Академический Документы
Профессиональный Документы
Культура Документы
Depending on the Meted used to schedule the job, these times are derived from various sources. They are: Methed Used DATE/TIME Schedule Calculation Meted DOTM CLOCK-TIME = DEADLINE (CLOCK-TIME is the running average from the DB.1 screen & DOTM is specified on the DB.2.1-E screen.) Current Time + QTM + LDTM = DOTM DOTM - CLOCK-TIME = DEADLINE (Clock-Time is located in DB.1) (The DOTM calculation is assuming DOTM is not specified on the DB.2.4 screen, If 2359 is not specified in the CLOCK-TIME field of the DB.1 screen, LDTM is the CLOCK-TIME (running average) form the DB.1screen) Current-Time + 1 hour = DOTM DOTM CLOCK-TIME = DEADLINE (Assuming the DOTM, DATE and TIME parameterare not used) Same as DEMANDed jobs.
TRIGGER
DEMAND
RUN