13
14 Check instrument tag is attached.
15
Note:
Signature
Construction check Iist for InstaIIation of LocaI
Instruments.
Form No. DBA-I&C-21
Project :- 14T2 Mesaieed A-PP Project
Instrument/Equipment No:VIBRATION SENSORS-39VS-91,92,101,102 39V-4A,4B,5A,5B
INSTALLATION INSPECTION DESCRIPTION
Check nstruments Stanchion is installed correctly and strong.
Date:
Status Remarks
RF No:89
S?S1LMLCAu LCulMLn1 Anu CLnL8A1C8
&nit:2.2
Check instrument type is correct for the area classification.
urawlng no134L3837
ITEM
Check nstruments Stanchion is earthed correctly.
Check nstrument tag number is correct.
Check earthing is as per specefication.
8lA no198
Check calibration is done and Calibration label is attached.
8LC81 nC
Check wiring,Glanding, and Termination are correct.
Check sunshade installed correctly. (As required)
Check nstrument line/Tubing Design pressure is @
and Pneumatic test carried at 1.2 times is @
Date
Check nstrument Location is correct as per the AFC Drawing.
Check nstrument is installed correctly & no obstruction for easy
maintenance.
Check cable markers are installed.
Check impulse line is installed correctly.(As required) Check all tubings
(Air lines,Air headers,impulse lines,Capillary tube,rimmed and protected
from welding arc's spot and installing "kick plate" for protection.
Check Air supply piping is installed correctly. (As required)
Name
DEBAJ CONS BERDROLA CONS
ueslgn pressure
1esL ressure