QUOTATION
Quotation :No.SKT 080925
TOTAL 38,640.00
VAT 7% 2,704.80
FINAL AMOUNT 41,344.80
We hope that our confirmation will meet with your requirement and look forward to receiving your valuable or
Your Faithfully,
SUMMARY OF QUOTATION
1 Direct Cost
A 1
Addition Works For New Toshiba Injection Install lot 31,600.00 31,600.00
Subtotal 1 31,600.00
2 Indirect Cost
2.1 Site Staff and Supervisor 1 lot
2.2 Transportation 1 lot
2.3 Tool and consumption 1 lot 2,000.00
2.4 Site Expense 1 lot
1 Temporary Facilities
2 Small Construction Supplies
3 Utility Supply Costs
Subtotal 2 2,000.00
COST Different
Estimation Sheet
Client Sankyu
: - Thai Co.,Ltd. Date : 24 September 2008
Project New :Injection Machine Installation Job Number : SKT 080925
Location Wellgrow
: Industial Estate Revision : 0
Title Of Work
Addition
: Works For New Toshiba Injection Install
1 DIRECT COST
- TAKEOFF AND RE-WIRING CABLE CV 1 C - 185x3 (x2) sq.1 LOT Existing Inj. M/C No.11
- TAKEOFF AND RE-INSTALL CABLE THW 1C - 50 sq. G 1 LOT Existing Inj. M/C No.11
TOTAL A1 25,600.00
- ABB BREAKER T1N 32AT 3P MCCB 2 SET Existing FOR MOLDCHANGE C/P
- ABB BREAKER T1N 160AT 3P MCCB (NEW INSTALL) 2 SET ### 5,200.00 FOR HOT RUN C/P
TOTAL A2 6,000.00
TOTAL A 31,600.00
#REF!