MANUAL DE PROCE

PLANEACION DE

PROGRAMACI

PROYECTO: RECONVERSION

EMPRESA CONTRATISTA: CONS

PROGRAMA DE TRA

ITEM

DESCRIPCION

1 PRELIMINARES
01 CAMPAMENTO
02 BAO OBREROS
TOTALPRELIMINARES
2 AREA INTERVENCION 2, CUBO DE ENTRADA PRINCIPAL
01 CERRAMIENTO
02 RETIRO DE PUERTA EXISTENTE
03 DEMOLICION MUROS EN BLOQUE
04 SUPERBOAD SOBRE BLOQUE INCLUYE ESTRUCTURA

UN

M2
MES

M2
M2
M2
M2

CANT

VR. UNIT.

63.00
2.00

80.00
38.00
30.00
330.00

VR. TOTAL

0.00
0.00

0.00
0.00
0.00
0.00

05 TAPAS LATERALES EN SUPERBOARD

ML

110.00

0.00

06 PERSIANA HUNTER DOUGLAS

M2

103.00

0.00

08 PINTURA EN POLIURETANO (AMARILLO)

M2

230.00

0.00

09 PINTURA KORAZA MUROS BLANCO

M2

96.50

0.00

10 PINTURA KORAZA MUROS

M2

2,956.60

0.00

11 SOPORTE PARA LOS AVISOS

UN

10.00

0.00

12 GALLINAZOS

UN

6.00

0.00

TOTALAREA INTERVENCION 2, CUBO DE ENTRADA PRINCIPAL


3 AREA DE INTERVENCION 3. INTERIORES Y LOCALES COMERCIALES
01 CERRAMIENTO

M2

60.00

0.00

DURAC
(DIAS)

3.00
4.00

3.00
4.00
4.00
14.00
15.00
9.00
8.00
12.00
19.00
7.00
3.00

4.00

FECHA

FECHA

INICIO

TERMINACION

10

03/07/07

05/07/07

##
04/07/07

07/07/07
##

06/07/07

08/07/07

##
08/07/07

12/07/07

1
##

09/07/07

13/07/07
##

09/07/07

28/07/07
##

14/07/07

28/07/07

20/07/07

28/07/07

24/07/07

31/07/07

20/07/07

31/07/07

13/07/07

31/07/07

23/07/07

29/07/07

27/07/07

29/07/07

##
##
##
##
##
##
##

01/08/07

05/08/07
##

ITEM

DESCRIPCION

UN

CANT

VR. UNIT.

VR. TOTAL

02 MAMPOSTERIA

M2

217.60

0.00

03 COLUMNETAS

ML

46.00

0.00

04 VIGUETAS

ML

34.50

0.00

05 CORTES DE PISOS

ML

135.00

0.00

GBL

1.00

0.00

07 REPARACION PISOS

ML

92.00

0.00

08 PAETES

M2

202.00

0.00

10 ESTUCO Y PINTURA MUROS

M2

106.00

0.00

12 MURO EN DRYWALL

M2

27.00

0.00

13 DESMONTE CIELORASSO

M2

145.35

0.00

14 MEDIACAA EN GRANITO

ML

31.00

0.00

15 MEDIACAA EN YESO

ML

44.00

0.00

16 CIELORASSO

M2

37.00

0.00

17 PUNTO HIDRAULICO

PTO

1.00

0.00

18 PUNTO SANITARIO

PTO

1.00

0.00

06 DESMONTE DE CAJERO

TOTALAREA DE INTERVENCION 3. INTERIORES Y LOCALES COMERCIALES


4 AREA DE INTERVENCION 4. ADECUACIN OFE
ADECUACION OFE
M2
TOTALAREA DE INTERVENCION 4. ADECUACIN OFE
5 AREA DE INTERVENCION 5, VESTIER
1
01 MAMPOSTERIA

