FOR INFORMATION
Keyplan:
N
THIS DRAWING
i v er E l ev at i on
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE Vegetation overgrows river wall Depot shed TW pumping station beyond Existing jetty with CSO below DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
SITE FOR CIRCADIAN REDEVELOPMENT DECOMISSIONED LOTS ROAD POWER STATION CHELSEA CREEK CREMORNE WHARF DEPOT CHELSEA WHARF CREMORNE GARDENS
10 m
40 m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
Project Name:
THAMES TUNNEL
Purpose:
KENSINGTON & CHELSEA - CS10X - LOTS ROAD PKC3X - CREMORNE WHARF DEPOT
Drawing Title:
110-DA-ARC-PKC3X-000392
c Thames Water Utilities Ltd 2008
1:1000@ A3 1:500@ A1
5 0
1 0 0
1 0 5
2 0 m 0 m
W d ls r o
nd E
S l o p i n g
a s o n r y
ED
TH I
G R
Status:
FOR INFORMATION
Keyplan:
N
O VE
Posts
O D R A R E O N R M C E
THIS DRAWING
R E
A S H B U R N H A M
S T A D
E C A R R E T
M A D
I U
S T R
E E T
A O D R ER O N R M C E
Play Area
LO
T S
R O A D
A D
Cremorne Gardens
T E E R T S
M U I D A T S
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE
M DE TA A RO
Y B A N R U B
T E E R T S
AD
S o u t h W
O L S T O R D A
NUMBER 100019345
D ER UV E AL RO AD
e s t E l e v a t i o n
FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
RN CE UP
O TC TE TT
RO
E RO
AD
AD
TW pumping station
Depot building
C e e Ce k h l a re s
PH 114
S T O L
D A O R
6.3m
STADIUM ST
LOTS RD
RIVER THAMES
Jetty retained as existing Ventilation columns Eaves line of new building to line through with existing pumping station
10 m
40 m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
Project Name:
THAMES TUNNEL
Purpose:
KENSINGTON & CHELSEA - CS10X - LOTS ROAD PKC3X - CREMORNE WHARF DEPOT
Drawing Title:
110-DA-ARC-PKC3X-000393
c Thames Water Utilities Ltd 2008
1:1000@ A3 1:500@ A1
5 0
1 0 0
1 0 5
2 0 m 0 m
N
Status:
FOR INFORMATION
O D R A R E O N R M C E
Keyplan:
N
at er
THIS DRAWING
E E T
A O D N R ER E O R M C
S T R
ea n
l ow
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE
10 4. 78
I U
S T A D
Pond
NUMBER 100019345
A D
A S H B U R N H A M
10 4. 78
1 0 4 . 7 7
FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES
10 4. 78
Pier
R O
TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
LO
T S
R O A D
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
10 4. 87
Pier
1 0 4 . 9 8
Landing Stage
KEY:
THAMES WATER ACCESS
10 5. 08
CL105.61
Cremorne Gardens
104.60
CSO OUTLET
10 5. 22
T E E R T S M U I D A T S
1 05 . 4 0
10 5. 31
10 6. 14
10 4. 99
10 4. 96
BUILDINGS/TREES TO BE DEMOLISHED/REMOVED
Station House
Chelsea Wharf
10 5. 67
1 0 5 . 6 5
4 6 . 5 0 1
1 0 5 . 6 3
105.33
1 0 5 . 3 1
1 0 5 . 3 2
O L
S T
O R
D A
+105.3m ATD
1 0 5 . 5 4
Weighbridge (recessed)
10 m
South Elevation
40 m
000392
River Elevation
+105.9m ATD
B C T
Water Screens
Lots Road Power Station Cooling water intakes (disused) part of Circadian development
Project Name:
THAMES TUNNEL
Purpose:
KENSINGTON & CHELSEA - CS10X - LOTS ROAD PKC3X - CREMORNE WHARF DEPOT
Drawing Title:
Tanks
110-DA-ARC-PKC3X-000390
c Thames Water Utilities Ltd 2008
1:1000@ A3 1:500@ A1
5 0
1 0 0
1 0 5
000393
2 0 m 0 m
FOR INFORMATION
Keyplan:
N
THIS DRAWING
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE
THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
Proposed Section AA
Interception chamber
Culvert
10 m
10 m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
Project Name:
THAMES TUNNEL
Purpose:
KENSINGTON & CHELSEA - CS10X - LOTS ROAD PKC3X - CREMORNE WHARF DEPOT
Drawing Title:
110-DA-ARC-PKC3X-000394
c Thames Water Utilities Ltd 2008
1:400@ A3 1:200@ A1
5 0
1 0 0
1 0 5
2 0 m 0 m
N
Status:
FOR INFORMATION
O D R A R E O N R M C E
Keyplan:
N
THIS DRAWING
E E T
S T R
ea n
Lo w
A O D N R ER E O R M C
at er
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
S T A D
I U
Pond
A D
A S H B U R N H A M
FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES
Pier
R O A D
TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
LO
T S
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
Pier
Landing Stage
KEY:
THAMES WATER ACCESS DRAFT LIMITS OF LAND TO BE ACQUIRED OR USED (LLAU)
Cremorne Gardens
CSO OUTLET
T E E R T S M U I D A T S
BUILDINGS/TREES TO BE DEMOLISHED/REMOVED
PROPOSED TREES
Station House
Chelsea Wharf
Thames Water hydraulic and electrical equipment to be housed inside existing pumping station
Green roof to new depot 2 0 m 0 m Cremorne Wharf depot building reconfigured and reinstated
L o s P tR S C o d i S a s O d e c x h a i r s g t i e n g a s
O L
S T
O R
D A
South Elevation
10 m
40 m
000392
River Elevation
B C T
Project Name:
THAMES TUNNEL
Purpose:
KENSINGTON & CHELSEA - CS10X - LOTS ROAD PKC3X - CREMORNE WHARF DEPOT
Drawing Title:
110-DA-ARC-PKC3X-000391
c Thames Water Utilities Ltd 2008
1:1000@ A3 1:500@ A1
5 0
1 0 0
1 0 5
000393