820.00

Daftar Analisa TARKIM

Halaman : 66+29

Analisa Satuan Pekerjaan

A.06.17

1 M2 PASANGAN JALUSI MATI KUSEN KAYU JATI

6=(3x5)

BAHAN :
Kayu Jati, Papan

0.0600

7,825,000.00

469,500.00

Paku Biasa 1/2" - 1"

0.1500

kg

9,000.00

1,350.00

Jumlah Bahan

470,850.00

UPAH :
Pekerja

0.5000

Oh

27,500.00

13,750.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0250

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

567,062.50

Keuntungan Max. 10 %

A.06.18

1,062.50
96,212.50

56,706.25

Jumlah Total

623,768.75

Dibulatkan

623,760.00

1 M2 PASANGAN JALUSI MATI KUSEN KAYU KAMPER


BAHAN :
Kayu Kamper , Papan

0.0600

5,500,000.00

Paku Biasa 1/2" - 1"

0.1500

kg

9,000.00

Jumlah Bahan

330,000.00
1,350.00
331,350.00

UPAH :
Pekerja

0.5000

Oh

27,500.00

13,750.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0250

Oh

42,500.00

1,062.50

Jumlah Pekerja

96,212.50

Jumlah Bahan + Pekerja

427,562.50

Keuntungan Max. 10 %

A.06.19

42,756.25

Jumlah Total

470,318.75

Dibulatkan

470,310.00

1 M2 PASANGAN JALUSI MATI KUSEN KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II , Papan

0.0600

2,210,000.00

132,600.00

Paku Biasa 1/2" - 1"

0.1500

kg

9,000.00

1,350.00

Jumlah Bahan

133,950.00

UPAH :
Pekerja

0.5000

Oh

27,500.00

13,750.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0250

Oh

42,500.00

1,062.50

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

96,212.50
230,162.50
23,016.25

Jumlah Total

253,178.75

Dibulatkan

253,170.00

Daftar Analisa TARKIM

Halaman : 67+29

Analisa Satuan Pekerjaan

1
A.06.20

6=(3x5)

1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II , Papan

0.0196

2,210,000.00

43,316.00

Paku Biasa 1/2" - 1"

0.0300

kg

9,000.00

270.00

Lem Kayu

0.3000

lt

13,000.00

3,900.00

Plywood 4' x 3' x 4 mm

1.0000

lbr

105,000.00

105,000.00

Jumlah Bahan

152,486.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0300

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

251,661.00

Keuntungan Max. 10 %

A.06.21

1,275.00
99,175.00

25,166.10

Jumlah Total

276,827.10

Dibulatkan

276,820.00

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU JATI


BAHAN :
Kayu Jati, Papan

0.0196

7,825,000.00

153,370.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

0.3000

lt

13,000.00

3,900.00

Teakwood 4' x 8' x 4 mm

1.0000

lbr

86,300.00

Jumlah Bahan

86,300.00
246,270.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0300

Oh

42,500.00

1,275.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

99,175.00
345,445.00
34,544.50

Jumlah Total

379,989.50

Dibulatkan

379,980.00

Daftar Analisa TARKIM

Halaman : 68+29

Analisa Satuan Pekerjaan

1
A.06.22

6=(3x5)

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Papan

0.0196

5,500,000.00

107,800.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

0.3000

lt

13,000.00

3,900.00

Teakwood 4' x 8' x 4 mm

1.0000

lbr

86,300.00

86,300.00

Jumlah Bahan

200,700.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0300

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

299,875.00

Keuntungan Max. 10 %

A.06.23

1,275.00
99,175.00

29,987.50

Jumlah Total

329,862.50

Dibulatkan

329,860.00

1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II, Papan

0.0196

2,210,000.00

43,316.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

0.3000

lt

13,000.00

3,900.00

Teakwood 4' x 8' x 4 mm

1.0000

lbr

86,300.00

Jumlah Bahan

86,300.00
136,216.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Kayu

2.0000

Oh

36,500.00

73,000.00

Kepala Tukang

0.2000

Oh

42,000.00

8,400.00

Mandor

0.0300

Oh

42,500.00

1,275.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

99,175.00
235,391.00
23,539.10

Jumlah Total

258,930.10

Dibulatkan

258,930.00

Daftar Analisa TARKIM

Halaman : 69+29

Analisa Satuan Pekerjaan

1
A.06.24

6=(3x5)

1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKAP, RANGKA KAYU JATI


BAHAN :
Kayu Jati, Papan

0.0196

7,825,000.00

153,370.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

0.8000

lt

13,000.00

10,400.00

Polywood 4' x 8' x 4 mm

1.0000

lbr

105,000.00

105,000.00

Formica

0.5000

lbr

94,000.00

47,000.00

Jumlah Bahan

318,470.00

UPAH :
Pekerja

0.8000

Oh

27,500.00

22,000.00

Tukang Kayu

2.5000

Oh

36,500.00

91,250.00

Kepala Tukang

0.2500

Oh

42,000.00

10,500.00

Mandor

0.0400

Oh

42,500.00

125,450.00

Jumlah Bahan + Pekerja

443,920.00

Keuntungan Max. 10 %

A.06.25

1,700.00

Jumlah Pekerja

44,392.00

Jumlah Total

488,312.00

Dibulatkan

488,310.00

1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKA KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Papan

0.0196

5,500,000.00

107,800.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

0.8000

lt

13,000.00

10,400.00

Polywood 4' x 8' x 4 mm

1.0000

lbr

105,000.00

105,000.00

Formica 4" x 3 "

0.5000

lbr

94,000.00

Jumlah Bahan

47,000.00
272,900.00

UPAH :
Pekerja

0.8000

Oh

27,500.00

22,000.00

Tukang Kayu

2.5000

Oh

36,500.00

91,250.00

Kepala Tukang

0.2500

Oh

42,000.00

10,500.00

Mandor

0.0400

Oh

42,500.00

1,700.00

Jumlah Pekerja

125,450.00

Jumlah Bahan + Pekerja

398,350.00

Keuntungan Max. 10 %

39,835.00

Jumlah Total

438,185.00

Dibulatkan

438,180.00

Daftar Analisa TARKIM

Halaman : 70+29

Analisa Satuan Pekerjaan

1
A.06.26

6=(3x5)

1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKA KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II, Papan

0.0196

2,210,000.00

43,316.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

0.8000

lt

13,000.00

10,400.00

Polywood 4' x 8' x 4 mm

1.0000

lbr

85,000.00

85,000.00

Formica 4" x 3 "

0.5000

lbr

94,000.00

47,000.00

Jumlah Bahan

188,416.00

UPAH :
Pekerja

0.8000

Oh

27,500.00

22,000.00

Tukang Kayu

2.5000

Oh

36,500.00

91,250.00

Kepala Tukang

0.2500

Oh

42,000.00

10,500.00

Mandor

0.0400

Oh

42,500.00

125,450.00

Jumlah Bahan + Pekerja

313,866.00

Keuntungan Max. 10 %

A.06.27

1,700.00

Jumlah Pekerja

31,386.60

Jumlah Total

345,252.60

Dibulatkan

345,250.00

1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI


BAHAN :
Kayu Jati, Papan

0.0196

7,825,000.00

153,370.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

0.8000

lt

13,000.00

10,400.00

Teakwood 4' x 8' x 4 mm

0.5000

lbr

86,300.00

43,150.00

Formica 4" x 8 "

0.5000

lbr

94,000.00

Jumlah Bahan

47,000.00
256,620.00

UPAH :
Pekerja

0.8000

Oh

27,500.00

22,000.00

Tukang Kayu

2.5000

Oh

36,500.00

91,250.00

Kepala Tukang

0.2500

Oh

42,000.00

10,500.00

Mandor

0.0400

Oh

42,500.00

1,700.00

Jumlah Pekerja

125,450.00

Jumlah Bahan + Pekerja

382,070.00

Keuntungan Max. 10 %

38,207.00

Jumlah Total

420,277.00

Dibulatkan

420,270.00

Daftar Analisa TARKIM

Halaman : 71+29

Analisa Satuan Pekerjaan

1
A.06.28

6=(3x5)

1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER BANJAR (DIVERNIS)
BAHAN :
Kayu Kamper, Papan

0.0196

5,500,000.00

107,800.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

0.8000

lt

13,000.00

10,400.00

Teakwood 4' x 8' x 4 mm

0.5000

lbr

86,300.00

43,150.00

Formica 4" x 8 "

0.5000

lbr

94,000.00

47,000.00

Vernis

0.5000

ltr

16,000.00

Jumlah Bahan

8,000.00
219,050.00

UPAH :
Pekerja

0.8000

Oh

27,500.00

22,000.00

Tukang Kayu

2.5000

Oh

36,500.00

91,250.00

Kepala Tukang

0.2500

Oh

42,000.00

10,500.00

Mandor

0.0400

Oh

42,500.00

1,700.00

Jumlah Pekerja

125,450.00

Jumlah Bahan + Pekerja

344,500.00

Keuntungan Max. 10 %

A.06.29

34,450.00

Jumlah Total

378,950.00

Dibulatkan

378,950.00

1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU LOKAL KLS II (DIVERNIS)
BAHAN :
Kayu Lokal Kls II, Papan

0.0196

2,210,000.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

0.8000

lt

13,000.00

10,400.00

Teakwood 4' x 8' x 4 mm

0.5000

lbr

86,300.00

43,150.00

Formica 4" x 8 "

0.5000

lbr

94,000.00

47,000.00

Vernis

0.5000

ltr

16,000.00

Jumlah Bahan

43,316.00

8,000.00
154,566.00

UPAH :
Pekerja

0.8000

Oh

27,500.00

22,000.00

Tukang Kayu

2.5000

Oh

36,500.00

91,250.00

Kepala Tukang

0.2500

Oh

42,000.00

10,500.00

Mandor

0.0400

Oh

42,500.00

1,700.00

Jumlah Pekerja

125,450.00

Jumlah Bahan + Pekerja

280,016.00

Keuntungan Max. 10 %

28,001.60

Jumlah Total

308,017.60

Dibulatkan

308,010.00

Daftar Analisa TARKIM

Halaman : 72+29

Analisa Satuan Pekerjaan

1
A.06.30

6=(3x5)

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI


BAHAN :
Kayu Jati, Papan

0.0196

7,825,000.00

153,370.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

1.2000

lt

13,000.00

15,600.00

Polywood 4' x 8' x 4 mm

1.0000

lbr

105,000.00

105,000.00

Formica 4" x 8 "

1.0000

lbr

94,000.00

Jumlah Bahan

94,000.00
370,670.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Kayu

2.6000

Oh

36,500.00

94,900.00

Kepala Tukang

0.2600

Oh

42,000.00

10,920.00

Mandor

0.0500

Oh

42,500.00

135,445.00

Jumlah Bahan + Pekerja

506,115.00

Keuntungan Max. 10 %

A.06.31

2,125.00

Jumlah Pekerja

50,611.50

Jumlah Total

556,726.50

Dibulatkan

556,720.00

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Papan

0.0196

5,500,000.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

1.2000

lt

13,000.00

15,600.00

Polywood 4' x 8' x 4 mm

1.0000

lbr

105,000.00

105,000.00

Formica 4" x 8 "

1.0000

lbr

160,150.00

160,150.00

Jumlah Bahan

107,800.00

391,250.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Kayu

2.6000

Oh

36,500.00

94,900.00

Kepala Tukang

0.2600

Oh

42,000.00

10,920.00

Mandor

0.0500

Oh

42,500.00

2,125.00

Jumlah Pekerja

135,445.00

Jumlah Bahan + Pekerja

526,695.00

Keuntungan Max. 10 %

52,669.50

Jumlah Total

579,364.50

Dibulatkan

579,360.00

Daftar Analisa TARKIM

Halaman : 73+29

Analisa Satuan Pekerjaan

1
A.06.32

6=(3x5)

1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II, Papan

0.0196

2,210,000.00

43,316.00

Paku Biasa 1/2" - 1"

0.3000

kg

9,000.00

2,700.00

Lem Kayu

1.2000

lt

13,000.00

15,600.00

Polywood 4' x 8' x 4 mm

1.0000

lbr

85,000.00

85,000.00

Formica 4" x 8 "

1.0000

lbr

94,000.00

Jumlah Bahan

94,000.00
240,616.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Kayu

2.6000

Oh

36,500.00

94,900.00

Kepala Tukang

0.2600

Oh

42,000.00

10,920.00

Mandor

0.0500

Oh

42,500.00

135,445.00

Jumlah Bahan + Pekerja

376,061.00

Keuntungan Max. 10 %

A.06.33

2,125.00

Jumlah Pekerja

37,606.10

Jumlah Total

413,667.10

Dibulatkan

413,660.00

1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU JATI


BAHAN :
Kayu Jati, Balok

1.1000

7,825,000.00

Paku Biasa 2" - 5"

5.8000

kg

9,000.00

Jumlah Bahan

8,607,500.00
52,200.00
8,659,700.00

UPAH :
Pekerja

3.0000

Oh

27,500.00

82,500.00

Tukang Kayu

5.0000

Oh

36,500.00

182,500.00

Kepala Tukang

2.0000

Oh

42,000.00

84,000.00

Mandor

0.4000

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

9,025,700.00

Keuntungan Max. 10 %

A.06.34

17,000.00
366,000.00
902,570.00

Jumlah Total

9,928,270.00

Dibulatkan

9,928,270.00

1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Balok

1.1000

4,900,000.00

Paku Biasa 2" - 5"

5.8000

kg

9,000.00

Jumlah Bahan

5,390,000.00
52,200.00
5,442,200.00

UPAH :
Pekerja

3.0000

Oh

27,500.00

82,500.00

Tukang Kayu

5.0000

Oh

36,500.00

182,500.00

Kepala Tukang

2.0000

Oh

42,000.00

84,000.00

Mandor

0.4000

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

17,000.00
366,000.00
5,808,200.00
580,820.00

Jumlah Total

6,389,020.00

Dibulatkan

6,389,020.00

Daftar Analisa TARKIM

Halaman : 74+29

Analisa Satuan Pekerjaan

1
A.06.35

6=(3x5)

1 M3 PASANGAN KONSTRUKSI KUDA - KUDA KAYU KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II, Balok

1.1000

1,950,000.00

2,145,000.00

Paku Biasa 2" - 5"

5.8000

kg

9,000.00

52,200.00

Jumlah Bahan

2,197,200.00

UPAH :
Pekerja

3.0000

Oh

27,500.00

82,500.00

Tukang Kayu

5.0000

Oh

36,500.00

182,500.00

Kepala Tukang

2.0000

Oh

42,000.00

84,000.00

Mandor

0.4000

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

2,563,200.00

Keuntungan Max. 10 %

A.06.36

17,000.00
366,000.00

256,320.00

Jumlah Total

2,819,520.00

Dibulatkan

2,819,520.00

1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KRUING


BAHAN :
Kayu Kruing, Balok

1.1000

3,000,000.00

3,300,000.00

Paku Biasa 2" - 5"

5.8000

kg

9,000.00

52,200.00

Jumlah Bahan

3,352,200.00

UPAH :
Pekerja

3.0000

Oh

27,500.00

82,500.00

Tukang Kayu

5.0000

Oh

36,500.00

182,500.00

Kepala Tukang

2.0000

Oh

42,000.00

84,000.00

Mandor

0.4000

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

3,718,200.00

Keuntungan Max. 10 %

A.06.37

17,000.00
366,000.00
371,820.00

Jumlah Total

4,090,020.00

Dibulatkan

4,090,020.00

1 M2 PASANG KASO + RENG GENTENG PALENTONG KAYU KAMPER


BAHAN :
Kayu Kamper, Balok

0.0120

4,900,000.00

Paku Biasa 2" - 5"

0.1500

kg

9,000.00

Jumlah Bahan

58,800.00
1,350.00
60,150.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.1500

Oh

36,500.00

5,475.00

Kepala Tukang

0.0150

Oh

42,000.00

630.00

Mandor

0.0075

Oh

42,500.00

318.75

Jumlah Pekerja

10,548.75

Jumlah Bahan + Pekerja

70,698.75

Keuntungan Max. 10 %

7,069.88

Jumlah Total

77,768.63

Dibulatkan

77,760.00

Daftar Analisa TARKIM

Halaman : 75+29

Analisa Satuan Pekerjaan

1
A.06.38

6=(3x5)

1 M2 PASANG KASO + RENG GENTENG PALENTONG KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II, Balok

0.0142

1,950,000.00

27,690.00

Paku Biasa 2" - 5"

0.2500

kg

9,000.00

2,250.00

Jumlah Bahan

29,940.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.1500

Oh

36,500.00

5,475.00

Kepala Tukang

0.0150

Oh

42,000.00

630.00

Mandor

0.0075

Oh

42,500.00

318.75

Jumlah Pekerja

10,548.75

Jumlah Bahan + Pekerja

40,488.75

Keuntungan Max. 10 %

4,048.88

Jumlah Total

44,537.63

Dibulatkan

44,530.00

Daftar Analisa TARKIM

Halaman : 76+29

Analisa Satuan Pekerjaan

1
A.06.39

6=(3x5)

1 M2 PASANG KASO + RENG GENTENG BETON KAYU KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II, Balok

0.0140

1,950,000.00

27,300.00

Paku Biasa 2" - 5"

0.1500

kg

9,000.00

1,350.00

Jumlah Bahan

28,650.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.1500

Oh

36,500.00

5,475.00

Kepala Tukang

0.0150

Oh

42,000.00

630.00

Mandor

0.0075

Oh

42,500.00

10,548.75

Jumlah Bahan + Pekerja

39,198.75

Keuntungan Max. 10 %

A.06.40

318.75

Jumlah Pekerja

3,919.88

Jumlah Total

43,118.63

Dibulatkan

43,110.00

1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Balok

0.0165

4,900,000.00

80,850.00

Paku Biasa 2" - 5"

0.2000

kg

9,000.00

1,800.00

Jumlah Bahan

82,650.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.1500

Oh

36,500.00

5,475.00

Kepala Tukang

0.0150

Oh

42,000.00

630.00

Mandor

0.0075

Oh

42,500.00

10,548.75

Jumlah Bahan + Pekerja

93,198.75

Keuntungan Max. 10 %

A.06.41

318.75

Jumlah Pekerja

9,319.88

Jumlah Total

102,518.63

Dibulatkan

102,510.00

1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II, Balok

0.0165

1,950,000.00

32,175.00

Paku Biasa 2" - 5"

0.2000

kg

9,000.00

1,800.00

Jumlah Bahan

33,975.00

UPAH :
Pekerja

0.1200

Oh

27,500.00

3,300.00

Tukang Kayu

0.1200

Oh

36,500.00

4,380.00

Kepala Tukang

0.0120

Oh

42,000.00

504.00

Mandor

0.0060

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

255.00
8,439.00
42,414.00
4,241.40

Jumlah Total

46,655.40

Dibulatkan

46,650.00

Daftar Analisa TARKIM

Halaman : 77+29

Analisa Satuan Pekerjaan

1
A.06.42

6=(3x5)

1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU JATI


BAHAN :
Kayu Jati, Balok

0.0120

6,825,000.00

81,900.00

Paku Biasa 2" - 5"

0.1000

kg

9,000.00

900.00

Jumlah Bahan

82,800.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.2500

Oh

36,500.00

9,125.00

Kepala Tukang

0.0250

Oh

42,000.00

1,050.00

Mandor

0.0750

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

100,287.50

Keuntungan Max. 10 %

A.06.43

3,187.50
17,487.50
10,028.75

Jumlah Total

110,316.25

Dibulatkan

110,310.00

1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAMPER


BAHAN :
Kayu Kamper, Balok

0.0120

4,900,000.00

58,800.00

Paku Biasa 2" - 5"

0.1000

kg

9,000.00

900.00

Jumlah Bahan

59,700.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.2500

Oh

36,500.00

9,125.00

Kepala Tukang

0.0250

Oh

42,000.00

1,050.00

Mandor

0.0750

Oh

42,500.00

17,487.50

Jumlah Bahan + Pekerja

77,187.50

Keuntungan Max. 10 %

A.06.44

3,187.50

Jumlah Pekerja

7,718.75

Jumlah Total

84,906.25

Dibulatkan

84,900.00

1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAYU LOKAL KLS II
BAHAN :
Kayu KAYU LOKAL KLS II, Balok

0.0120

1,950,000.00

Paku Biasa 2" - 5"

0.1000

kg

9,000.00

Jumlah Bahan

23,400.00
900.00
23,400.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.2500

Oh

36,500.00

9,125.00

Kepala Tukang

0.0250

Oh

42,000.00

1,050.00

Mandor

0.0750

Oh

42,500.00

3,187.50

Jumlah Pekerja

17,487.50

Jumlah Bahan + Pekerja

40,887.50

Keuntungan Max. 10 %

4,088.75

Jumlah Total

44,976.25

Dibulatkan

44,970.00

Daftar Analisa TARKIM

Halaman : 78+29

Analisa Satuan Pekerjaan

1
A.06.45

6=(3x5)

1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU JATI


BAHAN :
Kayu Jati, Papan

0.0072

6,825,000.00

Paku Biasa 2" - 5"

0.0500

kg

9,000.00

Jumlah Bahan

49,140.00
450.00
49,590.00

UPAH :
Pekerja

0.1000

Oh

27,500.00

2,750.00

Tukang Kayu

0.2000

Oh

36,500.00

7,300.00

Kepala Tukang

0.0250

Oh

42,000.00

1,050.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

11,312.50

Jumlah Bahan + Pekerja

60,902.50

Keuntungan Max. 10 %

A.06.46

6,090.25

Jumlah Total

66,992.75

Dibulatkan

66,990.00

1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Papan

0.0072

5,500,000.00

Paku Biasa 2" - 5"

0.0500

kg

9,000.00

Jumlah Bahan

39,600.00
450.00
40,050.00

UPAH :
Pekerja

0.1000

Oh

27,500.00

2,750.00

Tukang Kayu

0.2000

Oh

36,500.00

7,300.00

Kepala Tukang

0.0200

Oh

42,000.00

840.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

11,102.50

Jumlah Bahan + Pekerja

51,152.50

Keuntungan Max. 10 %

A.06.47

5,115.25

Jumlah Total

56,267.75

Dibulatkan

56,260.00

1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II, Papan

0.0072

2,210,000.00

15,912.00

Paku Biasa 2" - 5"

0.0500

kg

9,000.00

450.00

Jumlah Bahan

16,362.00

UPAH :
Pekerja

0.1000

Oh

27,500.00

2,750.00

Tukang Kayu

0.2000

Oh

36,500.00

7,300.00

Kepala Tukang

0.0200

Oh

42,000.00

840.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

11,102.50

Jumlah Bahan + Pekerja

27,464.50

Keuntungan Max. 10 %

2,746.45

Jumlah Total

30,210.95

Dibulatkan

30,210.00

Daftar Analisa TARKIM

Halaman : 79+29

Analisa Satuan Pekerjaan

1
A.06.48

6=(3x5)

1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU JATI


BAHAN :
Kayu Jati, Papan

0.0110

7,825,000.00

Paku Biasa 2" - 5"

0.0500

kg

9,000.00

Jumlah Bahan

86,075.00
450.00
86,525.00

UPAH :
Pekerja

0.1100

Oh

27,500.00

3,025.00

Tukang Kayu

0.2200

Oh

36,500.00

8,030.00

Kepala Tukang

0.0220

Oh

42,000.00

924.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

12,191.50

Jumlah Bahan + Pekerja

98,716.50

Keuntungan Max. 10 %

A.06.49

9,871.65

Jumlah Total

108,588.15

Dibulatkan

108,580.00

1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper , Papan

0.0110

5,500,000.00

Paku Biasa 2" - 5"

0.0500

kg

9,000.00

Jumlah Bahan

60,500.00
450.00
60,950.00

UPAH :
Pekerja

0.1100

Oh

27,500.00

3,025.00

Tukang Kayu

0.2200

Oh

36,500.00

8,030.00

Kepala Tukang

0.0220

Oh

42,000.00

924.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

12,191.50

Jumlah Bahan + Pekerja

73,141.50

Keuntungan Max. 10 %

A.06.50

7,314.15

Jumlah Total

80,455.65

Dibulatkan

80,450.00

1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU LOKAL KLS II


BAHAN :
Kayu Lokal Kls II , Papan

0.0110

2,210,000.00

24,310.00

Paku Biasa 2" - 5"

0.0500

kg

9,000.00

450.00

Jumlah Bahan

24,760.00

UPAH :
Pekerja

0.1100

Oh

27,500.00

3,025.00

Tukang Kayu

0.2200

Oh

36,500.00

8,030.00

Kepala Tukang

0.0220

Oh

42,000.00

924.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

12,191.50

Jumlah Bahan + Pekerja

36,951.50

Keuntungan Max. 10 %

3,695.15

Jumlah Total

40,646.65

Dibulatkan

40,640.00

Daftar Analisa TARKIM

Halaman : 80+29

Analisa Satuan Pekerjaan

1
A.06.51

6=(3x5)

1 M2 PASANG LISPLANG UKURAN 2 x (3 x 20) cm, KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Papan

0.0145

5,500,000.00

Paku Biasa 2" - 5"

0.0600

kg

9,000.00

Jumlah Bahan

79,750.00
540.00
80,290.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.2500

Oh

36,500.00

9,125.00

Kepala Tukang

0.0250

Oh

42,000.00

1,050.00

Mandor

0.0750

Oh

42,500.00

3,187.50

Jumlah Pekerja

17,487.50

Jumlah Bahan + Pekerja

97,777.50

Keuntungan Max. 10 %

A.06.52

9,777.75

Jumlah Total

107,555.25

Dibulatkan

107,550.00

1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Papan

0.0086

5,500,000.00

Paku Biasa 2" - 5"

0.0600

kg

9,000.00

Jumlah Bahan

47,300.00
540.00
47,840.00

UPAH :
Pekerja

0.1000

Oh

27,500.00

2,750.00

Tukang Kayu

0.1000

Oh

36,500.00

3,650.00

Kepala Tukang

0.0100

Oh

42,000.00

420.00

Mandor

0.0500

Oh

42,500.00

2,125.00

Jumlah Pekerja

8,945.00

Jumlah Bahan + Pekerja

56,785.00

Keuntungan Max. 10 %

A.06.53

5,678.50

Jumlah Total

62,463.50

Dibulatkan

62,460.00

1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II, Papan

0.0088

2,210,000.00

19,448.00

Paku Biasa 2" - 5"

0.0600

kg

9,000.00

540.00

Jumlah Bahan

19,988.00

UPAH :
Pekerja

0.1000

Oh

27,500.00

2,750.00

Tukang Kayu

0.1000

Oh

36,500.00

3,650.00

Kepala Tukang

0.0100

Oh

42,000.00

420.00

Mandor

0.0500

Oh

42,500.00

2,125.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

8,945.00
28,933.00
2,893.30

Jumlah Total

31,826.30

Dibulatkan

31,820.00

Daftar Analisa TARKIM

Halaman : 81+29

Analisa Satuan Pekerjaan

1
A.06.54

6=(3x5)

1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Balok

0.0195

4,900,000.00

95,550.00

Kayu Kamper, Papan

0.0070

6,550,000.00

45,850.00

Paku Biasa 2" - 5"

0.1000

kg

9,000.00

900.00

Jumlah Bahan

142,300.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.4500

Oh

36,500.00

16,425.00

Kepala Tukang

0.0450

Oh

42,000.00

1,890.00

Mandor

0.0225

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

165,696.25

Keuntungan Max. 10 %

A.06.55

956.25
23,396.25

16,569.63

Jumlah Total

182,265.88

Dibulatkan

182,260.00

1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAYU LOKAL KLS II


BAHAN :
Kayu KAYU LOKAL KLS II , Balok

0.0195

1,950,000.00

38,025.00

Kayu KAYU LOKAL KLS II, Papan

0.0070

2,210,000.00

15,470.00

Paku Biasa 2" - 5"

