Вы находитесь на странице: 1из 10

LOCATION :

RAILWAY

KARJAT
CONNECTIVITY
MUMBAI-KARJAT-PUNE

ROAD

MUMBAI-KARJAT-PUNE

INTERNAL TOWN ROAD TO SITE AIR WATER TELECOMMUNICATIONS

INTERNET PHONE

PHYSICAL PARAMETERS
AREA

PERIMETER

SERVICES
ENERGY HYDROELECTRICITY

SOLAR

WIND WATER SUPPLY WASTE WATER DISPOSAL

SURFACE RUN-OFF STORM WATER DRAINAGE USED WATER

SOLID WASTE MANAGEMENT

NATURAL FACTORS

SOIL/EARTH

TOPOGRAPHY

TYPE(REDDISH BROWN LATERITE SOIL) PHYSIOLOGY WATER RAIN LAKE

GROUND WATER

SEASONAL STREAMS AIR HUMIDITY POLLUTION LEVELS (AIR POLLUTION)

DUST POLLUTION NOISE POLLUTION (HUMAN ACTIVITIES) MOVEMENT OF AIR(PRESSURES)

VEGETATION

MOIST DECIDUOUS AVIFAUNA TERRESTRIAL FAUNA

DISASTER MANAGEMENT
FIRE EPIDEMICS NUCLEAR

LEGAL PERMISSIONS VALUATION


CAPITAL COSTS RUNNING COSTS ENERGY COSTS

INTANGIBLE ANALYSIS
VISUAL FOCUS

SPATIAL ANALYSIS
CIRCULATION

STRENGTH

WEAKNESS

OPPORTUNITIES

CONNECTIVITY CATERING DISTANCE FROM SITE, TO ALL STRATA OF SOCIETY ACTS AS GENERATOR FOR _LESS FREQUENCY DEVELOPMENT STRONG CONNECTOR BETWEEN TWO DEVELOPED CITIES LEADING ASAND ALSO DELAY,CANNOT CATER TO INLAND AREAS DIRECTL TRAFFIC CONGESTION LEADING TO ACTS TOA CONNECTOR FOR FROM EITHER SIDES CHAOS INFLUX OF PEOPLE SITE TO DEVELOP AS A WEEKEND GATEAWAY FOR CITY PEOPLE

CONNECTING THE MAIN HIGHWAY OF THE ROAD MIGHTTHE SITE QUALITY (PRIMARY ROAD)TO APPROACABLE TO GET COMPROMISED AS IT LOCAL PEOPLE AND CONNECTING DOESNT COME UNDER THE SITE TO PROSPECTIVE BUYERS STATE AUTHORITIES. PROVIDING FRONTAGE TO THE SITE COMPROMISED, ROAD UNDER DISPUTE FRONTAGE PRIVATELY DEVELOPED, WELL DESIGNED ROAD LEADING TO GOOD IM LUXUROUS CONNECTIVITY REGULAR FLIGHTS, DOESNT DEAL WITHCONNECTION CAN BE ACHIEVED FOR FURTHER DEVELOPME NO GLOBAL MASS TRANSPORT GOOD ECOLOGY, RECREATIONAL VALUES, HELPS REGULATECOMMUNITY, LEADING TO WATER BOURNE DISEASES, ACCESSIBLE OLNY TO THE GATED THE MICRO CLIMATE AND RECREATION, VANTAGE POINTS,SCENIC BEAUTY, WATER SPORTS TABLE GLOBAL CONNECTED, EASE FOR TRANSACTIONS AND EXCHANGE OF THE SITE PUTTING THE SITE ON GLOBAL MAP FOR FUTURE PR NETWORK PROBLEM CAN LEAD TO GIS OF DATA IN TRANSACTIONS INTERUPTION BUSINESS, USEFUL DURING EMERGENCY SITUATIONS COMMUNICATION FOR LOCAL NEEDS AND EMERGANCY. COMMERCE TOWERS OCCUPIES AREA ON SITE, MAINTAINANCE COST

VIRGINITY OF THE LAND LEADING TOFRONT AREA, DESIGNING OPTIONS, OPPORTUNITY CONSTRAINTS THEPROJECTS. DISPUTED ENORMOUS EXISTING LAND USE BRING PROJECT FOR LARGE SCALE DESIGN, DESIGN FLEXIB INTEGRATING NATURAL ELEMENTS INTO DEVELOPMENT OF THE EDGES FOR CLOSED GATED GROWTH CREATING BUFFER, AVOIDING FORMED ILLEGAL ENCROACHMENT ON SITES LEADS TO DIFFERENT EDGE CONDITIONS, PROVIDES SECURITY TO SITE, DEFINING BOUNDARIES, ONE EDGE HAS A WATER FRONT. CANNOT BE PRODUCED ENVIRONMENTALLY HARMLESS,CAN BE USED FOR LEED AREA LARGE ENOUGH TO RESTRICTED USE IN THE RAINS, HAVE SOLAR PANELS, ADDITIONAL RATINGS OF ENERGY, SOURCE OF THE BUILDINGS