31.00

0.00

10.00
5.00
3.00
9.00

FECHA

FECHA

INICIO

TERMINACION

10

05/08/07

15/08/07

06/08/07

11/08/07

08/08/07

11/08/07

04/08/07

13/08/07

##
##
##
##
00/01/00

6.00
9.00
8.00
7.00
8.00
6.00
6.00
5.00
2.00
2.00

31.00

0
11/08/07

17/08/07

12/08/07

21/08/07

16/08/07

24/08/07

11/08/07

18/08/07

05/08/07

13/08/07

11/08/07

17/08/07

11/08/07

17/08/07

19/08/07

24/08/07

11/08/07

13/08/07

11/08/07

13/08/07

##
##
##
##
##
##
##
##
##
##

16/07/07

16/08/07
##
0

M2

38.00

0.00

02 COLUMNETAS

ML

18.00

0.00

03 VIGUETAS

ML

9.00

0.00

04 PAETES

M2

75.00

0.00

05 DEMOLICION MUROS

M2

17.00

0.00

06 MURO DRYWALL

M2

58.00

0.00

07 MEZANINE BODEGA MANIQUI EN MACHIMBRE

M2

28.00

0.00

08 RETIRO DE ESCALERA METALICA

UN

1.00

0.00

UND

1.00

0.00

08 SUM. E INSTALACION DE MARCO Y PUERTA

DURAC
(DIAS)

5.00
3.00
3.00
4.00
4.00
6.00
6.00
3.00
5.00

16/07/07

21/07/07

18/07/07

21/07/07

19/07/07

22/07/07

21/07/07

25/07/07

14/07/07

18/07/07

21/07/07

27/07/07

25/07/07

31/07/07

18/07/07

21/07/07

26/07/07

31/07/07

##
##
##
##
##
##
##
##
##

ITEM

DESCRIPCION

TOTALAREA DE INTERVENCION 5, VESTIER


6 AREA DE INTERVENCION 6. CAFETERA, COCINA, PANADERIA

UN

CANT

VR. UNIT.

VR. TOTAL

DURAC
(DIAS)

FECHA

FECHA

INICIO

TERMINACION

10

ITEM

DESCRIPCION

UN

CANT

VR. UNIT.

VR. TOTAL

01 CERRAMIENTO

M2

80.00

0.00

01 DEMOLICION DE ENCHAPES

M2

220.00

0.00

02 SUM. E ISNTALCION DE ENCHAPES

M2

220.00

0.00

03 CORTES EN PISOS

ML

192.00

0.00

04 MOVIMIENTO DE EQUIPOS PARA INSTAL. MEDIACAA

GL

1.00

0.00

04 BRILLADA DE PISO

M2

402.00

0.00

05 MEDIACAA EN GRANITO

ML

96.00

0.00

TOTALAREA DE INTERVENCION 6. CAFETERA, COCINA, PANADERIA


7 AREA DE INTERVENCION 7 ALMACEN
01 CERRAMIENTO
02 MOVIMIENTO DE GABINETES

M2

70.00

0.00

UN

3.00

0.00

03 PTOS SANITARIOS

PTOS

15.00

0.00

04 RETIRO DE PUERTAS

UND

1.00

0.00

05 CAMBIO DE PISOS

M2

100.00

0.00

06 PINTURA MUROS ALMACEN

M2

5,800.00

0.00

07 BRILLADA DE PISO

M2

6,597.00

0.00

08 ASEO DUCTOS VENTILACIN

ML

750.00

0.00

09 PINTURA METLICA PUERTAS ENROLLABLES

M2

150.00

0.00

10 ASEO

M2

5,108.00

0.00

TOTALAREA DE INTERVENCION 7 ALMACEN


8 AREA DE INTERVENCION 8 ADMINISTRACION Y TRASTIENDA
01 CERRAMIENTO
01 DEMOLICION MUROS

M2
M2

40.00
406.00

0.00
0.00

02 MAMPOSTERIA

M2

209.00

0.00

03 COLUMNETAS

ML

62.00

0.00

04 CORTES DE PISOS

ML

22.00

0.00

05 PAETES

M2

140.00

0.00

06 PAETES ML

ML

22.00

0.00

DURAC
(DIAS)

4.00
13.00
16.00
11.00
12.00
23.00
5.00

6.00
9.00
11.00
2.00
26.00
53.00
20.00
50.00
18.00
51.00

3.00
24.00
16.00
7.00
7.00
12.00
7.00

FECHA

FECHA

INICIO

TERMINACION

10

16/07/07

20/07/07

19/07/07

01/08/07

24/07/07

09/08/07

19/07/07

30/07/07

19/07/07

31/07/07

08/08/07

31/08/07

01/08/07

06/08/07

##
##
##
##
##
##
##

09/07/07

15/07/07
##

14/07/07

23/07/07

18/07/07

29/07/07

14/07/07

16/07/07

18/07/07

13/08/07

09/07/07

31/08/07

##
##
##
##
##
01/08/07

21/08/07

12/07/07

31/08/07

26/07/07

13/08/07

12/07/07

01/09/07

##
##
##
##

07/07/07

10/07/07

##
08/07/07

01/08/07

##
20/07/07

05/08/07

25/07/07

01/08/07

10/07/07

17/07/07

##
##
1
##
01/08/07

13/08/07

08/08/07

15/08/07

##
##

ITEM

DESCRIPCION

UN

CANT

VR. UNIT.

