Академический Документы
Профессиональный Документы
Культура Документы
Zone IV: Gives the area liable to MM VIII. This, zone is second in
severity to zone V. This is referred here as High Damage Risk
Zone.
Zone III: The associated intensity is MM VII. This is termed here
as Moderate Damage Risk Zone.
Zone II: The probable intensity is MM VI. This zone is referred to
as Low Damage Risk Zone.
Zone I: Here the maximum intensity is estimated as MM V or less.
This zone is termed here as Very Low Damage Risk Zone.
MIHAN PROJECT AREA
BHAMTI
KHAMLA
S ONE GAON
S OMALWADA
EXISTING AIRPORT
S HIVANGAON
S PA BOUNDARY
ISASANI
KALKUHI
T ELHARA
CHINCHUBHAVAN
MEGHDUT P HASE I
KHAPRI
S UMT HANA
DAHE GAON
LEGEND:
1 RESIDENTIAL
2 COMMERCIAL
3 INDUSTRIAL
P ARSODI 4 BARREN
5 GOVERNMENT BARREN
6 GOVT. BUILTUP/PUBLIC
9 AGRICULTURE
JAMTHA
10 ORCHARDS
11 WATERBODY
12 DEFENCE
13 SPECIAL PLANNING
AUTHORITY BOUNDARY
14 MIHAN PROJECT BOUNDARY
15 EXISTING AIRPORT BOUNDARY
16 VILLAGE BOUNDARY
17 NIT/NMC BOUNDARY
18 MEGHDOOT BOUNDARY
19 GAJ RAJ BOUNDRY
20 C.R.P.F. BOUNDRY
21 ROADS
22 EXISTING RAILWAYLINE
0.01% Barren
1.22% Residential
31.27%
Industrial
7.47% 10.15%
Government land
Government built up
1.24%
Water bodies
0.9%
Orchards
1.71% Roads
1% Rails
1.19% Forest
Nalla
0.37%
S.R.P.F
2.75 35.5
C.R.P.F
% %
EXISTING LAND USE ANALYSIS
RESIDENTIAL = 74 Ha
ROADS = 49 Ha
DAHEGAON : 37.0 Ha
TELHARA : 17.0 Ha
RECREATIONAL/
COMMERCIAL OPEN
AREA : 44 Ha
GOLF COURSE : 40 Ha
TOTAL : 159.96 Ha
OTHER COMPONENTS
REHABILITATION AREA
• AT CHINCHBHAVAN = 40 Ha
• AT KHAPRI = 28.93 Ha
INTERNATIONAL SCHOOL = 10
Ha
THANK YOU