0.1000

kg

9,000.00

900.00

Jumlah Bahan

54,395.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.4500

Oh

36,500.00

16,425.00

Kepala Tukang

0.0450

Oh

42,000.00

1,890.00

Mandor

0.0225

Oh

42,500.00

956.25

Jumlah Pekerja

23,396.25

Jumlah Bahan + Pekerja

77,791.25

Keuntungan Max. 10 %

A.06.56

7,779.13

Jumlah Total

85,570.38

Dibulatkan

85,570.00

1 M2 PASANG DINDING PEMISAH , RANGKA KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Balok

0.0195

4,900,000.00

95,550.00

Kayu Kamper, Papan

0.0070

6,550,000.00

45,850.00

Paku Biasa 2" - 5"

0.1000

kg

9,000.00

Jumlah Bahan

900.00
142,300.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.4500

Oh

36,500.00

16,425.00

Kepala Tukang

0.0450

Oh

42,000.00

1,890.00

Mandor

0.0225

Oh

42,500.00

956.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

23,396.25
165,696.25
16,569.63

Jumlah Total

182,265.88

Dibulatkan

182,260.00

Daftar Analisa TARKIM

Halaman : 82+29

Analisa Satuan Pekerjaan

1
A.06.57

6=(3x5)

1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR


BAHAN :
Kayu Kamper, Balok

0.0195

5,500,000.00

107,250.00

Kayu Kamper, Papan

0.0070

6,550,000.00

45,850.00

Paku Biasa 2" - 5"

0.1000

kg

9,000.00

900.00

Lem Kayu

0.5600

13,000.00

7,280.00

Plywood 4 mm 120 x 240

0.7000

Lbr

85,000.00

59,500.00

Jumlah Bahan

220,780.00

UPAH :
Pekerja

0.2000

Oh

27,500.00

5,500.00

Tukang Kayu

0.6000

Oh

36,500.00

21,900.00

Kepala Tukang

0.0600

Oh

42,000.00

2,520.00

Mandor

0.0100

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

251,125.00

Keuntungan Max. 10 %

A.06.58

425.00
30,345.00

25,112.50

Jumlah Total

276,237.50

Dibulatkan

276,230.00

1 M2 PASANG POLYWOOD TEBAL 4 mm, UNTUK DINDING


BAHAN :

Plywood 4 mm 120 x 240

0.7000

lbr

85,000.00

Paku Biasa 1/2" - 1"

0.0500

kg

9,000.00

Jumlah Bahan

59,500.00
450.00
59,950.00

UPAH :
Pekerja

0.0250

Oh

27,500.00

687.50

Tukang Kayu

0.0750

Oh

36,500.00

2,737.50

Kepala Tukang

0.0075

Oh

42,000.00

315.00

Mandor

0.0013

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

63,745.25

Keuntungan Max. 10 %

A.06.59

55.25
3,795.25

6,374.53

Jumlah Total

70,119.78

Dibulatkan

70,110.00

1 M1 PASANG LIST PLAFOND PROFIL KAYU KAMPER BANJAR 4/4 CM


BAHAN :
Kayu Profil

1.0500

m'

4,000.00

Jumlah Bahan

4,200.00
4,200.00

UPAH :
Pekerja

0.0210

Oh

27,500.00

577.50

Tukang Kayu

0.0210

Oh

36,500.00

766.50

Kepala Tukang

0.0020

Oh

42,000.00

84.00

Mandor

0.0010

Oh

42,500.00

42.50

Jumlah Pekerja

1,470.50

Jumlah Bahan + Pekerja

5,670.50

Keuntungan Max. 10 %

567.05

Jumlah Total

6,237.55

Dibulatkan

6,230.00

Daftar Analisa TARKIM

Halaman : 83+29

Analisa Satuan Pekerjaan

1
A.06.60

6=(3x5)

1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4


BAHAN :
Kayu Profil

1.0500

m'

2,200.00

Jumlah Bahan

2,310.00
2,310.00

UPAH :
Pekerja

0.0210

Oh

27,500.00

577.50

Tukang Kayu

0.0210

Oh

36,500.00

766.50

Kepala Tukang

0.0020

Oh

42,000.00

84.00

Mandor

0.0010

Oh

42,500.00

1,470.50

Jumlah Bahan + Pekerja

3,780.50

Keuntungan Max. 10 %

A.06.61

42.50

Jumlah Pekerja

378.05

Jumlah Total

4,158.55

Dibulatkan

4,150.00

1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II LAPIS ALUMUNIUM


BAHAN :
Kayu Lokal Kls II , Papan

0.0400

Aluminium

1.0000

2,210,000.00

88,400.00

80,700.00

80,700.00

Jumlah Bahan

169,100.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Kayu

2.5000

Oh

36,500.00

91,250.00

Kepala Tukang

0.2500

Oh

42,000.00

10,500.00

Mandor

0.0500

Oh

42,500.00

2,125.00

Jumlah Pekerja

131,375.00

Jumlah Bahan + Pekerja

300,475.00

Keuntungan Max. 10 %

A.07.01

30,047.50

Jumlah Total

330,522.50

Dibulatkan

330,520.00

1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr


BAHAN :
Semen Portland

218.0000

kg

1,000.00

Pasir Beton

0.5200

M3

75,000.00

39,000.00

Batu Pecah Mesin 2/3

0.8700

M3

150,000.00

130,500.00

Jumlah Bahan

218,000.00

387,500.00

UPAH :
Pekerja

1.6500

Oh

27,500.00

45,375.00

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Kepala Tukang

0.0250

Oh

39,500.00

987.50

Mandor

0.0800

Oh

42,500.00

3,400.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

58,262.50
445,762.50
44,576.25

Jumlah Total

490,338.75

Dibulatkan

490,330.00

Daftar Analisa TARKIM

Halaman : 84+29

Analisa Satuan Pekerjaan

1
A.07.05

6=(3x5)

232.0000

kg

Pasir Beton

0.5200

M3

75,000.00

39,000.00

Batu Pecah Mesin 2/3

0.7800

M3

150,000.00

117,000.00

1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr


BAHAN :
Semen Portland

1,000.00

Jumlah Bahan

232,000.00

388,000.00

UPAH :
Pekerja

1.6500

Oh

27,500.00

45,375.00

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Kepala Tukang

0.0250

Oh

39,500.00

987.50

Mandor

0.0800

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

446,262.50

Keuntungan Max. 10 %

A.07.13

3,400.00
58,262.50

44,626.25

Jumlah Total

490,888.75

Dibulatkan

490,880.00

1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr


BAHAN :
Semen Portland

336.0000

kg

1,000.00

336,000.00

Pasir Beton

0.5400

m3

75,000.00

40,500.00

Batu Pecah Mesin 2/3

0.8100

m3

150,000.00

121,500.00

Jumlah Bahan

498,000.00

UPAH :
Pekerja

2.0000

Oh

27,500.00

55,000.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Mandor

1.0000

Oh

42,500.00

42,500.00

Jumlah Pekerja

110,782.50

Jumlah Bahan + Pekerja

608,782.50

Keuntungan Max. 10 %

A.07.25

60,878.25

Jumlah Total

669,660.75

Dibulatkan

669,660.00

1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR


BAHAN :
Besi Beton (Polos / ulir)

1.0500

kg

8,000.00

8,400.00

Kawat Beton

0.0150

kg

8,550.00

128.25

Jumlah Bahan

8,528.25

UPAH :
Pekerja

0.0070

Oh

27,500.00

192.50

Tukang Besi

0.0070

Oh

36,500.00

255.50

Kepala Tukang

0.0007

Oh

43,500.00

30.45

Mandor

0.0003

Oh

42,500.00

12.75

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

491.20
9,019.45
901.95

Jumlah Total

9,921.40

Dibulatkan

9,920.00

Daftar Analisa TARKIM

Halaman : 85+29

Analisa Satuan Pekerjaan

1
A.07.28

6=(3x5)

1 m2 PASANG BEKISTING UNTUK PONDASI


BAHAN :
Kayu Terentang Albasiah, Papan

0.0400

1,105,000.00

44,200.00

Paku Biasa 2" - 5"

0.3000

9,000.00

2,700.00

Minyak Bekisting

0.1000

ltr

23,800.00

2,380.00

Jumlah Bahan

49,280.00

UPAH :
Pekerja

0.3000

Oh

27,500.00

8,250.00

Tukang Kayu

0.2600

Oh

36,500.00

9,490.00

Kepala Tukang

0.0260

Oh

42,000.00

1,092.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

19,044.50

Jumlah Bahan + Pekerja

68,324.50

Keuntungan Max. 10 %

A.07.29

6,832.45

Jumlah Total

75,156.95

Dibulatkan

75,150.00

1 m2 PASANG BEKISTING UNTUK SLOOF


BAHAN :
Kayu Terentang Albasiah, Papan

0.0044

1,105,000.00

4,862.00

Paku Biasa 2" - 5"

0.3000

9,000.00

2,700.00

Minyak Bekisting

0.1000

23,800.00

2,380.00

Jumlah Bahan

9,942.00

UPAH :
Pekerja

0.3000

Oh

27,500.00

8,250.00

Tukang Kayu

0.2600

Oh

36,500.00

9,490.00

Kepala Tukang

0.0260

Oh

42,000.00

1,092.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

19,044.50

Jumlah Bahan + Pekerja

28,986.50

Keuntungan Max. 10 %

2,898.65

Jumlah Total

31,885.15

Dibulatkan

31,880.00

Daftar Analisa TARKIM

Halaman : 86+29

Analisa Satuan Pekerjaan

1
A.07.30

6=(3x5)

1 m2 PASANG BEKISTING UNTUK KOLOM


BAHAN :
Kayu Terentang Albasiah, Papan

0.0040

1,105,000.00

4,420.00

Paku Biasa 2" - 5"

0.4000

kg

9,000.00

3,600.00

Minyak Bekisting

0.2000

ltr

23,800.00

4,760.00

Kayu Balok Albasiah

0.0015

1,100,000.00

Jumlah Bahan

1,650.00
14,430.00

UPAH :
Pekerja

0.3000

Oh

27,500.00

8,250.00

Tukang Kayu

0.3300

Oh

36,500.00

12,045.00

Kepala Tukang

0.0330

Oh

42,000.00

1,386.00

Mandor

0.0060

Oh

42,500.00

255.00

Jumlah Pekerja

21,936.00

Jumlah Bahan + Pekerja

36,366.00

Keuntungan Max. 10 %

A.07.31

3,636.60

Jumlah Total

40,002.60

Dibulatkan

40,000.00

1 m2 PASANG BEKISTING UNTUK BALOK


BAHAN :
Kayu Terentang Albasiah, Papan

0.0040

1,105,000.00

4,420.00

Paku Biasa 2" - 5"

0.4000

kg

9,000.00

3,600.00

Minyak Bekisting

0.2000

ltr

23,800.00

4,760.00

Kayu Balok Albasiah

0.0018

1,100,000.00

1,980.00

Dolken Kayu Galam - 8 - 10 / 4 m

2.0000

btg

58,500.00

117,000.00

Jumlah Bahan

131,760.00

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Kayu

0.3300

Oh

36,500.00

12,045.00

Kepala Tukang

0.0330

Oh

42,000.00

1,386.00

Mandor

0.0060

Oh

42,500.00

255.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

22,486.00
154,246.00
15,424.60

Jumlah Total

169,670.60

Dibulatkan

169,670.00

Daftar Analisa TARKIM

Halaman : 87+29

Analisa Satuan Pekerjaan

1
A.07.32

6=(3x5)

1 m2 PASANG BEKISTING UNTUK LANTAI


BAHAN :
Kayu Terentang Albasiah, Papan

0.0020

1,105,000.00

2,210.00

Paku Biasa 2" - 5"

0.4000

kg

9,000.00

3,600.00

Minyak Bekisting

0.2000

ltr

23,800.00

4,760.00

Kayu Balok Albasiah

0.0015

1,100,000.00

1,650.00

Polywood tebal 9 mm

0.3500

lbr

117,650.00

41,177.50

Dolken Kayu Galam - 8 - 10 / 4 m

4.0000

btg

58,500.00

234,000.00

Jumlah Bahan

287,397.50

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Kayu

0.3300

Oh

36,500.00

12,045.00

Kepala Tukang

0.0330

Oh

42,000.00

1,386.00

Mandor

0.0060

Oh

42,500.00

255.00

Jumlah Pekerja

22,486.00

Jumlah Bahan + Pekerja

309,883.50

Keuntungan Max. 10 %

A.07.33

30,988.35

Jumlah Total

340,871.85

Dibulatkan

340,870.00

1 m2 PASANG BEKISTING UNTUK DINDING


BAHAN :
Kayu Terentang
Paku Biasa 2" - 5"
Minyak Bekisting

0.0300
0.4000
0.2000

m
kg
ltr

1,105,000.00
9,000.00
23,800.00

33,150.00
3,600.00
4,760.00

Balok Kayu KAYU LOKAL KLS II

0.0200

3,250,000.00

65,000.00

Polywood tebal 9 mm

0.3500

lbr

117,650.00

41,177.50

Dolken Kayu Galam - 8 - 10 / 4 m

3.0000

btg

58,500.00

175,500.00

Formtie / Penjaga Jarak Berkisar / Spacer

4.0000

bh

Jumlah Bahan

323,187.50

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Kayu

0.3300

Oh

36,500.00

12,045.00

Kepala Tukang

0.0330

Oh

42,000.00

1,386.00

Mandor

0.0060

Oh

42,500.00

255.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

22,486.00
345,673.50
34,567.35

Jumlah Total

380,240.85

Dibulatkan

380,240.00

Daftar Analisa TARKIM

Halaman : 88+29

Analisa Satuan Pekerjaan

1
A.07.34

6=(3x5)

1 m2 PASANG BEKISTING UNTUK TANGGA


BAHAN :
Kayu Terentang Albasiah, Papan

0.0030

1,105,000.00

3,315.00

Paku Biasa 2" - 5"

0.4000

kg

9,000.00

3,600.00

Minyak Bekisting

0.1500

ltr

23,800.00

3,570.00

Kayu Balok Albasiah

0.0015

1,100,000.00

1,650.00

Polywood tebal 9 mm

0.3500

lbr

117,650.00

41,177.50

Dolken Kayu Galam - 8 - 10 / 4 m

2.0000

btg

58,500.00

117,000.00

Jumlah Bahan

170,312.50

UPAH :
Pekerja

0.3200

Oh

27,500.00

8,800.00

Tukang Kayu

0.3300

Oh

36,500.00

12,045.00

Kepala Tukang

0.0330

Oh

42,000.00

1,386.00

Mandor

0.0060

Oh

42,500.00

255.00

Jumlah Pekerja

22,486.00

Jumlah Bahan + Pekerja

192,798.50

Keuntungan Max. 10 %

A.07.35

19,279.85

Jumlah Total

212,078.35

Dibulatkan

212,070.00

1 M3 MEMBUAT BETON DENGAN MUTU K 225


BAHAN :
Semen Portland

388.0000

kg

1,000.00

388,000.00

Pasir Beton

0.6500

75,000.00

48,750.00

Batu Pecah Mesin 2/3

0.6500

150,000.00

97,500.00

Jumlah Bahan

534,250.00

UPAH :
Pekerja

6.0000

Oh

27,500.00

165,000.00

Tukang Batu

1.0000

Oh

34,000.00

34,000.00

Kepala Tukang

0.1000

Oh

39,500.00

3,950.00

Mandor

0.3000

Oh

42,500.00

12,750.00

Jumlah Pekerja

215,700.00

Jumlah Bahan + Pekerja

749,950.00

Keuntungan Max. 10 %

74,995.00

Jumlah Total

824,945.00

Dibulatkan

824,940.00

Daftar Analisa TARKIM

Halaman : 89+29

Analisa Satuan Pekerjaan

1
A.07.36

6=(3x5)

1 M3 MEMBUAT BETON DENGAN MUTU K 275


BAHAN :
Semen Portland

400.0000

kg

1,000.00

400,000.00

Pasir Beton

0.4000

75,000.00

30,000.00

Batu Pecah Mesin 2/3

0.8200

150,000.00

123,000.00

Jumlah Bahan

553,000.00

UPAH :
Pekerja

6.0000

Oh

27,500.00

165,000.00

Tukan Batu

1.0000

Oh

34,000.00

34,000.00

Kepala Tukang

0.1000

Oh

39,500.00

3,950.00

Mandor

0.3000

Oh

42,500.00

12,750.00

Jumlah Pekerja

215,700.00

Jumlah Bahan + Pekerja

768,700.00

Keuntungan Max. 10 %

A.07.37

76,870.00

Jumlah Total

845,570.00

Dibulatkan

845,570.00

1 M2 PASANG TANGGA PENGECORAN


BAHAN :
Kayu Terentang Albasiah, Papan

0.0264

1,105,000.00

Paku Biasa 2" - 5"

0.6000

kg

9,000.00

5,400.00

Dolken Kayu Galam - 8 - 10 / 4 m

0.5000

btg

58,500.00

29,250.00

Jumlah Bahan

29,172.00

63,822.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Batu

0.0500

Oh

34,000.00

1,700.00

Kepala Tukang

0.0050

Oh

39,500.00

197.50

Mandor

0.0070

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

297.50
6,320.00
70,142.00
7,014.20

Jumlah Total

77,156.20

Dibulatkan

77,150.00

Daftar Analisa TARKIM

Halaman : 90+29

Analisa Satuan Pekerjaan

1
A.07.38

6=(3x5)

1 M3 MEMBUAT PONDASI BETON BERTULANG (150 kg BESI + BEKISTNG)


BAHAN :
Kayu Terentang Albasiah, Papan

0.2000

1,105,000.00

221,000.00

Paku Biasa 2" - 5"

1.5000

kg

9,000.00

13,500.00

Minyak Bekisting

0.4000

lt

23,800.00

9,520.00

Besi Beton Polos

150.0000

kg

8,000.00

1,200,000.00

2.2500

kg

8,550.00

19,237.50

323.0000

kg

1,000.00

323,000.00

Pasir Beton

0.5200

m3

75,000.00

39,000.00

Batu Pecah Mesin 2/3

0.7800

m3

150,000.00

117,000.00

Kawat Beton
Semen Portland

Jumlah Bahan

1,942,257.50

UPAH :
Pekerja

3.9000

Oh

27,500.00

107,250.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Tukang Kayu

1.0400

Oh

36,500.00

37,960.00

Tukang Besi

1.0500

Oh

36,500.00

38,325.00

Kepala Tukang

0.2450

Oh

43,500.00

10,657.50

Mandor

0.1650

Oh

42,500.00

7,012.50

Jumlah Pekerja

213,105.00

Jumlah Bahan + Pekerja

2,155,362.50

Keuntungan Max. 10 %

A.07.47

215,536.25

Jumlah Total

2,370,898.75

Dibulatkan

2,370,890.00

1 M3 MEMBUAT SLOOF 10/15 (202 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.4400

1,105,000.00

486,200.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

Pelumas Bekesting

0.4000

lt

23,800.00

9,520.00

Besi Beton Polos U 24

202.0000

kg

8,000.00

1,616,000.00

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,623,457.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

5,206.25
193,693.75
2,817,151.25
281,715.13

Jumlah

3,098,866.38

Dibulatkan

3,098,860.00

Daftar Analisa TARKIM

Halaman : 91+29

Analisa Satuan Pekerjaan

1
A.07.48

6=(3x5)

1 M3 MEMBUAT SLOOF 12/15 (257,778 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.3700

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

408,850.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

257.7780

kg

8,000.00

2,062,224.00

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,992,331.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pembantu Tukang

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

3,186,025.25

Keuntungan Max. 10 %

A.07.49

318,602.53

Jumlah

3,504,627.78

Dibulatkan

3,504,620.00

1 M3 MEMBUAT SLOOF 12/15 (170.78 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.3700

1,105,000.00

408,850.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

170.7800

kg

8,000.00

1,366,240.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
2,296,347.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pembantu Tukang

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
2,490,041.25
249,004.13

Jumlah

2,739,045.38

Dibulatkan

2,739,040.00

Daftar Analisa TARKIM

Halaman : 92+29

Analisa Satuan Pekerjaan

1
A.07.50

6=(3x5)

1 M3 MEMBUAT SLOOF 15/20 (180,8889 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.2900

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

320,450.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

180.8889

kg

8,000.00

1,447,111.20

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,288,818.70

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pembantu Tukang

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

2,482,512.45

Keuntungan Max. 10 %

A.07.51

248,251.25

Jumlah

2,730,763.70

Dibulatkan

2,730,760.00

1 M3 MEMBUAT SLOOF 15/20 (116.89 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.2900

1,105,000.00

320,450.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

116.8900

kg

8,000.00

935,120.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
1,776,827.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pembantu Tukang

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
1,970,521.25
197,052.13

Jumlah

2,167,573.38

Dibulatkan

2,167,570.00

Daftar Analisa TARKIM

Halaman : 93+29

Analisa Satuan Pekerjaan

1
A.07.52

6=(3x5)

1 M3 MEMBUAT KOLOM 12/12 (314.0964 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.4000

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

442,000.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

314.0964

kg

8,000.00

2,512,771.20

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

3,476,028.70

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

3,669,722.45

Keuntungan Max. 10 %

A.07.53

366,972.25

Jumlah

4,036,694.70

Dibulatkan

4,036,690.00

1 M3 MEMBUAT KOLOM 12/12 (208.864 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.4000

1,105,000.00

442,000.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

208.8640

kg

8,000.00

1,670,912.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
2,634,169.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
2,827,863.25
282,786.33

Jumlah

3,110,649.58

Dibulatkan

3,110,640.00

Daftar Analisa TARKIM

Halaman : 94+29

Analisa Satuan Pekerjaan

1
A.07.54

6=(3x5)

1 M3 MEMBUAT KOLOM 15/15 (211,5556 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.5300

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

585,650.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

211.5556

kg

8,000.00

1,692,444.80

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,799,352.30

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

2,993,046.05

Keuntungan Max. 10 %

A.07.55

299,304.61

Jumlah

3,292,350.66

Dibulatkan

3,292,350.00

1 M3 MEMBUAT KOLOM 15/15 (139.550 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.5300

1,105,000.00

585,650.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

139.5500

kg

8,000.00

1,116,400.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
2,223,307.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
2,417,001.25
241,700.13

Jumlah

2,658,701.38

Dibulatkan

2,658,700.00

Daftar Analisa TARKIM

Halaman : 95+29

Analisa Satuan Pekerjaan

1
A.07.56

6=(3x5)

1 M3 MEMBUAT KOLOM 15/20 (180,8889 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.4700

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

519,350.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

180.8889

kg

8,000.00

1,447,111.20

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,487,718.70

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

2,681,412.45

Keuntungan Max. 10 %

A.07.57

268,141.25

Jumlah

2,949,553.70

Dibulatkan

2,949,550.00

1 M3 MEMBUAT KOLOM 15/20 (116.889 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.4700

1,105,000.00

519,350.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

116.8890

kg

8,000.00

935,112.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
1,975,719.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
2,169,413.25
216,941.33

Jumlah

2,386,354.58

Dibulatkan

2,386,350.00

Daftar Analisa TARKIM

Halaman : 96+29

Analisa Satuan Pekerjaan

1
A.07.59

6=(3x5)

1 M3 MEMBUAT KOLOM 20/20 (142,333 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.4400

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

486,200.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

142.3333

kg

8,000.00

1,138,666.40

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,146,123.90

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

2,339,817.65

Keuntungan Max. 10 %

A.07.60

233,981.77

Jumlah

2,573,799.42

Dibulatkan

2,573,790.00

1 M3 MEMBUAT KOLOM 20/20 (91.334 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.4400

1,105,000.00

486,200.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

91.3340

kg

8,000.00

730,672.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
1,738,129.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
1,931,823.25
193,182.33

Jumlah

2,125,005.58

Dibulatkan

2,125,000.00

Daftar Analisa TARKIM

Halaman : 97+29

Analisa Satuan Pekerjaan

1
A.07.61

6=(3x5)

1 M3 MEMBUAT KOLOM 25/25 (99.6267 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.3500

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

386,750.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

99.6267

kg

8,000.00

797,013.60

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

1,705,021.10

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

1,898,714.85

Keuntungan Max. 10 %

A.07.62

189,871.49

Jumlah

2,088,586.34

Dibulatkan

2,088,580.00

1 M3 MEMBUAT KOLOM 30/30 (74,67 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.3500

1,105,000.00

386,750.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

74.6700

kg

8,000.00

597,360.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

11,500.00

74,290.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
1,256,657.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
1,450,351.25
19,369.38

Jumlah

1,663,414.38

Dibulatkan

1,663,410.00

Daftar Analisa TARKIM

Halaman : 98+29

Analisa Satuan Pekerjaan

1
A.07.63

6=(3x5)

1 M3 MEMBUAT KOLOM 40/25 (153,067 Kg Besi + Bekesting)


DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.2900

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

320,450.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

153.0670

kg

8,000.00

1,224,536.00

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

11,500.00

74,290.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

1,817,533.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

2,011,227.25

Keuntungan Max. 10 %

A.07.64

201,122.73

Jumlah

2,212,349.98

Dibulatkan

2,212,340.00

1 M3 MEMBUAT RING BALK 10/15 (202 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.4800

1,105,000.00

530,400.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

202.0000

kg

8,000.00

1,616,000.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
2,667,657.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
2,861,351.25
286,135.13

Jumlah

3,147,486.38

Dibulatkan

3,147,480.00

Daftar Analisa TARKIM

Halaman : 99+29

Analisa Satuan Pekerjaan

1
A.07.65

6=(3x5)

1 M3 MEMBUAT RING BALK 10/15 (202 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.4800

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

530,400.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

202.0000

kg

8,000.00

1,616,000.00

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,667,657.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

2,861,351.25

Keuntungan Max. 10 %

A.07.66

286,135.13

Jumlah

3,147,486.38

Dibulatkan

3,147,480.00

1 M3 MEMBUAT BALOK 12/15 (217.7900 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.5600

1,105,000.00

618,800.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

217.7900

kg

8,000.00

1,742,320.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
2,882,377.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
3,076,071.25
307,607.13

Jumlah

3,383,678.38

Dibulatkan

3,383,670.00

Daftar Analisa TARKIM

Halaman : 100+29

Analisa Satuan Pekerjaan

1
A.07.67

6=(3x5)

1 M3 MEMBUAT RING BALK 15/15 (211,5556 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.3200

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

353,600.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

211.5556

kg

8,000.00

1,692,444.80

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,567,302.30

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

2,760,996.05

Keuntungan Max. 10 %

A.07.68

276,099.61

Jumlah

3,037,095.66

Dibulatkan

3,037,090.00

1 M3 MEMBUAT RING BALK 15/15 (139.550 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM
BAHAN :
Bekesting Albasiah

0.3200

1,105,000.00

353,600.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

139.5500

kg

8,000.00

1,116,400.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
1,991,257.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
2,184,951.25
218,495.13

Jumlah

2,403,446.38

Dibulatkan

2,403,440.00

Daftar Analisa TARKIM

Halaman : 101+29

Analisa Satuan Pekerjaan

1
A.07.69

6=(3x5)

1 M3 MEMBUAT RING BALK 15/20 (180,8889 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.3200

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

353,600.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

180.8889

kg

8,000.00

1,447,111.20

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,321,968.70

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

2,515,662.45

Keuntungan Max. 10 %

A.07.70

251,566.25

Jumlah

2,767,228.70

Dibulatkan

2,767,220.00

1 M3 MEMBUAT RING BALK 15/20 (116,889 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.3200

1,105,000.00

353,600.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

116.8890

kg

8,000.00

935,112.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
1,809,969.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
2,003,663.25
200,366.33

Jumlah

2,204,029.58

Dibulatkan

2,204,020.00

Daftar Analisa TARKIM

Halaman : 102+29

Analisa Satuan Pekerjaan

1
A.07.71

6=(3x5)

1 M3 MEMBUAT RING BALK 15/25 (151,8222 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.3200

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

353,600.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

151.8222

kg

8,000.00

1,214,577.60

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,089,435.10

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

2,283,128.85

Keuntungan Max. 10 %

A.07.72

228,312.89

Jumlah

2,511,441.74

Dibulatkan

2,511,440.00

1 M3 MEMBUAT RING BALK 15/25 ( 97.423 Kg Besi + Bekesting)


DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.3200

1,105,000.00

353,600.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

0.4000

lt

23,800.00

9,520.00

97.4230

kg

8,000.00

779,384.00

Pelumas Bekesting
Besi Beton Polos U 24
Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

Jumlah Bahan

117,000.00
1,654,241.50

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

193,693.75
1,847,935.25
184,793.53

Jumlah

2,032,728.78

Dibulatkan

2,032,720.00

Daftar Analisa TARKIM

Halaman : 103+29

Analisa Satuan Pekerjaan

1
A.07.73

6=(3x5)

1 M3 MEMBUAT RING BALK 15/25 (175,5556 Kg Besi + Bekesting)


DENGAN TULANGAN 5 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM
BAHAN :
Bekesting Albasiah

0.3200

Paku 5 - 7 cm

1.5000

Pelumas Bekesting

0.4000

Besi Beton Polos U 24

1,105,000.00

353,600.00

kg

9,000.00

13,500.00

lt

23,800.00

9,520.00

175.5556

kg

8,000.00

1,404,444.80

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Jumlah Bahan

2,279,302.30

UPAH :
Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

43,500.00

10,657.50

Pekerja

3.0000

org

27,500.00

82,500.00

Mandor

0.1225

org

42,500.00

5,206.25

Jumlah Pekerja

193,693.75

Jumlah Bahan + Pekerja

2,472,996.05

Keuntungan Max. 10 %

A.07.74

247,299.61

Jumlah

2,720,295.66

Dibulatkan

2,720,290.00

1 M2 PASANGAN LANTAI BATU SIKAT


BAHAN :
Batu sikat 0,5 / 2 cm

1.0000

40,000.00

40,000.00

P.C (50 kg) + Campuran khusus

0.2600

zak

#REF!