VR. TOTAL

07 VIGUETAS

ML

33.00

0.00

08 ENCHAPE MURO

M2

100.00

0.00

09 MEDIACAA EN GRANITO

ML

23.40

0.00

10 PUNTO SANITARIOS

PTO

3.00

0.00

11 PUNTOS HIDRAULICOS

PTO

3.00

0.00

12 INSTALACION DE GAS

GL

1.00

0.00

13 EXTRACCIN ESTUFA

GL

1.00

0.00

14 DEMOLICION DE PISO

M2

58.00

0.00

15 PISO EN DUROPISO

M2

58.00

0.00

16 MURO EN MALLA ESLABONADA

M2

192.00

0.00

17 MEZANINNE 2 (INC. ESTRUCTURA)

M2

430.00

0.00

18 ESCALERA METALICA PAA ACCESO MEZANINNE

GL

1.00

0.00

19 PISO EN MADERA

M2

163.00

0.00

20 CIELORASSO EN DRYWALL

M2

163.00

0.00

21 PASAMANOS CAFETERA

ML

3.30

0.00

22 PUERTA VIDRI TEMPLADO + BARRA ANTIPANICO

M2

4.60

0.00

23 MANTENIMIENTO BAOS EMPLEADOS

GL

1.00

0.00

24 DIVISION METALICA BAOS EMPLEADOS

M2

38.00

0.00

25 PINTURA MUROS

M2

930.00

0.00

26 PINTURA

ML

830.00

0.00

27 DESMONTE Y SUM. MESON GRANITO B.EMPLEADOS

ML

11.30

0.00

28 PINTURA GRIS ANOLOC CORTINAS ENR.

M2

74.00

0.00

29 REPARACION DE PISO

M2

100.00

0.00

30 PINTURA PASAMANOS

ML

45.00

0.00

31 PINTURA CARPINTERIA METALICA

M2

250.00

0.00

32 RETIRO DE PUERTAS

UN

11.00

0.00

DURAC
(DIAS)

6.00
8.00
5.00
3.00
3.00
3.00
3.00
7.00
8.00
28.00
7.00
25.00
7.00
4.00
8.00
20.00
12.00
31.00
31.00
9.00
7.00
21.00
12.00
13.00
7.00

FECHA

FECHA

INICIO

TERMINACION

10

26/07/07

01/08/07

01/08/07

09/08/07

03/08/07

08/08/07

27/07/07

30/07/07

27/07/07

30/07/07

27/07/07

30/07/07

27/07/07

30/07/07

23/07/07

30/07/07

29/07/07

06/08/07

01/08/07

29/08/07

01/08/07

00/01/00

12/08/07

19/08/07

01/08/07

26/08/07

29/07/07

05/08/07

05/08/07

09/08/07

19/08/07

27/08/07

09/07/07

29/07/07

##
##
##
##
##
##
##
##
##
##
0
##
##
##
##
##
##
17/07/07

29/07/07

29/07/07

29/08/07

29/07/07

29/08/07

16/07/07

25/07/07

22/07/07

29/07/07

02/08/07

23/08/07

26/07/07

07/08/07

22/07/07

04/08/07

13/07/07

20/07/07

##
##
##
##
##
##
##
##
##

ITEM

DESCRIPCION

UN

CANT

VR. UNIT.