SELF DEPENDENT SITE DUE TO SELF GENERATION OF ELECTRICITY GENERATION OF ELECTRICITY, INITIAL INVESTMENT, CHECKING IF SITE IS IN ANY WIND CHANNEL, FLUCTUATING WINDS, REQUIRE HIGH LIMITED SUPPLY OF DRINKING WATER GOOD EASY SUPPLY HIGH WASTAGE OF WATER RAIN WATER HARVESTING NO SOIL CLOGGING WASTAGE OF WATER RAIN WATER HARVESTING TREATMENT OF WATER FOR LANDSCAPE, FLUSHING HIGH CONTAINS TOXIC MATERIALS RICH IN ORGANIC MATTER NEEDS PRE-DESIGNING VARIATION IN BUILT MASS DUE TO TOPOGRAPHY MANURE

GOOD VIEW _EXPENSIVE BECAUSE OF CUT AND FILL _DESIGN RESTRICTED DUE TO THE STEPS

DIRECTLY FAVROUABLE FOR CONSTRUCTION

CAN BE USED AS CONSTRUCTION MATERIAL IN THE FORM OF LATERITE BRICKS RESTRICT IN MOVEMENT RAIN WATER HARVESTATION

GROUND WATER CREATED SCENIC BEAUTY AVAILABILITY OF WATER FOR DOMESTIC USE AVAILABILITY OF WATER FOR DOMESTIC USE LESS DRYNESS -

POLLUTION FISH BREEDING, BOATING EXCESS GROUND WATER CONSTRUCTION HAZARDOUS FOR CONSTRUCTION OF BOREWELLS TO BE DESIGNED AS PER THE FLOW OF THE STREAM NOT CONDUCIVE TO CONSTRUCTION MATERIALS GLOBAL WARMING CAN BE USED AS LANDSCAPE ELEMENT MORE TREES CAN BE PLANTED -

COLLECTION OF DUST, AND THUS FREQUENT CLEANING REQUIRED LOSS OF PEACE GOOD BREEZE NATURAL VENTILATION ORIENTATION OF BUILDINGS ACCORDINGLY HELPS FOR SUSTAINING MOIST LEAVES GIVE GIVES A GOOD THE ENVIRONMENT UNPLEASANT ODOUR SCENIC AND FRESH VIEW FEED ON INSECTS BIRD WATCHING CAN BE DEVELOPED ANIMAL SANCTUARY

ADJOINING LAKE

DIFFICULT ACCESS FOR FIRE BRIGADE

LAKE WATER CAN BE USED IN FIRE FIGHTING

THREATS
DEVELOPMENT OF SITE HAMPERED, EXISTANCE UNKNOWN TO THE MASSES, PREFERENCE TOWARDS PRIVATE VEHICLES. INFLOW TO THE SITE WILL BE HAMPERED, SITE MIGHT LOSE ITS POTENTIAL CAPITAL VALUE.

LOSING CONNECTIVITY FROM MAIN ROAD (HIGHWAYS) CAUSING INCONVINENCE TO THE PEOPLE.

IF FRONTAGE IS COMPROMISED THE ELEVATIONAL VALUE IS LOST ENVIRONMENTAL IMPACT, NEGLECT TOWARDS THE SERVICES INCREASE IN WATER LEVEL LEADING TO FLOODS, WATER BOURNE DISEASE CAUSING HEALTH ISSUES TO THE PEOPLE STAYING IN T SOCIAL INTERACTION BETWEEN PEOPLE CUTS OFF. NOISE POLLUTION, HEALTH HAZARDS, OBSTRUCTING THE SCENIC BEAUTY OF THE SITE

IRREGULAR SHAPE HAMPERING OPTIMUM USAGE OF SITE, CONTOURED SITE LEADING TO DIFFICULTY IN DESIGNING WHICH FURT

SOCIAL DISCONNECT.

HIGH INITIAL INVESTMENT, RELY ON OTHER ENERGY FORMS IN RAINS, TAKES UP A LOT OF AREA ON SITE,

HIGH INITIAL INVESTMENT, OBSTUCTION OF VIEW, RECURRING COST

SOIL EROSION MAINTAINENCE POLLUTING THE ECOSYSTEM POLLUTES THE SOIL IF NOT TREATED PROPERLY LANDSLIDES, SOIL EROSION

FLOODING FLOODING MOISTURE CONTENT OF SOIL INCREASES AFFECTING CONSTRUCTION OVERFLOW OF THE STREAM

METAL RUSTS HAZARDOUS TO HEALTH IN LONG TERM GIVES RISE TO ALLERGIES Eg:ASTHAMA DAMAGE TO HEARING ABILITY TO MUCH BREEZE WILL CREATE MORE DUST POLLUTION THREATS FROM INSECTS INHABITING THE TREES DAMAGE TO VEGETATION POSSIBILITY OF ATTACK ON HUMANS

NO PROPER FIRE EXIT

RENCE TOWARDS PRIVATE VEHICLES.

G HEALTH ISSUES TO THE PEOPLE STAYING IN THE SURROUNGINGS, PRIVATISATION OF NATURAL FEATURE

NG TO DIFFICULTY IN DESIGNING WHICH FURTHER INCREASES THE PROJECT COST

LOT OF AREA ON SITE,

Вам также может понравиться