#REF!

Pasir pasang

0.0300

#REF!

Jumlah Bahan

#REF!
#REF!

UPAH :
Pekerja

0.5000

org

27,500.00

13,750.00

Tk. batu

1.5000

org

34,000.00

51,000.00

Kep. Tukang batu

0.1000

org

39,500.00

3,950.00

Mandor

0.0250

org

42,500.00

1,062.50

Jumlah Pekerja

69,762.50

Jumlah Bahan + Pekerja

#REF!

Keuntungan Max. 10 %

#REF!

Jumlah

#REF!

Dibulatkan

#REF!

Daftar Analisa TARKIM

Halaman : 104+29

Analisa Satuan Pekerjaan

1
A.07.75

6=(3x5)

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm


BAHAN :
Semen Portland

232.0000

kg

1,000.00

232,000.00

Pasir Beton

0.5200

lbr

75,000.00

39,000.00

Batu Pecah Mesin 2/3

0.7800

M3

150,000.00

117,000.00

137.3610

Kg

8,000.00

1,098,888.00

Kawat Beton

1.9623

Kg

8,550.00

16,777.67

Kayu Terentang Albasiah, Papan

0.2450

1,105,000.00

270,725.00

Paku Biasa 2" - 5"

0.1500

kg

9,000.00

1,350.00

Minyak Bekisting

1.4000

Ltr

23,800.00

33,320.00

Kayu Balok Albasiah

0.0700

1,100,000.00

77,000.00

Besi Beton (Polos / ulir)

Jumlah Bahan

1,886,060.67

UPAH :
Pekerja

6.4697

Oh

27,500.00

177,917.85

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Tukang Kayu

4.0260

Oh

36,500.00

146,949.00

Tukang Besi

1.0073

Oh

36,500.00

36,766.96

Kepala Tukang

0.5192

Oh

43,500.00

22,584.07

Mandor

0.1924

Oh

42,500.00

8,178.96

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

400,896.84
2,286,957.50
228,695.75

Jumlah Total

2,515,653.25

Dibulatkan

2,515,650.00

Daftar Analisa TARKIM

Halaman : 105+29

Analisa Satuan Pekerjaan

1
A.07.76

6=(3x5)

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm


BAHAN :
Semen Portland

232.0000

kg

1,000.00

232,000.00

Pasir Beton

0.5200

lbr

75,000.00

39,000.00

Batu Pecah Mesin 2/3

0.7800

M3

150,000.00

117,000.00

197.1795

Kg

8,000.00

1,577,436.00

Kawat Beton

2.8169

Kg

8,550.00

24,084.07

Kayu Terentang Albasiah, Papan

0.2450

1,105,000.00

270,725.00

Paku Biasa 2" - 5"

0.1500

kg

9,000.00

1,350.00

Minyak Bekisting

1.4000

Ltr

23,800.00

33,320.00

Kayu Balok Albasiah

0.0700

1,100,000.00

77,000.00

Besi Beton (Polos / ulir)

Jumlah Bahan

2,371,915.07

UPAH :
Pekerja

6.4697

Oh

27,500.00

177,917.85

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Tukang Kayu

4.0260

Oh

36,500.00

146,949.00

Tukang Besi

1.0073

Oh

36,500.00

36,766.96

Kepala Tukang

0.5192

Oh

43,500.00

22,584.07

Mandor

0.1924

Oh

42,500.00

8,178.96

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

400,896.84
2,772,811.90
277,281.19

Jumlah Total

3,050,093.09

Dibulatkan

3,050,090.00

Daftar Analisa TARKIM

Halaman : 106+29

Analisa Satuan Pekerjaan

1
A.07.77

6=(3x5)

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm


BAHAN :
Semen Portland

232.0000

kg

1,000.00

232,000.00

Pasir Beton

0.5200

lbr

75,000.00

39,000.00

Batu Pecah Mesin 2/3

0.7800

M3

150,000.00

117,000.00

164.1262

Kg

8,000.00

1,313,009.88

Kawat Beton

2.3447

Kg

8,550.00

20,046.85

Kayu Terentang Albasiah, Papan

0.2450

1,105,000.00

270,725.00

Paku Biasa 2" - 5"

0.1500

kg

9,000.00

1,350.00

Minyak Bekisting

1.4000

Ltr

23,800.00

33,320.00

Kayu Balok Albasiah

0.0700

1,100,000.00

77,000.00

Besi Beton (Polos / ulir)

Jumlah Bahan

2,103,451.73

UPAH :
Pekerja

6.4697

Oh

27,500.00

177,917.85

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Tukang Kayu

4.0260

Oh

36,500.00

146,949.00

Tukang Besi

1.0073

Oh

36,500.00

36,766.96

Kepala Tukang

0.5192

Oh

43,500.00

22,584.07

Mandor

0.1924

Oh

42,500.00

8,178.96

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

400,896.84
2,504,348.56
250,434.86

Jumlah Total

2,754,783.42

Dibulatkan

2,754,780.00

Daftar Analisa TARKIM

Halaman : 107+29

Analisa Satuan Pekerjaan

1
A.07.78

6=(3x5)

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm


BAHAN :
Semen Portland

232.0000

kg

1,000.00

232,000.00

Pasir Beton

0.5200

lbr

75,000.00

39,000.00

Batu Pecah Mesin 2/3

0.7800

M3

150,000.00

117,000.00

349.5591

Kg

8,000.00

2,796,472.56

Kawat Beton

4.9937

Kg

8,550.00

42,696.14

Kayu Terentang Albasiah, Papan

0.2450

1,105,000.00

270,725.00

Paku Biasa 2" - 5"

0.1500

kg

9,000.00

1,350.00

Minyak Bekisting

1.4000

Ltr

23,800.00

33,320.00

Kayu Balok Albasiah

0.0700

1,100,000.00

77,000.00

Besi Beton (Polos / ulir)

Jumlah Bahan

3,609,563.70

UPAH :
Pekerja

6.4697

Oh

27,500.00

177,917.85

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Tukang Kayu

4.0260

Oh

36,500.00

146,949.00

Tukang Besi

1.0073

Oh

36,500.00

36,766.96

Kepala Tukang

0.5192

Oh

43,500.00

22,584.07

Mandor

0.1924

Oh

42,500.00

8,178.96

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

400,896.84
4,010,460.54
401,046.05

Jumlah Total

4,411,506.59

Dibulatkan

4,411,500.00

Daftar Analisa TARKIM

Halaman : 108+29

Analisa Satuan Pekerjaan

1
A.07.79

6=(3x5)

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.16-17.5CM DAN DIA. 10-12.5 cm TEBAL 20 cm
BAHAN :
Semen Portland

232.0000

kg

1,000.00

232,000.00

Pasir Beton

0.5200

lbr

75,000.00

39,000.00

Batu Pecah Mesin 2/3

0.7800

M3

150,000.00

117,000.00

176.4000

Kg

8,000.00

1,411,200.00

Kawat Beton

2.5200

Kg

8,550.00

21,546.00

Kayu Terentang Albasiah, Papan

0.2450

1,105,000.00

270,725.00

Paku Biasa 2" - 5"

0.1500

kg

9,000.00

1,350.00

Minyak Bekisting

1.4000

Ltr

23,800.00

33,320.00

Kayu Balok Albasiah

0.0700

1,100,000.00

77,000.00

Besi Beton (Polos / ulir)

Jumlah Bahan

2,203,141.00

UPAH :
Pekerja

5.1940

Oh

27,500.00

142,835.00

Tukang Batu

0.2500

Oh

34,000.00

8,500.00

Tukang Kayu

2.4420

Oh

36,500.00

89,133.00

Tukang Besi

1.2936

Oh

36,500.00

47,216.40

Kepala Tukang

0.3868

Oh

43,500.00

16,825.80

Mandor

0.1748

Oh

42,500.00

7,429.00

Jumlah Pekerja

311,939.20

Jumlah Bahan + Pekerja

2,515,080.20

Keuntungan Max. 10 %

A.08.02

251,508.02

Jumlah Total

2,766,588.22

Dibulatkan

2,766,580.00

1 M2 PASANG ATAP GENTENG PALENTONG


BAHAN :
Genteng Palentong

25.0000

buah

1,200.00

Jumlah Bahan

30,000.00
30,000.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.0750

Oh

36,500.00

2,737.50

Kepala Tukang

0.0080

Oh

42,000.00

336.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

7,411.00
37,411.00
3,741.10

Jumlah Total

41,152.10

Dibulatkan

41,150.00

Daftar Analisa TARKIM

Halaman : 109+29

Analisa Satuan Pekerjaan

1
A.08.03

6=(3x5)

1 M2 PASANG ATAP GENTENG MORANDO NATURAL (18 BH)


BAHAN :
Genteng Morando Natural

18.0000

buah

1,650.00

Jumlah Bahan

29,700.00
29,700.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.0600

Oh

36,500.00

2,190.00

Kepala Tukang

0.0060

Oh

42,000.00

252.00

Mandor

0.0050

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

36,479.50

Keuntungan Max. 10 %

A.08.05

212.50
6,779.50

3,647.95

Jumlah Total

40,127.45

Dibulatkan

40,120.00

1 M2 PASANG BUBUNG GENTENG PALENTONG


BAHAN :
Genteng Bubung Palentong

5.0000

Semen Portland

8.0000

Pasir Pasang

0.0320

buah

1,600.00

8,000.00

kg

1,000.00

8,000.00

buah

65,000.00

2,080.00

Jumlah Bahan

18,080.00

UPAH :
Pekerja

0.4000

Oh

27,500.00

11,000.00

Tukang Kayu

0.2000

Oh

36,500.00

7,300.00

Kepala Tukang

0.0200

Oh

42,000.00

840.00

Mandor

0.0020

Oh

42,500.00

19,225.00

Jumlah Bahan + Pekerja

37,305.00

Keuntungan Max. 10 %

A.08.06

85.00

Jumlah Pekerja

3,730.50

Jumlah Total

41,035.50

Dibulatkan

41,030.00

1 M2 PASANG BUBUNG GENTENG MORANDO NATURAL


BAHAN :
Genteng Bubung Morando Natural

4.0000

buah

2,800.00

11,200.00

Semen Portland

8.0000

kg

1,000.00

8,000.00

Pasir Pasang

0.0320

buah

65,000.00

Jumlah Bahan

2,080.00
21,280.00

UPAH :
Pekerja

0.4000

Oh

27,500.00

11,000.00

Tukang Kayu

0.2000

Oh

36,500.00

7,300.00

Kepala Tukang

0.0200

Oh

42,000.00

840.00

Mandor

0.0020

Oh

42,500.00

85.00

Jumlah Pekerja

19,225.00

Jumlah Bahan + Pekerja

40,505.00

Keuntungan Max. 10 %

4,050.50

Jumlah Total

44,555.50

Dibulatkan

44,550.00

Daftar Analisa TARKIM

Halaman : 110+29

Analisa Satuan Pekerjaan

1
A.08.11

6=(3x5)

1 M2 PASANG ATAP ASBES GELOMBANG (1,80 x 0,90m) x 5 mm


BAHAN :
Asbes Gelombang

0.6200

lbr

68,700.00

42,594.00

Paku Pancing 60 x 230

0.1200

kg

12,500.00

1,500.00

Jumlah Bahan

44,094.00

UPAH :
Pekerja

0.1400

Oh

27,500.00

3,850.00

Tukang Kayu

0.0700

Oh

36,500.00

2,555.00

Kepala Tukang

0.0070

Oh

42,000.00

294.00

Mandor

0.0035

Oh

42,500.00

148.75

Jumlah Pekerja

6,847.75

Jumlah Bahan + Pekerja

50,941.75

Keuntungan Max. 10 %

A.08.12

5,094.18

Jumlah Total

56,035.93

Dibulatkan

56,030.00

1 M2 PASANG ATAP ASBES GELOMBANG (0,80 x 1,80m) x 5 mm


BAHAN :
Asbes Gelombang

0.6200

lbr

46,000.00

Paku Pancing

0.1200

kg

12,500.00

Jumlah Bahan

28,520.00
1,500.00
30,020.00

UPAH :
Pekerja

0.1400

Oh

27,500.00

3,850.00

Tukang Kayu

0.0700

Oh

36,500.00

2,555.00

Kepala Tukang

0.0070

Oh

42,000.00

294.00

Mandor

0.0035

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

36,867.75

Keuntungan Max. 10 %

A.08.13

148.75
6,847.75

3,686.78

Jumlah Total

40,554.53

Dibulatkan

40,550.00

1 M2 PASANG ATAP ASBES GELOMBANG (0,90m x 1,80m) x 4 mm


BAHAN :
Asbes Gelombang

0.6200

lbr

40,000.00

24,800.00

Paku Pancing

0.1200

kg

12,500.00

1,500.00

Jumlah Bahan

26,300.00

UPAH :
Pekerja

0.1400

Oh

27,500.00

3,850.00

Tukang Kayu

0.0700

Oh

36,500.00

2,555.00

Kepala Tukang

0.0070

Oh

42,000.00

294.00

Mandor

0.0070

Oh

42,500.00

297.50

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

6,996.50
33,296.50
3,329.65

Jumlah Total

36,626.15

Dibulatkan

36,620.00

Daftar Analisa TARKIM

Halaman : 111+29

Analisa Satuan Pekerjaan

A.08.14

1 M' PASANG NOK ASBES GELOMBANG , 4 mm

6=(3x5)

BAHAN :
Asbes Gelombang

1.1000

bh

22,000.00

24,200.00

Paku Pancing

0.0240

kg

12,500.00

300.00

Jumlah Bahan

24,500.00

UPAH :
Pekerja

0.0160

Oh

27,500.00

440.00

Tukang Kayu

0.0800

Oh

36,500.00

2,920.00

Kepala Tukang

0.0080

Oh

42,000.00

336.00

Mandor

0.0040

Oh

42,500.00

170.00

Jumlah Pekerja

3,866.00

Jumlah Bahan + Pekerja

28,366.00

Keuntungan Max. 10 %

A.08.30

2,836.60

Jumlah Total
Dibulatkan
1 M2 PASANG ATAP GENTENG BETON

31,202.60
31,200.00

BAHAN :
Genteng Beton
Paku Biasa 2" - 5"

11.0000

bh

3,300.00

36,300.00

0.0300

bh

9,000.00

270.00

Jumlah Bahan

36,570.00

UPAH :
Pekerja

0.2000

Oh

27,500.00

5,500.00

Tukang Kayu

0.1000

Oh

36,500.00

3,650.00

Kepala Tukang

0.0100

Oh

42,000.00

420.00

Mandor

0.0010

Oh

42,500.00

42.50

Jumlah Pekerja

9,612.50

Jumlah Bahan + Pekerja

46,182.50

Keuntungan Max. 10 %

A.09.02

4,618.25

Jumlah Total

50,800.75

Dibulatkan

50,800.00

1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm


BAHAN :
Eternit

1.1000

lbr

8,450.00

9,295.00

Paku

0.0100

kg

9,000.00

90.00

Jumlah Bahan

9,385.00

UPAH :
Pekerja

0.0300

Oh

27,500.00

825.00

Tukang Kayu

0.0700

Oh

36,500.00

2,555.00

Kepala Tukang

0.0070

Oh

42,000.00

294.00

Mandor

0.0015

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

63.75
3,737.75
13,122.75
1,312.28

Jumlah Total

14,435.03

Dibulatkan

14,430.00

Daftar Analisa TARKIM

Halaman : 112+29

Analisa Satuan Pekerjaan

1
A.09.24

6=(3x5)

1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mm


BAHAN :
Gypsum Board (120 x 240 x9) mm

0.3640

lbr

54,000.00

19,656.00

Paku Sekrup

0.1100

kg

6,750.00

742.50

Jumlah Bahan

20,398.50

UPAH :
Pekerja

0.1000

Oh

27,500.00

2,750.00

Tukang Kayu

0.0500

Oh

36,500.00

1,825.00

Kepala Tukang

0.0050

Oh

42,000.00

210.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

4,997.50

Jumlah Bahan + Pekerja

25,396.00

Keuntungan Max. 10 %

A.10.01

2,539.60

Jumlah Total

27,935.60

Dibulatkan

27,930.00

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK


BAHAN :
Kloset duduk/monoblok

1.0000

Perlengkapan

0.0600

bh
harga
kloset

1,098,750.00
1,098,750.00

Jumlah Bahan

1,098,750.00
65,925.00
1,164,675.00

UPAH :
Pekerja

2.1000

Oh

27,500.00

57,750.00

Tukang Batu

0.9600

Oh

34,000.00

32,640.00

Kepala Tukang

0.0010

Oh

39,500.00

39.50

Mandor

0.1600

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

1,261,904.50

Keuntungan Max. 10 %

A.10.02

6,800.00
97,229.50

126,190.45

Jumlah Total

1,388,094.95

Dibulatkan

1,388,090.00

MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN


BAHAN :
Kloset Jongkok porselen

1.0000

bh

109,200.00

109,200.00

Semen Portland

6.0000

kg

1,000.00

6,000.00

Pasir Pasang

0.0100

65,000.00

Jumlah Bahan

650.00
115,850.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Batu

0.3000

Oh

34,000.00

10,200.00

Kepala Tukang

0.1500

Oh

39,500.00

5,925.00

Mandor

0.0800

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

3,400.00
36,025.00
151,875.00
15,187.50

Jumlah Total

167,062.50

Dibulatkan

167,060.00

Daftar Analisa TARKIM

Halaman : 113+29

Analisa Satuan Pekerjaan

1
A.10.04

6=(3x5)

MEMASANG 1 BUAH URINOIR


BAHAN :
Urinoir

1.0000

Perlengkapan

0.3000

Semen Portland

6.0000

bh
hrg
urinoir
kg

Pasir Pasang

0.0100

1,276,200.00

1,276,200.00

1,276,200.00

382,860.00

1,000.00

6,000.00

65,000.00

Jumlah Bahan

650.00
1,665,710.00

UPAH :
Pekerja

1.0000

Oh

27,500.00

27,500.00

Tukang Batu

0.9000

Oh

34,000.00

30,600.00

Kepala Tukang

0.1000

Oh

39,500.00

3,950.00

Mandor

0.1000

Oh

42,500.00

4,250.00

Jumlah Pekerja

66,300.00

Jumlah Bahan + Pekerja

1,732,010.00

Keuntungan Max. 10 %

A.10.05

173,201.00

Jumlah Total

1,905,211.00

Dibulatkan

1,905,210.00

MEMASANG 1 BUAH WASTAFEL


BAHAN :
Wastafel

1.0000

511,800.00

511,800.00

511,800.00

61,416.00

6.0000

bh
hrg
kloset
kg

Perlengkapan

0.1200

Semen Abu-abu
Pasir Pasang

1,000.00

6,000.00

0.0100

65,000.00

650.00

Jumlah Bahan

579,866.00

UPAH :
Pekerja

1.2000

Oh

27,500.00

33,000.00

Tukang Batu

1.4500

Oh

34,000.00

49,300.00

Kepala Tukang

0.1500

Oh

39,500.00

5,925.00

Mandor

0.1000

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

4,250.00
92,475.00
672,341.00
67,234.10

Jumlah Total

739,575.10

Dibulatkan

739,570.00

Daftar Analisa TARKIM

Halaman : 114+29

Analisa Satuan Pekerjaan

1
A.10.06

6=(3x5)

MEMASANG 1 BUAH BAK MANDI TRASO VOLUME 0,3 M3


BAHAN :
Bak Teraso

1.0000

bh

204,000.00

204,000.00

Semen Portland

6.0000

kg

1,000.00

6,000.00

Pasir Pasang

0.0100

65,000.00

650.00

Jumlah Bahan

210,650.00

UPAH :
Pekerja

2.1000

Oh

27,500.00

57,750.00

Tukang Batu

0.7500

Oh

34,000.00

25,500.00

Kepala Tukang

0.0700

Oh

39,500.00

2,765.00

Mandor

0.1100

Oh

42,500.00

4,675.00

Jumlah Pekerja

90,690.00

Jumlah Bahan + Pekerja

301,340.00

Keuntungan Max. 10 %

A.10.07

30,134.00

Jumlah Total

331,474.00

Dibulatkan

331,470.00

MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3


BAHAN :
Bak Fibreglass

1.0000

Perlengkapan

0.1800 hrg bak

bh

95,500.00

95,500.00

95,500.00

17,190.00

Jumlah Bahan

112,690.00

UPAH :
Pekerja

1.8000

Oh

27,500.00

49,500.00

Tukang Batu

0.6000

Oh

34,000.00

20,400.00

Kepala Tukang

0.5400

Oh

39,500.00

21,330.00

Mandor

0.1100

Oh

42,500.00

4,675.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

95,905.00
208,595.00
20,859.50

Jumlah Total

229,454.50

Dibulatkan

229,450.00

Daftar Analisa TARKIM

Halaman : 115+29

Analisa Satuan Pekerjaan

1
A.10.08

6=(3x5)

MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3


BAHAN :
Batu Bata
Semen Portland
Pasir Pasang
Porselen (11x11)cm
Semen nat

110.0000

bh

240.00

26,400.00

80.0000

kg

1,000.00

80,000.00

0.3000

65,000.00

19,500.00

216.0000

bh

419.84

90,686.03

6.0000

kg

5,000.00

30,000.00

Jumlah Bahan

246,586.03

UPAH :
Pekerja

2.0000

Oh

27,500.00

55,000.00

Tukang Batu

1.0000

Oh

34,000.00

34,000.00

Kepala Tukang

0.3000

Oh

39,500.00

11,850.00

Mandor

0.1500

Oh

42,500.00

107,225.00

Jumlah Bahan + Pekerja

353,811.03

Keuntungan Max. 10 %

A.10.09

6,375.00

Jumlah Pekerja

35,381.10

Jumlah Total

389,192.13

Dibulatkan

389,190.00

MEMASANG 1 BUAH BADKIP PORSELEN


BAHAN :
Badkip
Perlengkapan

1.0000

m
hrg
0.2000
badkip

1,633,800.00
1,633,800.00

Jumlah Bahan

1,633,800.00
326,760.00
1,960,560.00

UPAH :
Pekerja

Oh

27,500.00

Tukang Batu

0.0750

Oh

34,000.00

2,550.00

Kepala Tukang

0.7500

Oh

39,500.00

29,625.00

Mandor

0.2500

Oh

42,500.00

10,625.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

42,800.00
2,003,360.00
200,336.00

Jumlah Total

2,203,696.00

Dibulatkan

2,203,690.00

Daftar Analisa TARKIM

Halaman : 116+29

Analisa Satuan Pekerjaan

1
A.10.16

6=(3x5)

MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM
BAHAN :
Batu Bata

0.1450

bh

240.00

34.80

44.0000

kg

1,000.00

44,000.00

Pasir Pasang

0.0700

m3

65,000.00

4,550.00

Batu Kerikil

0.0700

m3

150,000.00

10,500.00

Besi beton

1.6000

kg

8,000.00

12,800.00

Pasir Beton

0.0600

m3

75,000.00

4,500.00

Semen Portland

Jumlah Bahan

76,384.80

UPAH :
Pekerja

3.2000

Oh

27,500.00

88,000.00

Tukang Batu

1.0150

Oh

34,000.00

34,510.00

Kepala Tukang

0.0015

Oh

39,500.00

59.25

Mandor

0.0160

Oh

42,500.00

680.00

Jumlah Pekerja

123,249.25

Jumlah Bahan + Pekerja

199,634.05

Keuntungan Max. 10 %

A.10.17

19,963.41

Jumlah Total

219,597.46

Dibulatkan

219,590.00

MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CM
BAHAN :
Batu Bata

0.2500

m3

240.00

60.00

77.0000

kg

1,000.00

77,000.00

Pasir Pasang

0.1300

m3

65,000.00

8,450.00

Batu Kerikil

0.0200

m3

150,000.00

3,000.00

Besi beton

2.6000

kg

9,000.00

23,400.00

Pasir Beton

0.0900

m3

75,000.00

6,750.00

Semen Portland

Jumlah Bahan

118,660.00

UPAH :
Pekerja

1.4200

Oh

27,500.00

39,050.00

Tukang Batu

0.4730

Oh

34,000.00

16,082.00

Kepala Tukang

0.0470

Oh

39,500.00

1,856.50

Mandor

0.0710

Oh

42,500.00

3,017.50

Jumlah Pekerja

60,006.00

Jumlah Bahan + Pekerja

178,666.00

Keuntungan Max. 10 %

17,866.60

Jumlah Total
Dibulatkan

Daftar Analisa TARKIM

196,532.60
-

196,530.00

Halaman : 117+29

Analisa Satuan Pekerjaan

1
A.10.18

6=(3x5)

MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CM
BAHAN :
Batu Bata

0.3710

m3

240.00

89.04

114.0000

kg

1,000.00

114,000.00

Pasir Pasang

0.1840

m3

65,000.00

11,960.00

Batu Kerikil

0.0330

m3

150,000.00

4,950.00

Besi beton

4.8500

kg

8,000.00

38,800.00

Pasir Beton

0.1200

m3

75,000.00

9,000.00

Semen Portland

Jumlah Bahan

178,799.04

UPAH :
Pekerja

2.1600

Oh

27,500.00

59,400.00

Tukang Gali

0.1000

Oh

34,000.00

3,400.00

Tukang Batu

0.7200

Oh

34,000.00

24,480.00

Kepala Tukang

0.0720

Oh

39,500.00

2,844.00

Mandor

0.1080

Oh

42,500.00

4,590.00

Jumlah Pekerja

94,714.00

Jumlah Bahan + Pekerja

273,513.04

Keuntungan Max. 10 %

A.10.19

27,351.30

Jumlah Total

300,864.34

Dibulatkan

300,860.00

MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5"


BAHAN :
Pipa Galvanis

1.2000

m'