VR. TOTAL

33 MARCOS METALICOS

UN

4.00

0.00

34 PUERTAS

UN

4.00

0.00

35 RETIRO DE ESCOMBROS

M3

1,000.00

0.00

36 PINTURAS Y MANTENIMIENTOS VARIOS

GBL

1.00

0.00

37 ASEO

JOR

820.00

0.00

TOTALAREA DE INTERVENCION 8 ADMINISTRACION Y TRASTIENDA


9 INSTALACIONES
03 INSTALACIONES HIDROSANITARIAS
TOTALINSTALACIONES
# EXTERIORES
01 PINTURA REJA DE CERRAMIENTO
02 PINTURA BASE DE CERRAMIENTO SOBRE BLOQUE PIEDRA

1.00

0.00

47.00
52.00
52.00

TERMINACION

10

20/07/07

26/07/07

22/07/07

28/07/07

11/07/07

27/08/07

11/07/07

01/09/07

11/07/07

01/09/07

##
##
##
##
##

38.00

11/07/07

18/08/07
##

0
M2
ML

693.75
412.50

0.00
0.00

1,400.00

0.00

04 REPARACIN ANDEN ACCESO PERSONAL

M2

18.00

0.00

TOTALASEO
# GASTOS GENERALES
01 GASTOS GENERALES (VALOR ESTIMADO ADMON DELEGADO)

6.00

FECHA

INICIO

0
GL

ML

02 RETIRO DE ESCOMBROS

6.00

FECHA

03 DEMARCACIN PARQUEOS EXTERIORES

TOTALEXTERIORES
# ASEO
01 ASEO FINAL

DURAC
(DIAS)

49.00
50.00
36.00
20.00

09/07/07

27/08/07
##

09/07/07

28/08/07
##

16/07/07

21/08/07

23/07/07

12/08/07

##
##

M2

5,864.00

0.00

M3

1,300.00

0.00

19.00
54.00

13/08/07

01/09/07

09/07/07

01/09/07

##
##

GL

1.00

0.00

02 OTROS GASTOS GENERALES (2%)

GL

1.00

0.00

03 JORNALES POR ADMINISTRACION

GL

1.00

0.00

04 JORNALES POR ADMINISTRACION ACARREO DE MATERIALES

GL

1.00

0.00

05 ALQUILERES DE EQUIPOS ADMON DELEGADO Y OTROS

GL

1.00

0.00

GL

1.00

0.00

62.00
62.00
62.00
62.00
62.00

01/07/07

01/09/07

01/07/07

01/09/07

01/07/07

01/09/07

01/07/07

01/09/07

01/07/07

01/09/07

09/07/07

01/09/07

1
##
1
##
1
##
1
##
1
##

TOTALGASTOS GENERALES
01 IMPREVISTOS 15% DEL CD
TOTALIMPREVISTOS 15% DEL CD
TOTAL GENERAL

54.00

##

##

ITEM

DESCRIPCION

ING. FREDY AMAYA MOTTA


DIRECTOR DE OBRA

UN

CANT

VR. UNIT.

VR. TOTAL

DURAC
(DIAS)

FECHA

FECHA

INICIO

TERMINACION

10

MANUAL DE PROCESOS OPERATIVOS


PLANEACION DE PROYECTOS

PROGRAMACIN DE OBRA

PROYECTO: RECONVERSION VIVERO - CUCUTA


EMPRESA CONTRATISTA: CONSTRUCOL CIA. LTDA.
PROGRAMA DE TRABAJO

MES 001 "JULIO"


M
11

1
1

MES 001 "JULIO"


M
11

MES 001 "JULIO"


M
11

MES 001 "JULIO"


M
11

MES 001 "JULIO"


M
11

MES 001 "JULIO"


M
11

1
1
1

1
1

1
1
1
1
1

MES 001 "JULIO"


M
11

AL DE PROCESOS OPERATIVOS

MPO 02 - 05 - R -1
VERSION: 1

ANEACION DE PROYECTOS

ENERO 30 DE 2006
APROBO: GERENTE

PROGRAMACIN DE OBRA

PAGINA 1 DE

DA.

