1. The current cost report shows items purchased for a project totaling $1849 with $1801 remaining in the account now. An additional $4175 is needed to complete the project.
2. Items still needing to be purchased include an engine, torque converter, final drive, frame material, and rod ends. Donations so far total $3650 with another $3000 still needed.
3. Material donations have been received from various sources including AJ's Custom Body & Paint, TerraTek, L3, Steve Radford, Sorenson BioScience, and Brown Bros Construction, totaling donations of $3600 with another $3000 still needed.
1. The current cost report shows items purchased for a project totaling $1849 with $1801 remaining in the account now. An additional $4175 is needed to complete the project.
2. Items still needing to be purchased include an engine, torque converter, final drive, frame material, and rod ends. Donations so far total $3650 with another $3000 still needed.
3. Material donations have been received from various sources including AJ's Custom Body & Paint, TerraTek, L3, Steve Radford, Sorenson BioScience, and Brown Bros Construction, totaling donations of $3600 with another $3000 still needed.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате XLS, PDF, TXT или читайте онлайн в Scribd
1. The current cost report shows items purchased for a project totaling $1849 with $1801 remaining in the account now. An additional $4175 is needed to complete the project.
2. Items still needing to be purchased include an engine, torque converter, final drive, frame material, and rod ends. Donations so far total $3650 with another $3000 still needed.
3. Material donations have been received from various sources including AJ's Custom Body & Paint, TerraTek, L3, Steve Radford, Sorenson BioScience, and Brown Bros Construction, totaling donations of $3600 with another $3000 still needed.
Авторское право:
Attribution Non-Commercial (BY-NC)
Доступные форматы
Скачайте в формате XLS, PDF, TXT или читайте онлайн в Scribd
Item Purchased Cost Purchaser Rembursed? Total amount spent
1 Registration fee 500 Will Yes 1849 2 2x4s for frame 24 Dan No 3 Copies for handouts 25 Matt No Remaining in the account NOW 4 Final Drive Housing 170 Jeremy No 1801 5 Steel Tubing 550 Team 1 6 Rod Ends 450 Team 1 Remaining needed funds 7 Engine 130 Will 4175 8 9 10
Whats left to buy What was give
Engine X Tires/Rims Torque Convertor 400 Locker Final Drive X Paint Shocks 1000 Steering 150 Frame material X Body Panels 100 Brakes(pistons & pads) 150 Safety Equipment 100 Electrical 50 Fasteners 75 Anadize Aluminum 150 Travel Gas 400 Travel Hotel 1000 Travel Food 400 Miscellaneous 200 Rod Ends & Inserts X
Donations Made Material Don
Source Secured Not Secured Source 1 Student fees fall 400 1 AJ's Custom Body & Paint 2 Student fees spring 400 2 3 College of Engineering 500 3 4 ME Department 500 5 ASUU Materials 500 6 ASUU Travel 500 7 TerraTek 300 8 L3 500 9 Steve Radford 50 10 Sorenson BioScience 500 11 Brown Bros Construction 300 12 Jone's Family (Lance) 600 13 Phil's Automotive (matt) 100 14 Vernal Express (Dustin) 300 15 Intermountain Wood Products (Josh) 1200 16 17