Perlengkapan

0.3500 hrg pipa

11,666.67

14,000.00

11,666.67

4,083.33

Jumlah Bahan

18,083.33

UPAH :
Pekerja

0.0540

Oh

27,500.00

1,485.00

Tukang Batu

0.0900

Oh

34,000.00

3,060.00

Kepala Tukang

0.0090

Oh

39,500.00

355.50

Mandor

0.0270

Oh

42,500.00

1,147.50

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

6,048.00
24,131.33
2,413.13

Jumlah Total

26,544.47

Dibulatkan

26,540.00

Daftar Analisa TARKIM

Halaman : 118+29

Analisa Satuan Pekerjaan

1
A.10.20

6=(3x5)

MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75"


BAHAN :
Pipa Galvanis

1.2000

m'

Perlengkapan

0.3500 hrg pipa

14,216.67

17,060.00

14,216.67

4,975.83

Jumlah Bahan

22,035.83

UPAH :
Pekerja

0.0540

Oh

27,500.00

1,485.00

Tukang Batu

0.0900

Oh

34,000.00

3,060.00

Kepala Tukang

0.0090

Oh

39,500.00

355.50

Mandor

0.0270

Oh

42,500.00

1,147.50

Jumlah Pekerja

6,048.00

Jumlah Bahan + Pekerja

28,083.83

Keuntungan Max. 10 %

A.10.21

2,808.38

Jumlah Total

30,892.22

Dibulatkan

30,890.00

MEMASANG 1 M' PIPA GALVANIS DIAMETER 1"


BAHAN :
Pipa Galvanis

1.2000

1,2 m'

Perlengkapan

0.3500 hrg pipa

21,133.33

25,360.00

21,133.33

7,396.67

Jumlah Bahan

32,756.67

UPAH :
Pekerja

0.0540

Oh

27,500.00

1,485.00

Tukang Batu

0.0900

Oh

34,000.00

3,060.00

Kepala Tukang

0.0090

Oh

39,500.00

355.50

Mandor

0.0270

Oh

42,500.00

1,147.50

Jumlah Pekerja

6,048.00

Jumlah Bahan + Pekerja

38,804.67

Keuntungan Max. 10 %

A.10.22

3,880.47

Jumlah Total

42,685.13

Dibulatkan

42,680.00

MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5"


BAHAN :
Pipa Galvanis

1.2000

1,2 m'

Perlengkapan

0.3500 hrg pipa

32,700.00

39,240.00

32,700.00

11,445.00

Jumlah Bahan

50,685.00

UPAH :
Pekerja

0.1080

Oh

27,500.00

2,970.00

Tukang Batu

0.1800

Oh

34,000.00

6,120.00

Kepala Tukang

0.0180

Oh

39,500.00

711.00

Mandor

0.0054

Oh

42,500.00

229.50

Jumlah Pekerja

10,030.50

Jumlah Bahan + Pekerja

60,715.50

Keuntungan Max. 10 %

6,071.55

Jumlah Total

66,787.05

Dibulatkan

66,780.00

Daftar Analisa TARKIM

Halaman : 119+29

Analisa Satuan Pekerjaan

A.10.23

MEMASANG 1 M' PIPA GALVANIS DIAMETER 3"

6=(3x5)

BAHAN :
Pipa Galvanis

1.2000

1,2 m'

Perlengkapan

0.3500 hrg pipa

77,333.33

92,800.00

77,333.33

27,066.67

Jumlah Bahan

119,866.67

UPAH :
Pekerja

0.1080

Oh

27,500.00

2,970.00

Tukang Batu

0.1800

Oh

34,000.00

6,120.00

Kepala Tukang

0.0180

Oh

39,500.00

711.00

Mandor

0.0054

Oh

42,500.00

229.50

Jumlah Pekerja

10,030.50

Jumlah Bahan + Pekerja

129,897.17

Keuntungan Max. 10 %

A.10.24

12,989.72

Jumlah Total

142,886.88

Dibulatkan

142,880.00

MEMASANG 1 M' PIPA GALVANIS DIAMETER 4"


BAHAN :
Pipa Galvanis

1.2000

Perlengkapan

0.3500 hrg pipa

1,2 m'

101,916.67

122,300.00

101,916.67

35,670.83

Jumlah Bahan

157,970.83

UPAH :
Pekerja

0.1350

Oh

27,500.00

3,712.50

Tukang Batu

0.2250

Oh

34,000.00

7,650.00

Kepala Tukang

0.0225

Oh

39,500.00

888.75

Mandor

0.0068

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

170,511.08

Keuntungan Max. 10 %

A.10.25

289.00
12,540.25

17,051.11

Jumlah Total

187,562.19

Dibulatkan

187,560.00

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"


BAHAN :
Pipa PVC

1.2000

m'

Perlengkapan

0.3500 hrg pipa

5,450.00

6,540.00

5,450.00

1,907.50

Jumlah Bahan

8,447.50

UPAH :
Pekerja

0.0360

Oh

27,500.00

990.00

Tukang Batu

0.0600

Oh

34,000.00

2,040.00

Kepala Tukang

0.0060

Oh

39,500.00

237.00

Mandor

0.0018

Oh

42,500.00

76.50

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

3,343.50
11,791.00
1,179.10

Jumlah Total

12,970.10

Dibulatkan

12,970.00

Daftar Analisa TARKIM

Halaman : 120+29

Analisa Satuan Pekerjaan

1
A.10.26

6=(3x5)

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75"


BAHAN :
Pipa PVC

1.2000

m'

Perlengkapan

0.3500 hrg pipa

7,675.00
7,675.00

Jumlah Bahan

9,210.00
2,686.25
11,896.25

UPAH :
Pekerja

0.0360

Oh

27,500.00

990.00

Tukang Batu

0.0600

Oh

34,000.00

2,040.00

Kepala Tukang

0.0060

Oh

39,500.00

237.00

Mandor

0.0018

Oh

42,500.00

76.50

Jumlah Pekerja

3,343.50

Jumlah Bahan + Pekerja

15,239.75

Keuntungan Max. 10 %

A.10.27

1,523.98

Jumlah Total

16,763.73

Dibulatkan

16,760.00

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1"


BAHAN :
Pipa PVC

1.2000

m'

Perlengkapan

0.3500 hrg pipa

9,550.00

11,460.00

9,550.00

3,342.50

Jumlah Bahan

14,802.50

UPAH :
Pekerja

0.0360

Oh

27,500.00

990.00

Tukang Batu

0.0600

Oh

34,000.00

2,040.00

Kepala Tukang

0.0060

Oh

39,500.00

237.00

Mandor

0.0018

Oh

42,500.00

76.50

Jumlah Pekerja

3,343.50

Jumlah Bahan + Pekerja

18,146.00

Keuntungan Max. 10 %

A.10.28

1,814.60

Jumlah Total

19,960.60

Dibulatkan

19,960.00

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5"


BAHAN :
Pipa PVC

1.2000

m'

Perlengkapan

0.3500 hrg pipa

17,200.00

20,640.00

17,200.00

6,020.00

Jumlah Bahan

26,660.00

UPAH :
Pekerja

0.0360

Oh

27,500.00

990.00

Tukang Batu

0.0600

Oh

34,000.00

2,040.00

Kepala Tukang

0.0060

Oh

39,500.00

237.00

Mandor

0.0018

Oh

42,500.00

76.50

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

3,343.50
30,003.50
3,000.35

Jumlah Total

33,003.85

Dibulatkan

33,000.00

Daftar Analisa TARKIM

Halaman : 121+29

Analisa Satuan Pekerjaan

1
A.10.29

6=(3x5)

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2"


BAHAN :
Pipa PVC

1.2000

m'

Perlengkapan

0.3500 hrg pipa

23,525.00

28,230.00

23,525.00

8,233.75

Jumlah Bahan

36,463.75

UPAH :
Pekerja

0.0540

Oh

27,500.00

1,485.00

Tukang Batu

0.0900

Oh

34,000.00

3,060.00

Kepala Tukang

0.0090

Oh

39,500.00

355.50

Mandor

0.0027

Oh

42,500.00

114.75

Jumlah Pekerja

5,015.25

Jumlah Bahan + Pekerja

41,479.00

Keuntungan Max. 10 %

A.10.30

4,147.90

Jumlah Total

45,626.90

Dibulatkan

45,620.00

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5"


BAHAN :
Pipa PVC

1.2000

Perlengkapan

0.3500 hrg pipa

m'

30,000.00

36,000.00

30,000.00

10,500.00

Jumlah Bahan

46,500.00

UPAH :
Pekerja

0.0360

Oh

27,500.00

990.00

Tukang Batu

0.0600

Oh

34,000.00

2,040.00

Kepala Tukang

0.0060

Oh

39,500.00

237.00

Mandor

0.0018

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

49,843.50

Keuntungan Max. 10 %

A.10.31

76.50
3,343.50

4,984.35

Jumlah Total

54,827.85

Dibulatkan

54,820.00

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"


BAHAN :
Pipa PVC

1.2000

m'

Perlengkapan

0.3500 hrg pipa

45,050.00

54,060.00

45,050.00

15,767.50

Jumlah Bahan

69,827.50

UPAH :
Pekerja

0.0810

Oh

27,500.00

2,227.50

Tukang Batu

0.1350

Oh

34,000.00

4,590.00

Kepala Tukang

0.0135

Oh

39,500.00

533.25

Mandor

0.0041

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

174.25
7,525.00
77,352.50
7,735.25

Jumlah Total

85,087.75

Dibulatkan

85,080.00

Daftar Analisa TARKIM

Halaman : 122+29

Analisa Satuan Pekerjaan

1
A.10.32

6=(3x5)

MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"


BAHAN :
Pipa PVC

1.2000

m'

Perlengkapan

0.3500 hrg pipa

69,937.50

83,925.00

69,937.50

24,478.13

Jumlah Bahan

108,403.13

UPAH :
Pekerja

0.0810

Oh

27,500.00

2,227.50

Tukang Batu

0.1350

Oh

34,000.00

4,590.00

Kepala Tukang

0.0135

Oh

39,500.00

533.25

Mandor

0.0041

Oh

42,500.00

174.25

Jumlah Pekerja

7,525.00

Jumlah Bahan + Pekerja

115,928.13

Keuntungan Max. 10 %

A.10.33

11,592.81

Jumlah Total

127,520.94

Dibulatkan

127,520.00

MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL


BAHAN :
Bak Cuci Stainless Steel

1.0000

bh

160,000.00

160,000.00

Water drain + asesories

1.0000

bh

20,000.00

20,000.00

Jumlah Bahan

180,000.00

UPAH :
Pekerja

0.0300

Oh

27,500.00

825.00

Tukang Batu

0.3000

Oh

34,000.00

10,200.00

Kepala Tukang

0.0300

Oh

39,500.00

1,185.00

Mandor

0.0015

Oh

42,500.00

63.75

Jumlah Pekerja

12,273.75

Jumlah Bahan + Pekerja

192,273.75

Keuntungan Max. 10 %

A.10.35

19,227.38

Jumlah Total

211,501.13

Dibulatkan

211,500.00

MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"


BAHAN :
Kran Air

1.0000

bh

20,400.00

20,400.00

Seal tape

0.0250

bh

1,300.00

32.50

Jumlah Bahan

20,432.50

UPAH :
Pekerja
Tukang Batu

0.0100
-

Oh

27,500.00

Oh

34,000.00

275.00
-

Kepala Tukang

0.0010

Oh

39,500.00

39.50

Mandor

0.0005

Oh

42,500.00

21.25

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

335.75
20,768.25
2,076.83

Jumlah Total

22,845.08

Dibulatkan

22,840.00

Daftar Analisa TARKIM

Halaman : 123+29

Analisa Satuan Pekerjaan

1
A.10.36

6=(3x5)

MEMASANG 1 BH FLOOR DRAIN


BAHAN :
Floordrain

1.0000

bh

20,000.00

Jumlah Bahan

20,000.00

20,000.00

UPAH :
Pekerja
Tukang Batu

0.0100
-

Oh

27,500.00

Oh

34,000.00

Kepala Tukang

0.0010

Oh

39,500.00

39.50

Mandor

0.0005

Oh

42,500.00

21.25

Jumlah Pekerja

335.75

Jumlah Bahan + Pekerja

20,335.75

Keuntungan Max. 10 %

A.10.37

275.00

2,033.58

Jumlah Total

22,369.33

Dibulatkan

22,360.00

1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA ( KANTOR TYPE BESAR )


Galian tanah

7.5000

16,675.00

125,062.50

Pasir urug

0.3570

74,675.00

26,658.98

Lantai kerja

3.7500

445,762.50

1,671,609.38

Pas. bata 1 PC : 2 PS + Plesteran

25.0000

70,360.00

1,759,000.00

Plat beton penutup & balok

0.5000

2,708,484.50

1,354,242.25

Pipa PVC 4" jenis AW + sambungan

9.0000

m1

34,125.00

307,125.00

Pipa GIP 1/2"

2.0000

m1

11,666.67

23,333.33

Galian tanah untuk rembesan

5.6250

16,675.00

93,796.88

Pas. injuk

9.0000

kg

19,162.50

172,462.50

Urugan kerikil 3,5 cm

1.7500

145,000.00

253,750.00

Pipa PVC 4" berlobang jenis AW

6.0000

m1

26,600.00

159,600.00

Urugan kembali perataan tanah

1.8750

6,087.50

11,414.06

Jumlah
Keuntungan Max. 10 %

5,958,054.87
595,805.49

Jumlah

6,553,860.36

Dibulatkan

6,553,860.00

Daftar Analisa TARKIM

Halaman : 124+29

Analisa Satuan Pekerjaan

1
A.10.38

6=(3x5)

1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA ( KANTOR TYPE KECIL )


Galian tanah

4.5000

16,675.00

75,037.50

Pasir urug

0.2142

74,675.00

15,995.39

Lantai kerja

2.2500

445,762.50

1,002,965.63

15.0000

70,360.00

1,055,400.00

Plat beton penutup & balok

0.3000

2,708,484.50

812,545.35

Pipa PVC 4" jenis AW + sambungan

5.4000

m1

34,125.00

184,275.00

Pipa GIP 1/2"

1.2000

btg

11,666.67

14,000.00

Galian tanah untuk rembesan

3.3750

16,675.00

56,278.13

Pas. injuk

5.4000

kg

19,162.50

103,477.50

Urugan kerikil 3,5 cm

1.0500

145,000.00

152,250.00

Pipa PVC 4" berlobang jenis AW

9.0000

m1

26,600.00

239,400.00

Urugan kembali perataan tanah

1.1250

6,087.50

6,848.44

Pas. bata 1 PC : 2 PS + Plesteran

Jumlah

3,718,472.92

Keuntungan Max. 10 %

A.10.39

371,847.29

Jumlah

4,090,320.21

Dibulatkan

4,090,320.00

1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)


Galian tanah

2.2500

16,675.00

37,518.75

Pasir urug

0.1071

74,675.00

7,997.69

Lantai kerja

1.1250

445,762.50

501,482.81

Pas. bata 1 PC : 2 PS + Plesteran

7.5000

70,360.00

527,700.00

Plat beton penutup & balok

0.1500

2,708,484.50

406,272.68

Pipa PVC 4" jenis AW + sambungan

9.0000

m1

34,125.00

307,125.00

Pipa GIP1/2"

0.6000

btg

11,666.67

7,000.00

Galian tanah untuk rembesan

1.6875

16,675.00

28,139.06

Pas. injuk

2.7000

kg

19,162.50

51,738.75

Urugan kerikil 3,5 cm

0.5250

145,000.00

76,125.00

Pipa PVC 4" berlobang jenis AW

9.0000

m1

26,600.00

239,400.00

Urugan kembali perataan tanah

0.5625

6,087.50

3,424.22

Jumlah

2,193,923.96

Keuntungan Max. 10 %

A.10.40

219,392.40

Jumlah

2,413,316.36

Dibulatkan

2,413,310.00

1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGAN


Galian Tanah

0.1500

12,700.00

1,905.00

Grefel Beton 20 Cm X 1/2

1.0000

bh

20,000.00

20,000.00

Pas . Bata + Plesteran 1 : 3

1.0000

m1

65,910.00

65,910.00

Jumlah Bahan

87,815.00

UPAH :
Upah kerja
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

0.1500

ls

87,815.00

13,172.25
13,172.25
100,987.25
10,098.73

Jumlah Total

111,085.98

Dibulatkan

111,080.00

Daftar Analisa TARKIM

Halaman : 125+29

Analisa Satuan Pekerjaan

1
A.10.41

6=(3x5)

1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN


Galian Tanah

0.2000

12,700.00

2,540.00

Grefel Beton 30 Cm X 1/2

1.0000

bh

30,000.00

30,000.00

Pas . Bata + Plesteran 1 : 3

1.0000

m1

65,910.00

65,910.00

Jumlah Bahan

98,450.00

UPAH :
Upah Kerja

0.1500

ls

98,450.00

Jumlah Pekerja

14,767.50

Jumlah Bahan + Pekerja

113,217.50

Keuntungan Max. 10 %

A.11.01

14,767.50

11,321.75

Jumlah Total

124,539.25

Dibulatkan

124,530.00

1 KG PASANG RANGKA ATAP BAJA


BAHAN :
Besi Profil WF

1.1000

kg

9,250.00

10,175.00

Meni Besi

0.0800

kg

15,600.00

1,248.00

Jumlah Bahan

11,423.00

UPAH :
Pekerja

0.0600

Oh

27,500.00

1,650.00

Tukang Besi

0.0060

Oh

34,000.00

204.00

Kepala Tukang

0.0060

Oh

47,500.00

285.00

Mandor

0.0003

Oh

42,500.00

12.75

Jumlah Pekerja

2,151.75

Jumlah Bahan + Pekerja

13,574.75

Keuntungan Max. 10 %

A.11.08

1,357.48

Jumlah Total

14,932.23

Dibulatkan

14,930.00

1 M2 PASANG ROLLING DOOR


BAHAN :
Roll Door

1.0000

m2

400,000.00

Jumlah Bahan

400,000.00
400,000.00

UPAH :
Pekerja

1.0500

Oh

27,500.00

28,875.00

Tukang Besi Konstruksi

1.5000

Oh

36,500.00

54,750.00

Kepala Tukang

0.1050

Oh

43,500.00

4,567.50

Mandor

0.0052

Oh

42,500.00

221.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

88,413.50
488,413.50
48,841.35

Jumlah Total

537,254.85

Dibulatkan

537,250.00

Daftar Analisa TARKIM

Halaman : 126+29

Analisa Satuan Pekerjaan

1
A.11.09

6=(3x5)

1 M2 PASANG PINTU ALUMINIUM


BAHAN :
Pintu Alluminium

1.0000

m2

150,000.00

Jumlah Bahan

150,000.00
150,000.00

UPAH :
Pekerja

1.0500

Oh

27,500.00

28,875.00

Tukang Besi Konstruksi

1.0500

Oh

36,500.00

38,325.00

Kepala Tukang

0.1050

Oh

43,500.00

4,567.50

Mandor

0.0052

Oh

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

221,988.50

Keuntungan Max. 10 %

A.11.12

221.00
71,988.50

22,198.85

Jumlah Total

244,187.35

Dibulatkan

244,180.00

1 M2 PASANG TERALIS BESI


BAHAN :
Besi Strip 2x3

1.0000

m2

80,000.00

Jumlah Bahan

80,000.00
80,000.00

UPAH :
Pekerja

1.2000

Oh

27,500.00

33,000.00

Tukang Kayu

1.2000

Oh

36,500.00

43,800.00

Kepala Tukang

0.0120

Oh

42,000.00

504.00

0.00060

Oh

42,500.00

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja

157,329.50

Keuntungan Max. 10 %

A.11.17

25.50
77,329.50

15,732.95

Jumlah Total

173,062.45

Dibulatkan

173,060.00

1 M2 PASANG JENDELA NAKO DAN TRALIS


BAHAN :
Jendela Nako

1.1000

m2

13,650.00

15,015.00

Paku Biasa 1/2"-1" atau skrup

0.0200

kg

9,000.00

180.00

Besi Strip 2x3

0.0250

m2

8,200.00

205.00

Jumlah Bahan

15,400.00

UPAH :
Pekerja

0.2000

Oh

27,500.00

5,500.00

Tukang Kayu

0.2000

Oh

36,500.00

7,300.00

Kepala Tukang

0.0200

Oh

42,000.00

840.00

0.00100

Oh

42,500.00

Mandor

42.50

Jumlah Pekerja

13,682.50

Jumlah Bahan + Pekerja

29,082.50

Keuntungan Max. 10 %

2,908.25

Jumlah Total

31,990.75

Dibulatkan

31,990.00

Daftar Analisa TARKIM

Halaman : 127+29

Analisa Satuan Pekerjaan

1
A.11.18

6=(3x5)

1 M2 PASANG TALANG DATAR, SENG BJLS 28


BAHAN :
Seng Plat 3 x 6 bjls 28

0.5000

lbr

21,850.00

10,925.00

Paku Biasa 1/2"-1"

0.0150

kg

9,000.00

135.00

Kayu KAYU LOKAL KLS II, papan

0.0096

m3

3,510,000.00

33,696.00

Flincote/Meni Besi

0.2500

kg

15,600.00

3,900.00

Jumlah Bahan

48,656.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.4000

Oh

36,500.00

14,600.00

Kepala Tukang

0.0250

Oh

42,000.00

1,050.00

0.00125

Oh

42,500.00

Mandor

19,828.13

Jumlah Bahan + Pekerja

68,484.13

Keuntungan Max. 10 %

A.11.19

53.13

Jumlah Pekerja

6,848.41

Jumlah Total

75,332.54

Dibulatkan

75,330.00

1 M2 PASANG TALANG MIRING, SENG BJLS 28


BAHAN :
Seng Plat 3 x 6 bjls 28

0.5000

lbr

21,850.00

10,925.00

Paku Biasa 1/2"-1"

0.0150

kg

9,000.00

135.00

Kayu KAYU LOKAL KLS II, papan

0.0190

m3

3,510,000.00

66,690.00

Flincote/Meni Besi

0.3000

kg

15,600.00

Jumlah Bahan

4,680.00
82,430.00

UPAH :
Pekerja

0.0400

Oh

27,500.00

1,100.00

Tukang Kayu

0.4000

Oh

36,500.00

14,600.00

Kepala Tukang

0.0250

Oh

42,000.00

1,050.00

0.00125

Oh

42,500.00

53.13

Mandor
Jumlah Pekerja

16,803.13

Jumlah Bahan + Pekerja

99,233.13

Keuntungan Max. 10 %

9,923.31

Jumlah Total

109,156.44

Dibulatkan

109,150.00

Daftar Analisa TARKIM

Halaman : 128+29

Analisa Satuan Pekerjaan

1
A.11.20

6=(3x5)

1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28


BAHAN :
Seng Plat 3 x 6 bjls 28

0.3000

lbr

21,850.00

6,555.00

Paku Biasa 1/2"-1"

0.1000

kg

9,000.00

900.00

Kayu KAYU LOKAL KLS II, papan

0.0190

m3

3,510,000.00

66,690.00

Besi Strip

0.5000

kg

9,500.00

4,750.00

Jumlah Bahan

78,895.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.2500

Oh

36,500.00

9,125.00

Kepala Tukang

0.0250

Oh

42,000.00

1,050.00

0.00125

Oh

42,500.00

53.13

Mandor
Jumlah Pekerja

14,353.13

Jumlah Bahan + Pekerja

93,248.13

Keuntungan Max. 10 %

A.11.21

9,324.81

Jumlah Total

102,572.94

Dibulatkan

102,570.00

1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 24


BAHAN :
Seng Plat 3 x 6 bjls 24

0.3000

lbr

21,850.00

6,555.00

Paku Biasa 1/2"-1"

0.1000

kg

9,000.00

900.00

Kayu KAYU LOKAL KLS II, papan

0.0190

m3

3,510,000.00

66,690.00

Besi Strip

0.5000

kg

9,500.00

4,750.00

Jumlah Bahan

78,895.00

UPAH :
Pekerja

0.1500

Oh

27,500.00

4,125.00

Tukang Kayu

0.2500

Oh

36,500.00

9,125.00

Kepala Tukang

0.0250

Oh

42,000.00

1,050.00

0.00125

Oh

42,500.00

53.13

Mandor
Jumlah Pekerja

14,353.13

Jumlah Bahan + Pekerja

93,248.13

Keuntungan Max. 10 %

9,324.81

Jumlah Total

102,572.94

Dibulatkan

102,570.00

Daftar Analisa TARKIM

Halaman : 129+29

Analisa Satuan Pekerjaan

1
A.12.02

6=(3x5)

1 BUAH PASANG KUNCI TANAM BIASA


BAHAN :
Kunci Tanam biasa

1.0000

bh

87,350.00

Jumlah Bahan

87,350.00
87,350.00

UPAH :
Pekerja

0.0100

Oh

27,500.00

275.00

Tukang Kayu

0.5000

Oh

36,500.00

18,250.00

Kepala Tukang

0.0100

Oh

42,000.00

420.00

Mandor

0.0050

Oh

42,500.00

212.50

Jumlah Pekerja

19,157.50

Jumlah Bahan + Pekerja

106,507.50

Keuntungan Max. 10 %

A.12.03

10,650.75

Jumlah Total

117,158.25

Dibulatkan

117,150.00

1 BUAH PASANG KUNCI TANAM KAMAR MANDI


BAHAN :
Kunci Tanam Kamar Mandi

1.0000

bh

40,950.00

Jumlah Bahan

40,950.00
40,950.00

UPAH :
Pekerja

0.0050

Oh

27,500.00

137.50

Tukang Kayu

0.5000

Oh

36,500.00

18,250.00

Kepala Tukang

0.0050

Oh

42,000.00

210.00

Mandor

0.0025

Oh

42,500.00

106.25

Jumlah Pekerja

18,703.75

Jumlah Bahan + Pekerja

59,653.75

Keuntungan Max. 10 %

A.12.04

5,965.38

Jumlah Total

65,619.13

Dibulatkan

65,610.00

1 BUAH PASANG KUNCI SILINDER


BAHAN :
Kunci Silinder

1.0000

bh

204,750.00

Jumlah Bahan

204,750.00
204,750.00

UPAH :
Pekerja

0.0050

Oh

27,500.00

137.50

Tukang Kayu

0.5000

Oh

36,500.00

18,250.00

Kepala Tukang

0.0050

Oh

42,000.00

210.00

0.00025

Oh

42,500.00

10.63

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

18,608.13
223,358.13
22,335.81

Jumlah Total

245,693.94

Dibulatkan

245,690.00

Daftar Analisa TARKIM

Halaman : 130+29

Analisa Satuan Pekerjaan

1
A.12.05

6=(3x5)