AMA DE TRABAJO

MES 001 "JULIO"

MES 002 "AGOSTO"

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

0
1 1
##

##
##
0
##
##
1
##

##
##
##
##
1

##
1

##
##
##

MES 001 "JULIO"

MES 002 "AGOSTO"

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

##
##
##
1

##
0
##
##
##
1

##
1

##
##
##
##
1

##
##

1 1
##
0
##
##

1
##
1

1
##

1
##
1

##
1

1
##

1
##
1

1
##

MES 001 "JULIO"

MES 002 "AGOSTO"

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MES 001 "JULIO"

MES 002 "AGOSTO"

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1
1

##
1 1
##

##
1

##
1
##
##
1 1
##

##
1 1
##

0
1

1
##
1

##
1

1
##

##
1
##
1
##
1
##
1
##
1
##
1
##
0
##

1
##

1
##
1 1
##
##

MES 001 "JULIO"

MES 002 "AGOSTO"

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1
##
1 1
##

##
1

##
##
##
##
1

##
1 1
##
1 1
##

##
1 1
##
1 1 1
##

##
##
1

##

##
1 1
##
1 1 1
##
1

##
1

1
##

1
1

1
##
1 1 1
##
1 1 1
##

1
##

MES 001 "JULIO"

MES 002 "AGOSTO"

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1
1

##
##
1 1
##
1 1 1
##
1 1 1
##

0
1 1
##

0
1
##
1 1
##
1 1
##
1 1
##

##
1 1 1
##

1 1
##

1
##
1
##
1
##
1
##
1
##

##

MES 001 "JULIO"

MES 002 "AGOSTO"

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MES 002 "AGOSTO"


V
31

MES 002 "AGOSTO"


V
31

MES 002 "AGOSTO"


V
31

MES 002 "AGOSTO"


V
31

MES 002 "AGOSTO"


V
31

MES 002 "AGOSTO"


V
31

1
1

1
1

1
1
1
1
1

MES 002 "AGOSTO"


V
31

OBRA: RECONVERSION VIVERO - CUCUTA


PRESUPUESTO DE MANO DE OBRA
ITEM

DESCRIPCION

2 AREA INTERVENCION 2, CUBO DE ENTRADA PRINCIPAL


01 CERRAMIENTO

UN

CANT

VR. UNIT.

VR. TOTAL

M2

80.00

2,500.00

200,000.00

M2

38.00

30,000.00

1,140,000.00

M2

60.00

2,500.00

150,000.00

02 MAMPOSTERIA

M2

217.60

7,000.00

1,523,200.00

03 COLUMNETAS

ML

46.00

15,200.00

699,200.00

04 VIGUETAS

ML

34.50

15,000.00

517,500.00

07 REPARACION PISOS

ML

92.00

12,000.00

1,104,000.00

08 PAETES

M2

202.00

7,000.00

1,414,000.00

10 ESTUCO Y PINTURA MUROS

M2

106.00

7,200.00

763,200.00

13 DESMONTE CIELORASSO

M2

145.35

3,000.00

436,050.00

02 RETIRO DE PUERTA EXISTENTE


TOTALAREA INTERVENCION 2, CUBO DE ENTRADA PRINCIPAL
3 AREA DE INTERVENCION 3. INTERIORES Y LOCALES COMERCIALES
01 CERRAMIENTO

17 PUNTO HIDRAULICO

PTO

1.00

18,000.00

18,000.00

18 PUNTO SANITARIO

PTO

1.00

18,000.00

18,000.00

38.00

7,000.00

266,000.00

TOTALAREA DE INTERVENCION 3. INTERIORES Y LOCALES COMERCIALES


5 AREA DE INTERVENCION 5, VESTIER
01 MAMPOSTERIA
M2
02 COLUMNETAS

ML

18.00

15,200.00

273,600.00

03 VIGUETAS

ML

9.00

15,000.00

135,000.00

04 PAETES

M2

75.00

7,000.00

525,000.00

M2

80.00

2,500.00

200,000.00

01 DEMOLICION DE ENCHAPES

M2

220.00

5,200.00

1,144,000.00

02 INSTALCION DE ENCHAPES

M2

220.00

9,000.00

1,980,000.00

M2

70.00

2,500.00

175,000.00

03 PTOS SANITARIOS

PTOS

15.00

18,000.00

270,000.00

04 RETIRO DE PUERTAS

UND

1.00

30,000.00

30,000.00

TOTALAREA DE INTERVENCION 5, VESTIER


6 AREA DE INTERVENCION 6. CAFETERA, COCINA, PANADERIA
01 CERRAMIENTO

TOTALAREA DE INTERVENCION 6. CAFETERA, COCINA, PANADERIA


7 AREA DE INTERVENCION 7 ALMACEN
01 CERRAMIENTO

05 CAMBIO DE PISOS

M2

100.00

13,000.00

1,300,000.00

10 ASEO

M2

5,108.00

500.00

2,554,000.00

M2

40.00

2,500.00

100,000.00

TOTALAREA DE INTERVENCION 7 ALMACEN


8 AREA DE INTERVENCION 8 ADMINISTRACION Y TRASTIENDA
01 CERRAMIENTO

OBRA: RECONVERSION VIVERO - CUCUTA


PRESUPUESTO DE MANO DE OBRA
ITEM

DESCRIPCION

UN

CANT

VR. UNIT.

