Вы находитесь на странице: 1из 2

1. Purpose and Application The purpose of this procedure is to supply the demand of motor, instrument equipment, and lighting.

And this installation would be applied in OCI MELAMINE. 2. Safety Equipment, Measuring Instrument, Material, and Tool Kits a) Safety Equipment 1) Helmet 2) Safety Shoes 3) Safety Clothes 4) Glasses 5) Masker 6) Ear Plug 7) Gloves b) Measuring Equipment 1) Insulation test(Megger Test) 2) Multimeter c) Material 1) NC(W)Y 4x35mm 2) NYM 2x1,5mm 3) NYY 2x4mm 4) Cable lug 35mm 5) Cable lug 1.5mm 6) Cable lug 4mm 7) Motor fuse 80A 8) Lighting fuse 6A 9) Lighting fuse 2A 10) Breaker 80A 11) Breaker 16A 12) Thermal Overload Relay 80A 13) Contractor 14) Motor panel 15) Lighting panel 16) Mercury lamp 500W 17) Mercury lamp 200W 18) Emergency Lighting 500W 19) Amperemeter (range 0-400A) 20) Current Trafo (400/5) 21) Bus bar 1.5x20x350mm 22) Selector Switch 23) Push Button 24) Timer On Delay 25) Relay Base Socket 26) Electrical Tape (isolation) 27) Pipe conduit 28) Union pipe 29) Cable ties 30) Socket bus bar 31) Socket fuse 32) Adhesive tape

d) Tool Kits 3. Installing a) Preparation of Installing There much things that must be preparation to do this procedure. Like safety equipment, material , tool kits, HSE book instruction, drawing, scheduling, and work permit. b) Installing Process 1) Wearing safety equipment. 2) Check and make sure the equipment in good condition with multimeter. 3) Clean the equipment likes cable lug, bus bar, breaker, etc, to makes connection strong. 4) Arrange device accordance to wiring diagram. 5) Each the end of cable must be crimped with cable lug and isolated when connected to other devices (ex: motor and breaker). 6) Every panel must be grounded in well. 7) Connect bus bar grounding in motor panel motor, motor panel control room, and motor panel - ground terminal. 8) Connect bus bar grounding in lighting panel ground terminal. 9) Bind the cable in cable tray with cable ties. 10) Recheck all connection like bolting, crimping, binding, and grounding before running. 11) Testing and measuring of motor, instrument and lighting with multimeter. Then compare the result with name plate in each equipment. If the result is much different, recheck all connection. 12) Before test drive the motor, doesn't connect it to pump. Because if any problem with installation or pump, doesn't damaging the motor.

Вам также может понравиться