1 BUAH PASANG ENGSEL PINTU


BAHAN :
Engsel pIntu

1.0000

bh

12,200.00

Jumlah Bahan

12,200.00
12,200.00

UPAH :
Pekerja

0.0150

Oh

27,500.00

412.50

Tukang Kayu

0.1000

Oh

36,500.00

3,650.00

Kepala Tukang

0.0150

Oh

42,000.00

630.00

0.00075

Oh

42,500.00

31.88

Mandor
Jumlah Pekerja

4,724.38

Jumlah Bahan + Pekerja

16,924.38

Keuntungan Max. 10 %

A.12.06

1,692.44

Jumlah Total

18,616.81

Dibulatkan

18,610.00

1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU


BAHAN :
Engsel Jendela

1.0000

bh

7,400.00

Jumlah Bahan

7,400.00
7,400.00

UPAH :
Pekerja

0.0100

Oh

27,500.00

275.00

Tukang Kayu

0.1000

Oh

36,500.00

3,650.00

Kepala Tukang

0.0100

Oh

42,000.00

420.00

0.00050

Oh

42,500.00

21.25

Mandor
Jumlah Pekerja

4,366.25

Jumlah Bahan + Pekerja

11,766.25

Keuntungan Max. 10 %

A.12.09

1,176.63

Jumlah Total

12,942.88

Dibulatkan

12,940.00

1 BUAH PASANG KAIT ANGIN


BAHAN :
Kait Angin

1.0000

ps

6,750.00

Jumlah Bahan

6,750.00
6,750.00

UPAH :
Pekerja

0.0150

Oh

27,500.00

412.50

Tukang Kayu

0.1500

Oh

36,500.00

5,475.00

Kepala Tukang

0.0150

Oh

42,000.00

630.00

Oh

42,500.00

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

0.00075

31.88
6,549.38
13,299.38
1,329.94

Jumlah Total

14,629.31

Dibulatkan

14,620.00

Daftar Analisa TARKIM

Halaman : 131+29

Analisa Satuan Pekerjaan

1
A.12.10

6=(3x5)

bh

129,600.00

1 BUAH PASANG DOOR CLOSER


BAHAN :
Door Closer

1.0000

Jumlah Bahan

129,600.00
129,600.00

UPAH :
Pekerja

0.0500

Oh

27,500.00

1,375.00

Tukang Kayu

0.5000

Oh

36,500.00

18,250.00

Kepala Tukang

0.0500

Oh

42,000.00

2,100.00

Oh

42,500.00

Mandor

0.00250

Jumlah Pekerja
Jumlah Bahan + Pekerja

151,431.25

Keuntungan Max. 10 %

A.12.11

106.25
21,831.25

15,143.13

Jumlah Total

166,574.38

Dibulatkan

166,570.00

1 BUAH PASANG KUNCI SELOT


BAHAN :
Kunci Selot

1.0000

bh

6,750.00

Jumlah Bahan

6,750.00
6,750.00

UPAH :
Pekerja

0.0200

Oh

27,500.00

550.00

Tukang Kayu

0.2000

Oh

36,500.00

7,300.00

Kepala Tukang

0.0200

Oh

42,000.00

840.00

Oh

42,500.00

Mandor

0.00100

Jumlah Pekerja
Jumlah Bahan + Pekerja

15,482.50

Keuntungan Max. 10 %

A.12.12

42.50
8,732.50

1,548.25

Jumlah Total

17,030.75

Dibulatkan

17,030.00

1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER


BAHAN :
Door Holder

1.0000

bh

23,000.00

Jumlah Bahan

23,000.00
23,000.00

UPAH :
Pekerja

0.0500

Oh

27,500.00

1,375.00

Tukang Kayu

0.5000

Oh

36,500.00

18,250.00

Kepala Tukang

0.0500

Oh

42,000.00

2,100.00

Oh

42,500.00

Mandor

0.00250

106.25

Jumlah Pekerja

21,831.25

Jumlah Bahan + Pekerja

44,831.25

Keuntungan Max. 10 %

4,483.13

Jumlah Total

49,314.38

Dibulatkan

49,310.00

Daftar Analisa TARKIM

Halaman : 132+29

Analisa Satuan Pekerjaan

1
A.12.14

6=(3x5)

1 BUAH PASANG REL PINTU DORONG


BAHAN :
Rel Pintu Dorong

1.0000

bh

64,800.00

Jumlah Bahan

64,800.00
64,800.00

UPAH :
Pekerja

0.0600

Oh

27,500.00

1,650.00

Tukang Kayu

0.6000

Oh

36,500.00

21,900.00

Kepala Tukang

0.0600

Oh

42,000.00

2,520.00

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

26,197.50

Jumlah Bahan + Pekerja

90,997.50

Keuntungan Max. 10 %

A.12.16

9,099.75

Jumlah Total

100,097.25

Dibulatkan

100,090.00

1 M2 PASANG KACA, TEBAL 3 MM


BAHAN :
Kaca

1.1000

m2

34,000.00

Jumlah Bahan

37,400.00
37,400.00

UPAH :
Pekerja

0.0150

Oh

27,500.00

412.50

Tukang Kayu

0.1500

Oh

36,500.00

5,475.00

Kepala Tukang

0.0150

Oh

42,000.00

630.00

Oh

42,500.00

31.88

Mandor

0.00075

Jumlah Pekerja

6,549.38

Jumlah Bahan + Pekerja

43,949.38

Keuntungan Max. 10 %

A.12.17

4,394.94

Jumlah Total

48,344.31

Dibulatkan

48,340.00

1 M2 PASANG KACA, TEBAL 5 MM


BAHAN :
Kaca

1.1000

m2

38,000.00

Jumlah Bahan

41,800.00
41,800.00

UPAH :
Pekerja

0.0150

Oh

27,500.00

412.50

Tukang Kayu

0.1500

Oh

36,500.00

5,475.00

Kepala Tukang

0.0150

Oh

42,000.00

630.00

Oh

42,500.00

31.88

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

0.00075

6,549.38
48,349.38
4,834.94

Jumlah Total

53,184.31

Dibulatkan

53,180.00

Daftar Analisa TARKIM

Halaman : 133+29

Analisa Satuan Pekerjaan

1
A.12.18

6=(3x5)

1 M2 PASANG KACA, TEBAL 8 MM


BAHAN :
Kaca

1.1000

m2

66,000.00

Jumlah Bahan

72,600.00
72,600.00

UPAH :
Pekerja

0.0165

Oh

27,500.00

453.75

Tukang Kayu

0.1650

Oh

36,500.00

6,022.50

Kepala Tukang

0.0165

Oh

42,000.00

693.00

Oh

42,500.00

34.00

Mandor

0.00080

Jumlah Pekerja

7,203.25

Jumlah Bahan + Pekerja

79,803.25

Keuntungan Max. 10 %

A.12.19

7,980.33

Jumlah Total

87,783.58

Dibulatkan

87,780.00

1 M2 PASANG KACA BURAM, TEBAL 12 MM


BAHAN :
Kaca Buram

1.1000

m2

Sealent

0.0500

kg

273,000.00

300,300.00
-

Jumlah Bahan

300,300.00

UPAH :
Pekerja

0.0250

Oh

27,500.00

687.50

Tukang Kayu

0.2500

Oh

36,500.00

9,125.00

Kepala Tukang

0.0250

Oh

42,000.00

1,050.00

Oh

42,500.00

53.13

Mandor

0.00125

Jumlah Pekerja

10,915.63

Jumlah Bahan + Pekerja

311,215.63

Keuntungan Max. 10 %

A.12.24

31,121.56

Jumlah Total

342,337.19

Dibulatkan

342,330.00

1 M2 PASANG KACA PATRI, TEBAL 5 MM


BAHAN :
Kaca Patri

1.1000

m2

38,000.00

Jumlah Bahan

41,800.00
41,800.00

UPAH :
Pekerja

0.0150

Oh

27,500.00

412.50

Tukang Kayu

0.1500

Oh

36,500.00

5,475.00

0.0150

Oh

42,000.00

630.00

Oh

42,500.00

31.88

Kepala Tukang
Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

0.00075

6,549.38
48,349.38
4,834.94

Jumlah Total

53,184.31

Dibulatkan

53,180.00

Daftar Analisa TARKIM

Halaman : 134+29

Analisa Satuan Pekerjaan

A.12.25

1 KG PEK. ERECTION KONST KUDA-KUDA BESI

6=(3x5)

Pekerja terampil

0.0010

org

31,500.00

31.50

Tukang besi profil terampil

0.0010

org

39,500.00

39.50

Kepala tukang besi profil

0.0002

org

47,500.00

9.50

Mandor

0.0001

org

42,500.00

4.25

Operator alat besar

0.0002

org

30,000.00

6.00

Pembantu operator

0.0200

org

26,000.00

520.00

Sewa alat ( Las Listrik + Tuckle )

0.0002

ls

28,750.00

5.75

Bahan bakar solar

0.0100

lt

5,500.00

55.00

Pelumas

0.0010

lt

23,800.00

23.80

Alat bantu

0.0002

lot

695.30

0.14

Jumlah

695.44

Keuntungan Max. 10 %

A.12.26

69.54

Jumlah

764.98

Dibulatkan

760.00

1 KG PEKERJAAN BAJA IWF EX DN


Besi IWF ex DN SII

1.0500

kg

9,250.00

Jumlah Bahan

9,712.50

9,712.50

UPAH :
Pekerja Terampil

0.0600

org

31,500.00

1,890.00

Tukang besi profil terampil

0.0040

org

42,000.00

168.00

Kepala tukang besi profil

0.0010

org

47,500.00

47.50

Mandor

0.0002

org

42,500.00

8.50

Peralatan ( Alat las, dll)

0.1250

lot

11,826.50

1,478.31

Jumlah Pekerja

3,592.31

Jumlah Bahan + Pekerja

13,304.81

Keuntungan Max. 10 %

A.12.27

1,330.48

Jumlah Total

14,635.29

Dibulatkan

14,630.00

1 KG PEKERJAAN BAJA EX JAPAN


Besi IWF ex Japan

1.0500

kg

10,900.00

Jumlah Bahan

11,445.00

11,445.00

UPAH :
Pekerja Terampil

0.0600

org

31,500.00

1,890.00

Tukang besi profil terampil

0.0040

org

42,000.00

168.00

Kepala tukang besi profil

0.0010

org

47,500.00

47.50

Mandor

0.0002

org

42,500.00

8.50

Peralatan ( Alat las, dll)

0.1250

lot

13,559.00

1,694.88

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

3,808.88
15,253.88
1,525.39

Jumlah Total

16,779.26

Dibulatkan

16,770.00

Dibulatkan

16,770.00

Daftar Analisa TARKIM

Halaman : 135+29

Analisa Satuan Pekerjaan

1
A.12.28

6=(3x5)

1 KG PEK. KONSTRUKSI BESI SIKU / PROFIL EX. DN


Besi profil / besi siku ex DN

1.0500

kg

10,900.00

Jumlah Bahan

11,445.00

11,445.00

UPAH :
Pekerja Terampil

0.0600

org

31,500.00

1,890.00

Tukang besi profil terampil

0.0040

org

42,000.00

168.00

Kepala tukang besi profil

0.0010

org

47,500.00

47.50

Mandor

0.0002

org

42,500.00

8.50

Peralatan ( Alat las, dll)

0.1250

lot

13,559.00

1,694.88

Jumlah Pekerja

3,808.88

Jumlah Bahan + Pekerja

15,253.88

Keuntungan Max. 10 %

A.12.29

1,525.39

Jumlah Total

16,779.26

Dibulatkan

16,770.00

1 Titik PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL = KAWAT 4 MM


Kawat las listrik

0.0400

kg

20,400.00

816.00

Bahan bakar solar

0.0300

Pelumas

0.0040

lt

5,500.00

165.00

lt

23,800.00

95.20

Jumlah Bahan

1,076.20

UPAH :
Pekerja Terampil

0.0040

org

31,500.00

126.00

Tukang besi profil terampil

0.0020

org

42,000.00

84.00

Kepala tukang besi profil

0.0020

org

47,500.00

95.00

Mandor

0.0010

org

42,500.00

42.50

Alat bantu ( Mesin Las Listrik)

0.2500

lot

1,423.70

355.93

Jumlah Pekerja

703.43

Jumlah Bahan + Pekerja

1,779.63

Keuntungan Max. 10 %

A.12.30

177.96

Jumlah Total

1,957.59

Dibulatkan

1,950.00

1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BOR


Pekerja Terampil

0.0500

org

31,500.00

1,575.00

Tukang besi profil terampil

0.0200

org

42,000.00

840.00

Kepala tukang besi profil

0.0030

org

47,500.00

142.50

Mandor

0.0010

org

42,500.00

42.50

Alat bantu ( Mesin Bor Listrik )

0.2500

lot

2,600.00

650.00

Jumlah
Keuntungan Max. 10 %

3,250.00
325.00

Jumlah

3,575.00

Dibulatkan

3,570.00

Daftar Analisa TARKIM

Halaman : 136+29

Analisa Satuan Pekerjaan

1
A.12.31

6=(3x5)

1 M2 PEKERJAAN BONDEX
Bondek

1.0100

110,500.00

111,605.00

Kawat las

0.1000

kg

20,400.00

2,040.00

Jumlah Bahan

113,645.00

UPAH :
Pekerja terampil

0.0500

org

31,500.00

1,575.00

Tukang besi profil setengah trampil

0.0300

org

38,000.00

1,140.00

Mandor

0.0100

org

42,500.00

425.00

Shear Connector

1.0000

ls

9,019.45

9,019.45

Jumlah Pekerja

12,159.45

Jumlah Bahan + Pekerja

125,804.45

Keuntungan Max. 10 %

A.12.32

12,580.45

Jumlah Total

138,384.90

Dibulatkan

138,380.00

1 M2 PEKERJAAN WIREMESH M8
Wiremesh M8

1.0100

31,200.00

31,512.00

Kawat las

0.1000

kg

20,400.00

2,040.00

Jumlah Bahan

33,552.00

UPAH :
Pekerja terampil

0.1000

org

31,500.00

3,150.00

Tukang besi profil setengah trampil

0.0750

org

38,000.00

2,850.00

Mandor

0.0100

org

42,500.00

425.00

Jumlah Pekerja

6,425.00

Jumlah Bahan + Pekerja

39,977.00

Keuntungan Max. 10 %

A.12.33

3,997.70

Jumlah Total

43,974.70

Dibulatkan

43,970.00

1 M1 PEK.PAGAR DEPAN TRALIS STANDARD


Galian Tanah

0.4500

12,700.00

5,715.00

Urugan Pasir 10 cm'

0.0800

74,675.00

5,974.00

Pasang Aanstamping

0.1200

155,600.50

18,672.06

Pas.Batu Belah 1 pc : 4 psr

0.2000

355,807.50

71,161.50

Plesteran & Acian 1 pc : 4 psr

0.4100

18,117.50

7,428.18

Beton Tulang ( 100 kg/m3 )

0.0563

1,510,727.50

84,978.42

Pagar Tralis

1.5000

m'

450,000.00

675,000.00

Pengecatan

1.0000

25,172.70

25,172.70

Jumlah
Keuntungan Max. 10 %

894,101.86
89,410.19

Jumlah

983,512.04

Dibulatkan

983,510.00

Daftar Analisa TARKIM

Halaman : 137+29

Analisa Satuan Pekerjaan

1
A.12.34

6=(3x5)

1 M1 PEK. PAGAR BELAKANG / SAMPING


Galian Tanah

0.4500

12,700.00

5,715.00

Urugan Pasir 10 cm'

0.0800

74,675.00

5,974.00

Pasang Aanstamping

0.1200

155,600.50

18,672.06

Pas.Batu Belah 1 pc : 4 psr

0.2000

355,807.50

71,161.50

Pas.bata + plesteran 1 : 4

1.8000

79,896.35

143,813.43

Beton Tulang ( 100 kg/m3 )

0.0563

1,510,727.50

84,978.42

Besi Siku

1.0000

kg

8,950.00

8,950.00

Kawat Duri

3.0000

m1

2,350.00

7,050.00

Pengecatan

1.0000

12,259.25

12,259.25

Jumlah

358,573.66

Keuntungan Max. 10 %

A.13.02

35,857.37

Jumlah

394,431.03

Dibulatkan

394,430.00

1 M2 PASANG LANTAI TEGEL BADAK ABU-ABU UKURAN 30X30 CM


BAHAN :
Tegel Badak Abu-abu 30x30 cm

11.8700

bh

2,350.00

27,894.50

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0215

m3

65,000.00

Jumlah Bahan

1,397.50
37,692.00

UPAH :
Pekerja

0.2600

Oh

27,500.00

7,150.00

Tukang Batu

0.1250

Oh

34,000.00

4,250.00

Kepala Tukang

0.0125

Oh

39,500.00

493.75

Oh

42,500.00

55.25

Mandor

0.00130

Jumlah Pekerja

11,949.00

Jumlah Bahan + Pekerja

49,641.00

Keuntungan Max. 10 %

A.13.09

4,964.10

Jumlah Total

54,605.10

Dibulatkan

54,600.00

1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40X40 CM


BAHAN :
Ubin Granito 40x40 cm

6.9300

bh

41,363.64

286,650.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0215

m3

65,000.00

1,397.50

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

298,947.50

UPAH :
Pekerja

0.2500

Oh

27,500.00

6,875.00

Tukang Batu

0.1200

Oh

34,000.00

4,080.00

Kepala Tukang

0.0120

Oh

39,500.00

474.00

Oh

42,500.00

53.13

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

0.00125

11,482.13
310,429.63
31,042.96

Jumlah Total

341,472.59

Dibulatkan

341,470.00

Daftar Analisa TARKIM

Halaman : 138+29

Analisa Satuan Pekerjaan

1
A.13.42

6=(3x5)

1 M2 PASANG LANTAI KERAMIK 10 X 20 CM


BAHAN :
Ubin Keramik 10 x 20 cm

50.0000

bh

900.00

45,000.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0420

m3

65,000.00

2,730.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

58,630.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

30,460.00

Jumlah Bahan + Pekerja

89,090.00

Keuntungan Max. 10 %

A.13.44

8,909.00

Jumlah Total

97,999.00

Dibulatkan

97,990.00

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


BAHAN :
Ubin Keramik 20 x 20 cm

25.0000

bh

1,800.00

45,000.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0420

m3

65,000.00

2,730.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

58,630.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

30,460.00

Jumlah Bahan + Pekerja

89,090.00

Keuntungan Max. 10 %

8,909.00

Jumlah Total

97,999.00

Dibulatkan

97,990.00

Daftar Analisa TARKIM

Halaman : 139+29

Analisa Satuan Pekerjaan

1
A.13.45

6=(3x5)

1 M2 PASANG LANTAI KERAMIK 25 X 25 CM


BAHAN :
Ubin Keramik 25 x 25 cm

16.0000

bh

2,687.50

43,000.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0420

m3

65,000.00

2,730.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

56,630.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

30,460.00

Jumlah Bahan + Pekerja

87,090.00

Keuntungan Max. 10 %

A.13.46

8,709.00

Jumlah Total

95,799.00

Dibulatkan

95,790.00

1 M2 PASANG LANTAI KERAMIK 15 X 20 CM


BAHAN :
Ubin Keramik 15 x 20 cm

35.0000

bh

1,285.71

45,000.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0420

m3

65,000.00

2,730.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

58,630.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

30,460.00

Jumlah Bahan + Pekerja

89,090.00

Keuntungan Max. 10 %

8,909.00

Jumlah Total

97,999.00

Dibulatkan

97,990.00

Daftar Analisa TARKIM

Halaman : 140+29

Analisa Satuan Pekerjaan

1
A.13.47

6=(3x5)

1 M2 PASANG LANTAI KERAMIK 33 X 33 CM


BAHAN :
Ubin Keramik 33 x 33 cm

10.0000

bh

5,500.00

55,000.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0420

m3

65,000.00

2,730.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

68,630.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

30,460.00

Jumlah Bahan + Pekerja

99,090.00

Keuntungan Max. 10 %

A.13.48

9,909.00

Jumlah Total

108,999.00

Dibulatkan

108,990.00

1 M2 PASANG LANTAI KERAMIK 33 X 33 CM ANTISLIP


BAHAN :
Ubin Keramik 33 x 33 cm Antislip

10.0000

bh

6,000.00

60,000.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0420

m3

65,000.00

2,730.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

73,630.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

127.50

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

0.00300

30,460.00
104,090.00
10,409.00

Jumlah Total

114,499.00

Dibulatkan

114,490.00

Daftar Analisa TARKIM

Halaman : 141+29

Analisa Satuan Pekerjaan

1
A.13.49

6=(3x5)

1 M2 PASANG LANTAI KERAMIK 10 X 33 CM


BAHAN :
Ubin Keramik 10 x 33 cm

33.0000

bh

1,666.67

55,000.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0420

m3

65,000.00

2,730.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

68,630.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

30,460.00

Jumlah Bahan + Pekerja

99,090.00

Keuntungan Max. 10 %

A.13.51

9,909.00

Jumlah Total

108,999.00

Dibulatkan

108,990.00

1 M2 PASANG LANTAI MARMER


BAHAN :
Marmer

1.0520

bh

180,800.00

190,201.60

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0390

m3

65,000.00

2,535.00

Semen Warna

2.0000

kg

5,000.00

Jumlah Bahan

10,000.00
211,136.60

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

1,275.00

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

0.03000

31,607.50
242,744.10
24,274.41

Jumlah Total

267,018.51

Dibulatkan

267,010.00

Daftar Analisa TARKIM

Halaman : 142+29

Analisa Satuan Pekerjaan

1
A.13.56

6=(3x5)

1 M2 PASANG LANTAI PARQUET JATI


BAHAN :
Parquet Jati

1.0500

m2

320,000.00

336,000.00

Lem Vinyl

0.6000

kg

13,000.00

7,800.00

Jumlah Bahan

343,800.00

UPAH :
Pekerja

0.6500

Oh

27,500.00

17,875.00

Tukang

0.3500

Oh

39,500.00

13,825.00

0.0350

Oh

42,000.00

1,470.00

Oh

42,500.00

1,381.25

Kepala Tukang
Mandor

0.03250

Jumlah Pekerja

34,551.25

Jumlah Bahan + Pekerja

378,351.25

Keuntungan Max. 10 %

A.13.58

37,835.13

Jumlah Total

416,186.38

Dibulatkan

416,180.00

1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH


BAHAN :
Porselen 11 x 11 cm

83.0000

bh

418.07

34,700.00

Semen Abu-abu

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0180

m3

65,000.00

1,170.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

46,770.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.5000

Oh

34,000.00

17,000.00

0.0500

Oh

39,500.00

1,975.00

Oh

42,500.00

127.50

Kepala Tukang
Mandor

0.00300

Jumlah Pekerja

36,152.50

Jumlah Bahan + Pekerja

82,922.50

Keuntungan Max. 10 %

8,292.25

Jumlah Total

91,214.75

Dibulatkan

91,210.00

Daftar Analisa TARKIM

Halaman : 143+29

Analisa Satuan Pekerjaan

1
A.13.59

6=(3x5)

1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA


BAHAN :
Porselen 11 x 11 cm, Warna

83.0000

bh

484.34

40,200.00

Semen Abu-abu

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0180

m3

65,000.00

1,170.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

52,270.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.5000

Oh

34,000.00

17,000.00

Kepala Tukang

0.0500

Oh

39,500.00

1,975.00

Oh

42,500.00

Mandor

0.00300

36,152.50

Jumlah Bahan + Pekerja

88,422.50

Keuntungan Max. 10 %

A.13.62

127.50

Jumlah Pekerja

8,842.25

Jumlah Total

97,264.75

Dibulatkan

97,260.00

1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNA


BAHAN :
Porselen 10 x 20 cm, Warna

50.0000

bh

900.00

45,000.00

Semen Abu-abu

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0180

m3

65,000.00

1,170.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

57,070.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Batu

0.4500

Oh

34,000.00

15,300.00

Kepala Tukang

0.0450

Oh

39,500.00

1,777.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

33,705.00

Jumlah Bahan + Pekerja

90,775.00

Keuntungan Max. 10 %

9,077.50

Jumlah Total

99,852.50

Dibulatkan

99,850.00

Daftar Analisa TARKIM

Halaman : 144+29

Analisa Satuan Pekerjaan

1
A.13.63

6=(3x5)

1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNA


BAHAN :
Porselen 20 x 20 cm, Warna

25.0000

bh

1,800.00

45,000.00

Semen Abu-abu

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0180

m3

65,000.00

1,170.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

57,070.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Batu

0.4500

Oh

34,000.00

15,300.00

Kepala Tukang

0.0450

Oh

39,500.00

1,777.50

Oh

42,500.00

1,275.00

Mandor

0.03000

Jumlah Pekerja

34,852.50

Jumlah Bahan + Pekerja

91,922.50

Keuntungan Max. 10 %

A.13.66

9,192.25

Jumlah Total

101,114.75

Dibulatkan

101,110.00

1 M2 PASANG DINDING KERAMIK 10 X 20 CM,


BAHAN :
Keramik 10 x 20 cm

50.0000

bh

900.00

45,000.00

Semen Abu-abu

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0180

m3

65,000.00

1,170.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

57,070.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Batu

0.4500

Oh

34,000.00

15,300.00

Kepala Tukang

0.0450

Oh

39,500.00

1,777.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

33,705.00

Jumlah Bahan + Pekerja

90,775.00

Keuntungan Max. 10 %

9,077.50

Jumlah Total

99,852.50

Dibulatkan

99,850.00

Daftar Analisa TARKIM

Halaman : 145+29

Analisa Satuan Pekerjaan

1
A.13.68

6=(3x5)

1 M2 PASANG DINDING KERAMIK 20 X 20 CM,


BAHAN :
Keramik 20 x 20 cm

25.0000

bh

1,800.00

45,000.00

Semen Abu-abu

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0180

m3

65,000.00

1,170.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

57,070.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Batu

0.1000

Oh

34,000.00

3,400.00

Kepala Tukang

0.0450

Oh

39,500.00

1,777.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

21,805.00

Jumlah Bahan + Pekerja

78,875.00

Keuntungan Max. 10 %

A.13.69

7,887.50

Jumlah Total

86,762.50

Dibulatkan

86,760.00

1 M2 PASANG DINDING KERAMIK 10 X 20 CM,


BAHAN :
Keramik 10 x 20 cm

50.0000

bh

900.00

45,000.00

Semen Abu-abu

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0180

m3

65,000.00

1,170.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

57,070.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Batu

0.1250

Oh

34,000.00

4,250.00

Kepala Tukang

0.0125

Oh

39,500.00

493.75

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

21,371.25

Jumlah Bahan + Pekerja

78,441.25

Keuntungan Max. 10 %

7,844.13

Jumlah Total

86,285.38

Dibulatkan

86,280.00

Daftar Analisa TARKIM

Halaman : 146+29

Analisa Satuan Pekerjaan

1
A.13.70

6=(3x5)

1 M2 PASANG DINDING MARMER


BAHAN :
Marmer

1.0200

m2

180,800.00

184,416.00

Paku Cacing

2.0000

bh

12,500.00

25,000.00

12.4400

kg

1,000.00

12,440.00

Pasir Pasang

0.0250

m3

65,000.00

1,625.00

Semen Warna

0.5000

kg

5,000.00

Semen Abu-abu

Jumlah Bahan

2,500.00
225,981.00

UPAH :
Pekerja

0.7200

Oh

27,500.00

19,800.00

Tukang Batu

0.6500

Oh

34,000.00

22,100.00

Kepala Tukang

0.0650

Oh

39,500.00

2,567.50

Oh

42,500.00

148.75

Mandor

0.0035

Jumlah Pekerja

44,616.25

Jumlah Bahan + Pekerja

270,597.25

Keuntungan Max. 10 %

A.13.74

27,059.73

Jumlah Total

297,656.98

Dibulatkan

297,650.00

1 M2 PASANG DINDING BATU TEMPEL


BAHAN :
Batu Tempel Hitam
Semen Abu-abu

1.0500

m2

117,000.00

122,850.00

11.7500

kg

1,000.00

11,750.00

0.0350

m3

65,000.00

2,275.00

Pasir Pasang
Jumlah Bahan

136,875.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

127.50

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

0.0030

30,460.00
167,335.00
16,733.50

Jumlah Total

184,068.50

Dibulatkan

184,060.00

Daftar Analisa TARKIM

Halaman : 147+29

Analisa Satuan Pekerjaan

1
A.13.75

6=(3x5)

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS


BAHAN :
Ubin Keramik 30 x 30 cm

12.0000

bh

3,412.50

40,950.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0420

m3

65,000.00

2,730.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

54,580.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

Mandor

0.00300

30,460.00

Jumlah Bahan + Pekerja

85,040.00

Keuntungan Max. 10 %

A.13.76

127.50

Jumlah Pekerja

8,504.00

Jumlah Total

93,544.00

Dibulatkan

93,540.00

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP


BAHAN :
Ubin Keramik 30 x 30 cm Warna/Corak/Anti Slip

12.0000

bh

3,954.17

47,450.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0420

m3

65,000.00

2,730.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

61,080.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

30,460.00

Jumlah Bahan + Pekerja

91,540.00

Keuntungan Max. 10 %

9,154.00

Jumlah Total

100,694.00

Dibulatkan

100,690.00

Daftar Analisa TARKIM

Halaman : 148+29

Analisa Satuan Pekerjaan

1
A.13.77

6=(3x5)

