Вы находитесь на странице: 1из 2

Electrical Inspection Report 1) Shri Dilip Kumar 2) Shri B.K.Jha 3) Shri Rahul Singh Equipment 1. 2. 3. 4. 5. 6.

7 8 9 Slab receiver#1 Slab receiver#1 Roller Table 127-15 R/T 93-11 ,92-8 Slab receiver#1 Roller Table 92 FCE#2,3 LBR FCE#2 CA FAN#1,2 FCE# 2 RCP AREA OBSERVATION Water is draining in slab receiver#1 area. Due to this seepage in MR#3. S/mill side MTB cover open. Water spraying on motor of from pipe going to feed roll 115 intermediate shaft. Coupling guard missing. Oil accumulation in pit around motor. GI sheets pilled up in between 92-7 and 92-8. Hot air Leakage near slabbing mill side LBR HT cable (6.6KV) laid through pipe at -7m is under heavy scale . a)Thermal insulation badly damaged at window (cable is of CA Fans) b) Power / control cable found immersed in water. Coupling guard missing. MTB cover missing. a) Heavy steam leakage through pipe near charging side wall. b) Lifting Valve Stand : Fixing of Pressure Switch found broken. a) Coupling guard missing. b) Power cable is laid in open. Proper dressing is required. a) #1,2Water spraying on motor from FCE#4. b) #3 MTB cover was missing for one phase. a) Scale Heap is almost touching Potentiometers. b) Water accumulated between 02T- 8 and Roller table 93 panel c) Oil leakage found near 02KB-1 a) Oil is found spread on floor b) Oil and Water Leakage on Cable Trays.

Date :21/2/2011

Remark

10 11 12

FCE# 2 RCP#1,2 FCE#3 RCP#2 FCE#3 proper(-7m)

13 14 15 16

FCE#3 RCP#1,2 FCE#3 CA Fan FCE#2 proper(-7m) Motor Room 3

17 C.C

MR #3 Cable Gallery 1) ED (W) 2) GM ( M&U) 3) DGM(T) / MD Office 4) HOD (HSM)

Electrical Inspection Report 1) Shri Dilip Kumar 2) Shri B.K.Jha 3) Shri Rahul Singh

Date :21/2/2011

Вам также может понравиться