---------- Forwarded message ---------From: <saijee@clenergen.

com> Date: Thu, Jan 27, 2011 at 8:20 PM Subject: Re: Fwd: Revised work order- Draft approved To: stanley <rsj@mmturbocare.com> Cc: psk9475@gmail.com Dear Mr. Stanley, Thanks for your Reply on 25.01.11. I wish to inform you the following points. 1.The plant was operated at 22.7 mw load operation during in the month of April,May and June at ambient temperature of 44 to 48 Deg.C. I to agree that it was never operated at 27.3 mw Load. Hence you need not give us at full load i.e. 27.3 mw load. We can restrict minimum of 22.7 mw load only. 2.we thanks for accepting 6.3kv panel testing and we also help from our side. 3.thanking you for accepting regarding post commissioning visit. 4.Regarding any modification if required in DCS, the same will be taken care by us. We are sure no modifications is required as the plant was operated with existing system and plant was taken shut down during last year only and have done all routine checkups and baring gear was regularly operated Hence please accept the offer and send your invoice to release 30 % of the advance payment. NOTE: Your invoice is needed to release the advance payment. Thanking you, Regards, SAIJEE INAVOLU SENIOR VICE PRESIDENT-POWER

CLENERGEN INDIA PRIVATE LIMITED SV SUGAR 27.3 POWER PLANT PALAYASEEVARAM


` From E. Venkateswarlu, Deputy General Manager, Clenergen India private Limited. To Ravichandran, Deputy General Manager, Nandha Energy Limited. Dear sir, Sub : Transferring man power to 18 MW power plant Reg. The following persons are deputed from 27.3MW power plant to 18 MW power plant. 1. Mr. Yuvaraj Nehru 2. Mr. Amal doss 3. Mr. Suderrajan - Fitter. - Welder. - Helper (Coal Handling operator). Date : 04.02.11.

Thanking you,

With Regards,

E. Venkateswarlu Deputy General Manager

Вам также может понравиться