1 M2 PASANG LANTAI KERAMIK 40 X 40 CM


BAHAN :
Ubin Keramik 40 x 40 cm

12.0000

bh

4,550.00

54,600.00

Semen Portland

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0420

m3

65,000.00

2,730.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

68,230.00

UPAH :
Pekerja

0.6200

Oh

27,500.00

17,050.00

Tukang Batu

0.3500

Oh

34,000.00

11,900.00

Kepala Tukang

0.0350

Oh

39,500.00

1,382.50

Oh

42,500.00

Mandor

0.00300

30,460.00

Jumlah Bahan + Pekerja

98,690.00

Keuntungan Max. 10 %

A.13.78

127.50

Jumlah Pekerja

9,869.00

Jumlah Total

108,559.00

Dibulatkan

108,550.00

1 M2 PASANG DINDING KERAMIK 20 X 25 CM,


BAHAN :
Keramik 20 x 25 cm

20.0000

bh

2,150.00

43,000.00

Semen Abu-abu

8.4000

kg

1,000.00

8,400.00

Pasir Pasang

0.0180

m3

65,000.00

1,170.00

Semen Warna

0.5000

kg

5,000.00

2,500.00

Jumlah Bahan

55,070.00

UPAH :
Pekerja

0.6000

Oh

27,500.00

16,500.00

Tukang Batu

0.4500

Oh

34,000.00

15,300.00

Kepala Tukang

0.0450

Oh

39,500.00

1,777.50

Oh

42,500.00

127.50

Mandor

0.00300

Jumlah Pekerja

33,705.00

Jumlah Bahan + Pekerja

88,775.00

Keuntungan Max. 10 %

8,877.50

Jumlah Total

97,652.50

Dibulatkan

97,650.00

Daftar Analisa TARKIM

Halaman : 149+29

Analisa Satuan Pekerjaan

1
A.13.82

6=(3x5)

1 M2 PASANG PLINT KAYU 2 X 10 CM


BAHAN :
Kayu Jati Papan

0.0024

m3

7,825,000.00

18,780.00

Paku Skrup 3-5

0.0500

kg

6,750.00

337.50

Jumlah Bahan

19,117.50

UPAH :
Pekerja

0.1200

Oh

27,500.00

3,300.00

Tukang Kayu

0.1200

Oh

36,500.00

4,380.00

Kepala Tukang

0.0120

Oh

42,000.00

504.00

Oh

42,500.00

255.00

Mandor

0.0060

Jumlah Pekerja

8,439.00

Jumlah Bahan + Pekerja

27,556.50

Keuntungan Max. 10 %

A.13.83

2,755.65

Jumlah Total

30,312.15

Dibulatkan

30,310.00

1 M2 PASANGAN PAVING BLOCK WARNA (6 CM)


BAHAN :
Paving Block Warna 6 cm

1.0100

m2

28,600.00

28,886.00

Pasir Beton

0.1000

75,000.00

7,500.00

Jumlah Bahan

36,386.00

UPAH :
Pekerja

0.2500

org

27,500.00

6,875.00

Tukang Batu

0.5000

org

34,000.00

17,000.00

Kepala Tukang Batu

0.0250

org

39,500.00

987.50

Mandor

0.0030

org

42,500.00

127.50

Jumlah Pekerja

24,990.00

Jumlah Bahan + Pekerja

61,376.00

Keuntungan Max. 10 %

A.13.84

6,137.60

Jumlah

67,513.60

Dibulatkan

67,510.00

1 M2 PASANGAN PAVING BLOCK WARNA (8 CM)


BAHAN :
Paving Block Warna 8 cm

1.0100

m2

30,000.00

30,300.00

Pasir Beton

0.1000

75,000.00

7,500.00

Jumlah Bahan

37,800.00

UPAH :
Pekerja

0.2500

org

27,500.00

6,875.00

Tukang Batu

0.5000

org

34,000.00

17,000.00

Kepala Tukang Batu

0.0250

org

39,500.00

987.50

Mandor

0.0030

org

42,500.00

127.50

Jumlah Pekerja

24,990.00

Jumlah Bahan + Pekerja

62,790.00

Keuntungan Max. 10 %

6,279.00

Jumlah

69,069.00

Dibulatkan

69,060.00

Daftar Analisa TARKIM

Halaman : 150+29

Analisa Satuan Pekerjaan

1
A.13.85

6=(3x5)

1 M2 PASANGAN BATU CANDI


BAHAN :
Batu Candi

1.0100

m2

95,000.00

95,950.00

Pasir Beton

0.1000

75,000.00

7,500.00

Jumlah Bahan

103,450.00

UPAH :
Pekerja

0.2500

org

27,500.00

6,875.00

Tukang Batu

0.5000

org

34,000.00

17,000.00

Kepala Tukang Batu

0.0250

org

39,500.00

987.50

Mandor

0.0030

org

42,500.00

127.50

Jumlah Pekerja

24,990.00

Jumlah Bahan + Pekerja

128,440.00

Keuntungan Max. 10 %

A.13.86

12,844.00

Jumlah

141,284.00

Dibulatkan

141,280.00

1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM)


BAHAN :
Paving Block Natural 6 cm

1.0100

26,000.00

26,260.00

Pasir Beton

0.1000

75,000.00

7,500.00

Jumlah Bahan

33,760.00

UPAH :
Pekerja

0.2500

org

27,500.00

6,875.00

Tukang Batu

0.5000

org

34,000.00

17,000.00

Kepala Tukang Batu

0.0250

org

39,500.00

987.50

Mandor

0.0030

org

42,500.00

24,990.00

Jumlah Bahan + Pekerja

58,750.00

Keuntungan Max. 10 %

A.13.87

127.50

Jumlah Pekerja

5,875.00

Jumlah

64,625.00

Dibulatkan

64,620.00

1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM)


BAHAN :
Paving Block Natural 8 cm

1.0100

27,000.00

27,270.00

Pasir Beton

0.1000

75,000.00

7,500.00

Jumlah Bahan

34,770.00

UPAH :
Pekerja

0.2500

org

27,500.00

6,875.00

Tukang Batu

0.5000

org

34,000.00

17,000.00

Kepala Tukang Batu

0.0250

org

39,500.00

987.50

Mandor

0.0030

org

42,500.00

127.50

Jumlah Pekerja

24,990.00

Jumlah Bahan + Pekerja

59,760.00

Keuntungan Max. 10 %

5,976.00

Jumlah

65,736.00

Dibulatkan

65,730.00

Daftar Analisa TARKIM

Halaman : 151+29

Analisa Satuan Pekerjaan

1
A.14.07

6=(3x5)

1 M2 PENGECATAN BIDANG KAYU LAMA


BAHAN :
Plamir

0.1500

kg

11,000.00

1,650.00

Cat dasar

0.1700

kg

38,000.00

6,460.00

Cat Penutup

0.1700

kg

38,000.00

6,460.00

Jumlah Bahan

14,570.00

UPAH :
Pekerja

0.0700

Oh

27,500.00

1,925.00

Tukang Cat

0.0750

Oh

36,500.00

2,737.50

0.0075

Oh

42,000.00

315.00

Oh

42,500.00

106.25

Kepala Tukang
Mandor

0.0025

Jumlah Pekerja

5,083.75

Jumlah Bahan + Pekerja

19,653.75

Keuntungan Max. 10 %

A.14.08

1,965.38

Jumlah Total

21,619.13

Dibulatkan

21,610.00

1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
BAHAN :
Cat Meni

0.2000

kg

38,000.00

7,600.00

Plamir

0.1500

kg

12,000.00

1,800.00

Cat dasar

0.1700

kg

38,000.00

6,460.00

Cat Penutup

0.2600

kg

38,000.00

9,880.00

Jumlah Bahan

25,740.00

UPAH :
Pekerja

0.0700

Oh

27,500.00

1,925.00

Tukang Cat

0.0090

Oh

36,500.00

328.50

Kepala Tukang

0.0060

Oh

42,000.00

252.00

Oh

42,500.00

Mandor
Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

0.0025

106.25
2,611.75
28,351.75
2,835.18

Jumlah Total

31,186.93

Dibulatkan

31,180.00

Daftar Analisa TARKIM

Halaman : 152+29

Analisa Satuan Pekerjaan

1
A.14.12

6=(3x5)

1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER


BAHAN :
Residu atau Ter

0.3500

ltr

650.00

227.50

Jumlah Bahan

227.50

UPAH :
Pekerja

Oh

27,500.00

Tukang Cat

Oh

36,500.00

Kepala Tukang

Oh

42,000.00

Oh

42,500.00

Mandor

0.1000

0.0060

2,750.00

255.00

Jumlah Pekerja

3,005.00

Jumlah Bahan + Pekerja

3,232.50

Keuntungan Max. 10 %

A.14.14

323.25

Jumlah Total

3,555.75

Dibulatkan

3,550.00

1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
BAHAN :
Plamir

0.1000

ltr

12,000.00

1,200.00

Cat dasar

0.1000

kg

8,000.00

800.00

Cat Penutup 2 x

0.2600

lbr

8,000.00

2,080.00

Jumlah Bahan

4,080.00

UPAH :
Pekerja

0.0200

Oh

27,500.00

550.00

Tukang Cat

0.0630

Oh

36,500.00

2,299.50

0.0063

Oh

42,000.00

264.60

Oh

42,500.00

106.25

Kepala Tukang
Mandor

0.0025

Jumlah Pekerja

3,220.35

Jumlah Bahan + Pekerja

7,300.35

Keuntungan Max. 10 %

A.14.15

730.04

Jumlah Total

8,030.39

Dibulatkan

8,030.00

1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


BAHAN :
Cat dasar

0.1200

kg

8,000.00

960.00

Cat Penutup 2 x

0.1800

lbr

8,000.00

1,440.00

Jumlah Bahan

2,400.00

UPAH :
Pekerja

0.0280

Oh

27,500.00

770.00

Tukang Cat

0.0420

Oh

36,500.00

1,533.00

0.0042

Oh

42,000.00

176.40

Oh

42,500.00

106.25

Kepala Tukang
Mandor

0.0025

Jumlah Pekerja

2,585.65

Jumlah Bahan + Pekerja

4,985.65

Keuntungan Max. 10 %

498.57

Jumlah Total

5,484.22

Dibulatkan

5,480.00

Daftar Analisa TARKIM

Halaman : 153+29

Analisa Satuan Pekerjaan

1
A.14.19

6=(3x5)

1 M2 PEMASANGAN WALL PAPER


BAHAN :
Walpapaer

1.2000

m3

Perekat

0.2000

kg

Jumlah Bahan

UPAH :
Pekerja

0.0200

Oh

27,500.00

550.00

Tukang Cat

0.2000

Oh

36,500.00

7,300.00

Kepala Tukang

0.0020

Oh

42,000.00

84.00

Oh

42,500.00

106.25

Mandor

0.0025

Jumlah Pekerja

8,040.25

Jumlah Bahan + Pekerja

8,040.25

Keuntungan Max. 10 %

A.14.21

804.03

Jumlah Total

8,844.28

Dibulatkan

8,840.00

1 M2 PLITURAN BIDANG KAYU (BIASA)


BAHAN :
Dempul plitur (dempul kasar)

0.0300

kg

2,750.00

82.50

Wood Filer (INFRA)

0.2000

kg

27,300.00

5,460.00

Oker putih

0.0200

kg

29,000.00

580.00

Oker warna

0.0100

kg

29,000.00

290.00

Batu Apung (gosok)

0.1000

kg

9,750.00

975.00

Sirlak ex India

0.2000

kg

16,000.00

3,200.00

Kwas 3"

0.0100

bh

9,750.00

97.50

Spirtus

0.2000

ltr

8,200.00

1,640.00

Ampelas kayu

0.1000

lbr

2,000.00

200.00

Jumlah Bahan

12,525.00

UPAH :
Pekerja

0.2500

org

27,500.00

6,875.00

Tk. Cat/Plitur

0.0285

org

36,500.00

1,040.25

Kep. tukang cat/plitur

0.0040

org

42,000.00

168.00

Mandor

0.0020

org

42,500.00

85.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

8,168.25
20,693.25
2,069.33

Jumlah Total

22,762.58

Dibulatkan

22,760.00

Daftar Analisa TARKIM

Halaman : 154+29

Analisa Satuan Pekerjaan

1
A.14.24

6=(3x5)

1 M2 PENGECATAN PLAFOND DAN DINDING (INTERIOR ICI)


BAHAN :
Cat tembok ICI / Sekelasnya

0.2500

lt

20,475.00

5,118.75

Cat dasar sebelum pengecatan

0.1250

lt

66,300.00

8,287.50

Rol cat

0.0100

bh

20,475.00

204.75

Ampelas

0.5000

lbr

2,000.00

1,000.00

Jumlah Bahan

14,611.00

UPAH :
Pekerja

0.2000

org

27,500.00

5,500.00

Tk. cat

0.3000

org

36,500.00

10,950.00

Kep. tukang cat

0.0300

org

42,000.00

1,260.00

Mandor

0.0100

org

42,500.00

425.00

Jumlah Pekerja

18,135.00

Jumlah Bahan + Pekerja

32,746.00

Keuntungan Max. 10 %

A.14.25

3,274.60

Jumlah

36,020.60

Dibulatkan

36,020.00

1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x)


BAHAN :
Cat tembok Vinilex / Sekelas Vinilex

0.1750

kg

11,500.00

2,012.50

Plamir tembok
Rol cat

0.1600

kg

12,000.00

1,920.00

0.0100

bh

20,475.00

204.75

Ampelas

0.5000

lbr

2,000.00

1,000.00

Jumlah Bahan

5,137.25

UPAH :
Pekerja

0.1040

org

27,500.00

2,860.00

Tk. cat

0.0182

org

36,500.00

664.30

Kep. tukang cat

0.0090

org

42,000.00

378.00

Mandor

0.0045

org

42,500.00

191.25

Jumlah Pekerja

4,093.55

Jumlah Bahan + Pekerja

9,230.80

Keuntungan Max. 10 %

923.08

Jumlah

10,153.88

Dibulatkan

10,150.00

Daftar Analisa TARKIM

Halaman : 155+29

Analisa Satuan Pekerjaan

1
A.14.26

6=(3x5)

1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x)


BAHAN :
Cat tembok Vinilex / Sekelas Vinilex

0.2000

kg

11,500.00

2,300.00

Plamir tembok

0.1600

kg

12,000.00

1,920.00

Rol cat

0.0100

bh

20,475.00

204.75

Ampelas

0.5000

lbr

2,000.00

1,000.00

Jumlah Bahan

5,424.75

UPAH :
Pekerja

0.2000

org

27,500.00

5,500.00

Tk. cat

0.0280

org

36,500.00

1,022.00

Kep. tukang cat

0.0150

org

42,000.00

630.00

Mandor

0.0090

org

42,500.00

382.50

Jumlah Pekerja

7,534.50

Jumlah Bahan + Pekerja

12,959.25

Keuntungan Max. 10 %

A.14.28

1,295.93

Jumlah

14,255.18

Dibulatkan

14,250.00

1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x)


BAHAN :
Cat tembok Sanlex / Sekelas Sanlex

0.1750

kg

8,000.00

1,400.00

Plamir tembok

0.1600

kg

12,000.00

1,920.00

Rol cat

0.0100

bh

20,475.00

204.75

Ampelas

0.5000

lbr

2,000.00

1,000.00

Jumlah Bahan

4,524.75

UPAH :
Pekerja

0.1040

org

27,500.00

2,860.00

Tk. cat

0.0182

org

36,500.00

664.30

Kep. tukang cat

0.0090

org

42,000.00

378.00

Mandor

0.0045

org

42,500.00

191.25

Jumlah Pekerja

4,093.55

Jumlah Bahan + Pekerja

8,618.30

Keuntungan Max. 10 %

861.83

Jumlah

9,480.13

Dibulatkan

9,480.00

Daftar Analisa TARKIM

Halaman : 156+29

Analisa Satuan Pekerjaan

1
A.14.29

6=(3x5)

1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x)


BAHAN :
Cat tembok Sanlex / Sekelas Sanlex

0.2000

kg

8,000.00

1,600.00

Plamir tembok

0.1600

kg

12,000.00

1,920.00

Rol cat

0.0100

bh

20,475.00

204.75

Ampelas

0.5000

lbr

2,000.00

1,000.00

Jumlah Bahan

4,724.75

UPAH :
Pekerja

0.2000

org

27,500.00

5,500.00

Tk. cat

0.0280

org

36,500.00

1,022.00

Kep. tukang cat

0.0150

org

42,000.00

630.00

Mandor

0.0090

org

42,500.00

Jumlah Pekerja
Jumlah Bahan + Pekerja

12,259.25

Keuntungan Max. 10 %

A.14.30

382.50
7,534.50

1,225.93

Jumlah

13,485.18

Dibulatkan

13,480.00

1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI


BAHAN :
Meni kayu

0.1670

kg

15,600.00

Plamir kayu

0.0830

kg

11,000.00

913.00

Cat kayu sekelas SEIV

0.2000

kg

44,000.00

8,800.00

Amplas kayu

0.4000

lbr

2,000.00

800.00

Minyak cat terpentin

0.1500

ltr

3,900.00

585.00

Kwas 3"

0.0500

bh

9,750.00

487.50

Jumlah Bahan

2,605.20

14,190.70

UPAH :
Pekerja

0.2000

org

27,500.00

5,500.00

Tk. Cat

0.0600

org

36,500.00

2,190.00

Kep. tukang cat

0.0300

org

42,000.00

1,260.00

Mandor

0.0100

org

42,500.00

425.00

Jumlah Pekerja
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

9,375.00
23,565.70
2,356.57

Jumlah

25,922.27

Dibulatkan

25,920.00

Daftar Analisa TARKIM

Halaman : 157+29

Analisa Satuan Pekerjaan

1
A.14.31

6=(3x5)

1 M2 PENGECATAN BESI (3X)


BAHAN :
Meni besi

0.1670

kg

15,600.00

2,605.20

Cat besi sekelas Seiv


Amplas besi

0.2000

kg

42,250.00

8,450.00

0.4000

lbr

2,000.00

800.00

Minyak cat / thiner B

0.1500

ltr

16,500.00

2,475.00

Kwas 3"

0.0500

bh

9,750.00

Jumlah Bahan

487.50
14,817.70

UPAH :
Pekerja

0.2000

org

31,500.00

6,300.00

Tk. Cat

0.0600

org

39,500.00

2,370.00

Kep. tukang cat

0.0300

org

42,000.00

1,260.00

Mandor

0.0100

org

42,500.00

425.00

Jumlah Pekerja

10,355.00

Jumlah Bahan + Pekerja

25,172.70

Keuntungan Max. 10 %

A.14.32

2,517.27

Jumlah

27,689.97

Dibulatkan

27,680.00

1 M2 PENGECATAN BIDANG KAYU LAMA BERCAT


BAHAN :
Ampelas Kayu

0.2500

lbr

2,000.00

500.00

Cat kayu sekelas SEIV


Kwas 3"

0.1700

kg

44,000.00

7,480.00

0.0500

bh

9,750.00

487.50

Jumlah Bahan

8,467.50

UPAH :
Pembantu Tukang

0.2000

org

27,500.00

5,500.00

Tk. Cat

0.0750

org

36,500.00

2,737.50

Kep. tukang cat

0.0300

org

42,000.00

1,260.00

Mandor

0.0100

org

42,500.00

425.00

Jumlah Pekerja

9,922.50

Jumlah Bahan + Pekerja

18,390.00

Keuntungan Max. 10 %

A.14.33

1,839.00

Jumlah

20,229.00

Dibulatkan

20,220.00

1 M2 PENGECATAN DINDING (LAMA)


BAHAN :
Cat Tembok sekelas Sanlex

0.1700

Kg

8,000.00

Roll Cat

0.0100

bh

20,475.00

1,360.00

Ampelas

0.2500

lbr

2,000.00

Jumlah Bahan

204.75
500.00
2,064.75

UPAH :
Pembantu Tukang

0.0700

org

27,500.00

1,925.00

Tk. Cat

0.0750

org

36,500.00

2,737.50

Kep. tukang cat

0.0075

org

42,000.00

315.00

Mandor

0.0025

org

42,500.00

106.25

Jumlah Pekerja

Daftar Analisa TARKIM

5,083.75

Halaman : 158+29

Analisa Satuan Pekerjaan

2
Jumlah Bahan + Pekerja
Keuntungan Max. 10 %

6=(3x5)
7,148.50
714.85

Jumlah

7,863.35

Dibulatkan

7,860.00

Daftar Analisa TARKIM

Halaman : 159+29

Analisa Satuan Pekerjaan

A002

6=(3x5)

1 M1 PEK. PASANGAN BOUWPLANK


Kayu Albasiah

0.0100

1,105,000.00

Paku 4 - 7

0.0380

kg

9,000.00

342.00

Ongkos Pasang

0.1550

ls

11,392.00

1,765.76

Jumlah

13,157.76

Keuntungan Max.

A003

1,315.78

Jumlah

14,473.54

Dibulatkan

14,470.00

1 M2 LOS KERJA / GUDANG


Kayu Albasiah

0.1000

1,105,000.00

110,500.00

Paku 4 - 7

0.2500

kg

9,000.00

2,250.00

Seng Glb BJLS 30

1.1000

lbr

27,300.00

30,030.00

Triplex 3 mm

0.5000

lbr

50,450.00

25,225.00

PC (50 kg)

0.1000

zak

50,000.00

5,000.00

Peralatan

0.0250

lot

173,005.00

4,325.13

Ongkos Pasang

0.1250

ls

177,330.13

22,166.27

Jumlah

199,496.39

Keuntungan Max. 10 %

A004

19,949.64

Jumlah

219,446.03

Dibulatkan

219,440.00

1 M2 PEK. KANTOR DIREKSI


Kayu Albasiah

0.1000

1,105,000.00

110,500.00

Paku 4 - 7

0.2500

kg

9,000.00

2,250.00

Seng Glb BJLS 28 ( 80 x 180 cm )

1.1000

lbr

23,900.00

26,290.00

Triplex 3 mm

0.5000

lbr

50,450.00

25,225.00

PC (50 kg)

0.1000

zak

50,000.00

5,000.00

Pasir pasang

0.2500

65,000.00

16,250.00

70.0000

bh

240.00

16,800.00

Peralatan

0.0200

lot

202,315.00

4,046.30

Ongkos Pasang

0.1500

ls

202,315.00

Bata merah

Jumlah

30,347.25
236,708.55

Keuntungan Max. 10 %

A005

11,050.00

23,670.86

Jumlah

260,379.41

Dibulatkan

260,370.00

1 M2 PAPAN NAMA PROYEK


Kayu Albasiah

Daftar Analisa TARKIM

0.1300

1,105,000.00

143,650.00

Halaman : 160+29

Analisa Satuan Pekerjaan

6=(3x5)

Paku 4 - 7

0.2500

kg

9,000.00

Pengecatan Kayu

1.0000

ls

9,375.00

9,375.00

Penulisan

0.1250

ls

155,275.00

19,409.38

Ongkos Pasang

0.1250

ls

174,684.38

21,835.55

Jumlah

196,519.92

Keuntungan Max. 10 %

A006

19,651.99

Jumlah

216,171.91

Dibulatkan

216,170.00

1 M2 PAGAR PENGAMAN PROYEK


Seng Glb BJLS 28 ( 80 x 180 )

1.4300

lbr

23,900.00

34,177.00

Kayu Albasiah

0.0360

1,100,000.00

39,600.00

Paku 4 - 7

0.2000

kg

9,000.00

1,800.00

Pengecatan cat minyak 2x bag. luar

1.8000

6,903.33

12,426.00

Ongkos Pasang

0.2000

ls

88,003.00

Jumlah

10,560.36

Jumlah

116,163.96

Dibulatkan

116,160.00

1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 1 M'


Tukang Gali

0.4000

org

34,000.00

13,600.00

Mandor

0.0400

org

42,500.00

1,700.00

Alat Bantu

0.0500

lot

15,300.00

Jumlah

1,606.50

Jumlah

17,671.50

Dibulatkan

17,670.00

1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 2 M'


Tukang Gali

0.5260

org

34,000.00

17,884.00

Mandor

0.0520

org

42,500.00

2,210.00

Alat Bantu

0.0500

lot

20,094.00

1,004.70

Jumlah

21,098.70

Keuntungan Max. 10 %

A009

2,109.87

Jumlah

23,208.57

Dibulatkan

23,200.00

1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 3 M'


Tukang Gali

0.7350

org

34,000.00

24,990.00

Mandor

0.0730

org

42,500.00

3,102.50

Alat Bantu

0.0500

lot

28,092.50

Jumlah

1,404.63
29,497.13

Keuntungan Max. 10 %

A010

765.00
16,065.00

Keuntungan Max. 10 %

A008

17,600.60
105,603.60

Keuntungan Max. 10 %

A007

2,250.00

2,949.71

Jumlah

32,446.84

Dibulatkan

32,440.00

1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 4 M'


Tukang Gali

0.9440

org

34,000.00

32,096.00

Mandor

0.0940

org

42,500.00

3,995.00

Alat Bantu

0.0500

lot

36,091.00

Jumlah
Keuntungan Max. 10 %
Jumlah

Daftar Analisa TARKIM

1,804.55
37,895.55
3,789.56
41,685.11

Halaman : 161+29

Analisa Satuan Pekerjaan

6=(3x5)

Dibulatkan
A011

41,680.00

1 M3 PEK.GALIAN TANAH BIASA KEDALAMAN 5 M1


Tukang Gali

1.1530

org

34,000.00

39,202.00

Mandor

0.1150

org

42,500.00

4,887.50

Alat Bantu

0.0500

lot

44,089.50

Jumlah
Keuntungan Max. 10 %

A012

4,629.40

Jumlah

50,923.37

Dibulatkan

50,920.00

1 M3 PEK.GALIAN TANAH BERBATU / TANAH KERAS MAX KEDALAMAN 1 M


Tukang Gali

0.6250

org

34,000.00

21,250.00

Mandor

0.1250

org

42,500.00

5,312.50

Alat Bantu

0.2500

lot

26,562.50

6,640.63

Jumlah

33,203.13

Keuntungan Max. 10 %

A013

3,320.31

Jumlah

36,523.44

Dibulatkan

36,520.00

1 M3 PEK.GALIAN TANAH CADAS MAX KEDALAMAN 1 M


Tukang Gali

0.7500

org

34,000.00

25,500.00

Mandor

0.1250

org

42,500.00

5,312.50

Alat Bantu

0.2500

lot

30,812.50

7,703.13

Jumlah

38,515.63

Keuntungan Max. 10 %

A014

3,851.56

Jumlah

42,367.19

Dibulatkan

42,360.00

1 M3 PEK.GALIAN TANAH LUMPUR MAX KEDALAMAN 1 M


Tukang Gali

0.5250

org

34,000.00

17,850.00

Mandor

0.1250

org

42,500.00

5,312.50

Alat Bantu

0.2500

lot

23,162.50

Jumlah

2,895.31

Jumlah

31,848.44

Dibulatkan

31,840.00

1 M2 PEK. STRIPING TANAH TEBAL = 20 CM


Tukang Gali

0.0500

org

34,000.00

1,700.00

Mandor

0.0050

org

42,500.00

212.50

Alat Bantu

0.3500

lot

1,912.50

669.38

Jumlah

2,581.88

Keuntungan Max. 10 %

A016

5,790.63
28,953.13

Keuntungan Max. 10 %

A015

2,204.48
46,293.98

258.19

Jumlah

2,840.06

Dibulatkan

2,840.00

1 M3 PEK. PEMBUANGAN DALAM RADIUS 150 METER


Tukang Gali

0.2500

org

34,000.00

8,500.00

Mandor

0.0500

org

42,500.00

2,125.00

Alat Bantu

0.1000

lot

10,625.00

1,062.50

Jumlah
Keuntungan Max. 10 %

11,687.50
1,168.75

Jumlah

12,856.25

Dibulatkan

12,850.00

Daftar Analisa TARKIM

Halaman : 162+29

Analisa Satuan Pekerjaan

1
A017

6=(3x5)