VR. TOTAL

02 MAMPOSTERIA

M2

209.00

7,000.00

1,463,000.00

03 COLUMNETAS

ML

62.00

15,200.00

942,400.00

05 PAETES

M2

140.00

7,000.00

980,000.00

06 PAETES ML

ML

22.00

5,000.00

110,000.00

07 VIGUETAS

ML

33.00

15,000.00

495,000.00

08 ENCHAPE MURO

M2

100.00

9,000.00

900,000.00

10 PUNTO SANITARIOS

PTO

3.00

18,000.00

54,000.00

11 PUNTOS HIDRAULICOS

PTO

3.00

18,000.00

54,000.00

15 PISO EN DUROPISO

M2

58.00

12,500.00

725,000.00

23 MANTENIMIENTO BAOS EMPLEADOS

GL

1.00

2,500,000.00

2,500,000.00

25 PINTURA MUROS

M2

930.00

4,500.00

4,185,000.00

26 PINTURA

ML

830.00

3,300.00

2,739,000.00

29 REPARACION DE PISO

M2

100.00

12,000.00

1,200,000.00

32 RETIRO DE PUERTAS

UN

11.00

30,000.00

330,000.00

35 RETIRO DE ESCOMBROS

M3

1,000.00

4,500.00

4,500,000.00

36 PINTURAS Y MANTENIMIENTOS VARIOS

GBL

1.00

2,500,000.00

2,500,000.00

37 ASEO

JOR

820.00

37,500.00

30,750,000.00

GL

1.00

2,500,000.00

2,500,000.00

M3

24.00

15,000.00

360,000.00

M2

18.00

12,000.00

216,000.00

M2

5,864.00

500.00

2,932,000.00

M3

1,300.00

4,500.00

5,850,000.00

TOTALAREA DE INTERVENCION 8 ADMINISTRACION Y TRASTIENDA


9 INSTALACIONES
03 MANTENIMIENTO HIDROSANITARIAS
TOTALINSTALACIONES
13 EXTERIORES
03 EXCAVACIONES
04 REPARACIN ANDEN ACCESO PERSONAL
TOTALEXTERIORES
14 ASEO
01 ASEO FINAL
02 RETIRO DE ESCOMBROS
TOTALASEO
TOTAL GENERAL

121,278,500.00

OBRA: RECONVERSION VIVERO - CUCUTA


PRESUPUESTO DE MANO DE OBRA
ITEM

DESCRIPCION

5 AREA DE INTERVENCION 5, VESTIER


08 SUM. E INSTALACION DE MARCO Y PUERTA

UN

UND

CANT

VR. UNIT.

VR. TOTAL

1.00

0.00

7 AREA DE INTERVENCION 7 ALMACEN


09 PINTURA METLICA PUERTAS ENROLLABLES

M2

150.00

0.00

8 AREA DE INTERVENCION 8 ADMINISTRACION Y TRASTIENDA


16 MURO EN MALLA ESLABONADA

M2

192.00

0.00

18 ESCALERA METALICA PAA ACCESO MEZANINNE

GL

1.00

0.00

21 PASAMANOS CAFETERA EN TUBO ACERO INOXIDABLE

ML

3.30

0.00

24 REPARACION DIVISION METALICA BAOS EMPLEADOS

M2

38.00

0.00

28 PINTURA GRIS ANOLOC CORTINAS ENR.

M2

74.00

0.00

30 PINTURA PASAMANOS

ML

45.00

0.00

31 PINTURA CARPINTERIA METALICA

M2

250.00

0.00

33 MARCOS METALICOS

UN

4.00

0.00

34 PUERTAS METALICAS

UN

4.00

0.00

36 PINTURAS Y MANTENIMIENTOS VARIOS

GBL

1.00

0.00

693.75

0.00

13 EXTERIORES
01 PINTURA REJA DE CERRAMIENTO

TOTAL GENERAL

M2

0.00