Вы находитесь на странице: 1из 2

Project Cost Management Please respond to the following:

Select and describe one or more components of Earned Value such as Planned Value, Actual Cost, schedule performance index or cost performance index and describe how you as a project manager can use these measurement techniques to plan, manage, communicate and forecast a new or existing project.

Project Cost Management Please respond to the following:

Describe and present real world examples of the three types of cost estimates and where you would find them in the context of the PMBOK process groups. Describe who would serve as your audience when presenting these estimates.

Case Study 2: Green Computing Research Project Part 2 Due Week 6 and worth 70 points This assignment is due for online students by midnight on Sunday of Week 6 and for on-ground students before Week 7s class meeting. Submit your assignment to the course shell. Read the Green Computing Research Project, Part 2 in

Appendix C. Document the requirements and develop a scope statement. Write a 2-3 page paper in which you: Document the requirements based on the information provided and assumptions that you have made, including a requirements traceability matrix. Include a list of questions to ask the sponsor about the project scope. Include at least six (6) questions for full credit. Develop a scope statement for the project. Describe product characteristics and deliverables. Use at least two (2) quality resources in this assignment.

1.

2.

3. 4. 5. Your assignment must:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or schoolspecific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the students name, the professors name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. The specific course learning outcomes associated with this assignment are: Summarize how the PMBOK process groups and knowledge area are involved throughout the project life cycle. Use technology and information resources to research issues in IT project management. Write clearly and concisely about issues in IT project management using proper writing mechanics.

Вам также может понравиться