1 M3 URUGAN TANAH KEMBALI


Tukang Gali

0.1920

org

34,000.00

6,528.00

Mandor

0.0190

org

42,500.00

807.50

Alat Bantu

0.1000

lot

7,335.50

733.55

Jumlah

8,069.05

Keuntungan Max. 10 %

A018

806.91

Jumlah

8,875.96

Dibulatkan

8,870.00

1 M3 PEK. PEMADATAN TANAH SETIAP 20 CM


Tukang Gali

0.3000

org

34,000.00

10,200.00

Mandor

0.0300

org

42,500.00

1,275.00

Alat Bantu ( Sewa Stamper )

0.1250

lot

11,475.00

Jumlah
Keuntungan Max. 10 %

A019

1,290.94

Jumlah

14,200.31

Dibulatkan

14,200.00

1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TS : 7 TL


Pasir Pasang

0.3300

65,000.00

Kapur Padam

0.1000

88,700.00

8,870.00

Tanah liat

0.7630

29,000.00

22,127.00

Tukang Gali

0.8330

org

34,000.00

28,322.00

Tk.batu setengah terampil

0.4160

org

34,000.00

14,144.00

Kep.tukang batu

0.0400

org

39,500.00

1,580.00

Mandor

0.0083

org

42,500.00

Jumlah

352.75

9,684.58

Jumlah

106,530.33

Dibulatkan

106,530.00

1 M3 PEK. LAPISAN PUDEL 1 KP : 5 TL


Kapur Padam

0.2000

88,700.00

17,740.00

Tanah liat
Tukang Gali

1.0000

29,000.00

29,000.00

0.8330

org

34,000.00

28,322.00

Tk.batu setengah terampil

0.4160

org

34,000.00

14,144.00

Kep.tukang batu

0.4100

org

39,500.00

16,195.00

Mandor

0.0830

org

42,500.00

3,527.50

Jumlah

108,928.50

Keuntungan Max. 10 %

A021

21,450.00

96,845.75

Keuntungan Max. 10 %

A020

1,434.38
12,909.38

10,892.85

Jumlah

119,821.35

Dibulatkan

119,820.00

1 M3 PEK. LAPISAN PUDEL 1 KP : 5 TS


Pasir Pasang

1.0000

65,000.00

65,000.00

Kapur Padam

0.2000

88,700.00

17,740.00

Tukang Gali

0.8330

org

34,000.00

28,322.00

Tk.batu setengah terampil

0.4160

org

34,000.00

14,144.00

Kep.tukang batu

0.0410

org

39,500.00

1,619.50

Mandor

0.0830

org

42,500.00

Jumlah
Keuntungan Max. 10 %
Jumlah

Daftar Analisa TARKIM

3,527.50
130,353.00
13,035.30
143,388.30

Halaman : 163+29

Analisa Satuan Pekerjaan

6=(3x5)

Dibulatkan
A022

143,380.00

1 M2 PEK. PEMASANGAN LAPISAN INJUK T = 10 CM


Injuk

6.0000

kg

12,000.00

72,000.00

Pekerja

0.1500

org

27,500.00

4,125.00

Mandor

0.0150

org

42,500.00

Jumlah
Keuntungan Max. 10 %

A023

7,676.25

Jumlah

84,438.75

Dibulatkan

84,430.00

1 M3 PEK. PERKERASAN SIRTU DIPADATKAN SETIAP 20 CM


Sirtu ( Membeli Sirtu )

1.2000

81,900.00

98,280.00

Tukang Gali

0.2500

org

34,000.00

8,500.00

Mandor

0.0250

org

42,500.00

1,062.50

Alat Bantu ( Pek. Pemadatan Tanah 1 m3 )

0.1000

lot

107,842.50

Jumlah

11,862.68

Jumlah

130,489.43

Dibulatkan

130,480.00

1 M2 PEK. PEMBUATAN JALAN SEMENTARA TEBAL 20 CM


Batu Belah

0.2500

85,000.00

21,250.00

Kerikil ( batu koral hitam / kali )

0.0300

125,500.00

3,765.00

Pasir Pasang

0.0500

65,000.00

3,250.00

Tukang Gali

0.5000

org

34,000.00

17,000.00

Mandor

0.1000

org

42,500.00

4,250.00

Alat Bantu ( Pek. Pemadatan Tanah 1 m2 )

0.0600

lot

49,515.00

2,970.90

Jumlah

52,485.90

Keuntungan Max. 10 %

A025

5,248.59

Jumlah

57,734.49

Dibulatkan

57,730.00

1 M3 PEK.GALIAN TANAH SUMURAN MAX KEDALAMAN 10 M'


Tukang Gali

1.1500

org

34,000.00

39,100.00

Mandor

0.0250

org

42,500.00

1,062.50

Alat Bantu

0.2000

lot

40,162.50

8,032.50

Jumlah

48,195.00

Keuntungan Max. 10 %

A026

4,819.50

Jumlah

53,014.50

Dibulatkan

53,010.00

1 M3 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (5000M3)


Pek. Galian ( 10 org ) 50 %

0.6000

21,098.70

6,329.61

Pek. Galian tanah berbatu ( 10 org ) 50 %

0.6000

33,203.13

9,960.94

Pek. Grading Plant ( 10 org ) 50 %

5.0000

2,581.88

6,454.69

Beli Tanah + Angkut Max 10 Km

1.2000

4,000.00

4,800.00

Jumlah

27,545.24

Keuntungan Max. 10 %

A027

10,784.25
118,626.75

Keuntungan Max. 10 %

A024

637.50
76,762.50

2,754.52

Jumlah

30,299.76

Dibulatkan

30,290.00

1 M3 URUGAN PASIR URUG


Pasir Urug

1.2000

55,000.00

66,000.00

Pekerja

0.1500

org

27,500.00

4,125.00

Daftar Analisa TARKIM

Halaman : 164+29

Analisa Satuan Pekerjaan

2
Mandor

4
0.0100

org

6=(3x5)

42,500.00

Jumlah

70,550.00

Keuntungan Max. 10 %

A027 Rob

7,055.00

Jumlah

77,605.00

Dibulatkan

77,600.00

1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)


Tanah Urug (didatangkan)

1.2000

6,500.00

7,800.00

Tukang Gali

0.4500

org

34,000.00

15,300.00

Mandor

0.0450

org

42,500.00

1,912.50

Alat Bantu (sewa stamper)

0.1250

lot

23,100.00

2,887.50

Jumlah

27,900.00

Keuntungan Max. 10 %

A028

2,790.00

Jumlah

30,690.00

Dibulatkan

30,690.00

1 M3 LANTAI KERJA 1 PC : 3 PS : 5 KRL(dengan Split 2/3)


PC (50 kg)

218.0000

kg

1,000.00

Pasir pasang

0.5200

65,000.00

33,800.00

Split Pecah mesin 2/3

0.8700

150,000.00

130,500.00

Pekerja

1.6500

org

27,500.00

45,375.00

Tk. Batu Setengah Terampil

0.2500

org

34,000.00

8,500.00

Kep. Tukang Batu

0.0250

org

39,500.00

987.50

Mandor

0.0800

org

42,500.00

3,400.00

Peralatan

0.0750

lot

58,262.50

4,369.69

Jumlah

44,493.22

Jumlah

489,425.41

Dibulatkan

489,420.00

1 M3 Membuat Plat Beton Bertulang (211,909 Kg Besi + Bekesting)


Bekesting Albasiah

0.2450

1,105,000.00

270,725.00

Paku 5 - 7 cm

1.5000

kg

9,000.00

13,500.00

Pelumas Bekesting

0.4000

lt

23,800.00

9,520.00

211.9090

kg

8,000.00

1,695,272.00

Kawat Beton

2.2500

kg

8,550.00

19,237.50

Semen Portland ( PC. )

6.4600

zak

50,000.00

323,000.00

Pasir Beton

0.5200

75,000.00

39,000.00

Batu Pecah 2/3

0.7800

150,000.00

117,000.00

Tukang Batu

0.3500

org

36,500.00

12,775.00

Tukang Kayu

1.0400

org

39,500.00

41,080.00

Tukang Besi

1.0500

org

39,500.00

41,475.00

Kepala Tukang

0.2450

org

47,500.00

11,637.50

Pembantu Tukang

3.9000

org

27,500.00

107,250.00

Mandor

0.1650

org

42,500.00

7,012.50

Besi Beton Polos U 24

Jumlah

2,708,484.50

Keuntungan Max. 10 %

A029

218,000.00

444,932.19

Keuntungan Max. 10 %

400.02.1

425.00

270,848.45

Jumlah

2,979,332.95

Dibulatkan

2,979,330.00

1 M3 PAS. BETON CYCLOOF + 40% BATU BELAH


Batu Belah 40%

0.4800

85,000.00

40,800.00

Adukan Beton Tumbuk 1:3:5

0.6000

444,932.19

266,959.31

Daftar Analisa TARKIM

Halaman : 165+29

Analisa Satuan Pekerjaan

2
Upah Kerja

3
0.0400

ls

307,759.31

Jumlah

32,006.97

Jumlah

352,076.65

Dibulatkan

352,070.00

1 M3 COR BETON SITE MIX K 175


Semen PC (50 kg)

6.8000

zak

50,000.00

340,000.00

Split pecah mesin 2/3

0.8300

150,000.00

124,500.00

Pasir Beton

0.5400

75,000.00

40,500.00

Pekerja

1.5000

org

27,500.00

41,250.00

Tukang batu setengah terampil

0.5000

org

34,000.00

17,000.00

Kep. tukang batu

0.0500

org

39,500.00

1,975.00

Mandor

0.0100

org

42,500.00

425.00

Peralatan

0.0700

lot

565,650.00

39,595.50

Jumlah

605,245.50

Keuntungan Max. 10 %

A031

60,524.55

Jumlah

665,770.05

Dibulatkan

665,770.00

1 M3 COR BETON SITE MIX K 225


Semen PC (50 kg)

7.8960

zak

50,000.00

394,800.00

Split pecah mesin 2/3

0.8100

150,000.00

121,500.00

Pasir beton

0.4900

75,000.00

36,750.00

Pekerja

1.5000

org

27,500.00

41,250.00

Tk.batu setengah terampil

0.5000

org

34,000.00

17,000.00

Kepala tk. batu

0.0500

org

39,500.00

1,975.00

Mandor

0.0100

org

42,500.00

425.00

Peralatan

0.0700

lot

613,700.00

Jumlah

65,665.90

Jumlah

722,324.90

Dibulatkan

722,320.00

1 M3 COR BETON SITE MIX K 300


Semen PC (50 kg)

8.6960

zak

50,000.00

434,800.00

Split pecah mesin 2/3

0.8100

150,000.00

121,500.00

Pasir beton

0.4900

75,000.00

36,750.00

Pekerja

1.5000

org

27,500.00

41,250.00

Tk.batu setengah terampil

0.5000

org

34,000.00

17,000.00

Kepala tk. batu

0.0500

org

39,500.00

1,975.00

Mandor

0.0100

org

42,500.00

425.00

Peralatan

0.7000

lot

653,700.00

Jumlah

457,590.00
1,111,290.00

Keuntungan Max. 10 %

A033

42,959.00
656,659.00

Keuntungan Max. 10 %

A032

12,310.37
320,069.69

Keuntungan Max. 10 %

A030

6=(3x5)

111,129.00

Jumlah

1,222,419.00

Dibulatkan

1,222,410.00

1 M3 COR BETON K-175 READY MIX MIN 6 M3 BERIKUT SLANG


Adukan K-175 Readymix

1.0000

494,000.00

494,000.00

Pekerja

2.5000

org

27,500.00

68,750.00

Tukang batu setengah terampil

0.2500

org

34,000.00

8,500.00

Daftar Analisa TARKIM

Halaman : 166+29

Analisa Satuan Pekerjaan

6=(3x5)

Kep. tukang batu

0.1000

org

39,500.00

3,950.00

Mandor

0.0100

org

42,500.00

425.00

Alat bantu (Slang + Tes Lab)

0.0450

lot

575,625.00

Jumlah
Keuntungan Max. 10 %

A034

60,152.81

Jumlah

661,680.94

Dibulatkan

661,680.00

1 M3 COR BETON K-225 READY MIX MIN 6 M3 BERIKUT SLANG


Adukan K-225 Readymix

1.0000

572,000.00

572,000.00

Pekerja

2.5000

org

27,500.00

68,750.00

Tukang batu setengah terampil

0.2500

org

34,000.00

8,500.00

Kep. tukang batu

0.1000

org

39,500.00

3,950.00

Mandor

0.0100

org

42,500.00

425.00

Alat bantu (Slang + Tes Lab)

0.0450

lot

653,625.00

29,413.13

Jumlah

683,038.13

Keuntungan Max. 10 %

A035

68,303.81

Jumlah

751,341.94

Dibulatkan

751,340.00

1 M3 COR BETON K-300 READY MIX MIN 6 M3 BERIKUT SLANG


Adukan K-300 Readymix

1.0000

676,000.00

676,000.00

Pekerja

2.5000

org

27,500.00

68,750.00

Tukang batu setengah terampil

0.2500

org

34,000.00

8,500.00

Kep. tukang batu

0.1000

org

39,500.00

3,950.00

Mandor

0.0100

org

42,500.00

425.00

Alat bantu (Slang + Tes Lab)

0.0450

lot

757,625.00

34,093.13

Jumlah

791,718.13

Keuntungan Max. 10 %

A036

79,171.81

Jumlah

870,889.94

Dibulatkan

870,880.00

1 KG BESI BETON TERPASANG U - 24


Besi Beton rata - rata

1.0500

kg

8,000.00

8,400.00

Kawat Beton

0.0100

kg

8,550.00

85.50

Tk. Besi Beton setengah terampil

0.0250

org

36,500.00

912.50

Tk. Besi Beton terampil

0.0150

org

39,500.00

592.50

Kepala Tukang Besi terampil

0.0100

org

43,500.00

435.00

Mandor

0.0050

org

42,500.00

212.50

Peralatan, Spancer

0.0200

lot

10,638.00

212.76

Jumlah

10,850.76

Keuntungan Max. 10 %

A037

25,903.13
601,528.13

1,085.08

Jumlah

11,935.84

Dibulatkan

11,930.00

1 KG BESI BETON TERPASANG U - 39


Besi Beton rata - rata U - 39

1.0500

kg

9,000.00

9,450.00

Kawat Beton

0.0100

kg

8,550.00

85.50

Tk. Besi Beton setengah terampil

0.0360

org

34,000.00

1,224.00

Tk. Besi Beton terampil

0.0160

org

39,500.00

632.00

Daftar Analisa TARKIM

Halaman : 167+29

Analisa Satuan Pekerjaan

6=(3x5)

Kepala Tukang Besi terampil

0.0110

org

43,500.00

478.50

Mandor

0.0050

org

42,500.00

212.50

Peralatan, Spancer

0.0200

lot

12,082.50

241.65

Jumlah

12,324.15

Keuntungan Max. 10 %

A046

1,232.42

Jumlah

13,556.57

Dibulatkan

13,550.00

1 M2 BEKISTING DENGAN PAPAN


Kayu Lokal Kelas II

0.0170

1,950,000.00

16,575.00

Papan terentang ( 2X pakai ) 75 % Kayu Albasiah

0.0240

1,105,000.00

19,890.00

Paku

0.4000

kg

9,000.00

3,600.00

Pekerja

0.1200

org

27,500.00

3,300.00

Tk. Kayu terampil

0.1500

org

39,500.00

5,925.00

Kepala Tukang Kayu

0.1500

org

42,000.00

6,300.00

Mandor

0.0500

org

42,500.00

2,125.00

Tk. Kayu 1/2 terampil (bongkar cetakan)

0.1200

org

36,500.00

4,380.00

Jumlah

62,095.00

Keuntungan Max. 10 %

A047

6,209.50

Jumlah

68,304.50

Dibulatkan

68,300.00

1 M2 BEKISTING MULTIPLEX 9 MM
Kayu Lokal Kelas II

0.0170

1,950,000.00

16,575.00

Multiplek 9 mm ( 2 x pakai ) 75%

0.3470

lbr

117,650.00

30,618.41

Paku

0.4000

kg

9,000.00

3,600.00

Pekerja

0.1200

org

27,500.00

3,300.00

Tk. Kayu terampil

0.1500

org

39,500.00

5,925.00

Kepala Tukang Kayu

0.1500

org

42,000.00

6,300.00

Mandor

0.0500

org

42,500.00

2,125.00

Tk. Kayu 1/2 terampil (bongkar cetakan)

0.1200

org

36,500.00

4,380.00

Jumlah

72,823.41

Keuntungan Max. 10 %

A048

7,282.34

Jumlah

80,105.75

Dibulatkan

80,100.00

1 M2 BEKISTING MULTIPLEX 12 MM
Kayu Lokal Kelas II

0.0170

1,950,000.00

16,575.00

Multiplek 12 mm ( 2 x pakai ) 75%

0.3470

lbr

156,900.00

40,833.23

Paku

0.4000

kg

9,000.00

3,600.00

Pekerja

0.1200

org

27,500.00

3,300.00

Tk. Kayu terampil

0.1500

org

39,500.00

5,925.00

Kepala Tukang Kayu

0.1500

org

42,000.00

6,300.00

Mandor

0.0500

org

42,500.00

2,125.00

Tk. Kayu 1/2 terampil (bongkar cetakan)

0.1200

org

36,500.00

4,380.00

Jumlah
Keuntungan Max. 10 %

Daftar Analisa TARKIM

83,038.23
8,303.82

Halaman : 168+29

Analisa Satuan Pekerjaan

A049

6=(3x5)

Jumlah

91,342.05

Dibulatkan

91,340.00

1 M2 PASANGAN STOOT WERK


Kayu stoot ( dinding 2x pakai ) 50%

9.0000

bt

26,000.00

117,000.00

Papan Albasiah ( 2X pakai )

0.0160

1,105,000.00

17,680.00

Paku

0.5000

kg

9,000.00

4,500.00

Pekerja

0.1500

org

27,500.00

4,125.00

Tk. Kayu terampil

0.2000

org

39,500.00

7,900.00

Kepala tukang Kayu

0.2000

org

42,000.00

8,400.00

Mandor

0.0170

org

42,500.00

722.50

Jumlah

160,327.50

Keuntungan Max. 10 %

A050

16,032.75

Jumlah

176,360.25

Dibulatkan

176,360.00

1 M3 PASANGAN ANSTAMPING BATU BELAH


Batu Belah

1.2000

85,000.00

102,000.00

Pasir Urug

0.1000

55,000.00

5,500.00

Pekerja

0.5000

org

27,500.00

13,750.00

Tk.batu setengah terampil

0.5625

org

34,000.00

19,125.00

Kep.tukang batu

0.0750

org

39,500.00

2,962.50

Mandor

0.0563

org

42,500.00

Jumlah
Keuntungan Max. 10 %

A051

14,573.03

Jumlah

160,303.28

Dibulatkan

160,300.00

1 M3 PASANGAN BATU BRONJONG


Batu Kali ( Batu Bulat ) Bronjol

1.2000

78,000.00

93,600.00

Kawat Bronjong

3.5000

kg

6,750.00

23,625.00

Pekerja

1.5000

org

27,500.00

41,250.00

Pekerja Terampil

0.2000

org

31,500.00

6,300.00

Mandor

0.0200

org

42,500.00

850.00

Jumlah

165,625.00

Keuntungan Max. 10 %

A052 Rob

16,562.50

Jumlah

182,187.50

Dibulatkan

182,180.00

1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH


Lempengan Rumput Gajah

1.2000

4,200.00

5,040.00

Pekerja Setengah Terampil

0.0400

org

42,000.00

1,680.00

Mandor

0.0100

org

29,000.00

290.00

Jumlah

7,010.00

Keuntungan Max. 10 %

A053

2,392.75
145,730.25

701.00

Jumlah

7,711.00

Dibulatkan

7,710.00

1 M3 PASANGAN BATU BELAH 1 : 6


Batu Belah

1.2000

85,000.00

102,000.00

P C (50 kg)

2.3400

zak

50,000.00

117,000.00

Daftar Analisa TARKIM

Halaman : 169+29

Analisa Satuan Pekerjaan

Pasir Pasang

0.5610

65,000.00

36,465.00

Pekerja

1.2500

org

27,500.00

34,375.00

Tk.batu setengah terampil

0.5000

org

34,000.00

17,000.00

Kep.tukang batu

0.1125

org

39,500.00

4,443.75

Mandor

0.0169

org

42,500.00

Jumlah

31,200.20

Jumlah

343,202.20

Dibulatkan

343,200.00

1 M3 PASANGAN BATU BELAH 1 : 5


Batu Belah

1.2000

85,000.00

102,000.00

P C (50 kg)

2.7200

zak

50,000.00

136,000.00

Pasir Pasang

0.5440

65,000.00

35,360.00

Pekerja

1.2500

org

27,500.00

34,375.00

Tk.batu setengah terampil

0.5000

org

34,000.00

17,000.00

Kep.tukang batu

0.1125

org

39,500.00

4,443.75

Mandor

0.0169

org

42,500.00

Jumlah

32,989.70

Jumlah

362,886.70

Dibulatkan

362,880.00

1 M3 PASANGAN BATU BELAH 1 : 4


Batu Belah

1.2000

85,000.00

102,000.00

P C (50 kg)

3.2600

zak

50,000.00

163,000.00

Pasir Pasang

0.5200

65,000.00

33,800.00

Pekerja

1.2500

org

27,500.00

34,375.00

Tk.batu setengah terampil

0.5000

org

34,000.00

17,000.00

Kep.tukang batu

0.1125

org

39,500.00

4,443.75

Mandor

0.0169

org

42,500.00

718.25

Jumlah

355,337.00

Keuntungan Max. 10 %

A056

35,533.70

Jumlah

390,870.70

Dibulatkan

390,870.00

1 M3 PASANGAN BATU BELAH 1 : 3


Batu Belah

1.2000

85,000.00

102,000.00

P C (50 kg)

4.0400

zak

50,000.00

202,000.00

Pasir Pasang

0.4850

65,000.00

31,525.00

Pekerja

1.2500

org

27,500.00

34,375.00

Tk.batu setengah terampil

0.5000

org

34,000.00

17,000.00

Kep.tukang batu

0.1125

org

39,500.00

4,443.75

Mandor

0.1690

org

42,500.00

7,182.50

Jumlah

398,526.25

Keuntungan Max. 10 %

A057

718.25
329,897.00

Keuntungan Max. 10 %

A055

718.25
312,002.00

Keuntungan Max. 10 %

A054

6=(3x5)

39,852.63

Jumlah

438,378.88

Dibulatkan

438,370.00

1 M3 PASANGAN BATU BELAH 1 : 2,5


Batu Belah

Daftar Analisa TARKIM

1.2000

85,000.00

102,000.00

Halaman : 170+29

Analisa Satuan Pekerjaan

P C (50 kg)

1.5900

zak

50,000.00

79,500.00

Pasir Pasang

0.3800

65,000.00

24,700.00

Pekerja

1.2500

org

27,500.00

34,375.00

Tk.batu setengah terampil

0.5000

org

34,000.00

17,000.00

Kep.tukang batu

0.1125

org

39,500.00

4,443.75

Mandor

0.0169

org

42,500.00

718.25

Jumlah

262,737.00

Keuntungan Max. 10 %

A058

26,273.70

Jumlah

289,010.70

Dibulatkan

289,010.00

1 M3 PASANGAN BATU BELAH 1 : 2


Batu Belah

1.2000

85,000.00

102,000.00

P C (50 kg)

5.3400

zak

50,000.00

267,000.00

Pasir Pasang

0.4270

65,000.00

27,755.00

Pekerja

1.2500

org

27,500.00

34,375.00

Tk.batu setengah terampil

0.5000

org

27,500.00

13,750.00

Kep.tukang batu

0.1125

org

39,500.00

4,443.75

Mandor

0.0169

org

42,500.00

Jumlah

45,004.20

Jumlah

495,046.20

Dibulatkan

495,040.00

1 M3 PASANGAN BATU BELAH 1 : 1


Batu Belah

1.2000

85,000.00

102,000.00

P C (50 kg)

7.8400

zak

50,000.00

392,000.00

Pasir Pasang

0.3140

65,000.00

20,410.00

Pekerja

1.2500

org

27,500.00

34,375.00

Tk.batu setengah terampil

0.5000

org

34,000.00

17,000.00

Kep.tukang batu

0.1125

org

39,500.00

4,443.75

Mandor

0.0169

org

42,500.00

718.25

Jumlah

570,947.00

Keuntungan Max. 10 %

A060

57,094.70

Jumlah

628,041.70

Dibulatkan

628,040.00

1 M3 PAS. BATU BELAH 1 : 4 PAKAI MUKA BATU SEGI ENAM + SIARAN


Batu Belah

1.5000

85,000.00

127,500.00

P C (50 kg)

1.2500

zak

50,000.00

62,500.00

Pasir Pasang

0.3480

65,000.00

22,620.00

Pekerja Terampil

1.2500

org

31,500.00

39,375.00

Tk.batu terampil

1.1250

org

36,500.00

41,062.50

Kep.tukang batu

0.1125

org

39,500.00

4,443.75

Mandor

0.0169

org

42,500.00

718.25

Jumlah

298,219.50

Keuntungan Max. 10 %

A061

718.25
450,042.00

Keuntungan Max. 10 %

A059

6=(3x5)

29,821.95

Jumlah

328,041.45

Dibulatkan

328,040.00

1 M2 PAS. BATU TEMPEL + SIARAN


Batu Tempel

Daftar Analisa TARKIM

1.1000

m2

85,000.00

93,500.00

Halaman : 171+29

Analisa Satuan Pekerjaan

P C (50 kg)

0.1200

Pasir Pasang
Pekerja Terampil

6=(3x5)

Zak

50,000.00

6,000.00

0.0310

65,000.00

2,015.00

0.1875

org

31,500.00

5,906.25

Tk.batu terampil

0.2250

org

36,500.00

8,212.50

Kep.tukang batu

0.0375

org

39,500.00

1,481.25

Mandor

0.0338

org

42,500.00

1,436.50

Peralatan

0.0250

lot

118,551.50

2,963.79

Jumlah

121,515.29

Keuntungan Max. 10 %

A063 B

12,151.53

Jumlah

133,666.82

Dibulatkan

133,660.00

1 M2 PASANGAN BATU MUKA


Batu Muka

1.0100

42,000.00

42,420.00

P.C (50 kg)

0.1600

zak

50,000.00

8,000.00

Pasir pasang

0.0300

65,000.00

1,950.00

Semen warna

0.0130

kg

5,000.00

65.00

Pekerja trampil

0.1875

org

31,500.00

5,906.25

Tk. batu trampil

0.3750

org

36,500.00

13,687.50

Kep. Tukang batu

0.0750

org

39,500.00

2,962.50

Mandor

0.0188

org

42,500.00

799.00

Jumlah

75,790.25

Keuntungan Max. 10 %

A071

7,579.03

Jumlah

83,369.28

Dibulatkan

83,360.00

1 M2 PASANGAN BATA MERAH 1 : 2


Bata merah

70.0000

bh

240.00

16,800.00

P.C (50 kg)

0.5440

zak

50,000.00

27,200.00

Pasir pasang

0.0470

65,000.00

3,055.00

Pekerja setengah trampil

0.4290

org

30,000.00

12,870.00

Tk. batu setengah trampil

0.2140

org

34,000.00

7,276.00

Kep. Tukang batu

0.0210

org

39,500.00

829.50

Mandor

0.0110

org

42,500.00

467.50

Jumlah

68,498.00

Keuntungan Max. 10 %

A072

6,849.80

Jumlah

75,347.80

Dibulatkan

75,340.00

1 M2 PASANGAN BATA MERAH 1 : 3


Bata merah

70.0000

bh

240.00

16,800.00

P.C (50 kg)

0.4200

zak

50,000.00

21,000.00

Pasir pasang

0.0540

65,000.00

3,510.00

Pekerja setengah trampil

0.4290

org

30,000.00

12,870.00

Tk. batu setengah trampil

0.2140

org

34,000.00

7,276.00

Kep. Tukang batu

0.0210

org

39,500.00

829.50

Mandor

0.0110

org

42,500.00

467.50

Jumlah

Daftar Analisa TARKIM

62,753.00

Halaman : 172+29

Analisa Satuan Pekerjaan

6=(3x5)

Keuntungan Max. 10 %

A073

6,275.30

Jumlah

69,028.30

Dibulatkan

69,020.00

1 M2 PASANGAN BATA MERAH 1 : 4


Bata merah

70.0000

bh

240.00

16,800.00

P.C (50 kg)

0.3354

zak

50,000.00

16,768.00

Pasir pasang

0.0580

65,000.00

3,770.00

Pekerja setengah trampil

0.3218

org

30,000.00

9,654.00

Tk. batu setengah trampil

0.1805

org

34,000.00

6,137.00

Kep. Tukang batu

0.0158

org

39,500.00

624.10

Mandor

0.0083

org

42,500.00

352.75

Jumlah

54,105.85

Keuntungan Max. 10 %

A074

5,410.59

Jumlah

59,516.44

Dibulatkan

59,510.00

1 M2 PASANGAN BATA MERAH 1 : 5


Bata merah

70.0000

bh

240.00

16,800.00

P.C (50 kg)

0.1936

zak

50,000.00

9,680.00

Pasir pasang

0.0450

65,000.00

2,925.00

Pekerja setengah trampil

0.3200

org

30,000.00

9,600.00

Tk. batu setengah trampil

0.1000

org

34,000.00

3,400.00

Kep. Tukang batu

0.0100

org

39,500.00

395.00

Mandor

0.0150

org

42,500.00

637.50

Jumlah

43,437.50

Keuntungan Max. 10 %

A075

4,343.75

Jumlah

47,781.25

Dibulatkan

47,780.00

1 M2 PLESTERAN DINDING 1 : 2 + ACIAN


P.C (50 kg)

0.2368

zak

50,000.00

11,840.00

Pasir pasang

0.0190

65,000.00

1,235.00

Pekerja setengah trampil

0.2860

org

30,000.00

8,580.00

Tk. batu setengah trampil

0.2140

org

34,000.00

7,276.00

Kep. Tukang batu

0.0210

org

39,500.00

829.50

Mandor

0.0200

org

42,500.00

850.00

Jumlah

30,610.50

Keuntungan Max. 10 %

A076

3,061.05

Jumlah

33,671.55

Dibulatkan

33,670.00

1 M2 PLESTERAN DINDING 1 : 3 + ACIAN


P.C (50 kg)

0.1600

zak

50,000.00

8,000.00

Pasir pasang

0.0190

65,000.00

1,235.00

Pekerja setengah trampil

0.2860

org

30,000.00

8,580.00

Tk. batu setengah trampil

0.2140

org

34,000.00

7,276.00

Kep. Tukang batu

0.0210

org

39,500.00

829.50

Daftar Analisa TARKIM

Halaman : 173+29

Analisa Satuan Pekerjaan

2
Mandor

4
0.0200

org

5
42,500.00

Jumlah

2,677.05

Jumlah

29,447.55

Dibulatkan

29,440.00

1 M2 PLESTERAN DINDING 1 : 4 + ACIAN


P.C (50 kg)

0.1404

zak

50,000.00

7,020.00

Pasir pasang

0.0190

65,000.00

1,235.00

Pekerja setengah trampil

0.2860

org

30,000.00

8,580.00

Tk. batu setengah trampil

0.2140

org

34,000.00

7,276.00

Kep. Tukang batu

0.0210

org

39,500.00

829.50

Mandor

0.0200

org

42,500.00

850.00

Jumlah

25,790.50

Keuntungan Max. 10 %

A079

2,579.05

Jumlah

28,369.55

Dibulatkan

28,360.00

1 M2 PLESTERAN DINDING 1 : 5 + ACIAN


P.C (50 kg)

0.0864

zak

50,000.00

4,320.00

Pasir pasang

0.0220

65,000.00

1,430.00

Pekerja setengah trampil

0.2000

org

30,000.00

6,000.00

Tk. batu setengah trampil

0.1500

org

34,000.00

5,100.00

Kep. Tukang batu

0.0150

org

39,500.00

592.50

Mandor

0.0100

org

42,500.00

425.00

Jumlah

17,867.50

Keuntungan Max. 10 %

A129

1,786.75

Jumlah

19,654.25

Dibulatkan

19,650.00

1 M2 PAS. ONDERLAG BATU BELAH T = 20 CM


Pasir pasang

0.1500

65,000.00

9,750.00

Batu Belah
Pekerja Trampil (Gali + Urug + Ampar)

0.2500

85,000.00

21,250.00

0.1500

org

31,500.00

4,725.00

Peralatan

0.1200

lot

35,725.00

4,287.00

Jumlah

40,012.00

Keuntungan Max. 10 %

A130

4,001.20

Jumlah

44,013.20

Dibulatkan

44,010.00

1 M2 AMPARAN BATU PECAH MESIN 5/7 t=10 cm


Batu Pecah Mesin 5/7

0.1200

120,000.00

14,400.00

Pekerja Trampil (Gali + Urug + Ampar)

0.1100

org

31,500.00

3,465.00

Peralatan

0.3200

lot

17,865.00

5,716.80

Jumlah

23,581.80

Keuntungan Max. 10 %

A131

850.00
26,770.50

Keuntungan Max. 10 %

A078

6=(3x5)

2,358.18

Jumlah

25,939.98

Dibulatkan

25,930.00

1 M2 AMPARAN BATU PECAH MESIN 2/3 t=5 cm


Batu Pecah Mesin 2/3

Daftar Analisa TARKIM

0.0600

150,000.00

9,000.00

Halaman : 174+29

Analisa Satuan Pekerjaan

6=(3x5)

Pekerja Trampil (Gali + Urug + Ampar)

0.0800

org

31,500.00

Peralatan

0.5000

lot

11,520.00

Jumlah

1,728.00

Jumlah

19,008.00

Dibulatkan

19,000.00

1 M2 LAPISAN PENGISI /PENUTUP


Batu pecah mesin 1/2

0.0120

160,000.00

1,920.00

Pasir Beton

0.0100

75,000.00

750.00

Pekerja Trampil (Gali + Urug + Ampar)

0.0500

org

31,500.00

1,575.00

Peralatan

0.9500

lot

4,245.00

4,032.75

Jumlah

8,277.75

Keuntungan Max. 10 %

A133

827.78

Jumlah

9,105.53

Dibulatkan

9,100.00

1 M2 PENGASPALAN MANUAL
Batu abu /pasir beton

0.0050

75,000.00

375.00

Aspal

4.0000

kg

5,100.00

20,400.00

Kayu Bakar

0.0300

45,000.00

1,350.00

Pekerja Trampil (Mengaspal)

0.0600

org

31,500.00

1,890.00

Peralatan

0.1800

lot

24,015.00

4,322.70

Jumlah

28,337.70

Keuntungan Max. 10 %

A133 Rob

2,833.77

Jumlah

31,171.47

Dibulatkan

31,170.00

1 M2 PENGASPALAN MANUAL
Batu abu /pasir beton

0.0050

75,000.00

375.00

Aspal

1.5000

kg

5,100.00

7,650.00

Kayu Bakar

0.0300

45,000.00

1,350.00

Pekerja Trampil (Mengaspal)

0.0600

org

31,500.00

1,890.00

Peralatan

0.1800

lot

24,015.00

4,322.70

Jumlah

15,587.70

Keuntungan Max. 10 %

A134

5,760.00
17,280.00

Keuntungan Max. 10 %

A132

2,520.00

1,558.77

Jumlah

17,146.47

Dibulatkan

17,140.00

1 M2 HOTMIX TANGAN T=3 cm (JADI) u/ HAL & JALAN KLS 6 TON KE BAWAH
Abu batu

0.0360

Aspal Panas

5.0000

Kayu Bakar

0.0080

Pekerja Setengah Trampil

0.0800

Pekerja Trampil

0.0300

Mandor
Peralatan
Jumlah
Keuntungan Max. 10 %

130,000.00

4,680.00

kg

5,100.00

25,500.00

45,000.00

360.00

org

30,000.00

2,400.00

org

31,500.00

945.00

0.0100

org

42,500.00

425.00

0.0980

lot

34,310.00

3,362.38
37,672.38
3,767.24

Jumlah

41,439.62

Dibulatkan

41,430.00

Daftar Analisa TARKIM

Halaman : 175+29

Analisa Satuan Pekerjaan

1
A135

6=(3x5)

1 M2 HOTMIX PAKAI ALAT BESAR T=5 cm KLS JALAN 8 TON LEBIH


Hotmix jadi + alat besar, tenaga & bhn bakar

0.1110

ton

546,000.00

60,606.00

Pekerja Trampil

0.0300

org

31,500.00

945.00

Mandor

0.0150

org

42,500.00

637.50

Jumlah

62,188.50

Keuntungan Max. 10 %

A136

6,218.85

Jumlah

68,407.35

Dibulatkan

68,400.00

1 M2 KONSTRUKSI PENETRASI LENGKAP


Amparan 5/7 T = 10 cm, digilas

1.0000

19,097.00

19,097.00

Amparan 2/3 T = 5 cm, digilas

1.0000

10,666.65

10,666.65

Lapisan Pengisi

1.0000

2,322.50

2,322.50

Lapisan Aspal

1.0000

5,747.00

5,747.00

Jumlah

37,833.15

Keuntungan Max. 10 %

3,783.32

Jumlah

41,616.47

Dibulatkan
900.02.1

42931.18

41,610.00

1M' PEMASANGAN PIPA PVC MELALUI GALIAN (TIDAK TERMASUK HARGA PIPA)
Urugan Pasir

0.0830

m3

70,550.00

5,855.65

Urugan Tanah Dipadatkan

0.2650

m3

30,290.00

8,026.85

Galian Tanah Biasa

0.3480

m3

16,065.00

5,590.62

Buangan Sisa Galian

0.0830

m3

9,200.00

763.60

Penyambungan Pipa

1.0000

ls

1,000.00

Jumlah
Keuntungan Max. 10 %

G.50.Crob

2,123.67

Jumlah

23,360.39

Dibulatkan

23,360.00

1 M2 SIARAN 1 PC : 2 PSR ( BID. PENGAIRAN )


PC. (50 kg )

0.0703

zak

50,000.00

3,513.50

Pasir Pasang

0.0085

m3

65,000.00

552.50

Tukang Batu

0.1200

org

36,500.00

4,380.00

Kepala Tukang Batu

0.0120

org

39,500.00

474.00

Pekerja

0.3600

org

27,500.00

9,900.00

Mandor

0.0180

org

42,500.00

765.00

Jumlah

19,585.00

Keuntungan Max. 10 %

A1

1,958.50

Jumlah

21,543.50

Dibulatkan

21,540.00

1 M3 PEK. GALIAN TANAH BIASA BASAH ( BID.PENGAIRAN )


Pekerja

0.7500

org

27,500.00

20,625.00

Mandor

0.0250

org

42,500.00

1,062.50

Jumlah
Keuntungan Max. 10 %

A3

1,000.00
21,236.72

21,687.50
2,168.75

Jumlah

23,856.25

Dibulatkan

23,850.00

1 M3 PEK. GALIAN TANAH YANG BANYAK TERDAPAT BATU BUNDAR ( BID. PENGAIRAN )

Daftar Analisa TARKIM

Halaman : 176+29

Analisa Satuan Pekerjaan

Pekerja

1.5000

org

27,500.00

Mandor

0.0330

org

42,500.00

Jumlah

G. 41

F.8'

41,250.00
1,402.50
42,652.50

Keuntungan Max. 10 %

G. 43 b.

6=(3x5)

4,265.25

Jumlah

46,917.75

Dibulatkan

46,910.00

BETON CYCLOOP 1 : 3 : 5 ( BID. PENGAIRAN )


Batu Belah

0.7690

m3

Kerikil Beton

0.5571

m3

Pasir Beton

0.3343

m3

P.C. (50 kg)

2.7855

zak

Tukang Batu Setengah Terampil

1.0000

org

Kepala Tukang Batu

0.1000

org

Pekerja

6.0000

org

Mandor

0.3000

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M3 COR BETON BERTULANG 1 PC : 2 PASIR BETON : 3 KORAL BETON ( BID. PENGAIRAN )


Batu Kerikil Beton

0.8200

m3

Pasir Beton

0.5400

m3

P.C. (50 kg)

6.8000

m3

Tukang Batu

1.0000

zak

Kepala Tukang Batu

0.1000

org

Pekerja

6.0000

org

Mandor

0.3000

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M2 CETAKAN BETON (BID. PENGAIRAN )


Tukang Kayu

0.5000

org

Kepala Tukang Kayu

0.0500

org

Pekerjan

0.2000

org

Mandor

0.0100

org

Paku

0.4000

kg

Kayu Gergajian

0.0400

m3

1 M3 BETON MEMERLUKAN 10 M2 CETAKAN 10 x f.8 = Rp. ..


Membongkar dan menyiram beton :
Pekerja

G. 32.K

4.0000 org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M3 PASANGAN BATU PAHAT / CANDI 30 X 30 X 30 CM, 1PC : 2 PSR ( BBID. PENGAIRAN )


Batu Candi/Pahat
P.C. (50 kg)

Daftar Analisa TARKIM

37.0000

bh

4.2320

zak

Halaman : 177+29

Analisa Satuan Pekerjaan

G. 32.I

6=(3x5)

Pasir Pasang

0.4275

m3

Tukang Batu

1.2000

org

Kepala Tukang Batu

0.1200

org

Pekerja

0.3600

org

Mandor

0.0180

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M3 PASANGAN BATU PAHAT / CANDI 30 X 30 X 30 CM, 1PC : 3 PSR ( BID. PENGAIRAN )


Batu Candi/Pahat

G.5.a

37.0000

bh

P.C. (50 kg)

3.2000

zak

Pasir Pasang

0.4560

m3

Tukang Batu

1.2000

org

Kepala Tukang Batu

0.1200

org

Pekerja

0.3600

org

Mandor

0.0180

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

BRONJONG KAWAT DIGALVANO UNTUK DIISI DENGAN BATU (1 X 1 X 3 m )


DIISI BATU UNTUK TIAP 3 M3 ( 2 SEKAT LUAS PERMUKAAAN BRONJONG = 16 M3 ) DIA. 3 MM
Batu Kali

3.0000

m3

28.5700

kg

Pekerja Penganyam

1.6000

org

Penganyam

2.0000

org

Mandor Penganyam

0.0800

org

Pekerjan Pengisi

4.5000

org

Mandor Pengisi

0.0750

org

Kawat Bronjong 3 mm

G.5.b

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

BRONJONG KAWAT DIGALVANO UNTUK DIISI DENGAN BATU (1 X 1 X 3 m )


DIISI BATU UNTUK TIAP 3 M3 ( 2 SEKAT LUAS PERMUKAAAN BRONJONG = 16 M3 ) DIA. 4 MM
Batu Kali
Kawat Bronjong 3 mm

G.5.a.R.

3.0000

m3

42.3500

kg

Pekerja Penganyam

1.8000

org

Penganyam

2.2000

org

Mandor Penganyam

0.0800

org

Pekerjan Pengisi

4.5000

org

Mandor Pengisi

0.0750

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 7,5 M2) 1 SEKAT


Batu Kali

Daftar Analisa TARKIM

1.0000

m3

Halaman : 178+29

Analisa Satuan Pekerjaan

2
Kawat Bronjong 3 mm

G.5.b.R.

6=(3x5)
-

Pekerja Penganyam

0.7500

org

Penganyam

0.9400

org

Mandor Penganyam

0.0400

org

Pekerjan Pengisi

2.1100

org

Mandor Pengisi

0.0400

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 4 MM ( 7,5 M2) 1 SEKAT


1.0000

m3

19.8500

kg

Pekerja Penganyam

0.7900

org

Penganyam

0.9700

org

Mandor Penganyam

0.0400

org

Pekerjan Pengisi

1.9900

org

Mandor Pengisi

0.0300

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 11,0 M2) 1 SEKAT


Batu Kali

1.5000

m3

19.6400

kg

Pekerja Penganyam

1.1000

org

Penganyam

1.3800

org

Mandor Penganyam

0.0600

org

Pekerjan Pengisi

3.0900

org

Mandor Pengisi

0.0500

org

Kawat Bronjong 3 mm

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 11,0 M2) 1 SEKAT


Batu Kali

1.5000

m3

29.1200

kg

Pekerja Penganyam

1.2400

org

Penganyam

1.5100

org

Mandor Penganyam

0.0600

org

Pekerjan Pengisi

3.0900

org

Mandor Pengisi

0.0500

org

Kawat Bronjong 3 mm

B2

kg

Kawat Bronjong 3 mm

G.5.b.R.

13.3900

Batu Kali

G.5.a.R.

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

ONGKOS ANGKUT 10 M2 LEMPENGEN TEMPEL ( BID. PENGAIRAN )


Angkutan 10 m2 lempengan = angkutan 1 m3 galian
Tidak lebih dari 30 m1 :

Daftar Analisa TARKIM

Halaman : 179+29

Analisa Satuan Pekerjaan

6=(3x5)

org

Mandor

0.0010

org

a
L
k

: Upah Pekerja Setempat ( rupiah )


: Jarak angkut dalam m1
: Harga angkutan per m3
( Termasuk harga bahan dan peralatan angkut: bambu, dll)

Jumlah

Dibulatkan

MENANAM 1 M1 PAGAR HIDUP ( BID. PENGAIRAN )


Buah Stek

E 13

0.0330

Keuntungan Max. 10 %

B6

Pekerja

Lebih dari 30 m' :


Jumlah

B5

10.0000

bh

Pekerja

0.1000

org

Mandor

0.0050

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

MENANAM 1 BATANG TANAMAN BERIKUT PELINDUNGNYA ( BID. PENGAIRAN )


Batang Tanaman

1.0000

bh

Bambu Tali

1.0000

bh

Pekerja

0.4000

org

Mandor

0.0050

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK ( BID. PENGAIRAN )


Tukang Kayu

0.0400

org

Kepala Tukang

0.0040

org

Pekerja

1.8000

org

Mandor

0.0430

org

Untuk tanah biasa dihitung = 1, 25 x analis E. 13


Untuk tanah biasa dihitung = 1, 50x analis E. 13
Untuk tanah biasa dihitung = 2, 00 x analis E. 13

E 14

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK ( BID. PENGAIRAN )


( Bila perancah dipancangkan diatas rakit )

E 17'

Tukang Kayu

0.0600

org

Kepala Tukang

0.0060

org

Pekerja

3.0000

org

Mandor

0.0750

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M1 PAPAN PENAHAN DIPANCANGKAN KE DALAM TANAH LUNAK ( BID.PENGAIRAN )


Tukang Kayu

0.0800

org

Kepala Tukang

0.0080

org

Daftar Analisa TARKIM

Halaman : 180+29

Analisa Satuan Pekerjaan

6=(3x5)

Pekerja

1.0000

org

Mandor

0.0250

org

Untuk tanah biasa dihitung = 1, 25 x analis E. 13


Untuk tanah biasa dihitung = 1, 50x analis E. 13
Untuk tanah biasa dihitung = 2, 00 x analis E. 13

E17

F3

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

MENCABUT TIANG PEMANCANG DARI DALAM TANAH ( BID. PENGAIRAN )


Tukang Kayu

0.3500

org

Kepala Tukang

0.0350

org

Pekerja

5.0000

org

Mandor

0.2500

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M1 MEMBUAT SENDERAN BALOK PEMIKUL & BALOK AIR ( BID. PENGAIRAN )


Tukang Kayu

F4

24.0000

org

Kepala Tukang

2.4000

org

Pekerja

8.0000

org

Mandor

0.4000

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M1 MEMASANG BALOK PENGGANTUNG & PENARIK S.D 15 M1 ( BID. PENGAIRAN )


Tukang Kayu

F5

F7

36.0000

org

Kepala Tukang

3.6000

org

Pekerja

1.2000

org

Mandor

0.6000

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

100 KG MEMASANG GELAGAR BESI ( BID. PENGAIRAN )


Tukang Kayu

0.1000

org

Kepala Tukang

0.0100

org

Pekerja

0.5000

org

Mandor

0.0250

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

100 KG MENURUNKAN GELAGAR BESI ( BID. PENGAIRAN )


Pekerja

0.5000

org

Mandor

0.0250

org

Daftar Analisa TARKIM

Halaman : 181+29

Analisa Satuan Pekerjaan

F18

G3

G4

G.50.I

G.50.J

6=(3x5)

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M2 MENGERJAKAN LANTAI JEMBATAN ( BID. PENGAIRAN )


Tukang Kayu

0.5000

org

Kepala Tukang

0.0500

org

Pekerja

0.2000

org

Mandor

0.0100

org

Upah menggergaji

1.2000

m2

Paku (Lantai Bawah ) atau

0.7500

kg

Paku

0.4000

kg

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M2 PASANGAN BATU KOSONG TEBAL = 0,25 M SEBELAH LUAR DISIAR DENGAN PEREKAT
Batu Kecil

0.2750

m3

PC. (50 kg )

0.0760

zak

Pasir

0.0080

m3

Tukang Batu

0.0800

org

Kepala Tukang

0.0080

org

Pekerja

0.6150

org

Mandor

0.0310

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M2 MEMASANG BATU PADA BENDUNG CURAHAN SALURAN MIRING DST. SETEBAL 0,23 M1
Batu Kali

0.2500

m3

Kerikil
Pekerja

0.0200

m3

0.8000

org

Mandor

0.0400

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M2 PLESTERAN 1 PC : 3 PSR ( TEBAL 15 MM )


PC. (50 kg )

0.1304

zak

Pasir Pasang

0.0194

m3

Tukang Batu

0.2000

org

Kepala Tukang Batu

0.0200

org

Pekerja

0.4000

org

Mandor

0.0200

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M2 PLESTERAN 1 PC : 3 PSR ( TEBAL 10 MM )

Daftar Analisa TARKIM

Halaman : 182+29

Analisa Satuan Pekerjaan

G.50.C

PC. (50 kg )

0.0864

Pasir Pasang
Tukang Batu

0.0130

m3

0.1500

org

Kepala Tukang Batu

0.0150

org

Pekerja

0.4000

org

Mandor

0.0200

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M2 SIARAN 1 PC : 2 PSR ( BID. PENGAIRAN )


PC. (50 kg )

0.1054

zak

50,000.00

5,270.00

Pasir Pasang

0.0085

m3

65,000.00

552.50

Tukang Batu

0.1200

org

36,500.00

4,380.00

Kepala Tukang Batu

0.0120

org

39,500.00

474.00

Pekerja

0.3600

org

27,500.00

9,900.00

Mandor

0.0180

org

42,500.00

L.2

765.00
21,341.50

Keuntungan Max. 10 %

L.4

6=(3x5)

zak

Jumlah

L.3

2,134.15

Jumlah

23,475.65

Dibulatkan

23,470.00

1 M2 BONGKARAN PASANGAN ( BID. PENGAIRAN )


Pekerja

4.0000

org

Mandor

0.4000

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M2 BONGKARAN PASANGAN (TEBAL 30 MM ) ( BID. PENGAIRAN )


Pekerja

2.0000

org

Mandor

0.1000

org

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

PEMBESIAN UNTUK SETIAP 100 KG


Besi Beton

110.0000

kg

2.0000

kg

Kawat beton

1 m3 Beton memerlukan = . (bb) ..kg (Hasil Perhitungan )

M.01

Jumlah
(bb) kg besi beton Rp. ..

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M' JEMBATAN SEMENTARA KAYU BULAT 30 CM PANJANG 3M' ( ASUMSI LEBAR JEMBATAN 3M' & TANPA TIANG)
Kayu Bulat 30 cm

7.5000

btg

Paku 12 cm

0.5600

kg

Daftar Analisa TARKIM

Halaman : 183+29

Analisa Satuan Pekerjaan

M.02

6=(3x5)

2.8000

kg

Tukang Kayu

1.2000

org

Kepala Tukang Kayu

0.1200

org

Pekerja

4.8000

org

Mandor

0.0120

org

Alat Bantu

0.0100

ls

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M' JEMBATAN SEMENTARA KAYU BULAT 30 CM PANJANG 6M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
18.0000

btg

Paku 12 cm

1.1200

kg

Pasak Besi 12 mm

5.6000

kg

Tukang Kayu

1.4000

org

Kepala Tukang Kayu

0.1400

org

Pekerja

5.3000

org

Mandor

0.0140

org

Alat Bantu

0.0100

ls

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M' JEMBATAN SEMENTARA KAYU BULAT 30 CM PANJANG 9M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat 30 cm

M.04

Pasak Besi 12 mm

Kayu Bulat 30 cm

M.03

28.5000

btg

Paku 12 cm

1.6800

kg

Pasak Besi 12 mm

8.4000

kg

Tukang Kayu

1.7000

org

Kepala Tukang Kayu

7.0000

org

Pekerja

5.9000

org

Mandor

0.0170

org

Alat Bantu

0.0100

ls

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

1 M' JEMBATAN SEMENTARA KAYU BULAT 30 CM PANJANG 12M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG)
Kayu Bulat 30 cm

39.0000

btg

1.6800

kg

11.2000

kg

Tukang Kayu

2.1000

org

Kepala Tukang Kayu

0.2100

org

Pekerja

6.3000

org

Mandor

0.0210

org

Alat Bantu

0.0100

ls

Paku 12 cm
Pasak Besi 12 mm

Jumlah

Keuntungan Max. 10 %

Jumlah

Dibulatkan

Daftar Analisa TARKIM

Halaman : 184+29

Analisa Satuan Pekerjaan

1
A7.R.

A6

6=(3x5)

UPAH ANGKUTAN 1 ZAK SEMEN PC ( BID. PENGAIRAN )


1 zak PC = 50 kg = 40 liter = 0.04 m3 = 1/25 m3
maka setiap jarak : (1 / (275 / ( L + 75 ))) /25 x a
Jumlah
L
=
10 m1
=
0,01236
x
a
L
=
50 10
m1% =
0,01818
x
a
Keuntungan
Max.
L
=
100 m1
=
0,02545
x
a
Jumlah
L
=
200 m1
=
0,04000
x
a
L
=
300 m1
=
0,05454
x
a
Dibulatkan
Ket. : L = Jarak angkut dalam m1
ONGKOSa ANGKUT
1 M3 TANAH
( BID.
PENGAIRAN
)
= Upah pekerja
setempat
( Rupiah
)

Sejauh 30 meter
Pekerja

0.3300

org

Mandor

0.0100

org

Lebih dari 30 meter

Jumlah

Keuntungan Max. 10 %
k = a /275
Jumlah
Dibulatkan

Daftar Analisa TARKIM

(L

75 )

a =
Upah Pekerja Setempat (rupiah )
L =
Jarak angkut dalam m1
k =
Harga angkutan per m3
(termasuk harga bahan dan peralatan angkut, bambu, dll)

Halaman : 185+29

Вам также может понравиться